Attachment 1 - Statement of Work.docx
DOCX document 25 KB Posted
- Solicitation number
- N00173-24-Q-CM01
About this file
This statement of work outlines maintenance support requirements for one UV-18 Twin Otter aircraft operated by the Naval Research Laboratory. The contractor will provide full-time and part-time personnel to perform organizational-level maintenance including ground handling, inspections, repairs and project installation support. The contractor is also responsible for supply support, developing procedures, maintaining publications, and providing remote site support for detachments within and outside the continental US. The contractor must follow all maintenance, technical, and FAA requirements. Required reports include contract funds, task progress, summary, and meeting reports. This support is being solicited under solicitation N00173-24-Q-CM01 by the Department of the Navy for Scientific Development Squadron ONE located at NAS Patuxent River, Maryland.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Questions and Answers - N00173-24-Q-CM01v2.docx | DOCX document | |
| N00173-24-Q-CM01 A00001 - Combined Syn-Sol_FINAL.docx | DOCX document | |
| Questions and Answers - N00173-24-Q-CM01.docx | DOCX document | |
| N00173-24-Q-CM01 - Combined Syn-Sol_FINAL.pdf | ||
| Attachment 2 - CDRLs.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work Maintenance Support of VXS-1 UV-18 Aircraft Twin Otter Operations Dated 11/30//2023
1.0. Introduction
Scientific Development Squadron ONE (VXS-1), a subordinate command of the Naval Research Laboratory (NRL), conducts Science & Technology (S&T) experimentation and advanced technology development. The contractor is to provide requirements for the flight operation services and maintenance support of one (1) UV-18 Twin Otter aircraft.
2.0. Scope
The contractor is responsible for the proper maintenance and repair of one (1) Twin Otter research aircraft located at Hangar 109, NAS Patuxent River, MD. All aircraft shall be provided by the Government and other aircrafts shall not be procured under this contract. The contractor shall be responsible for providing one (1) full-time employee (CLIN 0001) and one (1) part-time employee as needed (CLIN 0005 Over and Above) (any additional personnel must be approved by the Government as necessary), equipment, peculiar tools, materials, and support equipment to perform aircraft maintenance and support an estimated 400 flight hours per year. Additional maintenance or support that the Government deems necessary during the course of this contract beyond the standard full-time will be included as a labor hour over and above (O&A) CLIN via a bilateral modification. The contractor shall maintain a spares package sufficient to support flight operations at NAS Patuxent River.
3.0. Basic Requirements
The contractor shall provide safe, airworthy, mission capable aircraft and well-maintained support equipment ready to meet mission requirements. The contractor shall accomplish contract requirements throughout the life of the contract and provide manpower capable of managing and maintaining all aircraft specified.
3.1. Basic Services: The contractor shall perform aircraft maintenance project support and equipment services that include, but not be limited to:
3.1.1. Organizational level maintenance activities: aircraft ground handling, launch and recovery, pre-flight, thru flight, basic post flight, hourly post flight, periodic and phase inspections, scheduled and unscheduled maintenance and project installation support.
3.1.2. At the Government’s request, the contractor shall develop and submit ground operating procedures (GOP), as well as detailed procedures for inspections, repairs, and records maintenance. (CDRL A005)
3.1.3. Other maintenance activities: maintenance operations services and off-station aircraft maintenance repair.
3.1.4. At the Government’s request, the contractor shall be involved in the fabrication, testing, installation, removal, modification, and integration of project/mission systems for the Twin Otter or other platforms.
3.2. Supply Support: The contractor shall obtain, establish, manage, maintain, procure, ship, receive, handle, and warehouse spare parts to maintain Twin Otter aircraft, tools and support equipment. (CDRL A005)
3.3. Remote Sites: The contractor shall provide support of remote sites to satisfy the maintenance and operational requirements of the aircraft research activities for extended detachments. The remote sites may occur outside of the United States.
3.4. Maintenance Publications, Technical Data, Flight Manuals, and FAA Regulations: The contractor shall follow all maintenance publications, technical data and flight manuals, as well as Federal Aviation Administration (FAA) regulations to safely operate the Twin Otter research aircraft and ground support equipment. The contractor shall maintain the aircraft under the Equalized Maintenance for Maximum Availability (EMMA) Continued Airworthiness Program as established by Viking Aircraft for DHC-6-300 Twin Otter (PSM 1-6-7, Inspection Requirements Manual). The contractor shall, as necessary, develop procedures and manuals for the operation of equipment in the operation of the Twin Otter research aircraft (CDRL A005). The contractor shall maintain all procedures and operations to current standards for the Twin Otter research aircraft.
4.0. Government Furnished Materials
The Government will make available one (1) UV-18 Twin Otter aircraft as necessary for maintenance actions at the Government’s facility in Patuxent River, MD.
5.0. Travel
Travel is necessary in performing tasks under the effort. Locations are conducted within the continental of the United States (CONUS) and outside of the continental of the United States (OCONUS).
Costs for transportation may be based upon mileage rates, actual costs incurred, or a combination thereof, provided the method used results in a reasonable charge. Travel costs will be considered reasonable and allowable only to the extent that they do not exceed on a daily basis, the maximum per diem rates in effect at the time of the travel. The Joint Travel Regulations (JTR), while not wholly applicable to contractors shall provide the basis for the determination as to reasonable and allowable. Maximum use is to be made of the lowest available customary standard coach or equivalent airfare accommodations available during normal business hours. All necessary travel meeting the above criteria shall be approved in advance by the Government. Exceptions to these guidelines shall be approved in advance by the Contracting Officer.
6.0. Deliverables
CDRLs A001-A005 for specific reporting requirements are listed below:
A001 – Contract Funds/Labor Status Report A002 – Monthly Task Progress Report A003 – Contract Summary Report A004 – Meetings and/or Trip Reports A005 - Technical Data Package
File details come from the government source that posted it. Updated .