N0017425R0006.pdf

PDF 886 KB Posted

Attached to
Metal Parts (Multiple) & MK 14 Tanks
Solicitation number
N0017425R0006
Issued by

About this file

This is a Statement of Work (SOW) for a Naval Surface Warfare Center, Indian Head Division (NSWC IHD) contract to manufacture metal parts for 5" projectiles and propelling charges. The required items include MK16 and MK11 Pallet Adapters, Dummy Nose Plugs, Fuze Adapters, Lid, MK4 MOD0 Fuze Protector Cap, MK3 MOD0 and MK12 MOD1 Pallets, and MK14 MOD4 Tank Assembly. The contract will be structured as a 5-year IDIQ with a minimum guarantee of $1.5M and maximum value of $30M.

The SOW details requirements for First Article Acceptance Testing (FAAT), Lot Acceptance Testing (LAT), quality assurance, statistical process control, configuration management, and critical defect control. The contractor must maintain ISO 9001-2008 quality management system certification and implement various quality control plans and procedures. Key deliverables include test plans/reports, quality program documentation, configuration management plans, and critical characteristics control plans. The work requires secure facilities meeting DoD standards for sensitive conventional arms, ammunition and explosives. The contractor must obtain technical data packages marked Distribution D through proper certifications and non-disclosure agreements.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CODE

(Hour)

PAGE(S)

until 03:00 PM local time 31 Jan 2025

X

A X B X C X D

EX

X

G F 120 - 134

135 - 151 X H 152 - 162 thomas.d.howes2.civ@us.navy.mil

RATING PAGE OF PAGES

7. ISSUED BY

(Date)

IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.

Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)

Prescribed by GSA FAR (48 CFR) 53.214(c)

DO-C9 1 162

(If other than Item 7)

15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO

AND

ADDRESS

SIGN OFFER (Type or print)

OF

OFFEROR

AMENDMENT NO. DATE

15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS

IS DIFFERENT FROM ABOVE - ENTER

SUCH ADDRESS IN SCHEDULE.

18. OFFER DATE

1. THIS CONTRACT IS A RATED ORDER

UNDER DPAS (15 CFR 700)

2. CONTRACT NO.

N00174 8. ADDRESS OFFER TO

See Item 7

9. Sealed offers in original and 1 copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in

CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.

10. FOR INFORMATION

CALL:

A. NAME (NO COLLECT CALLS)

THOMAS HOWES 973-724-9277

11. TABLE OF CONTENTS

SOLICITATION/ CONTRACT FORM

SUPPLIES OR SERVICES AND PRICES/ COSTS

1 - 2 3 - 46

X I CONTRACT CLAUSES

DESCRIPTION/ SPECS./ WORK STATEMENT X

PACKAGING AND MARKING

47 - 77 78 - 80

J LIST OF ATTACHMENTS

INSPECTION AND ACCEPTANCE

DELIVERIES OR PERFORMANCE

81 - 84 85 - 89

X K

REPRESENTATIONS, CERTIFICATIONS AND

OTHER STATEMENTS OF OFFERORS

CONTRACT ADMINISTRATION DATA 90 - 101 X

SPECIAL CONTRACT REQUIREMENTS

OFFER (Must be fully completed by offeror) 102 - 104 X M

L INSTRS., CONDS., AND NOTICES TO OFFERORS

EVALUATION FACTORS FOR AWARD

NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.

13. DISCOUNT FOR PROMPT PAYMENT

(See Section I, Clause No. 52.232-8)

14. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments

AMENDMENT NO. DATE

to the SOLICITATION for offerors and related documents numbered and dated):

FACILITY

12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period

SOLICITATION, OFFER AND AWARD

X

(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)

PART I - THE SCHEDULE

26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE

EMAIL:TEL: (Signature of Contracting Officer)

CODE CODE

B. TELEPHONE (Include area code) C. E-MAIL ADDRESS

AWARD (To be completed by Government)

19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION

22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:

10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)

23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE

PART IV - REPRESENTATIONS AND INSTRUCTIONS

PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

105 - 118

PART II - CONTRACT CLAUSES

NSWC IHD C02

PICATINNY DETACHMENT

3RD AVENUE

BLDG. 61N

PICATINNY ARSENAL NJ 07806-5000

FAX:

TEL:

FAX:

TEL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SOLICITATION

6. REQUISITION/PURCHASE NO.5. DATE ISSUED

20 Dec 2024

4. TYPE OF SOLICITATION

SEALED BID (IFB)

NEGOTIATED (RFP)

[ X ]

3. SOLICITATION NO.

N0017425R0006

Section A - Solicitation/Contract Form

INTRODUCTION

1. Introduction The Naval Sea Systems Command, Naval Surface Warfare Center, Indian Head Division (NSWC IHD), Contracts Department, Code 02, has a requirement to procure various Metal Parts including the Mk14 MOD4 Tank Assembly in accordance with the effort described in the Statement of Work (SOW), Section C.

2. Acquisition Strategy This requirement will be procured as a 100% Small Business Set Aside (SBSA), Firm-fixed-price (FFP), single award, Indefinite Delivery Indefinite Quantity (IDIQ) solicitation.

MINIMUM GUARANTEE: $1,500,000.00

MAXIMUM CONTRACT VALUE: $30,000,000.00

3. Technical Data Package The Technical Data Packages (TDP) are marked Distribution D (Limited to DoD and US DoD contractors only).

Disclosure and use of the TDPs are restricted by the Non-Disclosure and Non-Use Agreement (NDA) that the offeror is required to execute prior to accessing the TDPs along with a current DD2345 Military Critical Technical Data Agreement (All forms can be found in Section J).

To receive this unclassified controlled technical information, an Offeror must be currently certified through the United States/Canada Joint Certification Program. To become certified for receipt of the technical documents, a U.S.

Offeror must submit a completed DD Form 2345 to the U.S./Canada Joint Certification Office. Canadian Offerors may submit either a completed DD Form 2345 or DSS-MAS 9379 for certification. In addition, a copy of the company's State/Provincial Business License, Incorporation Certificate, sales Tax Identification Form or other documentation which verifies the legitimacy of the company must accompany all DD Form 2345s. Additional information on the Joint Certification Program and a checklist for completion of the DD Form 2345 is available at the following website: http://www.dla.mil/HQ/InformationOperations/Offers/Products/LogisticsApplications/JCP/.

