ATTACHMENT_1_-_QASP.docx
DOCX document 31 KB Posted
- Attached to
- FirstDefender RMX, TruDefender FT, TruDefender FTX, and Gemini Federal contract opportunity
- Solicitation number
- N00174-19-R-0105
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| CDRL_A001-KICKOFF_CS_6212018.docx | DOCX document | |
| CDRL-A002-STATUSREPORT_CS_6212018.docx | DOCX document | |
| RFP.pdf | ||
| PastPerformanceMatrix.doc | DOC document | |
| PastPerformanceQuestionnaire_Attachment_3.doc | DOC document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT 1
Quality Assurance Surveillance Plan (QASP)
1. PURPOSE
This Quality Assurance Surveillance Plan (QASP) is a Government developed and applied document used to ensure that systematic quality assurance methods are used in this performance based service contract. The Contractor shall perform in accordance with the QASP performance metrics, and the Government shall receive the quality of services identified in the contract. A properly executed QASP will assist the Government in achieving the objectives of this acquisition.
This contract is for the procurement of Maintenance Support Services and Consumables for the First Defender RMX, TruDefender FT, TruDefender FTX and Gemini. The period of performance for this contract will cover a base period of 12 months and four (4) option periods for a total of ten (10) periods. There will be one (1) assessment period during each 12 months of the contract for a total of five (5) assessment periods. A properly executed QASP will assist the Government in achieving the overall objectives of this procurement.
2. AUTHORITY
Authority for issuance of this QASP is provided under Contract Section E – Inspection and Acceptance, which provides for inspection and acceptance of the services and documentation called for in service contracts, to be executed by the Contracting Officer or a duly authorized representative.
3. SCOPE
The QASP is put in place to provide Government surveillance and oversight of the Contractor’s efforts to assure that they are timely, effective and are delivering the results specified in the contract.
The Contractor’s performance on this contract will be evaluated by the Government as described below and summarized in the Contractor Self-Assessment Milestone Chart. The first evaluation will cover the period ending six months after date of contract award, with successive evaluations being performed for each twelve month period thereafter, until the Contractor completes performance under this contract. The evaluation will encompass all work performed by the Contractor during the assessment period, but will not include cumulative information from prior assessments. The Contractor will complete a self-assessment of the work performed, to be delivered to the Contracting Officer’s Representative (COR) and the Contract Administrator, as identified in the contract, No Later Than (NLT) 60 days after the end of the assessment period. The self-assessment shall cover all areas of the Government QASP. Based on the evaluation results, provided by the COR and the Contract Administrator, the Contracting Officer will assign an overall performance rating. If the Contracting Officer assigns an “Unsatisfactory” performance rating for the period evaluated, the next option period will not be exercised. A final assessment shall be completed by the Government within four months of the completion date of the contract (inclusive of all exercised options).
CONTRACTOR SELF-ASSESSMENT MILESTONE CHART
BASE
OPTION I
OPTION II
Option III
Option IV
| Month 1 |
| *PD 1 |
| Month 1 |
| PD 3 |
| Month 1 |
| PD 5 |
| Month 1 |
| PD 7 |
| Month 1 |
| PD 9 |
Month 2
Month 2
Month 2
Month 2
Month 2
Month 3
Month 3
Month 3
Month 3
Month 3
Month 4
Month 4
Month 4
Month 4
Month 4
Month 5
Month 5
Month 5
Month 5
Month 5
Month 6
Month 6
Month 6
Month 6
Month 6
| Month 7 |
| PD 2 |
| Month 7 |
| PD 4 |
| Month 7 |
| PD 6 |
| Month 7 |
| PD 8 |
| Month 7 |
| PD 10 |
Month 8
Month 8
Month 8
Month 8
Month 8
Month 9
Month 9
Month 9
Month 9
Month 9
Month 10
Month 10
Month 10
Month 10
Month 10
Month 11
Month 11
Month 11
Month 11
Month 11
Month 12
Month 12
Month 12
Month 12
Month 12
Contractor Self Assessment Reporting Due Date
*PD = Period
4. GOVERNMENT RESOURCES AND RESPONSIBILITIES
The following Government resources shall have responsibility for the implementation of this QASP:
Procurement Contracting Officer – The Procurement Contracting Officer (PCO) ensures performance of all necessary actions for effective contracting, ensures compliance with the terms of the contract and safeguards the interest of the United States in the contractual relationship. It is the PCO that assures the Contractor receives impartial, fair and equitable treatment under the contract. The PCO is ultimately responsible for the final determination of the adequacy of the Contractor’s performance. The PCO for this contract is identified in Section G.
