TWR Craft Information Book.PDF
PDF 19 MB Posted
- Attached to
- Security Craft (TWR6) Ship Yard Work
- Solicitation number
- N0017325QMB03
About this file
Cannot provide a detailed summary as no actual file content was shared, only the metadata for a file titled "TWR Craft Information Book.PDF" associated with a Department of Navy solicitation (N0017325QMB03) for Security Craft (TWR6) Ship Yard Work. The metadata indicates this is related to naval shipyard work, but without access to the actual document contents, I cannot summarize its specific details, requirements, or objectives.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| TWR-6 SOW.pdf | ||
| CSS N0017325QMB03_TR6shipyardwork.pdf | ||
| 87 Foot Torpedo Weapons Retriever Ship Yard Work Requirment.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CRAFT INFORMATION BOOK
FOR
TWR/SC
87 FOOT TORPEDO WEAPONS RETRIEVER/SECURITY CRAFT
September 2006
C & G Boatworks Hull #078
N00253-05-C-0004
DI-002
Craft Information Book (CIB)
PREPARED BY TECHNOLOGY ASSOCIATES, INC., NEW ORLEANS, LOUISIANA
ORIGINAL
21 SEPTEMBER 2006
CRAFT INFORMATION BOOK
FOR
TWR/SC
87 FOOT TORPEDO WEAPONS RETRIEVER/SECURITY CRAFT
September 2006
C & G Boatworks Hull #078
N00253-05-C-0004
DI-002
Craft Information Book (CIB)
PREPARED BY TECHNOLOGY ASSOCIATES, INC., NEW ORLEANS, LOUISIANA
ORIGINAL
21 SEPTEMBER 2006
LIST OF EFFECTIVE PAGES
All pages are original. Date of original pages are:
Original 0 21 September 2006
The total number of pages in this publication is 234.
FOREWORD
This manual is intended to reflect the configuration of the installed systems, equipment and components described for the Torpedo Weapons Retrieval/Security Craft (TWR/SC), a 88 foot 1 ¾ inch naval vessel.
The contents of this document are prepared in accordance with the Data Requirement List
002 provided by the Navy. The information found in the Craft Information Book (CIB) is reflective of the vessel as of delivery in Fall 2006. Any changes or additions to the craft in the future may not be reflected in this book.
Ships, training activities, supply points, depots, naval shipyards and supervisors of shipbuilding are requested to arrange for maximum practical use and evaluation of
NAVSEA technical manuals.
This book is intended as a guide only. It contains key information for the operations and systems included in the TWR/SC. The CIB makes reference to the technical manuals for further information of many systems. When operating any systems on the TWR/SC, all safety procedures shall be followed.
Torpedo Weapons Retriever/Security Craft C & G Boatworks Hull 078
TABLE OF CONTENTS
Table of Contents......................................................................................................................... i List of Figures Chapters 1-13….................................................................................................. v List of Tables Chapters 1-13....................................................................................................... vi List of Abbreviations................................................................................................................... vii
SAFETY SUMMARY
1-0 GENERAL INFORMATION AND SAFETY PRECAUTIONS......................................... 1-1 1-1 INTRODUCTION...................................................................................................................... 1-1 1-2 GENERAL DESCRIPTION....................................................................................................... 1-1 1-3 PRINCIPLES OF DESIGN AND CONSTRUCTION............................................................... 1-2 1-4 HULL DATA.............................................................................................................................. 1-2 1-5 DOORS, MANHOLES, HATCHES AND SCUTTLES............................................................ 1-3 1-6 LIST OF MANUFACTURERS’ TECHNICAL MANUALS.................................................... 1-4 1-7 MASTER EQUIPMENT LIST................................................................................................... 1-6 1-8 SPECIFIC SAFETY PRECAUTIONS....................................................................................... 1-6 1-9 PERSONAL PROTECTIVE DEVICES..................................................................................... 1-6
2-0 GENERAL ARRANGEMENT............................................................................................... 2-1 2-1 INTRODUCTION...................................................................................................................... 2-1 2-2 HULL CONSTRUCTION.......................................................................................................... 2-1 2-3 DECKHOUSE CONSTRUCTION............................................................................................ 2-1 2-4 BULKHEADS AND PARTITIONS.......................................................................................... 2-2 2-5 INTERIOR ARRANGEMENT.................................................................................................. 2-2 2-6 EXTERIOR ARRANGEMENT................................................................................................. 2-4 2-7 MACHINERY ARRANGEMENT............................................................................................ 2-6 2-8 TANK SOUNDING TABLES................................................................................................... 2-6
3-0 PIPING AND DUCTING SYSTEMS..................................................................................... 3-1 3-1 INTRODUCTION...................................................................................................................... 3-1 3-2 PIPING SYSTEM DIAGRAMS................................................................................................ 3-1 3-3 DUCTING AND VENTILATION SYSTEM DIAGRAMS...................................................... 3-6 3-4 TANKS AND DRAINAGE....................................................................................................... 3-7 3-5 PUMPS....................................................................................................................................... 3-7
4-0 ELECTRIC POWER AND LIGHTING SYSTEMS............................................................ 4-1 4-1 INTRODUCTION...................................................................................................................... 4-1 4-2 VESSEL’S SERVICE SWITCHBOARDS............................................................................... 4-1 4-3 VESSEL’S SERVICE ELECTRICAL DISTRIBUTION.......................................................... 4-2 4-4 DC POWER SYSTEM............................................................................................................... 4-3 4-5 ELECTRONICS......................................................................................................................... 4-4 4-6 SHORE POWER TRANSFER....................................................................................................4-4 4-7 GENERATOR OPERATIONS................................................................................................... 4-5