Offerors are encouraged to apply for certification as early as possible in order for processing and receipt of information to be completed in sufficient time to prepare a proposal before solicitation closing.

Interested Offerors must request the drawing package in writing. E-mail the following information with the required documentation stated above and in Section J- Attachments to thomas.howes1@navy.mil and gerardo.ilaria.civ@us.navy.mil:

-Name -Title -Company name and address -DUNS and CAGE numbers -E-mail address

Some technical documents contain export-control technical data and are subject to the following warning:

EXPORT-CONTROL WARNING - All technical documents that are determined to contain export-controlled technical data shall be marked WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et. seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C., App. 2401 et. seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25. When it is technically infeasible to use the entire statement, an abbreviated marking may be used, and a copy of the full statement added to the Notice To Accompany Release of Export-Controlled Data required by DoD Directive 5230.25.

Section B - Supplies or Services and Prices

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

MK 16 MOD 0 Pallet Adapter

FFP

Production FFP Order Period I (DAC - 365ADC) Manufacture, assemble, inspect, test, package, and deliver in accordance with the Statement of Work.

FOB: Destination

MFR PART NR: 8140-00-710-1377

PSC CD: 8140

NET AMT

STEPLADDER PRICING

STEPLADDER NAME ITEM NO FROM QUANTITY TO QUANTITY UNIT PRICE

Mk16 Pallet Adapt 0001 1.00 199.00

200.00 399.00

400.00 700.00

MK 11 MOD 2 Pallet Adapter

FFP

Production FFP Order Period I (DAC - 365ADC) Manufacture, assemble, inspect, test, package, and deliver in accordance with the Statement of Work.

FOB: Destination

MFR PART NR: 8140-01-074-5517

Mk11 Pallet Adapt 0002 1.00 199.00

Dummy Nose Plug

FFP

Production FFP Order Period I (DAC - 365ADC) Manufacture, assemble, inspect, test, package, and deliver in accordance with the Statement of Work.

FOB: Destination

MFR PART NR: 1320-01-115-1000

Dummy Nose Plug 0003 1.00 4,999.00 5,000.00 9,999.00 10,000.00 20,000.00

Fuze Adapter

FFP

Production FFP Order Period I (DAC - 365ADC) Manufacture, assemble, inspect, test, package, and deliver in accordance with the Statement of Work.

FOB: Destination

MFR PART NR: 1320-01-328-5943

Fuze Adapter 0004 1.00 4,999.00

Lid

FFP

Production FFP Order Period I (DAC - 365ADC) Manufacture, assemble, inspect, test, package, and deliver in accordance with the Statement of Work.

FOB: Destination

MFR PART NR: 1320-01-590-1286

Lid 0005 1.00 4,999.00

Mk 4 MOD 0 Fuze Protector Cap

FFP

Production FFP Order Period I (DAC - 365ADC) Manufacture, assemble, inspect, test, package, and deliver in accordance with the Statement of Work.

FOB: Destination

MFR PART NR: 8140-00-038-9909

Fuze Cap 0006 1.00 4,999.00

Dummy Nose Plug (76mm Projectile)

FFP

Production FFP Order Period I (DAC - 365ADC) Manufacture, assemble, inspect, test, package, and deliver in accordance with the Statement of Work.

FOB: Destination

MFR PART NR: 1315-01-083-0574

Dummy Nose Plug 0007 1.00 4,999.00

Mk 3 MOD 0 Pallet

FFP

Production FFP Order Period I (DAC - 365ADC) Manufacture, assemble, inspect, test, package, and deliver in accordance with the Statement of Work.

FOB: Destination

MFR PART NR: 3990-00-039-0223

Mk3 MOD 0 Pallet 0008 1.00 199.00

200.00 799.00

800.00 2,000.00

Mk 12 MOD 1 Pallet

FFP

Production FFP Order Period I (DAC - 365ADC) Manufacture, assemble, inspect, test, package, and deliver in accordance with the Statement of Work.

FOB: Destination

MFR PART NR: 3990-00-566-2472

Mk12 MOD1 Pallet 0009 1.00 199.00

MK 14 MOD 4 Tank Assembly

FFP

Production FFP Order Period I (DAC - 365ADC) Manufacture, assemble, inspect, test, package, and deliver in accordance with the Statement of Work.

FOB: Destination

MFR PART NR: 8140-01-688-8941

Mk14 Tank 0010 1,000.00 2,499.00 2,500.00 4,999.00 5,000.00 9,999.00 10,000.00 19,999.00 20,000.00 30,000.00

0011 1 Lot First Article Acceptance Test (FAAT)

FFP

Order Period I (ADC- 365ADC)

In accordance with MK 14 MOD 4 Tank Assembly IAW MIL-DTL-18492 and ADL 53711-8411302 REV. - (NSN: 8140-01-688-8941), MK 14 MOD 4 Tank Assembly, applicable Government Standards, drawings and the Statement of Work.

FOB: Destination

0012 1 Lot Lot Acceptancde Test (LAT)

FFP

LAT requirements shall be in accordance with all applicable Government Standards, and each items ADL listed in Table 2 of the Statement of Work.

This CLIN shall be performed as Required throughout the contract period of Performance. Not Separately Priced

0013 1 Each Contract Data Requirement List (CDRL)

FFP

Not Separately Priced

MK 16 MOD 0 Pallet Adapter

FFP

Production FFP Order Period II (366ADC - 730ADC) Manufacture, assemble, inspect, test, package, and deliver in accordance with the Statement of Work.

FOB: Destination

Mk16 Pallet Adapt 2001 1.00 199.00

MK 11 MOD 2 Pallet Adapter

FFP

Production FFP Order Period II (366ADC - 730ADC) Manufacture, assemble, inspect, test, package, and deliver in accordance with the Statement of Work.

FOB: Destination

Mk11 Pallet Adapt 2002 1.00 199.00

Dummy Nose Plug

FFP

Production FFP Order Period II (366ADC - 730ADC) Manufacture, assemble, inspect, test, package, and deliver in accordance with the Statement of Work.

FOB: Destination

Dummy Nose Plug 2003 1.00 4,999.00

Fuze Adapter

FFP

Production FFP Order Period II (366ADC - 730ADC) Manufacture, assemble, inspect, test, package, and deliver in accordance with the Statement of Work.

FOB: Destination

Fuze Adapter 2004 1.00 4,999.00

Lid

FFP

Production FFP Order Period II (366ADC - 730ADC) Manufacture, assemble, inspect, test, package, and deliver in accordance with the Statement of Work.

