N0017422R0070U0003_FINAL.pdf
PDF 190 KB Posted
- Attached to
- MK22 Nozzles Federal contract opportunity
- Solicitation number
- N0017422R0070
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| N0017422R0070U0004_FINAL.pdf | ||
| Past Performance Questionnaire.doc | DOC document | |
| N0017422R0070U0002_FINAL.pdf | ||
| N0017422R0070U0001-FINAL.pdf | ||
| N0017422R0070U0001_FINAL.docx | DOCX document | |
| Past Performance Matrix.doc | DOC document | |
| Past Performance Questionnaire.doc | DOC document | |
| MK22_Nozzles_22R0070.pdf | ||
| Manufacturing of MK 22 Nozzles - CDRL A003 CoC_v1-eSigned (002).pdf | ||
| Manufacturing of MK 22 Nozzles - CDRL A004 TestPlan_v1-eSigned (002).pdf | ||
| Manufacturing of MK 22 Nozzles - CDRL A001 Inspection_v1-eSigned.pdf | ||
| Manufacturing of MK 22 Nozzles - CDRL A005_CoC.pdf | ||
| Manufacturing of MK 22 Nozzles - CDRL A002 CoA_v1-eSigned.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to 1) answ er questions received in response to the solicitation issuance.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 08-Jul-2022
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N0017422R0070
X 9B. DATED (SEE ITEM 11)
24-May-2022
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
08-Jul-2022
CODE
NSWC IHD C02
4081 N. JACKSON RD
BLDG 841
INDIAN HEAD MD 20640-5116
N00174 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N0017422R0070
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
The following items are applicable to this modification:
SUMMARY OF CHANGES (REVISED)
SUMMARY OF CHANGES
The purpose of this amendment is to 1) answer questions received in response to the solicitation issuance as follows:
1. Questions submitted in response to the solicitation issuance, as well as answers to those questions, are as follows:
Question 1: Is the Contractor responsible for making 5 Tensile Test Samples, testing all 5 FAT Tensile Test Samples per note 12, and submitting 5 Test Reports only? Or, is the Contractor responsible for making 5 Tensile Test Samples, testing all 5 FAT Tensile Test Samples per note 12, and submitting 5 Test Reports and submitting in addition to the reports, 5 extra FAT Tensile Test Samples for the government to conduct their own testing? Also, for production, is the Contractor responsible for making 5 Tensile Test Samples, testing all 5 Production Lot Tensile Test Samples per note 12, and submitting 5 Test Reports and submitting in addition to the reports, 5 extra Production Lot Tensile Test Samples for the government to conduct their own testing?
Answer 1: The Government does not need to perform the tensile test specimen. The Government requests the contractor perform the 5 tensile tests and draft a single report detailing the test results of all 5 parts for FAT. The Government requests the contractor to perform only one (1) production tensile test per production lot batch quantity based on the heat treatment batch size. This is for Machining the nozzle only.
2. All other terms remain unchanged.
3. Direct any questions to Bridget Taylor at bridget.m.taylor.civ@us.navy.mil.
(End of Summary of Changes) mailto:bridget.m.taylor.civ@us.navy.mil
File details come from the government source that posted it. Updated .