5-0 MECHANICAL SYSTEMS OPERATIONS......................................................................... 5-1 i
5-1 INTRODUCTION...................................................................................................................... 5-1 5-2 MACHINERY PLANT CONTROL AND MONITORING SYSTEM..................................... 5-1 5-3 MAIN PROPULSION SYSTEM............................................................................................... 5-2 5-4 STEERING SYSTEM................................................................................................................ 5-4 5-5 VESSEL’S SERVICE GENERATORS..................................................................................... 5-8 5-6 WATER PURIFIER................................................................................................................... 5-9 5-7 HVAC SYSTEMS...................................................................................................................... 5-10 5-8 FIRE SUPPRESSION SYSTEM................................................................................................ 5-10 5-9 FIRE DETECTION SYSTEM................................................................................................... 5-10 5-10 MARINE SANITATION SYSTEM.......................................................................................... 5-10 5-11 ANCHOR HANDLING AND STOWAGE............................................................................... 5-10 5-12 DECK EQUIPMENT (CRANE AND WINCHES)................................................................... 5-13 5-13 SOUND POWERED TELEPHONES........................................................................................ 5-19 5-14 GALLEY EQUIPMENT............................................................................................................ 5-20
6-0 SYSTEMS MAINTENANCE AND TROUBLESHOOTING.............................................. 6-1 6-1 INTRODUCTION...................................................................................................................... 6-1 6-2 MACHINERY PLANT CONTROL AND MONITORING SYSTEM..................................... 6-1 6-3 MAIN PROPULSION SYSTEM............................................................................................... 6-2 6-4 STEERING SYSTEM................................................................................................................ 6-3 6-5 VESSEL’S SERVICE GENERATORS..................................................................................... 6-5 6-6 WATER PURIFIER................................................................................................................... 6-9 6-7 HVAC SYSTEMS...................................................................................................................... 6-9 6-8 FIRE SUPPRESSION SYSTEM................................................................................................ 6-11 6-9 FIRE DETECTION SYSTEM................................................................................................... 6-12 6-10 ANCHOR HANDLING AND STOWAGE............................................................................... 6-15 6-11 DECK EQUIPMENT (CRANE AND WINCHES)................................................................... 6-15 6-12 GALLEY EQUIPMENT............................................................................................................ 6-15 6-13 DOORS AND HATCHES LUBRICATION.............................................................................. 6-15 6-14 BEARING AND AIR SEAL STUFFING BOX........................................................................ 6-16 6-15 SOUND POWERED TELEPHONES........................................................................................ 6-16
7-0 ELECTRONIC SYSTEMS...................................................................................................... 7-1 7-1 NAVIGATION EQUIPMENT................................................................................................... 7-1 7-2 EXTERNAL COMMUNICATIONS......................................................................................... 7-10 7-3 INTERNAL COMMUNICATIONS.......................................................................................... 7-10 7-4 COMMAND AND CONTROL SYSTEMS.............................................................................. 7-11 7-5 UPS SYSTEM (UNINTERRUPTIBLE POWER SUPPLY)..................................................... 7-11
8-0 EMERGENCY SYSTEMS AND PROCEDURES................................................................ 8-1 8-1 INTRODUCTION...................................................................................................................... 8-1 8-2 FIRE SUPPRESSION SYSTEM................................................................................................ 8-1 8-3 FIRE DETECTION SYSTEM................................................................................................... 8-7 8-4 FIREFIGHTING PROCEDURES.............................................................................................. 8-8 8-5 SOUND POWERED TELEPHONES........................................................................................ 8-10 ii
8-6 SIREN AMPLIFIER SYSTEM.................................................................................................. 8-11 8-7 LIFESAVING EQUIPMENT..................................................................................................... 8-11 8-8 LIFESAVING CONDITIONS................................................................................................... 8-12 8-9 DAMAGE CONTROL............................................................................................................... 8-12 8-10 FLOODING................................................................................................................................ 8-14 8-11 STABILITY AND BUOYANCY.............................................................................................. 8-14 8-12 ANCHOR HANDLING AND OPERATION............................................................................ 8-15 8-13 EMERGENCY STEERING........................................................................................................8-15
9-0 EMERGENCY UNDERWAY PROCEDURES.................................................................... 9-1 9-1 HANDLING AND OPERATION EMERGENCY PROCEDURES......................................... 9-1 9-2 TWR/SC HANDLING............................................................................................................... 9-1 9-3 DAMAGE CONTROL............................................................................................................... 9-6 9-4 FLOODING................................................................................................................................ 9-7 9-5 STABILITY AND BUOYANCY.............................................................................................. 9-7