Contract Administrator – An individual assigned by the PCO to assist in the daily administration of the contract. The Contract Administrator also provides input to the PCO and the COR as to the quality of performance for areas addressed in this QASP. The Contract Administrator for this contract is identified in Section G.
Contracting Officer’s Representative – The Contracting Officer’s Representative (COR) is responsible for technical administration of the contract and assures proper Government surveillance of the Contractor’s performance. The COR is not empowered to make any contractual commitments or to authorize any changes on the Government’s behalf. Any changes that the Contractor deems may affect contract price, terms or conditions shall be referred to the PCO for action.
Government Technical Point of Contact – The COR designates an individual Government Technical Point of Contact (TPOC) to assist in administering specific projects under the contract. The Government TPOC is responsible for assisting in administering a specific project under the contract. A Government TPOC cannot, in any manner, alter the scope of the contract, make commitments or authorize any changes on the Government’s behalf.
5. METHODS OF QA SURVEILLANCE
a. QASP – The below listed methods of surveillance shall be used by the COR in the technical administration and by the PCO/Contract Administrator in non-technical administration of this QASP. The QASP will be the prime determinant in exercising the option.
b. Contractor Performance Assessment Report System (CPARS) – The market place for information technology, engineering, and management support services is very competitive. As such, the successful offeror has a vested interest in the Government generated CPARS under this contract. Additionally, an evaluation using the CPARS format will be performed at the end of each year of performance. This evaluation will be one determinant in exercising an option. For this procurement, the Government will address the quality of product or service, schedule, cost control, business relations, management, and other important areas. As this information may affect future source selections throughout DoD, and the continuation of the contract, the annual Government assessment will be used appropriately as an additional performance oversight and communication tool with the QASP.
6. DOCUMENTATION
In addition to providing annual reports to the Contracting Officer, the COR will maintain a complete Quality Assurance file. The file will contain copies of all reports, evaluations, recommendations, and any actions related to the Government’s performance of the quality assurance function. The COR shall forward these records to the Contracting Officer at termination or completion of the contract.
7. SURVEILLANCE
The tables below set forth the performance ratings, standards, outcome and surveillance methods to document the results of the surveillance on an annual basis, as well as interim and informal reviews (i.e., In-Process Reviews (IPRs)) on a more frequent basis. The standards associated with these ratings are given in Table 1. Table 2 lists the objectives; Table 3 lists Task Performance Evaluation Criteria and Standards and Table 4 lists Performance Requirements.
(a) Performance Ratings: The Government will evaluate the Contractor’s performance of the Performance Work Statement (PWS) and the Contracting Officer will assign one of the following ratings:
(1) Excellent
(2) Satisfactory
(3) Unsatisfactory
Table 1: Overall Performance Ratings
| Overall Performance Rating |
| Standard |
| Excellent |
| “Excellent” ratings for all performance evaluation criteria. |
| Satisfactory |
| A minimum of “Satisfactory” ratings for all performance evaluation criteria. |
| Unsatisfactory |
| A rating of “Unsatisfactory” for one or more performance evaluation criteria. |
(b) Objectives/Determination
1. Interim/Informal
Interim/Informal performance evaluations will be provided to assess performance at each IPR.
2. Annual
The PCO will make a performance determination at the end of each evaluation period. The determination will be based upon the COR’s recommendations, the Contractor’s comments, including any Self-Evaluation Report, and any other information deemed relevant by the PCO. The PCO shall resolve disagreements between the COR’s recommendations and the Contractor’s comments/report regarding the evaluation. The PCO’s performance determination is unilateral and final. The PCO will document the determination and provide a copy to the Contractor within 30 days of receipt of the Contractor’s self-assessment.