FOB: Destination

Lid 2005 1.00 4,999.00

Mk 4 MOD 0 Fuze Protector Cap

FFP

Production FFP Order Period II (366ADC - 730ADC) Manufacture, assemble, inspect, test, package, and deliver in accordance with the Statement of Work.

FOB: Destination

Fuze Cap 2006 1.00 4,999.00

Dummy Nose Plug (76mm Projectile)

FFP

Production FFP Order Period II (366ADC - 730ADC) Manufacture, assemble, inspect, test, package, and deliver in accordance with the Statement of Work.

FOB: Destination

Dummy Nose Plug 2007 1.00 4,999.00

Mk 3 MOD 0 Pallet

FFP

Production FFP Order Period II (366ADC - 730ADC) Manufacture, assemble, inspect, test, package, and deliver in accordance with the Statement of Work.

FOB: Destination

Mk3 MOD 0 Pallet 2008 1.00 199.00

Mk 12 MOD 1 Pallet

FFP

Production FFP Order Period II (366ADC - 730ADC) Manufacture, assemble, inspect, test, package, and deliver in accordance with the Statement of Work.

FOB: Destination

Mk12 MOD1 Pallet 2009 1.00 199.00

MK 14 MOD 4 Tank Assembly

FFP

Production FFP Order Period II (366ADC - 730ADC) Manufacture, assemble, inspect, test, package, and deliver in accordance with the Statement of Work.

FOB: Destination

Mk14 Tank 2010 1,000.00 2,499.00 2,500.00 4,999.00 5,000.00 9,999.00

2011 1 Lot First Article Acceptance Test (FAAT)

FFP

Order Period II (366ADC - 730ADC)

In accordance with MK 14 MOD 4 Tank Assembly IAW MIL-DTL-18492 and ADL 53711-8411302 REV. - (NSN: 8140-01-688-8941), MK 14 MOD 4 Tank Assembly, applicable Government Standards, drawings and the Statement of Work.

MK 16 MOD 0 Pallet Adapter

FFP

Production FFP Order Period III (731ADC - 1,095ADC) Manufacture, assemble, inspect, test, package, and deliver in accordance with the Statement of Work.

FOB: Destination

Mk16 Pallet Adapt 3001 1.00 199.00

MK 11 MOD 2 Pallet Adapter

FFP

Production FFP Order Period III (731ADC - 1,095ADC) Manufacture, assemble, inspect, test, package, and deliver in accordance with the Statement of Work.

FOB: Destination

Mk11 Pallet Adapt 3002 1.00 199.00

Dummy Nose Plug

FFP

Production FFP Order Period III (731ADC - 1,095ADC) Manufacture, assemble, inspect, test, package, and deliver in accordance with the Statement of Work.

FOB: Destination

Dummy Nose Plug 3003 1.00 4,999.00

Fuze Adapter

FFP

Production FFP Order Period III (731ADC - 1,095ADC) Manufacture, assemble, inspect, test, package, and deliver in accordance with the Statement of Work.

FOB: Destination

Fuze Adapter 3004 1.00 4,999.00

Lid

FFP

Production FFP Order Period III (731ADC - 1,095ADC) Manufacture, assemble, inspect, test, package, and deliver in accordance with the Statement of Work.

FOB: Destination

Lid 3005 1.00 4,999.00

Mk 4 MOD 0 Fuze Protector Cap

FFP

Production FFP Order Period III (731ADC - 1,095ADC) Manufacture, assemble, inspect, test, package, and deliver in accordance with the Statement of Work.

FOB: Destination

Fuze Cap 3006 1.00 4,999.00

Dummy Nose Plug (76mm Projectile)

FFP

Production FFP Order Period III (731ADC - 1,095ADC) Manufacture, assemble, inspect, test, package, and deliver in accordance with the Statement of Work.

FOB: Destination

Dummy Nose Plug 3007 1.00 4,999.00

Mk 3 MOD 0 Pallet

FFP

Production FFP Order Period III (731ADC - 1,095ADC) Manufacture, assemble, inspect, test, package, and deliver in accordance with the Statement of Work.

FOB: Destination

Mk3 MOD 0 Pallet 3008 1.00 199.00

Mk 12 MOD 1 Pallet

FFP

Production FFP Order Period III (731ADC - 1,095ADC) Manufacture, assemble, inspect, test, package, and deliver in accordance with the Statement of Work.

FOB: Destination

Mk12 MOD1 Pallet 3009 1.00 199.00

MK 14 MOD 4 Tank Assembly

FFP

Production FFP Order Period III (731ADC - 1,095ADC) Manufacture, assemble, inspect, test, package, and deliver in accordance with the Statement of Work.

FOB: Destination

Mk14 Tank 3010 1,000.00 2,499.00 2,500.00 4,999.00 5,000.00 9,999.00

3011 1 Lot First Article Acceptance Test (FAAT)

FFP

Order Period III (731ADC- 1,095ADC)

In accordance with MK 14 MOD 4 Tank Assembly IAW MIL-DTL-18492 and ADL 53711-8411302 REV. - (NSN: 8140-01-688-8941), MK 14 MOD 4 Tank Assembly, applicable Government Standards, drawings and the Statement of Work.

MK 16 MOD 0 Pallet Adapter

FFP

Production FFP Order Period IV (1,096ADC - 1,460ADC) Manufacture, assemble, inspect, test, package, and deliver in accordance with the Statement of Work.

FOB: Destination

Mk16 Pallet Adapt 4001 1.00 199.00

MK 11 MOD 2 Pallet Adapter

FFP

Production FFP Order Period IV (1,096ADC - 1,460ADC) Manufacture, assemble, inspect, test, package, and deliver in accordance with the Statement of Work.

FOB: Destination

Mk11 Pallet Adapt 4002 1.00 199.00

Dummy Nose Plug

FFP

Production FFP Order Period IV (1,096ADC - 1,460ADC) Manufacture, assemble, inspect, test, package, and deliver in accordance with the Statement of Work.

FOB: Destination

Dummy Nose Plug 4003 1.00 4,999.00

Fuze Adapter

FFP

Production FFP Order Period IV (1,096ADC - 1,460ADC) Manufacture, assemble, inspect, test, package, and deliver in accordance with the Statement of Work.