10-0 SHUTDOWN PROCEDURES................................................................................................ 10-1 10-1 INTRODUCTION...................................................................................................................... 10-1 10-2 DECK WASHDOWN................................................................................................................ 10-1 10-3 ROUTINE SHUTDOWN........................................................................................................... 10-1
11-0 REMOVAL AND INSTALLATION OF MAJOR EQUIPMENT...................................... 11-1 11-1 INTRODUCTION...................................................................................................................... 11-1 11-2 ENGINE REMOVAL................................................................................................................. 11-1 11-3 GENERATOR REMOVAL....................................................................................................... 11-1 11-4 SHAFT AND PROPELLER REMOVAL.................................................................................. 11-1
12-0 HULL COATINGS, SPECIFICATIONS, MAINTENANCE AND REPAIR.................... 12-1 12-1 HULL FITTINGS........................................................................................................................ 12-1 12-2 HULL PREPARATIONS AND COATINGS............................................................................ 12-1 12-3 HULL DESIGNATION AND MARKINGS.............................................................................. 12-2 12-4 DECK COVERINGS.................................................................................................................. 12-2 12-5 CATHODIC PROTECTION...................................................................................................... 12-2 12-6 DOCKING PLAN...................................................................................................................... 12-2 12-7 HULL AND DECKHOUSE REPAIRS...................................................................................... 12-2
13-0 MISCELLANEOUS................................................................................................................. 13-1 13-1 DRY DOCKING ARRANGEMENT......................................................................................... 13-1 13-2 TOWING ARRANGEMENT..................................................................................................... 13-1 13-3 ONBOARD STOWAGE............................................................................................................ 13-1 13-4 ROLLER ATTITUDE FOR TORPEDO RETRIEVAL OPERATIONS....................................13-1 iii
VOLUME I
Appendix A AUTO-CAD FIGURES Appendix B TANK SOUNDING TABLES
VOLUME II (see separate stability booklet) Appendix C STABILITY BOOKLET iv
LIST OF FIGURES CHAPTERS 1-13
Figure Number Title
Page Number
Figure 3.2.3 Typical Sea Suction 3-2 Figure 3.2.4 Stbd Aft Fuel Oil Tank Sight glass 3-3 Figure 3.2.6 Starboard Hydraulic Power Unit 3-4 Figure 3.2.9 Remote Operated Fire Main Suction 3-5 Figure 4.2.1 12 V DC Switchboard 4-1 Figure 4.2.2 24 V DC Switchboard 4-1 Figure 4.6 Shore Power Safety Switch 4-5
Figure 4.7.1 Engine Control Panel For Port Generator 4-6
Figure 4.7.2 PTO Hydraulic Bow Thruster Pump on #2 Generator 4-7
Figure 5.2.1 Alarm Panel in Engine Room 5-1 Figure 5.2.2 Alarm Panel on Bridge 5-1 Figure 5.3 Main Engines 5-3
Figure 5.13.1 Sound Powered Phone Located in Galley 5-18
Figure 7.1.1 Forward Pilothouse View, Stbd Side 7-1
Figure 7.1.2 Pilothouse Controls Port Side Main Console 7-2
Figure 7.1.3 Port Side View of Overhead Electronics/Comm. equipment 7-3
Figure 7.1.4 Stbd Side View of Overhead Electronics/Comm. equipment 7-4
Figure 7.1.5 Forward View of Overhead Electronics/Comm. Equipment 7-5
Figure 7.1.6 Multi View Display Fwd Overhead 7-6 Figure 7.1.7 SSB Radio Overhead in Pilothouse 7-7 Figure 8.2 Fire Suppression System 8-1 Figure 8.2.1 FM 200 Remote Release Boxes 8-2 Figure 8.3 Fire Detection Panel In Pilothouse 8-7 Figure 8.5 Sound Powered Telephone 8-9 Figure 8.13.2 Auxiliary Helm In Engine Room 8-16 Figure 9.2 Emergency Stop Button on Engine 9-2 Figure 13.4 Tank Locations for Torpedo Retrieval 13-2
LIST OF FIGURES CHAPTERS 1-13
v
LIST OF TABLES CHAPTERS 1-13
Table Number Title
Page Number
Table 1.2 Patrol Craft Characteristics 1-1 Table 1.6 List of Technical Manuals 1-4 Table 1.7 Master Equipment List 1-6 Table 2.8 Tank Sounding Table at 0.0 Trim 2-6 Table 3.4 Tank Capacities 3-7 Table 3.5 Pumps 3-8 Table 4.4 D/C Electrical system 4-3
Table 6.2 Machinery Plant Control and Monitoring System Troubleshooting 6-1
Table 6.15 Handset Troubleshooting Guide 6-17 Table 8.4 Fire Extinguishing Systems 8-9 Table 8.8 Lifesaving Equipment 8-11 Table 12.2 Painting Schedule 12-1
LIST OF TABLES CHAPTERS 1-13
vi
LIST OF ABBREVIATIONS
Abbreviation Actual ABS American Bureau of Shipping AC Alternating Current A/C Air Conditioning AHU Air Handling Unit AIS Automatic Identification System BBFFI Black Box Fish Finder Indicator BBWGPS Black Box Wide Area Augmentation System Global Positioning System BHD Bulkhead BHP Brake Horsepower CFR Code of Federal Regulations Comm. Communications DARB Double Acting Relief Bypass D/C Direct Current DDF Direct Drive Fan DOT Department of Transportation DSC Distress Message Controller E/R Engine Room ECM Engine Control Module ENT Enter EOS Engine Operating Station EPIRB Emergency Position Indicating Radio Beacon EXT. External FO Fuel Oil FPM Feet Per Minute FRM Frame FT. Feet FWD. Forward GPM Gallons Per Minute GPS Global Positioning System HF High Frequency HHLF High Heat Load, Fibered HP Horsepower HPU Hydraulic Power Unit HVAC Heating, Ventilation and Air Conditioning Hz Hertz INC. Incorporated kW Kilowatt LAN Local Area Network LBS Pounds Force LCD Liquid Crystal Display LED Light-Emitting Diode MSA Motor Starter and Alarm NC Normally Closed NFPA National Fire Protection Association NTS Not To Scale vii
NUWC Naval Underwater Warfare Center NVIC Navigation and Vessel Inspection Circular O.D. Outside Diameter OPNAVINST Office of the Chief of Naval Operations Instruction P/N Part Number PCB Printed Circuit Board PSIG Pounds Per Square Inch Gage R&D Research & Development RFU Rudder Feedback Unit RPM Rotations Per Minute SART Search and Rescue Transponder SCES Strongly Correlated Electron Systems SSB Single-Sideband Modulation SSBR Single Side Band Radio Stbd Starboard TWR/SC Torpedo Weapons Retriever/Security Craft TW-RSC Torpedo Weapons Retriever/Security Craft U-AIS Universal Automatic Identification System UHF Ultra High Frequency UL Underwriters Laboratories Inc.
