N00174-21R-0097 RFP Final.pdf

PDF 580 KB Posted

Attached to
M51A4N 20MM Plastic Dummy Cartridge
Solicitation number
N00174-21-R-0097
Issued by

View the file

Other files

File Type Posted
Amendment 0005.pdf PDF
Amendment 0004.pdf PDF
Amendment 0003.pdf PDF
Amendment 0002.pdf PDF
Amendment 0001.pdf PDF
Non Disclosure-Non Use Agreement.docx DOCX document
Non Disclosure-Non Use Agreement.docx DOCX document
DD2345_Military Critical Tech Data Agreement.pdf PDF
Past Performance Matrix.doc DOC document
Consolidated GFP Request Form.xlsx XLSX spreadsheet
CDRLs A001-A014.pdf PDF
Past Performance Questionnaire.doc DOC document
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CODE

(Hour)

PAGE(S)

until 03:00 PM local time 14 Dec 2021

X

A X B X C X D

EX

X

G F 65 - 70

71 - 75 X H 76 - 83 alexander.polster@navy.mil

RATING PAGE OF PAGES

7. ISSUED BY

(Date)

IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.

Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)

Prescribed by GSA FAR (48 CFR) 53.214(c)

DOA6 1 83

(If other than Item 7)

15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO

AND

ADDRESS

SIGN OFFER (Type or print)

OF

OFFEROR

AMENDMENT NO. DATE

15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS

IS DIFFERENT FROM ABOVE - ENTER

SUCH ADDRESS IN SCHEDULE.

18. OFFER DATE

1. THIS CONTRACT IS A RATED ORDER

UNDER DPAS (15 CFR 700)

2. CONTRACT NO.

N00174 8. ADDRESS OFFER TO

See Item 7

9. Sealed offers in original and 1 copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in

CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and electronically submitted conditions contained in this solicitation.

10. FOR INFORMATION

CALL:

A. NAME (NO COLLECT CALLS)

ALEXANDER A POLSTER 973-724-9568

11. TABLE OF CONTENTS

SOLICITATION/ CONTRACT FORM

SUPPLIES OR SERVICES AND PRICES/ COSTS

1 - 3 4 - 8

X I CONTRACT CLAUSES

DESCRIPTION/ SPECS./ WORK STATEMENT X

PACKAGING AND MARKING

9 - 30 31 - 33

J LIST OF ATTACHMENTS

INSPECTION AND ACCEPTANCE

DELIVERIES OR PERFORMANCE

34 - 36 37 - 38

X K

REPRESENTATIONS, CERTIFICATIONS AND

OTHER STATEMENTS OF OFFERORS

CONTRACT ADMINISTRATION DATA 39 - 49 X

SPECIAL CONTRACT REQUIREMENTS

OFFER (Must be fully completed by offeror) 50 X M

L INSTRS., CONDS., AND NOTICES TO OFFERORS

EVALUATION FACTORS FOR AWARD

NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.

13. DISCOUNT FOR PROMPT PAYMENT

(See Section I, Clause No. 52.232-8)

14. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments

AMENDMENT NO. DATE

to the SOLICITATION for offerors and related documents numbered and dated):

FACILITY

12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period

SOLICITATION, OFFER AND AWARD

X

(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)

PART I - THE SCHEDULE

26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE

EMAIL:TEL: (Signature of Contracting Officer)

CODE CODE

B. TELEPHONE (Include area code) C. E-MAIL ADDRESS

AWARD (To be completed by Government)

19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION

22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:

10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)

23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE

PART IV - REPRESENTATIONS AND INSTRUCTIONS

PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

51 - 63

PART II - CONTRACT CLAUSES

NSWC IHD C02

PICATINNY DETACHMENT

3RD AVENUE

BLDG. 61N

PICATINNY ARSENAL NJ 07806-5000

FAX:

TEL:

FAX:

TEL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SOLICITATION

6. REQUISITION/PURCHASE NO.5. DATE ISSUED

12 Nov 2021

4. TYPE OF SOLICITATION

SEALED BID (IFB)

NEGOTIATED (RFP)

[ X ]

3. SOLICITATION NO.

N0017421R0097

Section A - Solicitation/Contract Form

EXECUTIVE SUMMARY

EXECUTIVE SUMMARY

This executive summary highlights some of the important features of this solicitation. If a conflict exists between this summary and the solicitation, the solicitation governs.

1. Introduction

The Naval Sea Systems Command, Naval Surface Warfare Center, Indian Head Division – Picatinny Detachment (NSWC IHD), Contracts Department, Code 02, has a requirement to procure the 20 MM Plastic Dummy Rounds, M51A4N with MK7 Links using the Government (USG) Technical Data Package (TDP) entitled ADL 53711- 8563566 in accordance with the effort described in the Statement of Work (SOW), Section C.

2. Acquisition Strategy

The Acquisition Strategy is to award a single award Firm Fixed Price (FFP) Indefinite Delivery, Indefinite Quantity (IDIQ)contract with five (5) one year ordering periods.

The following minimum quantity guarantee and maximum amount are for the items being procured under this contract, which has a 5 year performance.

Minimum Quantity Guarantee: 10,000 20MM Dummy Rounds Maximum Contract Value: $5,150,000.00

3. Technical Data Package (TDP)

The Technical Data Packages (TDP) are marked Distribution D (Limited to DoD and US DoD contractors only). Disclosure and use of the TDPs are restricted by the Non- Disclosure and Non-Use Agreement (NDA) that the offeror is required to execute prior to accessing the TDPs along with a current DD2345 Military Critical Technical Data Agreement (All forms can be found in Section J).