FOB: Destination

Fuze Adapter 4004 1.00 4,999.00

Lid

FFP

Production FFP Order Period IV (1,096ADC - 1,460ADC) Manufacture, assemble, inspect, test, package, and deliver in accordance with the Statement of Work.

FOB: Destination

Lid 4005 1.00 4,999.00

Mk 4 MOD 0 Fuze Protector Cap

FFP

Production FFP Order Period IV (1,096ADC - 1,460ADC) Manufacture, assemble, inspect, test, package, and deliver in accordance with the Statement of Work.

FOB: Destination

Fuze Cap 4006 1.00 4,999.00

Dummy Nose Plug (76mm Projectile)

FFP

Production FFP Order Period IV (1,096ADC - 1,460ADC) Manufacture, assemble, inspect, test, package, and deliver in accordance with the Statement of Work.

FOB: Destination

Dummy Nose Plug 4007 1.00 4,999.00

Mk 3 MOD 0 Pallet

FFP

Production FFP Order Period IV (1,096ADC - 1,460ADC) Manufacture, assemble, inspect, test, package, and deliver in accordance with the Statement of Work.

FOB: Destination

Mk3 MOD 0 Pallet 4008 1.00 199.00

Mk 12 MOD 1 Pallet

FFP

Production FFP Order Period IV (1,096ADC - 1,460ADC) Manufacture, assemble, inspect, test, package, and deliver in accordance with the Statement of Work.

FOB: Destination

Mk12 MOD1 Pallet 4009 1.00 199.00

MK 14 MOD 4 Tank Assembly

FFP

Production FFP Order Period IV (1,096ADC - 1,460ADC) Manufacture, assemble, inspect, test, package, and deliver in accordance with the Statement of Work.

FOB: Destination

Mk14 Tank 4010 1,000.00 2,499.00 2,500.00 4,999.00 5,000.00 9,999.00

4011 1 Lot First Article Acceptance Test (FAAT)

FFP

Order Period IV (1,096ADC- 1,460ADC)

In accordance with MK 14 MOD 4 Tank Assembly IAW MIL-DTL-18492 and ADL 53711-8411302 REV. - (NSN: 8140-01-688-8941), MK 14 MOD 4 Tank Assembly, applicable Government Standards, drawings and the Statement of Work.

MK 16 MOD 0 Pallet Adapter

FFP

Production FFP Order Period V (1,461ADC - 1,825ADC) Manufacture, assemble, inspect, test, package, and deliver in accordance with the Statement of Work.

FOB: Destination

Mk16 Pallet Adapt 5001 1.00 199.00

MK 11 MOD 2 Pallet Adapter

FFP

Production FFP Order Period V (1,461ADC - 1,825ADC) Manufacture, assemble, inspect, test, package, and deliver in accordance with the Statement of Work.

FOB: Destination

Mk11 Pallet Adapt 5002 1.00 199.00

Dummy Nose Plug

FFP

Production FFP Order Period V (1,461ADC - 1,825ADC) Manufacture, assemble, inspect, test, package, and deliver in accordance with the Statement of Work.

FOB: Destination

Dummy Nose Plug 5003 1.00 4,999.00

Fuze Adapter

FFP

Production FFP Order Period V (1,461ADC - 1,825ADC) Manufacture, assemble, inspect, test, package, and deliver in accordance with the Statement of Work.

FOB: Destination

Fuze Adapter 5004 1.00 4,999.00

Lid

FFP

Production FFP Order Period V (1,461ADC - 1,825ADC) Manufacture, assemble, inspect, test, package, and deliver in accordance with the Statement of Work.

FOB: Destination

Lid 5005 1.00 4,999.00

Mk 4 MOD 0 Fuze Protector Cap

FFP

Production FFP Order Period V (1,461ADC - 1,825ADC) Manufacture, assemble, inspect, test, package, and deliver in accordance with the Statement of Work.

FOB: Destination

Fuze Cap 5006 1.00 4,999.00

Dummy Nose Plug (76mm Projectile)

FFP

Production FFP Order Period V (1,461ADC - 1,825ADC) Manufacture, assemble, inspect, test, package, and deliver in accordance with the Statement of Work.

FOB: Destination

Dummy Nose Plug 5007 1.00 4,999.00

Mk 3 MOD 0 Pallet

FFP

Production FFP Order Period V (1,461ADC - 1,825ADC) Manufacture, assemble, inspect, test, package, and deliver in accordance with the Statement of Work.

FOB: Destination

Mk3 MOD 0 Pallet 5008 1.00 199.00

Mk 12 MOD 1 Pallet

FFP

Production FFP Order Period I (DAC - 365ADC) Manufacture, assemble, inspect, test, package, and deliver in accordance with the Statement of Work.

FOB: Destination

Mk12 MOD1 Pallet 5009 1.00 199.00

MK 14 MOD 4 Tank Assembly

FFP

Production FFP Order Period V (1,461ADC - 1,825ADC) Manufacture, assemble, inspect, test, package, and deliver in accordance with the Statement of Work.

FOB: Destination

Mk14 Tank 5010 1,000.00 2,499.00 2,500.00 4,999.00 5,000.00 9,999.00

5011 1 Lot First Article Acceptance Test (FAAT)

FFP

Order Period V (1,461ADC- 1,825ADC)

In accordance with MK 14 MOD 4 Tank Assembly IAW MIL-DTL-18492 and ADL 53711-8411302 REV. - (NSN: 8140-01-688-8941), MK 14 MOD 4 Tank Assembly, applicable Government Standards, drawings and the Statement of Work.

CONTRACT MINIMUM/MAXIMUM QUANTITY AND CONTRACT VALUE

The minimum quantity and contract value for all orders issued against this contract shall not be less than the minimum quantity and contract value stated in the following table. The maximum quantity and contract value for all orders issued against this contract shall not exceed the maximum quantity and contract value stated in the following table.

MINIMUM

QUANTITY

MINIMUM

AMOUNT

MAXIMUM

QUANTITY

MAXIMUM

AMOUNT

$1,500,000.00 $30,000,000.00

Section C - Descriptions and Specifications

STATEMENT OF WORK

STATEMENT OF WORK

Metal Parts (Multiple) & MK 14 Tanks

1 BACKGROUND AND SCOPE

The U.S. Navy (USN) seeks to acquire metal parts (see Table 1) for use in the manufacture, assembly, packaging, and shipping of All Up Round 5” Projectiles (AUR) and 5” Propelling Charges for training, combat, test and development, renovation projects, and Foreign Military Sales (FMS). There are rigorous quality assurance requirements including First Article Acceptance Test (FAAT) and or Lot Acceptance Test (LAT) for each of the components listed in Table 1 below.