UPS Uninterruptible Power Supply USCG United States Coast Guard UV Ultraviolet Radiation V Volt VAC Volts Alternating Current VDC Volts Direct Current VHF Very High Frequency W Watt WA Washington WAAS Wide Area Augmentation System viii
SAFETY SUMMARY
GENERAL SAFETY NOTICES.
The following general safety notices supplement specific warnings and cautions appearing elsewhere in this manual. General and specific precautions must be understood and applied during operation and maintenance of systems and equipment covered herein. The Commanding officer or other authority will issue orders necessary for any situations not covered in these general and specific safety precautions.
DO NOT REPAIR OR ADJUST ALONE.
Under no circumstances should repair or adjustment of energized equipment be attempted alone.
The immediate presence of someone capable of rendering aid is required. Before making adjustments, be sure to protect against grounding. If possible, adjustments should be made with one hand, with the other hand free and clear of equipment. Even when power has been removed from equipment circuits, dangerous potentials may still exist due to retention of charges by capacitors. Circuits must be grounded and all capacitors discharged prior to attempting repairs.
TEST EQUIPMENT.
Make certain test equipment is in good condition. If a test meter must be held, ground the case of the meter before starting measurement. Do not touch live equipment or personnel working on live equipment while holding a test meter. Some types of measuring devices should not be grounded; these devices should not be held when taking measurements.
MOVING EQUIPMENT.
If equipment must be repaired/adjusted while in motion, a safety watch is posted. The safety watch must have a full view of the repair/adjustment operation and immediate access to controls that can stop the equipment in motion.
FIRST AID.
An injury, no matter how slight, should never go unattended. Always obtain first aid or medical attention immediately.
RESUSCITATION.
Personnel working with or near high voltage is familiar with approved resuscitation methods. If someone is injured and stops breathing, initiate resuscitation immediately. A delay could cost the victim’s life.
GENERAL PRECAUTIONS.
The following general precautions are to be observed at all times:
1. All electrical components associated with system/equipment is installed and grounded in accordance with applicable Navy regulations and approved shipboard practices.
2. All maintenance operations comply with Navy Safety Precautions for Forces Afloat, OPNAVINST 5100 series.
3. Proper installation and maintenance of protective guards and shutdown devices around rotating parts of machinery and high voltage sources is observed.
4. Special precautionary measures are essential to prevent applying power to systems equipment at any time maintenance work is in progress.
5. Do not make any unauthorized alterations to systems/equipment.
6. Before working on electrical systems/equipment, use voltmeter to ensure that system is not energized.
7. All circuits not known to be DEAD must be considered LIVE and dangerous at all times.
8. Do not wear loose clothing while working around rotating parts of machinery.
9. When working near electricity, do not use metal rules, flashlights, metallic pencils or any other objects having exposed conducting material.
10. Be sure to de-energize all equipment before connecting or disconnecting meters or test leads.
11. When connecting a meter to terminals for measurement, use range higher than expected voltage.
12. Before operating equipment or performing any tests or measurements, ensure that frames of all motors and starter panels are securely grounded.
13. Ensure that areas are well-ventilated when using cleaning solvent. Avoid prolonged breathing of fumes and solvent contact with skin or eyes.
14. Before entering voids and tanks, make sure that they have been properly ventilated and all gas freed.
WARNINGS AND CAUTIONS.
Specific warnings and cautions covered by this manual, and corresponding systems manuals, are summarized below for emphasis.
WARNING
When the FM 200 system discharge warning alarm sounds, all personnel should immediately evacuate the space. FM 200 discharged is hazardous to an individual’s health.
WARNING
Before taking on fuel, ensure safeguards and firefighting equipment are ready. Immediately clean all spills.
WARNING
Hydrogen gas is present and explosive around batteries. Ensure no sparks or open flames are near batteries.
WARNING
Hydrogen sulfide gas can cause unconsciousness and death. If a space is suspected of containing hydrogen sulfide, it should be thoroughly ventilated and personnel entering the space will wear self-contained breathing apparatus.
WARNING
Personnel with duty of servicing refrigeration systems using halocarbon compounds (freon) shall wear safety goggles to eliminate the possibility of the liquid refrigerant coming in contact with the eyes and causing injury due to the freezing effects of the liquid.
WARNING
For HVAC, liquid and gas under pressure, overheating and over pressurizing may cause gas release or violent cylinder bursting. May decompose on contact with flames or extremely hot metal surfaces to produce toxic and corrosive products. Vapor reduces oxygen available for breathing and is heavier than air. Harmful if inhaled and may cause heart irregularities, unconsciousness or death. Liquid contact with eyes or skin may cause frostbite.
WARNING
When working with the UV filter, DO NOT LOOK AT THE UV LIGHT!!!
WARNING
Working with R-401A requires that you use tools, pumps and recovery equipment and tanks rated for the higher pressure.
WARNING
The searchlight becomes hot with prolonged use. Do not touch it.
WARNING
Open shore side circuit breaker or disconnect switch before disconnecting incoming power leads. Live power leads could cause electrical shock to personnel.
WARNING
Prior to emergency stopping, inform crew to stow loose gear and position themselves as required. Unless precautions are taken, this procedure may cause injuries.
WARNING
Stop propulsion engine and tag out starter controls before locking shaft to prevent injury to personnel caused by rotating machinery.
WARNING
The fuel oil capacity exceeds the endurance requirements for the vessel. DO NOT OVERLOAD the vessel. Please follow the stability booklet attached as Appendix C.
WARNING
Use insulated tools and test equipment when working on electrical components. To prevent hazards to personnel, ensure equipment is de-energized and tagged out of service.
CAUTION
To prevent damage to ship-service generator starer winding, verify generator circuit breaker is open before attempting to start diesel.
CAUTION
When working with the refrigerant Genetron AZ-20 R-410A for commercial air conditioning, tools, pumps and recovery equipment and tanks rated for higher pressure are required.
