Amendment 01.pdf

PDF 405 KB Posted

Attached to
MK70 Ballast Kits (Solicitation) Amendment 01
Solicitation number
N0017423R0074
Issued by

About this file

This is an amendment to a solicitation for MK70 Ballast Kits. The amendment extends the closing date of the solicitation to September 19, 2023 at 3:00 PM EST. It removes drawing 1030-5210 from the certification requirements table in the Performance Work Statement. It also updates Section J Attachments to include drawing 1030-5802B for Release Assembly Cork Insulation Instructions. The solicitation is issued by the Department of the Navy Naval Sea Systems Command for MK70 Ballast Kits. All other terms and conditions of the solicitation remain the same.

View the file

Other files

File Type Posted
1030-2052-.PDF PDF
1030-5022-.pdf PDF
1030-5080-.pdf PDF
Ballast Kits - CDRL A006 TESTREPORT - Signed.pdf PDF
Ballast Kits - CDRL A010 MEETINGMIN -Signed.pdf PDF
1030-5043-.PDF PDF
Ballast Kits - CDRL A014 QUALCERT - Signed.pdf PDF
1030-2048-.PDF PDF
Ballast Kits - CDRL A007 COC - Signed.pdf PDF
Ballast Kits - CDRL A011 PROGRESSREP -Signed.pdf PDF
Attachment X_Past_Performance_Questionnaire.doc DOC document
Ballast_Kits CAPFFP.doc DOC document
A23819.pdf PDF
1030-2044-.PDF PDF
Ballast Kits - CDRL A003 SOURCES - signed.pdf PDF
1702332______001.pdf PDF
1030-5214-.pdf PDF
1030-2040-.PDF PDF
Ballast Kits - CDRL A002 MANPLAN - signed.pdf PDF
1030-2054-.PDF PDF
Ballast Kits - CDRL A013 CONTAINER TEST - Signed.pdf PDF
1030-5211-.pdf PDF
1030-2042-.pdf PDF
Ballast Kits - CDRL A001 RFV - signed.pdf PDF
1030-2046-.PDF PDF
B23818.pdf PDF
PastPerformanceMatrixrev3.docx DOCX document
Ballast Kits - CDRL A009 FACAR - Signed.pdf PDF
Ballast Kits - CDRL A012 CONTAINER - Signed.pdf PDF
Ballast Kits - CDRL A005 TESTPLAN - signed.pdf PDF
Ballast Kits - CDRL A008 COA - Signed.pdf PDF
Ballast Kits - CDRL A004 QPP - signed.pdf PDF
C23816.pdf PDF
RFP N0017423R0074.docx DOCX document
1030-5052-.PDF PDF
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to 1) extend the closing period of this solicitaiton, 2) remove the DWG 1030-5210 from the certif ication requirements table (table 4) of the Performance Work Statement (PWS), and 3) update SECTION J Attachments to include Release Assembly Cork Insulation Instructions draw ing 1030-5802B.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 5

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 05-Sep-2023

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X N0017423R0074

X 9B. DATED (SEE ITEM 11)

02-Aug-2023

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

05-Sep-2023

CODE

NSWC IHD C02

4081 N. JACKSON RD

BLDG 841

INDIAN HEAD MD 20640-5116

N00174 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N0017423R0074

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

The following items are applicable to this modification:

SUMMARY OF CHANGES

The purpose of this amendment is to 1) extend the closing period of this solicitation, 2) remove the DWG 1030-5210 from the certification requirements table (table 4) of the Performance Work Statement (PWS), and 3) update SECTION J Attachments to include Release Assembly Cork Insulation Instructions drawing 1030-5802B.

1) The closing period of this solicitation has been extended to 09/19/2023 3:00 pm Eastern

Standard Time (EST).

2) SECTION C - DESCRIPTIONS AND SPECIFICATIONS

Table 4: Certificate Requirements has been changed as follows:

SECTION C- PWS

Section C - Descriptions and Specifications

FROM:

Table 4: Certificate Requirements Test Requirement Certificate CDRL

Dwg Location Spec Compliance LS-1512 PSA20 or PSA21 N/A Compliance A007 Material 1030-2040-001 Note 2 Analysis A008 Plating 1030-2040-001 Note 3 Compliance A007 Material 1030-2042-001 Note 2 Analysis A008 Plating 1030-2042-001 Note 3 Compliance A007 Material 1030-5043-001 Note 1 Analysis A008 Prime and Paint 1030-5043-001 Note 2 Compliance A007 Material 1030-2044-001 Note 1 Analysis A008 Prime and Paint 1030-2044-001 Note 2 Compliance A007 Material 1030-2046-001 Note 1 Analysis A008 Prime and Paint 1030-2046-001 Note 2 Compliance A007 Material 1030-2048-001 Note 1 Analysis A008 Prime and Paint 1030-2048-001 Note 2 Compliance A007 Material 1030-5052-001 Note 1 Analysis A008 Prime and Paint 1030-5052-001 Note 2 Compliance A007 Material 1030-2052-001 Note 1 Analysis A008 Prime and Paint 1030-2052-001 Note 2 Compliance A007 Material 1030-2054-001 Note 1 Analysis A008