Table 1.

Description NSN Automated Data List (ADL)

ADAPTER, PALLET, MK 16 MOD 0, FOR 5"/54

CARTRIDGE TANK 8140-00-710-1377 ADL 10001-1360034

ADAPTER, PALLET MK 11

MOD 2 ASSEMBLY 8140-01-074-5517 ADL 10001-2642774

DUMMY NOSE PLUG 1320-01-115-1000 ADL 53711-8605687

FUZE ADAPTER 1320-01-328-5943 ADL 53711-8605688

LID 1320-01-590-1286 ADL 53711-8605689

CAP, FUZE PROTECTOR MK 4 MOD 0 8140-00-038-9909 ADL 53711-8605695

PLUG, DUMMY NOSE, F/USE ON 76 MILLIMETER

PROJECTILE 1315-01-083-0574 ADL5366521

PALLET, MATERIAL HANDLING, MK 3 MOD 0 3990-00-039-0223 ADL10001-564200

PALLET, MATERIAL HANDLING MK 12 MOD 1 3990-00-566-2472 ADL 10001-2645217

5"54 CARTRIDGE TANK, MK 14 MOD 4 ASSEMBLY 8140-01-688-8941 ADL 53711-8411302

1.1 Applicable Documents

The contractor shall use the following documents as appropriate in support of the requirements of this contract.

Unless otherwise specified, the most current revision at the time of contract award shall apply.

1.2 Military and Weapon Specifications

Table 2.

Part Name, Description NSN ADL Specification Top

Drawing MK 16 Pallet adapters 8140-00-710-1377 ADL1360034 MIL-DTL-21618 1360034

MK 11 Pallet adapters 8140-01-074-5517 ADL2642774 MIL-A-23685 2642774

Dummy Nose Plug 1320-01-115-1000 ADL 8605687 MIL-PRF-16173 8605687

Fuze adapter 1320-01-328-5943 ADL8605688 MIL-PRF-16173 8605688

Lid 1320-01-590-1286 ADL8605689 MIL-PRF-68625 8605689

Fuze Cap 8140-00-038-9909 ADL8605695 MIL-W-12332A 8605695

Dummy Nose Plug 1315-01-083-0574 ADL5366521 MIL-PRF-16173 5366521

MK 3 Pallet 3990-00-039-0223 ADL 564200 MIL-DTL-23312 564200

MK 12 Pallet 3990-00-566-2472 ADL2645217 MIL-DTL-23312 2645217

MK 14 Tank 8140-01-688-8941 ADL 8411302 MIL-DTL-18492 8411302

1.3 Military Standards

See Table 2 and each ADL listed for details.

1.4 Industry/Commercial Standards

ANSI/NCSL Z540.3-2006 Requirements for the Calibration of Measuring and Test Equipment ISO 10012 Quality Assurance Requirements for Measuring Equipment NAS 410 NAS Certification & Qualification of NDT Personnel ANSI/ASNT-CP-189 ASNT Standard for Qualification and Certification of NDT Personnel

SNT-TC-1A

Recommended Practice for Personnel Qualification and Certification in

NDT

ASTM E543

Standard Specifications for Agencies Performing Nondestructive Testing

ASME Y14.100 04 Engineering Drawing Practices

ASME Y14.5.1M-1994 Mathematical Definition of Dimensioning and Tolerancing Principles

ASTM B117 Standard Practice For Operating Salt Spray (Fog) Apparatus

ASTM B209/B209M Standard Specification for Aluminum and Aluminum-Alloy Sheet and Plate

ASTM B633 Standard Specification for Electrodeposited Coatings of Zinc on Iron and Steel ASTM D3951 Standard Practice For Commercial Packaging

AWS D17.1/D17.1m Specification for Fusion Welding For Aerospace Applications

SAE AMS-STD-595A Colors Used In Government Procurement

1.5 DoD Regulations and References

DoD 5100.76-M Physical Security of Sensitive Conventional Arms, Ammunition, and Explosives

DoD 4500.9R Defense Transportation Regulation MIL-HDBK-1461 Manufacturer’s Symbols OPNAVINST 3432.1A Operations Security (OPSEC)

1.6 Navy Automated Data Lists

See Table 2

2 GENERAL REQUIREMENTS

2.1 Production: The Contractor shall produce all required components, and manufacture, assemble, inspect, test, package, and deliver the items specified in Table 1 and in accordance with the specified Automated Data List (ADL) as well as this Statement of Work. The Contractor shall be also responsible for providing all equipment, and tooling, except for any Government Furnished Equipment (GFE) or Material (GFM), if applicable.

2.1.1 Applies to all Metal Parts referenced in Table 1. All requirements from section 2 to section 3 of this SOW apply to each of the components listed in Table 1, unless otherwise specified by the Government with exceptions for each one as applicable.

2.2 Government Furnished Material (GFM). The Government will provide, if necessary, items specified in

2.2.1 as GFM to support this contract when placing orders of MK 14 MOD 4 Tanks. This is consumable GFM and is not all-inclusive of GFE.

2.2.1 GFM List.

2.2.1.1 10001-ADL2645217, MK 12 MOD 1 Pallets or 10001-2086479 MK 12 MOD 0 Pallets, NSN 3990-

00-566-2472 or 8140-00-076-5588 (if assets are available, if not, a procurement of MK 16 MOD 0 Pallet Adapters will be made through this contract)

2.2.1.2 10001-ADL1360034, MK 16 MOD 0 Pallet Adapters, NSN 8140-00-710-1377 (if assets are available, if not, a procurement of MK 16 MOD 0 Pallet Adapters will be made through this contract)

2.2.1.3 10001-ADL2642781, Cover Assembly (NSN: 8140-00-038-9982)

2.2.2 The Contractor is responsible for contacting the Navy at least 60 days in advance of the date GFM is required and provide designated locations to schedule delivery.

2.2.3 The Contractor shall deliver GFM Consumption reports for the items listed in 2.2.1 (CDRL A001) DI-

MGMT-80438B.

2.2.4 The Contractor shall prepare Government Furnished Property Baseline Report when mandated by the

CDRL A002 (DI-MGMT-80441D).