CAUTION
When working with the UV system, rapid successive cycling of the power to the ballasts can cause premature failure of the system components.
CAUTION
For HVAC, do not turn off fan until all heat is fully dissipated from heater. If switch is turned off during heating cycle, auto and manual hi-limits may open due to the excessive heat build-up.
CAUTION
To prevent damage to starter, when engine does not start, do not depress START switch while starter motor is running down.
CAUTION
Do not use crane without studying crane safety and vessel stability impact. Improper crane usage in a seaway can pose a safety hazard.
CAUTION
Do not reverse craft using full throttle. The sudden and fast reverse movement of the craft can make the ramp serve as a large water scoop and fill the ramp up the main deck. This can be a safety hazard.
CAUTION
Do not crank engine more than 20 seconds at a time when using an electric starting motor.
Allow 3 minutes between starting attempts so starting motor will cool down and not become damaged through overheating.
CAUTION
If the power supply fails, the transmission automatically shifts to neutral. This can cause the vessel to become un-maneuverable.
CAUTION
Please see the safety section of the Caterpillar Operation and Maintenance Manual to ensure safe engine operation.
CAUTION
Always reduce engine speed to idle when reversing propeller rotation to avoid damage to the marine gear and propulsion shafting.
CAUTION
Hydraulic steerage pumps have suction shutoff valves. Even short term operation with valve closed can cause pump damage.
CAUTION
Rapid shifting at high engine speeds can damage the marine gear.
CAUTION
Serious damage may occur to the bilge pumps if they are operated in a dry condition. Ensure bilge pump priming line valve is open.
CAUTION
To protect electronic circuits, the 24 V and 12 V battery systems should be set to OFF during loss or transfer of ship’s power. Damage to electronic circuits can result from voltage spike.
CAUTION
Use of the emergency air shutdown system can cause oil to be drawn past the propulsion engine oil seals and into the blower housing.
CAUTION
Do not operate fire main pumping unit without suction valve open, permitting liquid in the pump volute. Without cooling liquid, pump will rapidly overheat.
CAUTION
Ensure sufficient time has elapsed before re-energizing engine room fans, to allow fire to be completely extinguished and space to cool. This will eliminate the possibility of flash back.
CAUTION
Side blocks must be tied at the top and bottom to keel blocking. This prevents side blocks from shifting and causing damage to the hull.
CAUTION
If full throttle is used while towing another vessel, watch for signs of overheating of the main propulsion engines. Reduce engine RPM, if necessary, to prevent main engine damage.
CHAPTER 1
GENERAL INFORMATION AND SAFETY PRECAUTIONS
1-1 INTRODUCTION
1-1.1 PURPOSE. This manual contains system descriptions, operating instructions, troubleshooting, and maintenance procedures for the Torpedo Weapons Retrieving/Security Craft (TWR/SC) home ported at the Naval Undersea Warfare Center (NUWC) Division, Keyport, Washington. This Craft Information Book is a general operating and systems integration guide designed to supplement, but not replace, individual equipment technical manuals. This manual provides technical information for use by ship operating force personnel, fleet commands, planning yards and other Naval activities.
1-1.2 DRAWINGS. Foldout drawings referenced in the text are located in Appendix A, Figures. All drawings referenced throughout the Book are located in this appendix.
1-1.3 PICTURES. Pictures from the craft showing operational displays and other needed information are imbedded in the section that describes the system. The pictures are labeled corresponding to the section in which they are referenced.
1-2 GENERAL DESCRIPTION.
1-2.1 MISSION PROFILE. Naval Undersea Warfare Center Division, Keyport, WA, plans to use the TWR/SC in dual roles as both a Torpedo Weapons Retriever and as a Security Craft. As a Torpedo Weapons Retriever, it is planned to be used for the support of production acceptance testing, post overhaul proofing and engineering evaluations of research and development and in-service undersea warfare weapons, vehicles and systems. As a security craft, it will provide range security while on the Pacific Northwest Range Complex, and Homeland Defense operations as required.
Table 1.2 Patrol Craft Characteristics
CHARACTERISTIC DESCRIPTION
Length, overall maximum (Hull) 88 feet 1 ¾ inches Length between perpendiculars 77 feet 5 ½ inches Beam, molded maximum 23 feet Draft (Full Load) 5.05 feet Depth, molded 10.5 feet Propulsion Engine & Horse Power Rating Two Caterpillar Model C32 Engine Cooling System Freshwater heat exchanger cooled by seawater Fuel Capacity(exceeds 1000 nm range req.) 7,252 gallons at 95% full capacity Cruising Range 1,000 nautical miles Crew 6 persons Riders 3 two person cabins for crew of 6
CHAPTER 1 – General Information and Safety Precautions
Page 1-1 of 7
Ship’s Service Diesel Generators Two 60HZ, 1,800 RPM, 480 V, Northern Lights generators M55C2, 55 kW each
Hull & Superstructure Construction Marine Aluminum Alloy
1-3 PRINCIPLES OF DESIGN AND CONSTRUCTION.
The TWR/SC consists of an aluminum hull and superstructure. The craft is powered by diesel engines and is equipped with electrical power, piping, heating, air-conditioning, ventilation, messing and living facilities and lifesaving equipment. The patrol craft is designed for service in salt water and has the following design features:
1. The superstructure consists of the pilothouse, mast and antenna arrangements.
2. The lower deckhouse level includes quarters to accommodate 6 crew members, galley, mess area, laundry space, head and passageways forward and aft. The upper deckhouse level includes sitting area, fwd and aft control station, hanging locker, range equipment, damage control locker, battery cabinet and electronic equipment space, including work bench and UPS. Vertical and inclined ladders, hatches, and scuttles are provided for interior and exterior access to the pilothouse, fuel tank compartment, engine room and weather deck.