Prime and Paint 1030-2054-001 Note 2 Compliance A007 Material 1030-5022-001 Note 1 Analysis A008 Passivate 1030-5022-001 Note 2 Compliance A007 Weld 1030-5022-001 Note 3 Compliance A007 Dye Penetrant 1030-5022-001 Note 4 Compliance A007 Material 1030-5080-001 Note 1 Analysis A008 Passivate 1030-5080-001 Note 2 Compliance A007 Fasteners 1030-5080-001 Find 2 Compliance A007 Material 1030-5211-001 Note 1 Analysis A008 Passivate 1030-5211-001 Note 3 Compliance A007 Heat Treat 1030-5211-001 Note 4 Compliance A007 Match Drill 1030-5211-001 Note 5 Analysis A008 Material 1030-5211-001 Note 6 Analysis A008 Weld 1030-5211-001 Note 7 Compliance A007 Dye Penetrant 1030-5211-001 Note 8 Compliance A007 Material 1030-5210-001 Note 1 Analysis A008 Heat Treat 1030-5210-001 Note 2 Compliance A007 Passivate 1030-5210-001 Note 6 Compliance A007 Weld 1030-5210-001 Note 7 Compliance A007 Material 1030-5214 Notes 1 or 2 Analysis A008 Weld 1030-5214 Note 3 Compliance A007 Passivate 1030-5214 Note 5 Compliance A007 Dye Penetrant 1030-5214 Note 6 Compliance A007 Material 1030-2017 Note 1 Analysis A008 Passivate 1030-2017 Note 2 Compliance A007 Material C23816 Matl. Block Analysis A008 Cork Installation 1030-5802 Compliance A007 Cork Material 1030-5802 Find 2 Compliance A007 Epoxy Material 1030-5802 Find 3 Compliance A007 Curing Agent Material 1030-5802 Find 3 Compliance A007 Material B23818 Matl. Block Analysis A008 Material A23819 Matl. Block Compliance A007 Material 170332 Matl. Block Compliance A007 Heat Treat 170332 Note 3 Compliance A007 Passivate 170332 Note 6 Compliance A007

TO:

Table 4: Certificate Requirements Test Requirement Certificate CDRL

Dwg Location Spec Compliance LS-1512 PSA20 or PSA21 N/A Compliance A007 Material 1030-2040-001 Note 2 Analysis A008 Plating 1030-2040-001 Note 3 Compliance A007

Material 1030-2042-001 Note 2 Analysis A008 Plating 1030-2042-001 Note 3 Compliance A007 Material 1030-5043-001 Note 1 Analysis A008 Prime and Paint 1030-5043-001 Note 2 Compliance A007 Material 1030-2044-001 Note 1 Analysis A008 Prime and Paint 1030-2044-001 Note 2 Compliance A007 Material 1030-2046-001 Note 1 Analysis A008 Prime and Paint 1030-2046-001 Note 2 Compliance A007 Material 1030-2048-001 Note 1 Analysis A008 Prime and Paint 1030-2048-001 Note 2 Compliance A007 Material 1030-5052-001 Note 1 Analysis A008 Prime and Paint 1030-5052-001 Note 2 Compliance A007 Material 1030-2052-001 Note 1 Analysis A008 Prime and Paint 1030-2052-001 Note 2 Compliance A007 Material 1030-2054-001 Note 1 Analysis A008 Prime and Paint 1030-2054-001 Note 2 Compliance A007 Material 1030-5022-001 Note 1 Analysis A008 Passivate 1030-5022-001 Note 2 Compliance A007 Weld 1030-5022-001 Note 3 Compliance A007 Dye Penetrant 1030-5022-001 Note 4 Compliance A007 Material 1030-5080-001 Note 1 Analysis A008 Passivate 1030-5080-001 Note 2 Compliance A007 Fasteners 1030-5080-001 Find 2 Compliance A007 Material 1030-5211-001 Note 1 Analysis A008 Passivate 1030-5211-001 Note 3 Compliance A007 Heat Treat 1030-5211-001 Note 4 Compliance A007 Match Drill 1030-5211-001 Note 5 Analysis A008 Material 1030-5211-001 Note 6 Analysis A008 Weld 1030-5211-001 Note 7 Compliance A007 Dye Penetrant 1030-5211-001 Note 8 Compliance A007 Material 1030-5214 Notes 1 or 2 Analysis A008 Weld 1030-5214 Note 3 Compliance A007 Passivate 1030-5214 Note 5 Compliance A007 Dye Penetrant 1030-5214 Note 6 Compliance A007 Material 1030-2017 Note 1 Analysis A008 Passivate 1030-2017 Note 2 Compliance A007 Material C23816 Matl. Block Analysis A008 Cork Installation 1030-5802 Compliance A007 Cork Material 1030-5802 Find 2 Compliance A007 Epoxy Material 1030-5802 Find 3 Compliance A007 Curing Agent Material 1030-5802 Find 3 Compliance A007 Material B23818 Matl. Block Analysis A008 Material A23819 Matl. Block Compliance A007 Material 170332 Matl. Block Compliance A007

Heat Treat 170332 Note 3 Compliance A007 Passivate 170332 Note 6 Compliance A007

3) SECTION J – ATTACHMENTS

Drawing 1030-5802B Release Assembly Cork Insulation Instructions has been added to this

SECTION J.

4) All other terms and conditions remain the same.

5) Contact Waylin M. Duhon with any questions or concerns at waylin.m.duhon.civ@us.navy.mil.

(End of Summary of Changes)

File details come from the government source that posted it. Updated .