To receive this unclassified controlled technical information, an Offeror must be currently certified through the United States/Canada Joint Certification Program. To become certified for receipt of the technical documents, a U.S. Offeror must submit a completed DD Form 2345 to the U.S./Canada Joint Certification Office. Canadian Offerors may submit either a completed DD Form 2345 or DSS-MAS 9379 for certification. In addition, a copy of the company's State/Provincial Business License, Incorporation Certificate, sales Tax Identification Form or other documentation which verifies the legitimacy of the company must accompany all DD Form 2345s. Additional information on the Joint Certification Program and a checklist for completion of the DD Form 2345 is available at the following website:

http://www.dla.mil/HQ/InformationOperations/Offers/Products/LogisticsApplications/JCP

Offerors are encouraged to apply for certification as early as possible in order for processing and receipt of information to be completed in sufficient time to prepare a proposal before solicitation closing.

Interested Offerors must request the drawing package in writing. E-mail the following information with the required documention stated above and in Section J-Attachments to Gerardo.ilaria@navy.mil:

-Name -Title -Company name and address -DUNS and CAGE numbers -E-mail address

Some technical documents contain export-control technical data and are subject to the following warning:

EXPORT-CONTROL WARNING - All technical documents that are determined to contain export-controlled technical data shall be marked WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et. seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C., App. 2401 et. seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25.

When it is technically infeasible to use the entire statement, an abbreviated marking may be used, and a copy of the full statement added to the Notice To Accompany Release of Export-Controlled Data required by DoD Directive 5230.25.

Section B - Supplies or Services and Prices

ORDERING PERIODS TIMEFRAME

Awarded delivery orders shall correspond with the each respective ordering period timeframe and subsequent pricing for awarded quantities within the step-ladder pricing of each ordering period.

These timeframes are listed below:

Ordering Period 1: Date of Contract Award To 365 days after award

Ordering Period 2: 366 days after contract award To 730 days after award

Ordering Period 3: 731 days after contract award To 1,095 days after award

Ordering Period 4: 1,096 days after contract award To 1,460 days after award

Ordering Period 5: 1,461 days after contract award To 1,825 days after award

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 Lot First Article Test (1 Lot)

FFP

Cartridge, 20mm, Plastic Dummy M51A4N Links to meet the requirements specified by ADL 53711-8563566 in accordance with the Statement of Work and all attachments. 1 Lot shall consist of 750 rounds.

FOB: Destination

PSC CD: 1305

NET AMT

0002 Each Ordering Period 1: 20MM Dummy Cartridge

FFP

Cartridge, 20mm, Plastic Dummy, M51A4N with MK7 Links to meet the requirements specified by ADL 53711-8563566 in accordance with the Statement of Work and all attachments (Production). Date of Contract Award To 365 days after contract award.

FOB: Origin (Shipping Point)

STEPLADDER PRICING

STEPLADDER NAME ITEM NO FROM QUANTITY TO QUANTITY UNIT PRICE

20MM Dummy Round Pricing 0002 5,000.00 19,999.00 20,000.00 39,999.00 40,000.00 79,999.00 80,000.00 150,000.00

0003 Each Ordering Period 2: 20MM Dummy Cartridge

FFP

Cartridge, 20mm, Plastic Dummy, M51A4N with MK7 Links to meet the requirements specified by ADL 53711-8563566 in accordance with the Statement of Work and all attachments (Production). 366 days after contract award To 730 days after contract award.

20MM Dummy Round Pricing 0003 5,000.00 19,999.00 20,000.00 39,999.00

0004 Each Ordering Period 3: 20MM Dummy Cartridge

FFP

Cartridge, 20mm, Plastic Dummy, M51A4N with MK7 Links to meet the requirements specified by ADL 53711-8563566 in accordance with the Statement of Work and all attachments (Production). 731 days after contract award To 1,095 days after contract award.

20MM Dummy Round Pricing 0004 5,000.00 19,999.00 20,000.00 39,999.00

0005 Each Ordering Period 4: 20MM Dummy Cartridge

FFP

Cartridge, 20mm, Plastic Dummy, M51A4N with MK7 Links to meet the requirements specified by ADL 53711-8563566 in accordance with the Statement of Work and all attachments (Production). 1,096 days after contract award To 1,460 days after contract award.

20MM Dummy Round Pricing 0005 5,000.00 19,999.00 20,000.00 39,999.00

0006 Each Ordering Period 5: 20MM Dummy Cartridge

FFP

Cartridge, 20mm, Plastic Dummy, M51A4N with MK7 Links to meet the requirements specified by ADL 53711-8563566 in accordance with the Statement of Work and all attachments (Production). 1,461 days after contract award To 1,825 days after contract award.

20MM Dummy Round Pricing 0006 5,000.00 19,999.00 20,000.00 39,999.00

0007 1 Each CDRLs - A001-A014

FFP

Technical data to be provided in accordance with the attached Contract Data Requirements LIst (CDRLS) - DD 1423. This CLIN is Not Seperately Priced

(NSP).

Section C - Descriptions and Specifications

STATEMENT OF WORK

STATEMENT OF WORK

FOR

CARTRIDGE, 20MM, PLASTIC DUMMY, M51A4N PRODUCTION

1. SCOPE

This Statement of Work (SOW) defines the requirements to manufacture, assemble, test, inspect, package, and deliver CARTRIDGE, 20MM, PLASTIC DUMMY, M51A4N in accordance with

ADL 53711-8563566.