Table 2: Objectives
| Assessment Period |
| Acceptable Performance Definition |
| Assessment Method |
| Outcome |
| First 6 Months of the Base Period of the contract (Period 1) |
| All measurement areas rated at least “Satisfactory” |
| Using the QASP evaluation criteria set forth in the contract. |
| (+) Meets the acceptable performance definition as condition for continuation under the base period.* |
(-) Does not meet the acceptable performance definition as a condition for continuation under the base period.*
| Last 6 months of Base Period (Period 2) |
| All measurement areas rated at least “Satisfactory” |
| Using the QASP evaluation criteria set forth in the contract. |
| (+) Meets the acceptable performance definition as condition for exercise of Option I.* |
(-) Does not meet the acceptable performance definition as a condition for exercise of Option I.*
| First 6 months of Option I (Period 3) |
| All measurement areas rated at least “Satisfactory” |
| Using the QASP evaluation criteria set forth in the contract. |
| (+) Meets the acceptable performance definition condition to continue performance under Option I |
(-) Does not meets the acceptable performance definition condition to continue performance under Option I
| Last 6 months of Option I (Period 4) |
| All measurement areas rated at least “Satisfactory” |
| Using the QASP evaluation criteria set forth in the contract. |
| (+) Meets the acceptable performance definition condition to exercise Option II |
(-) Does not meets the acceptable performance definition condition to exercise Option II
| Assessment Period |
| Acceptable Performance Definition |
| Assessment Method |
| Outcome |
| First 6 months of Option II (Period 5) |
| All measurement areas rated at least “Satisfactory” |
| Using the QASP evaluation criteria set forth in the contract. |
| (+) Meets the acceptable performance definition condition to continue performance under Option II |
(-) Does not meets the acceptable performance definition condition to continue performance under Option II
| Last 6 months of Option II (Period 6) |
| All measurement areas rated at least “Satisfactory” |
| Using the QASP evaluation criteria set forth in the contract. |
| (+) Meets the acceptable performance definition condition to complete contract |
(-) Does not meets the acceptable performance definition condition to complete contract
| First 6 months of Option III (Period 5) |
| All measurement areas rated at least “Satisfactory” |
| Using the QASP evaluation criteria set forth in the contract. |
| (+) Meets the acceptable performance definition condition to continue performance under Option II |
(-) Does not meets the acceptable performance definition condition to continue performance under Option II
| Last 6 months of Option III (Period 6) |
| All measurement areas rated at least “Satisfactory” |
| Using the QASP evaluation criteria set forth in the contract. |
| (+) Meets the acceptable performance definition condition to complete contract |
| First 6 months of Option IV (Period 5) |
| All measurement areas rated at least “Satisfactory” |
| Using the QASP evaluation criteria set forth in the contract. |
| (+) Meets the acceptable performance definition condition to continue performance under Option II |
(-) Does not meets the acceptable performance definition condition to continue performance under Option II
| Last 6 months of Option IV (Period 6) |
| All measurement areas rated at least “Satisfactory” |
| Using the QASP evaluation criteria set forth in the contract. |
| (+) Meets the acceptable performance definition condition to complete contract |
*The Government will not exercise the next option year term unless the Contractor meets the acceptable performance definition.
(c) Performance Evaluation Criteria. The Contractor’s performance will be evaluated using the criteria and standards provided for each objective and identified in Tables 3 through 5 of this contract QASP.
(d) Organization. The performance evaluation organization consists of the PCO, who will serve as the Determining Official and the COR. In some instances, a TPOC will be assigned to the contract in addition to the COR. This performance evaluation does not replace any other requirement for evaluating Contractor performance that may be required by this contract such as a Contractor Performance Assessment Reporting System (CPARS) report or other required reports.
Table 3: Task Performance Evaluation Criteria and Standards
| Criterion |
| Unsatisfactory |
| Satisfactory |
| Excellent |
| Task Performance |
| Work product fails to meet Acceptable Quality Levels (AQLs) defined in Performance Requirements Summary Table (4). |
| Work product routinely meets Acceptable Quality Levels (AQLs) defined in Performance Requirements Summary Table 4. |
| Work product frequently exceeds Acceptable Quality Levels (AQLs) defined in Performance Requirements Summary Table 4. |
| Cost Management |
| Contractor routinely fails to complete tasks within agreed upon cost, i.e., cost over runs frequently occur |
ODC funds are not properly tracked and/or are not within the scope of the TI.
Contractor routinely completes task within the originally agreed upon cost.