3. The main propulsion system consists of two CAT C 32 diesel engines. Each delivers power through reverse-reduction gear units to the propeller shafts.
4. Piping, wiring, ducting, and equipment are installed to preserve the appearance of living spaces without unnecessarily obstructing passageways or overhead height.
5. Electrical power is supplied by two Northern Lights, Model MP 55C diesel generators, 1800 RPM rated at 55KW each 480 volt 60 Hz. These are three phase, 4-wire units and are sized so that either can supply the entire Craft electrical load. The generators are capable of parallel operation.
6. The following piping systems are installed: fuel, lube oil, sanitary, potable water, seawater cooling, hydraulic steering, bilge/fire pump, bow thruster hydraulic piping, and exhaust.
7. Heating and cooling is provided by a reverse cycle system utilizing Genetron AZ-20 R- 410A heating/cooling expansion coils. The system consists of compressor/condensers located in the engine room and cooling/heating units throughout the patrol craft.
8. The patrol craft has the following characteristics:
A. Cruising speed - 16 knots B. Maximum cruising range - 1,000 nautical miles (Fuel capacity exceeds this requirement. Please see Safety Section for specific safety warning)
1-4 HULL DATA.
All compartments, usable spaces, and voids within the craft are accessible via doors, hatches, scuttles, or removable plates, as appropriate. Lighting fixtures, ventilation ducts, piping, and wiring are installed as close to the overhead as practicable. Whenever possible, machinery, piping, operating rods, and cables that restrict passage or present a source of danger to personnel
Page 1-2 of 7 are kept clear of normal access routes. Where such installations cannot be avoided, guards or protective padding are provided. Fittings such as railings, vent pipes, chocks, bitts, and towing bollard are inboard from the deck edge to avoid damage when the craft is alongside piers or larger ships. Structural arrangement, structural details, and scantlings are designed so as to successfully meet the applicable requirements of ABS. The Craft is built in accordance with ABS Guide for Building and Classing High Speed Naval Craft 2003. Periodic surveys will be required to maintain this certification
The hull structural features are as follows:
1. The basic hull structure consists of longitudinal and transverse aluminum framing.
2. The weather deck is 3/8” plate aft of frame 25.5 and 5/16” plate forward of frame 25.5.
Deck beams are 2”x3”x1/4” T beams. Transverse girders are a 3/8”x8” plate by a 3/8”x4” rider. Other sizes of frames and girders are used at certain spaces.
3. The transverse bulkheads are ¼” plate with 5x2x3/8” vertical tee beams.
1-5 DOORS, MANHOLES, HATCHES AND SCUTTLES.
The various pilothouse, deckhouse, and hull access openings are described as follows:
1-5.1 DOORS. Doors are designed and constructed to at least the tightness requirements of the bulkhead in which they are installed. Doors providing access to the superstructure from the weather are watertight. Staterooms are fitted with joiner non-tight doors. Doors to water closets, washrooms, and showers (or spaces with any combination thereof) are fitted with locks operable from within only.
1-5.2 MANHOLES. Oil tight or watertight manholes with gaskets are fitted for access to void spaces. Manholes to spaces, which will require frequent maintenance or inspection are hinged, drop bolt type, flush wherever practicable.
1-5.3 HATCHES AND SCUTTLES. Watertight hatches and scuttles in the main deck are flush.
All hatches and scuttles shall have devices for holding in the open position.
1-5.4 LOCKS AND KEYS. Padlocks with two keys each are provided for doors, hatches, manholes and scuttles providing access to the interior of the craft from the weather. Stateroom doors and the electronic space have key locks. A latching device operable from below only are provided for all escape scuttles. Hasps and staples are so fitted that when the door is opened or closed, padlocks cannot be caught between the door and the doorframe. Two master keys are provided for opening all locks. Keys, including duplicate keys, are provided with key rings and brass tags, engraved or stamped with the necessary identifying information. A key locker is provided in the pilothouse. The locker is of the size required to provide a separate hook for the keys to each lock and four spare key hooks. Each key hook is labeled or the key pattern may be duplicated and labeled on the door.
Page 1-3 of 7
1-6 LIST OF MANUFACTURERS’ TECHINICAL MANUALS.
The following is a table of manuals provided by the manufacturers for all non government equipment furnished, on board. When applicable, the corresponding system and model number is noted. For detailed information regarding operations or maintenance of the system, the corresponding manual shall be referenced.
Table 1.6 List of Technical Manuals
Equipment System Manufacturer Model Number
120-Volt Electric Dryer
LDR 3822
PQ1Whirlpool
2-Way and Flush Tank Ball Valves Torpedo Retrieval PBM AC Generator Stamford/Newage UCI224F
Fuel Oil Service and Fire Main System
Triac Valves & ActuatorsActuators
Alarm and Monitoring Systems Sentinel Inc.
LCD 4332
TVOAutomatic Washer Whirlpool
Autopilot Navigation SIMRAD AP50 Bearings Shafting Duramax Marine
Coastal Marine Equipment, Inc.
