Q A.pdf
PDF 25 KB Posted
- Attached to
- Systems Engineering & Modeling & Simulation Research and Development for NRL Electronic Warfare Systems Federal contract opportunity
- Solicitation number
- N00173-16-R-JH03
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Award_Notice_-_MARS_IDIQ.pdf | ||
| Attachment_L-3_-_Cost_Summary_Format_Workbook.xls | XLS spreadsheet | |
| Attachment_10_-_Task_Order_Staffing_Plan.xlsx | XLSX spreadsheet | |
| Attachment_L-2_-_Previous_Contracting_Efforts.docx | DOCX document | |
| Attachment_1_-_Statement_of_Work.pdf | ||
| Attachment_3_-_DD254.pdf | ||
| Attachment_11_-_Task_Order_Cost-Pricing_Spreadsheet.xlsx | XLSX spreadsheet | |
| N00173-16-R-JH03_RFP.pdf | ||
| Attachment_L-1_Past_Performance_Questionnaire.pdf | ||
| Attachment_2_-_Labor_Categories.pdf | ||
| Attachment_L-5_-_Initial_Task_Order_SOW.pdf | ||
| Attachment_L-4_-_DCAA_Pre_Award_Survey.pdf | ||
| Attachment_4_-_Requirements_for_Onsite_Contractors.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N00173-16-R-JH03
Question & Answers
10/14/2016
RFP Reference Question Answer 1 Page 67 Section L of the RFP and Attachment L-3 lists specific labor categories only under the heading of "onsite" and others under the heading of "off-site". Is it allowable to propose personnel as offsite under categories that are only listed under the heading "onsite" in the spreadsheet?
No. In accordance with the RFP, L- 15(d)(i)(A), “This distribution shall be used by the offeror in preparing the cost/price proposal. If the offeror uses labor category terminology other than that used in this provision, the offeror must provide a matrix clearly relating their proposed labor categories to those in this provision.”
2 Pages 60 – 61 Instructions in section L indicate that files must be stored in folders matching the volume. Does this indicate that the electronic versions of the volumes can be delivered on a single CD-ROM, or does each volume require a separately-labeled CD-ROM?
The electronic versions of the volumes can be delivered on a single CD-ROM or on separately-labeled CD-ROMs.
3 H-3/H-4
L-16 (2)(c)(1) Subfactor A- Personnel Qualifications
Is identification and submission of a resume/LOC of a Program Manager required in Proposal Volume 2 (Technical)?
Yes.
4 H-3/H-4
L-16 (2)(c)(1) Subfactor A- Personnel Qualifications
Is the Table contained in H-4 (Program Manager identification) to be submitted with the RFP response, and if so which volume?
Yes, the table should be submitted in Volume II.
5 H-3/H-4
L-16 (2)(c)(1) Subfactor A- Personnel Qualifications
L-16 (2)(d)(2)(i) Subfactor B- Cost/Pricing
Please confirm as no Key Personnel have been identified other than those in the Initial Task Order Competition and the Program Manager (see above)
A. Senior Engineer / Scientist (Systems Engineering) (KEY)
B. Senior Engineer / Scientist (Distributed Simulation) (KEY)
C. Program Manager
Yes.
6 L–16 VOLUME
V: INITIAL
TASK ORDER
COMPETITION
– CONTROL
NUMBER (CN)
Please confirm that not only is a submission of Volume V is optional, but that it will not affect the overall evaluation of qualifications for the base IDIQ
Correct.
N00173-16-R-JH03
Question & Answers
10/14/2016
1 (a) GENERAL (1)
7 L–16 VOLUME
V: INITIAL
TASK ORDER
COMPETITION
– CONTROL
NUMBER (CN)
1 (d)
COPST/PRICE
(2) (i)
Are resumes and LOI’s required for all personnel listed in this table?
Yes. See Page 70, L-16(c)(1)(i(B)(2).
8 L-16 (2)(c)(1) Subfactor A- Personnel Qualifications
Is there any requirement to submit Resumes and/or LOCs other than those in Volume 5, which is an optional submission?
See Page 65, Subfactor B: Company Experience/Management, “As part of this plan, the Offeror shall include resumes for proposed Key Personnel.”
File details come from the government source that posted it. Updated .