2.2.5 Gages – Gages listed below are all active and interchangeable and only apply to MK 14 Tanks.

DODIC NSN/FRN Nomenclature Status - Name

D308

1320-00-038-8782 CHARGE, DUMMY

PROPELLING, 5"/54 CAL, MK

8 MOD 0

Active, Gage

1320-00-073-6819 CHARGE, DUMMY

PROPELLING, 5"/54 CAL

Active, Gage

1320-00-889-8185 CHARGE, DUMMY

PROPELLING, 5"/54 RF

Active, Gage

1320-01-055-9974 CHARGE, DUMMY

PROPELLING, 5"/54 CAL, MK

8 MOD 2

Active, Gage

2.3 First Article and Lot Acceptance Requirements and Test Responsibility:

2.3.1 The Contractor’s FAAT and LAT requirements and test responsibilities are detailed in Table 3 below2.1.

Table 3: FAAT and LAT Requirements

Item ADL Reference SOW Para

First Article Acceptance Test

(FAAT)

Lot Acceptance Test

(LAT)

Requirement Requirement

Metal Parts (Multiple) See Table 1 N/A See Table 2 See Table 2

2.3.2 The first article shall be representative of items to be manufactured, using the same processes and procedures, and at the same facilities as the production lot. All parts and materials, including packaging and packing, shall be obtained from the same sources of supply as will be used for the production lot(s). All components, subassemblies, and assemblies in the first article sample shall have been produced by the Contractor (including subcontractors) using the technical data package2.1.

2.3.3 The first article shall be inspected and tested by the Contractor for all requirements of the drawing(s), and specification(s), referenced thereon, except for:

2.3.3.1 Inspections and tests contained in material specifications provided that the required inspection and tests have been performed previously and certificates of conformance are submitted with the FAAT Report.

2.3.3.2 Inspections and tests for Military Standard components and parts if inspection and tests have been performed previously and certifications of the components and parts are submitted with the FAAT Report.

2.3.3.3 Corrosion resistance tests over 10 days in length provided that a test specimen or sample representing the same process has successfully passed the same test within 30 days prior to processing the first article, and results of the test are submitted with the FAAT.

2.3.3.4 Life cycle tests over 10 days in length provided that the same or similar items manufactured using the same processes have successfully passed the same test within 1 year prior to processing the first article and results of the tests are submitted with the FAAT.

2.3.3.5 One-time qualification tests, which are defined as a one-time on the drawing(s), provided that the same or similar items manufactured using the same processes has successfully passed the tests, and results of the test are on file at the Contractor’s facility and certifications are submitted with the FAAT Report.

2.3.4 Those inspections which are of a destructive nature shall be performed upon additional sample parts selected from the same lot(s) or batch(es) from which the first article was selected.

2.3.5 Notwithstanding the provisions for waiver of first article, an additional first article sample or portion thereof, may be ordered by the Contracting Officer in writing when (i) a major change is made to the technical data, (ii) whenever there is a lapse in production for a period in excess of 90 days, or (iii) whenever a change occurs in place of performance, manufacturing process, material used, drawing, specification, or source of supply. When conditions (i), (ii), or (iii) above occur, the Contractor shall notify the Contracting Officer so that a demonstration can be made concerning the need for the additional first article sample or portion thereof, and instructions provided concerning the submission, inspection, and notification of results. Costs of the additional first article testing resulting from any of the causes listed herein that were instituted by the Contractor and not due to changes directed by the Government shall be borne by the Contractor.

2.3.6 Before first article approval, the Contracting Officer may, by written authorization, authorize the Contractor to acquire specific materials or components or to commence production to the extent essential to meet the delivery schedules. Until first article approval is granted, only costs for the first article and costs incurred under this authorization are allocable to this contract for (1) progress payments, or (2) termination settlements if the contract is terminated for the convenience of the Government. If first article tests reveal deviations from contract requirements, the Contractor shall, at the location designated by the Government, make the required changes or replace all items produced under this contract at no change in contract price.

2.3.7 Government representative(s) may attend any FAAT or LAT event, at Government discretion. The Government shall be notified a minimum of 30 calendar days prior to the beginning of any FAAT or LAT event.

2.3.8 During the course of this contract, the Contractor shall notify the Government of any proposed changes to manufacturing processes, equipment, or materials. Any proposed changes to a qualified design, shall require review and approval by the Government prior to production. The Government will determine at that time if another FAAT will be required to certify the changes. Additional testing at the Contractor’s expense may be required to qualify those proposed changes.

2.3.9 The Contractor/subcontractor shall produce both the first article and the production quantities at the same facility.

2.4 Test Plans and Test Reports:

2.4.1 First Article Acceptance Test Plans. The Contractor shall prepare a FAAT) Plan2.1 IAW the requirements listed in Table 4 (CDRL A003) DI-NDTI-80603A.

2.4.2 Lot Acceptance Test Plans. The Contractor, as required, shall prepare a Lot Acceptance Test Plan2.1

IAW the requirements listed in Table 4 (CDRL A004) DI-NDTI-80603A.

2.4.3 First Article Acceptance Test Report. The Contractor shall deliver a FAAT Reports 2.1IAW the requirements listed in Table 4 (CDRL A005) DI-NDTI-80809B.

2.4.3.1 The FAAT Report shall include actual inspection and test results to include all measurements (Critical, Major, Minor, Non-Listed), recorded test data, and material certifications (if applicable, for any component or part, which has a material requirement on its associated drawing or specification) keyed to each drawing or specification. Associated “performance”-type data (e.g. salt fog, weld resistance, destructive), shall include pre- and post- test pictures of the samples.

2.4.4 Lot Acceptance Test Reports. Along with the completion of each lot, the Contractor shall deliver a LAT Report2.1 IAW the requirements listed in Table 4 (CDRL A006) DI-NDTI-80809B.

2.4.4.1 The LAT Report shall include actual inspection and test results to include all measurements as required by the TDP, recorded test data, and material certifications (if applicable, for any component or part, which has a material requirement on its associated drawing or specification) keyed to each drawing or specification for those material batches or lots used in the ammunition lot. For all associated “performance”-type data (e.g. salt fog, weld resistance, destructive), shall include pre- and post- test pictures of the samples.

2.5 Destructive Testing:

2.5.1 All costs of destructive testing are considered as being included in the contractual unit price.

2.5.2 Where destructive testing of items or components thereof is required by contract or specification, the number of items or components required to be destructively tested, whether destructively tested or not, shall be in addition to the quantity to be delivered to the Government as set forth in the contract schedule.