1.1. Background. The M51A4N 20mm Plastic Dummy Cartridge is planned for use with the Navy’s Close-In Weapon System (CIWS), which is the 20mm anti-missile defense system. The M51A4N is used for weighting, balancing, gun checks, and dry cycling of the CIWS during ship install verification.

2. APPLICABLE DOCUMENTS

2.1 General. The documents listed below are not necessarily all of the documents referenced herein, but are the ones that are needed in order to fully understand the information provided by this document.

2.2 Government documents.

2.2.1 Specifications and standards. The following specifications, standards and handbooks form a part of this document to the extent specified herein. Unless otherwise specified, the issues of these documents are those listed in the Automated Data List (ADL).

STANDARDS

DEPARTMENT OF DEFENSE

MIL-STD-1916 DOD Preferred Methods for Acceptance of Product

MIL-STD-1168 Ammunition Lot Numbering and Ammunition Data Card

2.2.2 Other Government Documents, Drawings and Publications.

LISTS

DEPARTMENT OF DEFENSE

ADL 53711-8563566 Cartridge, 20mm Plastic Dummy, M51A4N

PUBLICATIONS

PEO-IWS3C CMP_Ammo PEO IWS 3C Configuration Management Plan (CMP) for Conventional Ammunition

ISO 9001:2015 Quality Management Systems

3. GENERAL REQUIREMENTS

3.1 General. The contractor shall meet the requirements specified by ADL 53711-8563566 (ADL), all lower-tier documents, and the detailed requirements below. The contractor shall also be responsible for providing all necessary equipment and tooling, with the exception of any Government Furnished Property.

3.2 First Article

3.2.1 First Article Test Plan (FATP). The contractor shall prepare and submit a FATP for Government review and approval in accordance with CDRL A001.

3.2.2 The contractor shall produce First Article lots of cartridges sufficient in quantity, representative of the same processes, procedures, facilities, and sources of supply as production assets, to meet the First Article requirements specified in the ADL.

3.2.3 The contractor shall notify the Contracting Officer in writing when (i) a major change is made to the technical data, (ii) whenever there is a lapse in production for a period in excess of 90 days, or (iii) whenever a change occurs in place of performance, manufacturing process, material used, drawing, specification or source of supply so that a determination can be made concerning the need for an additional first article sample or portion thereof. Costs of the first article testing resulting from production process change, change in the place of performance, or material substitution shall be borne by the contractor.

3.2.4 First Article (contractor Testing). The contractor shall examine and test First Article lots in accordance with contract requirements (ADL, Quality Assurance Provisions (QAPs)).

3.2.4.1 The contractor shall provide to the Contracting Officer at least 15 calendar days advance notice of the schedule date for final inspection(s) of the first article.

3.2.4.2 The contractor shall perform destructive inspections on additional sample parts selected from the same lot(s) or batch(es) from which the First Article was produced.

3.2.5 First Article (Government Testing). The contractor shall provide First Article samples for Government testing in sufficient quantities after successful completion of 3.2.4.

3.2.5.1 The contractor shall provide to the Contracting Officer at least 15 calendar days advance notice of the delivery of First Article samples.

3.2.5.2 The contractor shall furnish instructions to the Contracting Officer for the disposition of any rejected First Article samples or portions thereof not destroyed during inspection and testing within 30 days following the date of notification of rejection. Failure to furnish such instructions within a 30 day period shall constitute abandonment of all material by the contractor and shall confer upon the Government the right to destroy or otherwise dispose of the rejected items at the discretion of the Government without liability to the contractor by reason of such destruction or disposition.

3.2.6 First Article Test Report. The contractor shall submit a First Article Test Report inclusive of all completed DD Form 1222, Material Certifications, and Government First Article Test Reports in accordance with CDRL A002. Certificates of Compliance will not be accepted in place of Material Certifications.

3.3 Lot Acceptance

3.3.1 Lot Acceptance Test (LAT) Plan. The contractor shall submit a LAT Plan for Government review and approval in accordance with CDRL A003. The contractor shall select a lot acceptance test sample in accordance with the requirements of MIL-STD-1916.

3.3.2 Lot Acceptance Test Report (LATR). The contractor shall conduct LAT in accordance with Government Approved LAT plan in accordance with CDRL A004. Resulting test data including any anomalies encountered during the testing of any accepted product shall be provided in a test report and uploaded in the Munitions History Program (MHP). Once the government has been notified by the contractor and a LAT has commenced, the PCO must approve any contractor request for stoppage or the government may withhold acceptance until a root cause determination has been reviewed and accepted by the government.

3.3.3 The Department of Defense (DoD) Preferred Methods for Acceptance of Product, MIL- STD-1916, shall be used for this procurement action. All references to MIL-STD-105, MIL- STD-414, MIL-STD-1235, and ANSI Z1.4 appearing in the Technical Data Package (TDP) are replaced by MIL-STD-1916. Verification Levels (VL) shall replace AQLs and shall be VL IV for major characteristics and VL II for minor characteristics.

3.4 Measurement System Evaluation (MSE). (CDRL A005)

3.4.1 Definitions. This paragraph defines specific terms utilized throughout the rest of this section, in the CDRL and in the Data Item Descriptions (DIDs). This aids in clarifying the MSE requirements to Government and contractor personnel.

3.4.1.1 Acceptance Inspection Equipment (AIE). All equipment (includes AAIE defined below), special and standard, including dimensional gages, measuring equipment, test fixtures, electronic and physical test equipment, and other test equipment used for examination and test of a product to determine conformance to the Technical Data Package (TDP) which may include drawings and specifications (e.g., Detail, Performance, Weapon specifications, and QAPs).