MC8-1AM-
1C02Capstan Anchor
Chest Freezer Whirlpool Crane JABCO 703m/3m Echo Sounder Navigation Furuno FE-700
Super Capacity 465 Electric Range Galley Whirlpool
Engine Caterpillar C32 Fire Detection System Hiller Inc. JG-5848 Fire Suppression System Hiller Inc. FM-200 Gear Control Transmission ZF Marine 3882 Generator Control and Power Distribution Switchboard
South Coast Electric System J202-501
Generators Northern Lights M55C2 55KW GPS Receiver Navigation Furuno GP-0320B Gyro Compass Navigation SIMRAD RGC50
Page 1-4 of 7
HF Marine Tranceiver Communications ICOM IC-M710
Lemoine Marine Refrigeration HVAC
Marine VHF Radiophone Communications Furuno FM-3000 Multi Display Navigation Furuno RD-30 NAVnet Communications Furuno 1953C Network Sounder Communications Furuno ETR-6/10N Pump, Centri-Thrift Sea Water Myers CT05S Pump, Ejecto Potable Water Myers HJ50S Pump, Hand Dirty Oil Blackmer 828B Pump, High Head Centrifugal
Fire Systems and Bilge Pump MP Pumps, Inc. MP HHLF
Pump, Submersible Grinder
Black and Gray Water Hydromatic NPG/PG 200
Refrigerator Galley Whirlpool ED2PHE N O Satellite Compas Navigation Furuno SC-50/110 Siren Amplifier Safety Signal SS670 Sound Powered Telephone System Safety Hose-McCann
Twin S2-16-1- 35Steering System Jastram
Tank, Pressure Potable Water Amtrol Champion
ZF 2500
Series Transmissions ZF Marine
Tunnel Thruster, Hydraulic Manuvering Thrustmaster 16TT50L-AL U-AIS Transponder Communications Furuno FA-150
UHF FM
Transceiver Communications ICOM IC-F4x-x- Water Treatment System Potable Water Aquafine SL Series Winch Torpedo Retrieval WARN CE M8274-50
Page 1-5 of 7
1-7 MASTER EQUIPMENT LIST.
The following is a table of all major equipment on the Craft.
Table 1.7 Master Equipment List Equipment Manufacturer QTY
Main Engine Caterpillar 2 Generator Northern Lights 2 Fire/Blige Pump MP Pump 2 Dirty Oil Pump Blackmer 1 Potable Water Pump Myers Jet Pump 1 Pressure Tank Myers Jet Pump 1 Potable Water Pump Jabsco 1 Water Heater Rheem 1 Bow Thruster Thrustmaster 1 Supplly Fan 24" DDF 2 Black/Gray Water Pump Hydromatic 1 U.V. Purifier Aquafine 1 Steering Gear Pumps Engine Monitor Corp. 2 Knuckle Boom Crane Jabco 1 Weapons Retrieval Winch Warren 4 Anchor Capstan Coastal Marine Equipment 1 16 Man Life Raft Zodiac 1 Bilge Hand Pump Blackmer 1 Fire Suppression System FM 200 Marine ECS --
1-8 SPECIFIC SAFETY PRECAUTIONS.
General and specific safety precautions must be understood and applied during operation and maintenance of systems and equipment covered in this manual. General safety notices and general precautions are listed in the Safety Summary. For specific safety precautions pertaining to specific components, see that component’s manual.
1-9 PERSONAL PROTECTIVE DEVICES.
The following is a list of hazardous situations and the personnel protective devices to be worn.
This is by no means an all-inclusive list; however, through safety awareness, proper supervision, and common sense, personnel can work in a hazardous environment in the proper protective devices.
1. Safety goggles shall be worn while working with liquid refrigerant.
2. In a space filled with smoke and expended FM 200 used to extinguish a fire, personnel entering this space will wear Oxygen Breathing Apparatus (OBA) and protective clothing.
Page 1-6 of 7
3. When handling battery acid and acid solution, face shield, gloves, and protective apron should be worn.
4. Use insulated tools and test equipment when working on electrical components.
5. If an emergency situation requires work on an energized distribution panel, use rubber mats to insulate the worker from ground, use only one hand, and wear rubber gloves.
6. Hearing protection must be worn in all machinery areas with excessive noise.
Page 1-7 of 7
CHAPTER 2
GENERAL ARRANGEMENT
2-1 INTRODUCTION.
This chapter provides a description of the arrangement of the Torpedo Weapons Retrieving Security Craft (TWR/SC) home ported at the Naval Undersea Warfare Center (NUWC) Division, Keyport, Washington. The hull contains space for living, galley, messing, main machinery, steering gear, and stowage. Air conditioning, ventilation, and heating systems are provided for proper ventilation and temperature control of the living and working spaces in the craft.
The deckhouse consists of a pilothouse, containing controls, internal and external communications and navigation equipment for operating the craft. A chart table and bookcase are provided. The deckhouse also contains an electronic equipment space, battery cabinet, work bench, UPS and aft control station. The quarters deck is located below the pilothouse. All areas mentioned in Chapter 2 can be found on the drawings in Appendix A.
2-2 HULL CONSTRUCTION.
2-2.1 MAJOR STRUCTURAL MEMBERS. Major structural members are all comprised of marine aluminum alloy welded to other members.
2-2.2 ALUMINUM. The craft is designed and fabricated from marine Aluminum alloy and is in accordance with applicable industry and regulatory body practices to minimize corrosion and deterioration in a marine environment.
2-2.3 JOINER WORK. The craft interior is built with a joiner system inside. The system complies with applicable ABS regulations, and is designed with adequate acoustic and thermal insulation.
2-3 DECKHOUSE CONSTRUCTION.
2-3.1 DECKHOUSE. The deckhouse contains the pilothouse, damage control locker, hanging locker, ventilation trunks and electrical equipment space and storage. The deckhouse is constructed of welded aluminum alloy plates welded in turn to aluminum, vertical, horizontal, and diagonal members. The deckhouse is fitted with watertight and weather tight stationary windows.
2-3.2 WINDOWS. There are three forward windows in the pilothouse. There are ten windows on the side of the deck house (5 port, 5 starboard). There are two windows on the bulkhead at frame 9. There are two windows in the watertight bulkhead at frame 12. All glass is tempered monolithic.
CHAPTER 2 – General Arrangements
Page 2-1 of 6
2-4 BULKHEADS AND PARTITIONS.