2.5.3 All pieces of the complete First Article shall be considered as destructively tested items unless specifically exempted by other provisions of this contract.

2.5.4 The Contractor shall not reuse any components from items used in a destructive test during First Article, lot acceptance or in process testing, unless specifically authorized by the Contracting Officer.

2.5.5 The Government reserves the right to take title to all or any items or components described above. The Government may take title to all or any items or components upon notice to the Contractor. The items or components of items to which the Government takes title shall be shipped in accordance with the Contracting Officer's instructions. Those items and components to which the Government does not obtain title shall be rendered inoperable and disposed of as scrap by the Contractor.

2.6 Quality Assurance Requirements:

2.6.1 Quality Management System. The Contractor shall implement and maintain a Quality Management System in accordance with ISO 9001-2008 or equivalent. Quality management system requirements shall be applied to, or “flowed down” to all supplies and services provided for use on this contract by all other sources than the Contractor’s plant. The QMS shall be controlled at all points necessary to ensure conformance to contractual requirements.

2.6.2 Quality Program Plan. The Contractor shall implement and maintain a Quality Program Plan and include sections covering Inspection/Test Plan, Critical Defect Program, Acceptance and Inspection Equipment (AIE), Process Control Documentation, and Rework (CDRL A007) DI-QCIC-81794A.

Changes to this program plan shall not be implemented without the permission of the Contracting Officer.

2.6.2.1 Quality Audit. The Contractor shall maintain the Quality Audit documentation for both the Contractor and its subcontracts/vendors.

2.6.2.2 Government Audit. At any time during this contract effort, the Government reserves the right to independently audit or examine the Contractor’s and sub-contractors’ Quality Management System and Records for compliance with all contractual quality requirements. The Contractor shall ensure the necessary provisions are placed in all sub-contractor/vendor purchase orders/contracts to grant the Government access to perform these audits. The Contractor shall provide personnel and facilities to support these audits.

2.6.3 Quality Deficiency Reporting. The contractor shall submit Product Quality Deficiency Reports (PQDRs) for any defective Government Furnished Material (GFM) utilized on this contract if the supplied items are non-conforming or damaged (CDRL A008) DI-QCIC-80736.

2.7 Measurement System Evaluation (MSE):

2.7.1 Acquisition, maintenance, and disposition of all measurement and inspection equipment shall be in accordance with NCSL Z540.3-2006 or ISO 10012. MSE shall be used to assure conformance of the components and end items to contract requirements. Inspection Equipment shall include all types of inspection, measuring, and test equipment whether Government-furnished, Contractor-designed, or commercially acquired, along with the necessary specifications, and the procedures for use.

2.7.2 The Contractor shall provide all inspection equipment except for the Government Furnished Equipment (GFE) listed in section 2.11.8 below if they elect to use it, necessary to ensure conformance of components and end-items to contract requirements. The GFE shall be provided in accordance with the Government Property clause of this contract. The Contractor is responsible for contacting the Navy 45 days in advance of the date the GFE is required in order to schedule delivery. Government-furnished equipment shall not be used by the Contractor or subcontractor in lieu of in-process or work gages. Contractor inspection equipment designs, specifications, and procedures for Critical and Major, and Minor characteristics shall be submitted to the Government for review and approval in accordance with the (CDRL A009), DI-QCIC-81960. The inspection equipment shall not create or conceal defects on the product being inspected. All inspection equipment documentation shall contain sufficient information to permit evaluation of its’ ability to test, verify, and/or measure the applicable characteristics or parameters with the required accuracy and precision. Contractor-designed inspection equipment requiring Government approval shall be made either in accordance with the equipment drawings specified in the Contract (Description/Specification Section), or in accordance with any other design documentation, provided that it is approved by the Government. The Government will approve the inspection equipment documentation or provide requirements for approval within 30 days of receipt. The Contractor shall be responsible for any delays resulting from late submission of inspection equipment documentation to the Government for approval, and any delays resulting from the submission of inadequate or incomplete inspection equipment documentation.

2.7.3 The Contractor must ensure that all inspection equipment is approved and available for use prior to First Article submission (if First Article is required) or prior to initiation of production under this contract.

2.7.4 The Contractor shall flow down inspection equipment requirements to sub-contractors at any tier who are performing acceptance inspections.

2.7.5 The Government reserves the right to disapprove at any time during the performance of this contract, use of any inspection equipment not meeting the requirements of the approved design, specification, or procedure documentation.

2.8 Automated Acceptance Inspection Equipment (AAIE). The AAIE shall accept only conforming material.

2.8.1 For Critical Characteristics, AAIE shall demonstrate a Reliability of 99.5% at a 90% Confidence Level to detect non-conforming material.

2.8.2 For Major and Minor Characteristics, AAIE shall demonstrate a Reliability of 90% at a 90% Confidence Level to detect non-conforming material.

2.8.3 All AAIE packages submitted to the Government for approval shall be in accordance with MIL-A- 70625. The Contractor shall be responsible for producing the acceptance and rejection verification standards representative of the characteristics the AAIE is designed to inspect. The verification standards and frequency of use require Government approval prior to use. When verification standards are used for VL-VII sampling per MIL-STD-1916, verification standards and frequency of use shall require Government approval prior to use.

2.8.4 The Contractor must ensure that all AAIE is approved and available for use prior to First Article submission (if First Article is required) or prior to initiation of production under this contract.

2.8.5 The Government reserves the right to disapprove at any time during the performance of this contract, use of any AAIE not meeting the requirements of the approved design, specification, or procedure documentation.

2.9 Non-Destructive Testing (NDT). NDT includes, but is not limited to radiography, ultrasonic testing/inspection, eddy current, magnetic particle inspection, liquid penetrant inspection, etc.

2.10 The Contractor shall submit detailed plans for qualifying and certifying NDT personnel and plans for qualification and ongoing use of NDT methods used for inspecting product. If re-qualification of NDT personnel and/or methods is required, then the applicable plans shall be submitted.

2.10.1 Personnel performing NDT examinations shall be qualified and certified in accordance with the standard practices prescribed by NAS 410, ASNI/ASNT-CP-189, or SNT-TC-1A, and additional procedures that may be identified by the Government. Acceptance of product using NDT shall be performed by personnel at a level of qualification consistent with that defined in the applicable standard.