3.4.1.2 Automated Acceptance Inspection Equipment (AAIE). AIE in which the inspection and acceptance determination of the product is performed, in whole or in part, in an automatic manner.

3.4.1.3 Contractor Inspection Equipment. Government-approved equipment utilized by the contractor to perform examination and tests to assure conformance to contract requirements.

3.4.1.4 Commercial Inspection Equipment. Industry-developed inspection equipment of universal application, without limitations to a specific part or item, which is advertised or cataloged as available to the trade or to the public on an unrestricted basis at an established price.

Examples follow:

3.4.1.4.1 Standard Test Equipment. Multiuse equipment that is specific to a function rather than to an item. It includes such items as hardness testers, tensile strength testers, meters, weighing devices, standard gear testers, ohmmeters, voltmeters, and oscilloscopes.

3.4.1.4.2 Standard Measuring Equipment (SME). Multipurpose equipment and standards used for performing measurements. It includes such items as micrometers, rulers, tapes, height gages, and protractors, etc. Standards include visual inspection equipment such as scratch and dig standards, surface finish comparator, color standards (AMS-STD-595), etc.

3.4.1.5 Nondestructive Testing. The development and application of technical methods to examine materials or components in ways that do not impair future usefulness and serviceability in order to detect, locate, measure and evaluate flaws; to assess integrity, properties and composition; and to measure geometrical characteristics. NDT includes Radiography/Radioscopic, Ultrasonic, Eddy Current, Magnetic Particle, and Liquid Penetrant.

3.4.1.6 Measurement System Analysis (MSA). Per ASTM E2782 (Standard Guide for MSA), paragraph 3.1.7, MSA is any of a number of specialized methods useful for studying a measurement system and its properties.

3.4.2 Scope. This section establishes requirements for design, supply, performance, and maintenance of AIE used for product inspection and acceptance. In addition, this section establishes requirements for the preparation, submission, and approval of AIE documentation.

3.4.3 AIE. The contractor shall provide all AIE necessary to ensure conformance of components and end-items to contract requirements. AIE shall include inspection, measuring, and test equipment whether Government furnished or contractor furnished (including commercially acquired) along with the necessary specifications and procedures for their use (see ISO 10012, paragraph 6.2.1). The AIE shall not create or conceal defects on the product being inspected. All AIE documentation shall contain sufficient information to permit evaluation of the AIE’s ability to test, verify, and/or measure the applicable characteristics or parameters.

3.4.4 AIE Designs & Government Furnished Gages. AIE designs are of two types – Government designs (see 3.4.4.1) and contractor designs (see 3.4.4.2). When applicable, Government designs or Government furnished gages are designated in the TDP/contract;

responsibility for all other AIE is assigned to the contractor. The designs, associated inspection procedures, and theory of operation shall have the level of detail to demonstrate capability of the proposed AIE to perform the required inspection.

3.4.4.1 Government AIE Designs. Government AIE designs may consist of detailed drawings necessary for the fabrication and use of the AIE. Unless otherwise specified, the contractor may submit alternate or modified contractor designs of Government AIE designs.

3.4.4.2 Contractor AIE Designs. Contractor AIE design drawings shall meet the requirements of ASME Y14.100, ASME Y14.5 and ASME Y14.43 and may include commercial inspection equipment. [“Commercial inspection equipment” is defined as shown in paragraph 3.4.1.4 above. It shall be fully described by catalog listings or other means which provide sufficient information to permit identification and evaluation by the Government and may include illustrations and engineering data.] Designs shall be submitted for any special fixture(s) to be used. Unless otherwise specified, Gage Tolerancing Policy shall be in accordance with ASME Y14.43, “Absolute Tolerancing (Pessimistic Tolerancing).”

3.4.4.3 Visual Inspection. Visual inspection standards used for the acceptance/rejection of product shall be submitted for approval.

3.4.5 AIE Package Submittals. The contractor shall prepare the AIE package submittal in accordance with CDRL A005. In addition, the contractor shall adhere to the following requirements:

3.4.5.1 Designs for Approval. Contractor designs and/or the submission for the use of Government designs shall be approved by the Government. Partial submission of AIE designs is permissible in order to expedite the approval process; however, the response date for design review will be based on the date of the final complete submission of designs.

3.4.5.2 Units of Measurement. The units of measurement within the AIE package submittal shall be consistent with the requirements of the Technical Data Package (TDP).

3.4.5.3 AIE Flow Down. The contractor shall flow down AIE requirements to sub-contractors at any tier who are performing acceptance inspections.

3.4.6 Characteristics for Inspection. AIE documentation for Critical, Special, and Major characteristic inspections shall be submitted to the Government for approval in accordance with CDRL A005. AIE for Minor characteristic inspections shall be submitted to the Government for approval in accordance with CDRL A005 and as required below:

3.4.6.1 Listed Minor (characteristics displayed on specifications and/or drawings)

3.4.7 Automated Acceptance Inspection Equipment. The AAIE shall accept only conforming material. All characteristics requiring AAIE per the TDP shall utilize inspection equipment with a minimum demonstrated reliability of 99.8% at a 90% confidence level to detect non-conforming material unless otherwise specified below.

3.4.7.1 Reliability of 99.5% at a 90% Confidence Level for Critical/Special Characteristics

3.4.7.2 Reliability of 90% at a 90% Confidence Level for Major Characteristics

3.4.7.3 For inspection of major and minor characteristics where contractor utilizes AAIE when it is not required by the TDP, the AAIE package shall be submitted to the Government for approval.