Funds and resources are generally used in a cost-effect manner. No major resource management problems are apparent
ODCs are reasonable, within scope, and clearly identified.
Reductions in direct and indirect costs to the Government below contract estimated costs are noteworthy.
Contractor provides detailed cost analysis and recommendations to government for resolution of problems identified.
Funds and resources are optimally used to provide the maximum benefit for the funds and resources available.
Documented savings are apparent.
| Reporting |
| Reports are generally late, inaccurate, incomplete, or unclear |
Reports do not accurately track and clearly identify ODC items
| Reports are timely, accurate, complete, and clearly written. Problems and/or trends are addressed and analysis submitted. |
| Reports are clear, accurate, and proactive. Problems and/or trends are addressed thoroughly, and the contractor’s recommendations and/or corrective plans are implemented and effective. |
| Criterion |
| Unsatisfactory |
| Satisfactory |
| Excellent |
| Timeliness |
| Contractor frequently misses deadlines, schedules, or is slow to respond to government requests or is non-responsive to government requests. |
| Contractor routinely meets deadlines, schedules, and responds quickly to government requests. |
| Contractor always meets deadlines, schedules, and responds immediately to government requests. |
| Customer Satisfaction |
| Fails to meet customer expectations. |
| Meets customer expectations. |
| Exceeds customer expectations to the benefit of the overall tasking. |
Table 4: Performance Requirements Summary Table
PWS Task Area
Performance Objective
Performance Standard
Acceptable Quality Level
Quality Assurance Surveillance Plan Typical Monitoring Methods
| 2.0-2.9 |
| Systems, DLRP and spares pass low magnetic signature testing |
| All specifications are met as stated in the PWS |
| 90% pass rate on first test; 100% past rate on second test |
| Government Lot Acceptance Testing will be conducted |
| 2.0-2.9 |
| Provide systems upon request |
| Systems provided within date specified in the delivery order |
| Systems delivered by specified date 95% of the time |
| Government LAT will be conducted |
| 2.0-2.9 |
| Depot Level Repair Service and troubleshooting assistance |
| Repair estimate provided within 72 hrs of failed DLRP; DLRP repaired within 30 days of Government approval of estimate |
| Repair estimated and failure repair completed 95% of the time within allotted timeframe |
| Government will conduct monthly review of COLTS database |
| 2.0-2.9 |
| COLTS database maintained |
| Data entered into COLTS two business days after the failure event; COLTS reviewed daily in order to perform daily tasks |
| Data entered/tasks reviewed in COLTS within established timeframe 95% of the time |
| Government will conduct monthly review of COLTS database |
| 2.0-2.9 |
| Context of repair estimate and FRACAS |
| Repair Estimate /FRACAS contains all required data and is submitted through COLTS |
| Repair estimate and FRACAS context met 95% of the time |
| Government will conduct monthly review of COLTS database |
Table 5 entitled: “COST EFFICIENCY PERFORMANCE EVALUATION CRITERIA AND STANDARDS”, shall be included when the contract will be cost-reimbursable.
TABLE 5: COST EFFICIENCY PERFORMANCE EVALUATION CRITERIA AND STANDARDS
| CRITERION |
| UNSATISFACTORY |
| SATISFACTORY |
| EXCELLENT |
| Cost Management |
| Contractor routinely fails to complete the effort within the originally agreed to estimated cost, i.e. cost overruns frequently occur. |
| Contractor routinely completes the effort within the originally agreed to estimated cost. Contractor provides measures for controlling all costs at estimated costs. Funds and resources are generally used in a cost-effective manner. No major resource management problems are apparent. |
| Reductions in direct costs to the Government below contract estimated costs are noteworthy. Contractor provides detailed cost analysis and recommendations to Government for resolution of problems identified. Funds and resources are optimally used to provide the maximum benefit for the funds and resources available. Documented savings are apparent. |
| All Reporting this table relates to cost efficiency which is why it was cost reporting |
| Reports are generally late, inaccurate, incomplete or unclear. |
| Reports are timely, accurate, complete and clearly written. Problems and/or trends are addressed, and an analysis is also submitted. |
| Reports are clear, accurate, and pro-active. Problems and/or trends are addressed thoroughly, and the Contractor’s recommendations and/or corrective plans are implemented and effective. |
File details come from the government source that posted it.