2.10.2 The NDT methods shall be applied in accordance with ASTM E543 and the current nationally recognized standard practices appropriate to the NDT methods employed such as ASTM E1742 and SAE AMS-STD-2154. Each application technique shall identify the standards that are utilized.

2.11 Navy Special Interface Gage (NSIG) Requirements:

2.11.1 At this time there has not been any NSIGs identified as needed for this contract. However, if would be a need for a particular gage it will be listed under this section of the SOW and will be forwarded to the Contractor for use by the Contract Administration Office (CAO) and the Contractor as an amendment to this SOW.

2.11.2 The Contractor may substitute Contractor-designed and built AIE for the NSIGs noted as applicable in the matrix (below). However, the designs require Government approval and Contractor inspection equipment hardware requires Government certification. The Contractor shall be responsible for any delays resulting from late submission of documentation or hardware. The Contractor shall also submit the calibration periods for each Contractor inspection equipment for approval. The Government shall affix calibration stickers to the Contractor inspection equipment for QAR identification.

2.11.3 The NSIGs are provided for verification of selected interface dimensions and do not constitute sole acceptance criteria of production items or relieve the Contractor of meeting all drawing/specification requirements under the Contract.

2.11.4 Items that fail to be accepted by the applicable NSIGs may be inspected by another means to determine acceptance or rejection, provided the alternate inspection method is acceptable to the Government approval authority.

2.11.5 The Government shall not be responsible for discrepancies or delays in production items resulting through misuse, damage, or excessive wear to the NSIGs.

2.11.6 Calibration and repair of the NSIGs shall only be performed, as authorized, by the Navy. Repair is at no cost to the Contractor unless repair is required due to damage to the gages resulting from Contractor fault or negligence. Damaged, worn, or otherwise unserviceable NSIGs shall be brought to the immediate attention of the CAO and the Navy. The Contractor shall not make adjustments, alterations, or add permanent markings to NSIG hardware unless specified by NSIG operating instructions or authorized by the Navy.

2.11.7 Within 45 days after final acceptance of all production items, the Contractor shall organize return shipping of the NSIGs with the Navy.

The following specifications are applicable:

(1) Shipping, MIL-STD-2073, “DOD Standard Practice for Military Packaging”

(2) Marking, MIL-STD-129, “Marking for Shipment and Storage”

2.11.8 There are some Navy Special Inspection Gages (NSIGs) that can be provided at the request of the Contractor but are not mandatory for use. Listed NSIGs apply to characteristics of the item nomenclature as shown on the Drawing(s) and Specification as listed in the matrix..

NAVY SPECIAL INSPECTION GAGES (NSIGS) for Metal Parts & MK 14 Tanks

DRAWING CHAR QTY

DIMENSIONS (in) WEIGHT

(lb)

VALUE

LENGTH WIDTH HEIGHT

Metal Parts (See Table 2)

Gages are Only Applicable to MK 14 Tank, see section 2.2.5

2.12 Statistical Process Control:

2.12.1.1 In addition to the quality requirements of the technical data package, the Contractor shall implement

Statistical Process Control (SPC) in accordance with a government accepted SPC Program Plan.

Control chart techniques shall be in accordance with the American National Standards Institute (ANSI) B1, B2 and B3. Alternate SPC charting methods may be proposed and submitted to the Government for review.

2.12.1.2 The SPC Program Plan developed by the contractor shall consist of a general plan and a detailed plan (CDRL A010) DI-MGMT-81987. Once a general plan for a facility has been approved by this Command, the approval remains in effect for subsequent contracts as long as the contractual requirements remain substantially unchanged from contract to contract. Therefore, resubmission of a previously accepted SPC program plan is not required if previous SPC plan and Data Item Description (DID) requirements are fulfilled. If this Command has previously accepted the general SPC plan under essentially the same SPC contractual requirements, so indicate by providing the Contracting Officer with the following information:

Date of Acceptance ______________ Contract Number(s) ______________

2.12.1.3 The Contractor is responsible for updating the general plan to current SPC contractual requirements. If errors or omissions are encountered in a previously accepted SPC general plan, opportunities for improvement will be identified by the Government, and corrective action shall be accomplished by the Contractor.

2.12.1.4 The contractor shall have a fully operational and government approved SPC program for those facilities that do not have, or have never had, a fully implemented SPC program prior to initiation of First Article build(s).

2.12.1.5 A milestone schedule shall be submitted for those facilities that do not have, or have never had a fully implemented SPC program and will not have a fully operational SPC program once production is initiated. The milestones shall provide a time phased schedule of all efforts planned relative to implementation of an SPC program acceptable to the Government. A milestone schedule shall include implementation start and complete dates for each SPC subject. The milestone schedule shall only include those actions that cannot be accomplished prior to first article or the initiation of production, if a First Article is not required. Milestones shall be submitted to the Government for acceptance. Any deviations from the accepted milestones, to include justification for such deviations, shall be resubmitted for review. The Government reserves the right to disapprove any changes to the previously accepted milestones.

2.12.1.6 Statistical evidence in the form of control charts shall be prepared and maintained for each process or operation parameter identified in the detailed plan. These charts shall identify all corrective actions taken on statistical signal. During production runs, control charts shall be maintained in such a manner to assure product is traceable to the control charts. At the conclusion of the production run, a collection of charts traceable to the product, shall be maintained for a minimum of three years. The control charts shall be provided to the Government for review at any time upon request.

2.12.1.7 When the process or operation parameter under control has demonstrated both stability and capability, the Contractor may request, in writing, through Administrative Contracting Officer (ACO) and Contracting Officer (CO) channels to the Product Assurance and Test Directorate, that acceptance inspection or testing performed in accordance with contract requirements be reduced or eliminated.

Upon approval by the CO, acceptance shall then be based upon the accepted SPC plan, procedures, practices, and the control charts.

2.12.1.8 The Government will not consider requests for reduction or elimination of 100% acceptance inspection and testing of parameters or characteristics identified as critical in the technical data package, specifications, or drawings of this contract if any one of the following conditions exists:

2.12.1.8.1 The existing process currently utilizes a fully automated, cost effective, and sufficiently reliable method of 100% acceptance inspection or testing for an attribute type critical parameter or characteristic.

2.12.1.8.2 The Contractor utilizes attribute SPC control chart methods for the critical parameter or characteristic.

2.12.1.8.3 The critical parameter or characteristic is a first order,…