3.4.7.4 All AAIE packages submitted to the Government for approval shall be in accordance with MIL-A-70625 (Automated Acceptance Inspection Equipment Design, Testing and

Approval of). Furthermore, the contractor shall be responsible for producing the acceptance and rejection verification standards/masters representative of the characteristics the AAIE is designed to inspect. The verification standards and frequency of use require Government approval prior to use. When verification standards are used for the VL-VII “sampling plan” per MIL-STD-1916 paragraph 4.4, verification standards and frequency of use shall require Government approval prior to use.

3.4.7.5 All AAIE shall be required to pass a Government-approved Acceptance (Prove-Out) Test. The contractor shall conduct this test per the approved test plan and shall submit a test analysis report for approval. See applicable DD Form 1423. This test shall be performed at the contractor’s facilities who’s manufacturing system has had the AAIE fully integrated and calibrated as per paragraph 3.4.8.2 of this section. The contractor shall allow Government personnel access to this facility and unobstructed monitoring of this test.

3.4.7.6 The contractor shall notify the Government prior to a modification and/or relocation of the Government-approved AAIE. The modified AAIE designs shall be submitted for approval.

The modified and/or relocated AAIE shall require submission of the acceptance test plan (prove-out) and results for review and approval prior to use. The modified and/or relocated AAIE shall be in accordance with paragraphs 3.4.7.1-3.4.7.5.

3.4.8 Measurement System Analysis (MSA). The contractor is responsible to ensure all AIE is, at a minimum, stable, repeatable, and reproducible for all characteristics. Refer to ASTM E2782 and/or AIAG MSA for guidance. The contractor shall provide objective evidence, including the MSA assessment plan, associated data, and analysis, which demonstrates the AIE is, at a minimum, stable, repeatable, and reproducible for the following characteristics (MSA

CDRL):

Specification Paragraph No. Drawing Characteristic

NOT APPLICABLE

Approval of submitted MSA(s) must be granted before the corresponding AIE can be used or continue to be used for acceptance of product. If at any time following approval of the AIE and MSA the AIE is disapproved, then the MSA shall be disapproved. After the resubmitted AIE is approved, the MSA shall be conducted on the approved AIE and resubmitted for approval.

3.4.8.1 Robust AIE System. The contractor shall ensure the AIE and its use is not negatively affected by any manufacturing/inspection environmental stimuli including, but not limited to production rate, noise, temperature, humidity, and vibration.

3.4.8.2 AIE Calibration and Verification. The calibration system shall be in accordance with ISO 10012 or ANSI/NCSL Z540.3. All AIE shall be subjected to scheduled calibration intervals to ensure that the equipment will accept only conforming product and reject all non-conforming product for the duration of the approved calibration period. AIE shall be subjected to periodic verification to ensure that the equipment will continue to accept and reject product with the same consistency as it did at the time of its previous calibration.

3.4.9 Non-Destructive Testing (NDT). Contractor shall submit detailed plans for qualifying and certifying NDT personnel and plans for qualification and ongoing use of NDT methods used for inspecting product. If re-qualification of NDT personnel and/or NDT methods is required, then the applicable plans shall be submitted.

3.4.9.1 Personnel performing NDT examinations shall be qualified and certified in accordance with the standard practices prescribed by NAS 410 (NAS Certification & Qualification of NDT Personnel), ANSI/ASNT-CP-189 (ASNT Standard for Qualification and Certification of NDT Personnel), or SNT-TC-1A (Recommended Practice for Personnel Qualification and Certification in NDT), and additional procedures that may be identified by the Government.

Acceptance of product using NDT shall be performed by personnel at a level of qualification consistent with that defined in the applicable standard.

3.4.9.2 The NDT method(s) shall be applied in accordance with ASTM E 543 (Standard Specification for Agencies Performing Nondestructive Testing) and the current nationally recognized standard practices appropriate to the NDT method(s) employed, such as ASTM E- 1742 (Standard Practice for Radiographic Examination) and SAE-AMS-STD-2154 (Inspection, Ultrasonic, Wrought Metals, Process For). Each application technique shall identify the standard(s) utilized. Non-destructive testing includes, but is not limited to, the following types of testing: Radiography/Radioscopic, Ultrasonic, Eddy Current, Magnetic Particle, and Liquid Penetrant.

3.4.10 Contractor Alternate Inspection Method(s), Modifications and/or Relocation of AIE (Non-Automated) After Government Approval. If the contractor proposes an alternate inspection method and/or modifies the AIE design(s) affecting hardware, software, or procedures after Government approval the intended change(s) shall be submitted in accordance with CDRL A005 and approved by the Government prior to implementation. If an AIE is relocated and the relocation risks the integrity of the inspection system, notify the Government to determine information needed to assess impact to AIE.

3.4.11 Responsibility for AIE Package Submittal. The contractor shall submit the AIE design documentation package within contractual timeframes in accordance with CDRL A005. The Government will provide approval or disapproval within the timeframe specified in the CDRL.

Disapproval of the AIE package will require re-submittal and subsequent Government review in accordance with the CDRL requirements. The AIE package and any required prove-outs must be approved prior to First Article (FA) (if required) or production start-up if FA is not required.

3.4.12 Government’s Right to Disapprove AIE. The Government reserves the right to revoke approval of any AIE that is not satisfying the required acceptance criteria at any time during the performance of this contract. See DD Form 1423.