2-4.1 CONSTRUCTION. Bulkheads are made of 5/16” aluminum plate and have 2x6x3/8” tee vertical stiffeners. The stiffeners are rigidly attached to the floor and deck beams by welding.
2-5 INTERIOR ARRANGEMENT.
The interior arrangement of the TWR/SC includes the pilothouse, deckhouse, living and messing areas, laundry areas, machinery spaces, stowage areas, rope locker, fuel tank compartment, boatswain stores, and steering compartment.
2-5.1 PILOTHOUSE AND ELECTRONICS SPACE. The pilothouse includes the following accommodations and equipment:
1. Permanent seating for the helmsman and the Craft Master.
2. Settee for two range operations personnel
3. Controls and indicators for all Craft functions and equipment.
4. Access is provided from main deck, port and starboard, and also from below.
5. The ladder from below is gated to prevent the possibility of personnel accidentally falling through opening. This should be kept closed and not latched open
6. A foldout chart table and bookcase.
7. Flares and a flare gun under settee.
8. Aft control station contains a set of engine controls, rudder controls and sound powered phone.
9. Battery Cabinet
10. Work bench
11. UPS
12. Two fire dampers
13. Hand held radio
14. Line throwing device
15. Emergency Lighting
16. Fire main isolation valve
17. General alarm
18. First aid kit
19. Dry Chemical fire extinguishers
20. Emergency Fuel Oil Shutdown
21. Emergency blower shutoff
22. Fire axe
23. Lifejackets with light
24. VHF radio
25. Aluminum inclined ladders provide access from the pilothouse to the crew quarters.
26. One Water Cooler.
2-5.2 HOLD PLAN. The below deck area includes the following spaces:
Page 2-2 of 6
1. One head
2. Galley
3. Mess
4. 3 Staterooms
5. Fender/Line storage
6. Potable water tanks
7. Rope locker
8. Utility space
9. Air Handling Unit (in engineer’s stateroom)
10. Engine Room.
2-5.3 FUEL TANK COMPARTMENT. Two fuel oil tanks, each 1,714.58 gal (98% capacity), are located between frames. 13 and 15, port and starboard at side shell. Two other fuel oil tanks, each 2,026.22 gal (98% capacity), are located between frames 21-24, on centerline, port and starboard. The fuel capacity significantly exceeds the vessel’s endurance requirements. Fuel should be loaded judiciously for each mission intended. Non judicious loading will cause speed and performance depreciation of the vessel.
2-5.4 UTILITY SPACE. The utility space is located between frames 13 and 15 and is equipped with the following:
1. FM 200 system marine ECS series engineered fire suppression system.
2. Washing Machine.
3. Clothes Dryer.
4. Chest Freezer.
5. Myers sea water pump for refrigeration.
2-5.5 ENGINE ROOM. The engine room is located between frames 15 and 21 and is equipped with the following:
1. Two Caterpillar Propulsion Engines.
2. Two Northern Lights Generator Engines.
3. Bilge manifold.
4. Bilge/fire pump, MP pump.
5. Fire pump, MP pump.
6. Electrical switch board.
7. Steering gear pumps, Jastram.
8. FM 200 fire suppression system piping with alarms and sprinklers.
9. Master Alarm Unit.
An emergency escape is located starboard at frame 18.5.
2-5.6 BELOW GALLEY VOID. The following equipment is located in the void below the galley, between frames 5 and 9.
Page 2-3 of 6
1. JABSCO Pressure Set.
2. Myers potable water pump.
3. Hydromatic black and gray water pump.
4. Rheem Water heater.
5. Bow thruster.
2-5.7 MESS ROOM AND GALLEY. The mess room is accessed from the main deck by an inclined, L ladder. It is equipped with seating arrangements for 6 persons. The mess room and galley is equipped with the following:
1. Two three-person booths with a table.
2. Two BII 10# dry chemical fire extinguishers
3. One BII 5# dry chemical fire extinguisher
4. Heat detector.
5. Fire Alarm Pull Box
6. General Alarm bell.
7. Refrigerator/freezer.
8. First aid box.
9. Linen Locker.
10. Pantry
11. Lavatory
12. Electric range with fire protection hood and exhaust blower.
13. Microwave oven.
14. Double sink.
2-6 EXTERIOR ARRANGEMENT.
2-6.1 MAIN DECK ARRANGEMENT. The main deck includes the deckhouse, pilothouse, and ramp. The following equipment and fittings are used
1. Mooring bitts forward and cleats.
2. Lifelines installed conforming to U.S. Coast Guard requirements.
3. One 75 pound Danforth anchor along with 20 ft of anchor chain and 600 ft of 1 5/8” rope.
4. Anchor capstan.
5. Removable, 14 ft. gangway with small openings through lifeline aft of pilothouse, port and starboard.
6. Weapons foundations for US Navy MK 58 machine gun mounts are provided port and starboard, just forward of the deck house.
7. Stern ramp with rollers provided to retrieve and store torpedoes.
8. Four Warn Model CE M8274-50 hydraulic operated winches are located at the end of each torpedo bay for torpedo retrieval. They utilize 3/8” stainless wire rope and are rated at 3200 lbs and line speeds up to 54 FPM.
9. A universal winch is designated to be mounted centerline on the ramp bridge deck.
Page 2-4 of 6
10. Removable centerline towing chocks are provided on ramp bridge deck.
11. Portable decking, with foundations and supports, is provided to cover the ramp area at the main deck level.
12. Shore power connection with a 50 foot portable power cable
13. Two fire stations and one 5 # dry chemical fire extinguisher.
14. One general alarm bell located aft of the pilot house.
15. Aft control station.
16. One bulkhead mounted safety plan.
17. Engine room intake exhaust vents port and starboard.
18. Removable floor grating in engine room.
19. Engine room supply vents, port and…