3.5 Ammunition Data Cards and Ammunition Lot Numbers. Detailed requirements and guidance for the preparation of Ammunition Data Cards (ADCs) and Ammunition Lot Numbers are contained in MIL-STD-1168, the applicable DD Form 1423 and the Worldwide Ammunition-data Repository Program (WARP) online user’s manual. Detailed requirements for obtaining and using a manufacturer’s identification symbol, which is an integral component of the ammunition lot number, can be found in MIL-STD-1168 and the WARP user’s manual. Information provided in paragraphs 6.7 through 6.16 of MIL-STD-1168 shall be considered mandatory requirements where all instances of the term “should” are considered to be replaced with the word “shall.”

3.5.1 The contractor shall develop and submit ADCs in accordance with the requirements of this section, MIL-STD-1168, the user’s manual located on the WARP database, and CDRL A006. The WARP application is accessed through the Munitions History Program (MHP) website. (Refer to “Ammunition Data Cards and Report of contractor Ballistic Testing” for more information.) The ADC requirement is a flow-down requirement that applies to contractors and their suppliers, vendors or subcontractors.

3.5.2 The contractor shall prepare an ADC for each lot of item(s) being produced under this contract, regardless of whether or not those lots are accepted or rejected by the Government. The ADC shall comply with MIL-STD-1168 and WARP requirements.

3.5.3 Unless otherwise authorized by the Procuring Contracting Officer, the contractor shall include, in the components sections on the ADC representing the deliverable item, as a minimum; all assemblies, sub-assemblies, components, explosives, and propellants listed below for the item being procured.

3.5.3.1 End Item Component Listing:

Drawing Number Nomenclature

53711-8563566 Cartridge, 20mm, Plastic Dummy, M51A4N

53711-8563567-11 Head

53711-8563567-12 Stem

3.5.4 Lot numbers shall be in accordance with MIL-STD-1168 lot number convention and the technical data package requirements. Lot numbers shall be used for all ammunition end items and their major components, including inert, dummy, or non-energetic items and components.

When not required by technical data package and not an end item or major component, the component lot number may be constructed through contractor lot number convention.

3.5.5 All component RFVECPs shall be listed on the ADC for the deliverable item. The WARP user’s manual provides information on the level of detail required.

3.5.6 The contractor shall develop a sample ADC and submit to the MHP-WARP system 30 days prior to First Article testing or 30 days prior to production in the event a first article is not required. The MHP-WARP ADC program will not allow the submission of additional ADCs until such time as the sample ADC has been approved in the system.

4. OTHER REQUIREMENTS

4.1 Failure Notification, Analysis, Corrective Action, and Report (CDRL A007).

4.1.1 The contractor shall notify the government when there is a failure during First Article, Lot Acceptance, other testing, or when there is a major production incident that includes, but is not limited to Critical characteristics, issues that will result in significant production stoppage, or issues that result in the failure of the all-up-round or components to meet the applicable performance or safety requirements.

4.1.2 The contractor shall document the failure, perform an investigation and analysis to determine the root cause of the failure, determine and implement the appropriate corrective actions to prevent the recurrence of the failure, and provide a Failure Analysis and Corrective Action Report in accordance with CDRL A007.

4.2 Destructive Testing

4.2.1 The contractor shall include all costs for destructive testing in the contract unit price.

4.2.2 Where destructive testing of items or components thereof is required by contract or specification, the contractor shall not decrement the quantity delivered to the Government as set forth in the Contract Schedule.

4.2.3 The contractor shall consider all pieces of the complete First Article as destructively tested items unless specifically exempted by other provisions of this contract.

4.2.4 The contractor shall not reuse any components from items used in a destructive test during First Article, lot acceptance in-process testing, unless specifically authorized by the Contracting Officer.

4.2.5 The contractor shall render inoperable and dispose of as scrap any item to which the Government does not take title.

4.2.6 The contractor shall ship items or components of items to which the Government takes title in accordance with the Contracting Officer’s instructions.

4.3 Rework and Repair of Nonconforming Material

4.3.1 Rework and Repair are defined as follows:

4.3.1.1 Rework. The reprocessing of nonconforming material to make it conform completely to the drawings, specifications or contract requirements.

4.3.1.2 Repair. The reprocessing of nonconforming material in accordance with approved written procedures and operations to reduce, but not completely eliminate, the nonconformance. The purpose of repair is to bring nonconforming material into a usable condition. Repair is distinguished from rework in that the item after repair still does not completely conform to all of the applicable drawings, specifications or contract requirements.

4.3.2 The contractor shall document rework procedures along with the associated inspection procedures and submit to the Government Quality Assurance Representative (QAR) for review prior to implementation. Rework procedures are subject to the QAR’s approval.

4.3.3 The contractor shall document repair procedures and submit on a Request for Variance, DD Form 1694, to the Contracting Officer for review and written approval prior to implementation.

4.3.4 Whenever the contractor submits a repair or rework procedure for Government review, the contractor shall also include a description of the cause for the non-conformances and a description of the action taken or to be taken to prevent recurrence in the submission.

4.3.5 The contractor shall submit a rework or repair procedure that also contains a provision for re-inspection which will take precedence over the Technical Data Package requirements and shall, in addition, provide the Government assurance that the reworked or repaired items have met reprocessing requirements.

4.3.6 The contractor shall flow-down rework and repair requirements to their suppliers, vendors or subcontractors.

4.4 Performance Oriented Packaging (POP). Prior to shipment, the contractor shall ensure the container has been tested by a government approved Performance Oriented Packaging (POP)

Test Laboratory for compliance with POP requirements in accordance with Title 49 Code of Federal Regulation.

4.4.1 The contractor must keep the report on file.

4.4.2 For multi-year contracts, the contractor shall be responsible for ensuring an updated POP report is on file is if: (a) the initial POP test report expires before the end of the contract or (b) there is a change in container manufacturer or design of the exterior shipping container.

4.5 Configuration Management

4.5.1 Configuration Management Plan. The contractor shall prepare all Configuration management documentation in accordance with the PEO IWS 3C Configuration Management Plan for Conventional Ammunition.

4.5.2 The contractor shall document proposed design changes in accordance with the approved Configuration Management Plan and work tasks as described in EIA-649-1. The preferred engineering change forms are available upon request by contacting the G2 Configuration Management group at: ihdiv_2t_cog_cfg_mgt@navy.mil.

4.5.3 The Requiring Technical Activity (RTA) shall verify/determine the Classification of all change requests.

4.5.4 Engineering Change Proposal (ECP) and Notice of Revision (NOR). The contractor shall submit a request for a permanent engineering change to the Government controlled product baseline configuration as an ECP in accordance with CDRL A008 and NOR in accordance with CDRL A009 for review and approval.

4.5.5 The contractor shall number ECPs serially with the number constructed as follows:

4.5.5.1 Two digit contract award year (19)

4.5.5.2 Last 4 digits of contract number,

4.5.5.3 The letter “E”, and

4.5.5.4 Sequential serial number starting with “0001”

4.5.5.5 If the initial formal contractor initiated ECP must be revised for any reason after submission to the Government, the ECP number constructed above shall have “R#” added to the end (where # is the revision being submitted) beginning with R1.

4.5.6 The contractor shall number NORs as follows:

4.5.6.1 ECP number as determined above,

4.5.6.2 Sequential serial number starting with “-001”, and

4.5.6.3 Revision numbering described in 3.2.5.1.4 is applicable to NORs if changes are required.

4.5.7 Request for Variance (RFV). The contractor shall submit a request for a temporary departure from any requirement of the Government controlled product baseline configuration to the Government as a RFV in accordance with CDRL A010 for review and approval.

4.5.8 The contractor shall number RFVs serially with the number constructed as follows:

4.5.8.1 Two digit contract award year (19)

4.5.8.2 Last 4 digits of contract number,

4.5.8.3 The letter “V”, and

4.5.8.4 Sequential serial number starting with “0001”

4.5.8.5 If the initial formal contractor initiated RFV must be revised for any reason after submission to the Government, the RFV number constructed above shall have “R#” added to the end (where # is the revision being submitted) beginning with R1.

4.5.9 Procuring Activity Number (PAN). Prior to formal submission of any contractor submitted change request (permanent or temporary) against the Government controlled product baseline configuration, the contractor shall contact the G2 Configuration Management group at: ihdiv_2t_cog_cfg_mgt@navy.mil to request a PAN for Government tracking. The number supplied shall be populated on the change request form when submitted.

4.5.10 In the interest of expedited processing and avoiding revisions, it is recommended that the contractor (copying the PCO) submit DRAFT copies of all change requests and supporting documentation in accordance with the applicable CDRLs for initial comments.

4.6 Quality Management (QMS). The contractor shall implement and maintain a quality management system utilizing ISO 9001-2015 or equivalent.

4.6.1 The contractor shall flow-down all QMS requirements to all supplies and services provided for use on this contract by all other sources than the contractor’s plant.

4.6.2 The contractor shall submit all changes to this Quality Management System to the Contracting Officer for approval.

4.7 Government Furnished Material and Government Furnished Equipment.

4.7.1 Government Furnished Material (GFM). If GFM is furnished under this contract and it is discovered to contain a quality deficiency, the contractor shall submit a Quality Deficiency Report (QDR) in accordance with CDRL A011. Web-based version of the QDR is available under the button marked electronic deficiency reporting at the following URL http://aeps.ria.army.mil/.

4.7.2 GFM Consumption Report: The contractor shall submit a Government Furnished Material Consumption Report in accordance with CDRL A012 detailing the usage of

GFM.

4.8 Post Award. The contractor shall hold a post award meeting at their facility within 30 days of contract award.

4.9 Integrated Master Schedule (IMS). The Contactor shall produce, manage contract work tasks to, and maintain the Integrated Master Schedule (IMS) in accordance with CDRL A013 and submitted with the proposal in Microsoft Project. It shall be fully automated, traceable to the Integrated Master Plan, the contractor's WBS and the SOW. It shall identify the critical paths for the baseline and risk mitigation paths, all major and minor events, work tasks, success criteria, predecessors and successors, resources, and their dependencies. The contractor shall provide work-hour allocation information that supports the Integrated Master Schedule (IMS). The Integrated Master Schedule shall comprehensively address all development activities for the prime contractor and shall provide sufficient detail to accurately integrate, track, and evaluate the progress of subcontractor & vendor efforts leading to deliveries.

4.10 Accident/Incident Report. The contractor shall report immediately any accident/incident (including fire) resulting in any one or more of the following: causing one or more fatalities or one or more disabling injuries; damaging of Government property exceeding $10,000;

affecting program planning or production schedules; degrading the safety of equipment under contract, such that a personnel injury or property damage may be involved; identifying a potential hazard requiring corrective action in accordance with CDRL A014.

5.0 ADMINISTRATIVE AND SECURITY REQUIREMENTS

5.1 Marking of Data. All contractor submitted data, including drawings, specifications, reports, plans, agenda, minutes, and test results shall be marked accordingly. Marking shall be located on the cover sheet or first sheet of all data and include the following four statements:

Distribution Statement D: Distribution authorized to Department of Defense and U.S. DoD contractors Only; Critical Technology, Export Controlled; MMM YYYY. Other requests for this document shall be referred to PEO IWS 3C, Naval Gunnery Project Office, 2450 Crystal Drive, Suite 1200, Arlington, Virginia 22202.

Warning. This document contains technical data whose export is restricted by the Arms Export Control Act Title 22, U.S.C. App. 2751 et seq. or the Export Administration Act of 1979, as amended, Title 50, U.S.C., App 2401, et seq. Violation of these export "laws are subject to severe criminal penalties. Disseminate in accordance with provisions of OPNAVINST 5510.161, Reference (F).

Destruction Notice. Destroy by any method that will prevent disclosure of contents or reconstruction of the document. Government documentation shall be destroyed upon completion of the contract or purchase order. Use of Government documentation for commercial purposes is forbidden.

For Official Use Only (FOIA exemption #2 and #3)

5.2 Physical Security

5.2.1 The contractor shall allow representatives of the Defense Security Service (DSS), and representatives of other appropriate offices of the Government, access at all reasonable times into its facilities and those of its sub-contractors, for the purpose of performing surveys, inspections, and investigations necessary to review compliance with the physical security standards applicable to this contract.

5.2.2 The contractor shall ensure that the requirements of this contract are included in all subcontracts, at every tier.

5.3 Transportation Security

5.3.1 Shipper's Defense Contract Management District/Area Operations (DCMD/DCMAO) transportation offices will furnish assistance in providing the sensitive category of items to be shipped, determining the TPS required, and obtaining the TPS from commercial carriers as necessary.

6.0 CONTROLLED UNCLASSIFED INFORMATION

The Contractor may be required to handle Controlled Unclassified Information (CUI). There are numerous types of CUI, e.g. documents with limited distribution statements, documents marked as For Official Use Only (FOUO), etc. The minimum level of protection for all CUI is adherence to FOUO protection standards. Distribution Statements (DS) and warning labels, such as the Arms Export Control Act Warning, identify additional protection requirements for a given document. Minimum FOUO protection requirements/controls applicable to the performance of this contract for CUI are listed below. Additional protection requirements, as marked on a given CUI document, are in addition to the standards listed.

(1) Handling/Storage: Access to FOUO is limited to those needing it to conduct official business for the Department of Defense (DoD). FOUO information is not classified information, but requires extra precautions to ensure it is not released to the public. During business hours, reasonable steps shall be taken to minimize risk of access by unauthorized personnel. After business hours, FOUO information shall be stored in unlocked containers, desks, or cabinets if Government or Government-contracted building security is provided. If it is not, store in locked desks, file cabinets, bookcases, locked rooms, or similar items.

(2) Transporting/Transmitting/Release/Destruction: FOUO information shall be transported in a manner that prevents disclosure of the contents. FOUO information may be sent via USPS first-class mail, parcel post, or – for bulk shipments – 4th class mail. Electronic transmission of FOUO information (voice, data, or facsimile) shall be by approved secure communications systems. Transmission via unsecure fax is acceptable if an authorized person is standing by on the receiving end to take custody. All emails containing FOUO or attachments with FOUO must be digitally signed and encrypted when transmitted within a Navy network or to an approved Contractor email address. Transmission of FOUO (i.e. any CUI) to personal email accounts (e.g. AOL, Yahoo, Hotmail, Comcast, etc.) is strictly prohibited. FOUO sent out of the Contractor’s facility electronically must be encrypted (DoD FIPS 140-2 standard).

FOUO material shall not be released outside the Contractor’s facility except to representatives of DoD. When no longer needed, destroy FOUO by a method that precludes its disclosure to unauthorized individuals.

(3) Markings: Unclassified documents (paper or electronic) generated in support of this contract which contain FOUO are to be marked “For Official Use Only” at the bottom on the outside of the front cover (if any), on each page containing FOUO information, and on the outside of the back cover (if any). Each paragraph containing FOUO information shall be marked as such.

Within a classified document, an individual page with both FOUO and classified information shall be marked at the top and bottom with the highest security classification of information appearing on the page. Individual paragraphs shall be marked at the appropriate classification level, as well as unclassified or FOUO, as appropriate. Within a classified document, an individual page that contains FOUO information but no classified information shall be marked “For Official Use Only” at the top and bottom of the page, as well as each paragraph that contains FOUO information.

Other records, such as photographs, films, tapes, or slides, shall be marked “For Official Use Only” or “FOUO” in a manner that ensures that a recipient or viewer is aware of the status of the information therein. DS on technical documents identify access restrictions. DS “B” through “D” preclude public release and while not marked as FOUO, are subject to all FOUO protection requirements, including the prohibition on unencrypted transmission over the public Internet.

CLAUSES INCORPORATED BY FULL TEXT

C-202-H001 ADDITIONAL DEFINITIONS–BASIC (NAVSEA) (OCT 2018)

(a) Department - means the Department of the Navy.

(b) Commander, Naval Sea Systems Command - means the Commander of the Naval Sea Systems Command of the Department of the Navy or his duly appointed successor.

(c) References to The Federal Acquisition Regulation (FAR) - All references to the FAR in this contract shall be deemed to also reference the appropriate sections of the Defense FAR Supplement (DFARS), unless clearly indicated otherwise.

(d) National Stock Numbers - Whenever the term Federal Item Identification Number and its acronym FIIN or the term Federal Stock Number and its acronym FSN appear in the contract, order or their cited specifications and standards, the terms and acronyms shall be interpreted as National Item Identification Number (NIIN) and National Stock Number (NSN) respectively which shall be defined as follows:

(1) National Item Identification Number (NIIN). The number assigned to each approved Item Identification under the Federal Cataloging Program.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .