RFP_Amendment_1_package.pdf

PDF 456 KB Posted

Attached to
Research and Development services for the Navy Research Laboratory Space Science Division
Solicitation number
N00173-13-R-JH01
Issued by

About this file

RFP Amendment 1 Questions and answers Modified sections L M.

View the file

Other files

File Type Posted
Amendment_to_solic_2.pdf PDF
Solicitation_all_files_combined.pdf PDF
synopsis.doc DOC document
synopsis.doc DOC document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

2. AMENDMENT/MODIFICAITON NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicble)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICIATION NO.

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 11)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a)By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPIRATION DATA (If required)

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

NSN 7540-01-152-8070

Previous edition unusable

INSTRUCTIONS

Instructions for items other than those that are self-explanatory, are as follows:

Item 1 (Contract ID Code). Insert the contract type identification code that appears in the title block of the contract being modified.

Item 3 (Effective date).

(1)

(2)

(3)

(4)

(5)

For a solicitation amendment, change order, or administrative change, the effective date shall be the issue date of the amendment, change order, or administrative change.

For a supplemental agreement, the effective date shall be the date agreed to by the contracting parties.

For a modification issued as an initial or confirming notice of termination for the convenience of the Government, the effective date and the modification number of the confirming notice shall be the same as the effective date and modification number of the initial notice.

For a modification converting a termination for default to a termination for the convenience of the Government, the effective date shall be the same as the effective date of the termination for default.

For a modification confirming the contacting officer's determination of the amount due in settlement of a contract termination, the effective date shall be the same as the effective date of the initial decision.

(a)

(b)

(c)

(d)

(e)

(f)

Item 6 (Issued By). Insert the name and address of the issuing office. If applicable, insert the appropriate issuing office code in the code block.

Item 8 (Name and Address of Contractor) . For modifications to a contract or order, enter the contractor's name, address, and code as shown in the original contract or order, unless changed by this or a previous modification.

Item 9, (Amendment of Solicitation No. - Dated), and 10, (Modification of Contract/Order No. - Dated). Check the appropriate box and in the corresponding blanks insert the number and date of the original solicitation, contract, or order.

Item 12 (Accounting and Appropriation Data).

When appropriate, indicate the impact of the modification on each affected accounting classification by inserting one of the following entries.

(2) Accounting classification Net decrease $

Include subject matter or short title of solicitation/contract where feasible.

Item 16B. The contracting officer's signature is not required on solicitation amendments. The contracting offier's signature is normally affixed last on supplemental agreements.

(i)

NOTE: If there are changes to multiple accounting classifications that cannot be placed in block 12, insert an asterisk and the words "See continuation sheet".

Item 13. Check the appropriate box to indicate the type of modification. Insert in the corresponding blank the authority under which the modification is issued. Check whether or not contractor must sign this document. (See FAR 43.103.)

Item 14 (Description of Amendment/Modification) .

Organize amendments or modifications under the appropriate Uniform Contract Format (UCF) section headings from the applicable solicitation or contract. The UCF table of contents, however, shall not be set forth in this document

Indicate the impact of the modification on the overall total contract price by inserting one of the following entries:

Total contract price increased by $

Total contract price decreased by $

Total contract price unchanged.

State reason for modification.

When removing, reinstating, or adding funds, identify the contract items and accounting classifications.

When the SF 30 is used to reflect a determination by the contracting officer of the amount due in settlement of a contract terminated for the convenience of the Government, the entry in Item 14 of the modification may be limited to --

A reference to the letter determination; and

A statement of the net amount determined to be due in settlement of the contract.

(g)

(h)

(i)

(ii)

(1)

(2)

(3)

(4)

(5)

(6)

(i)

(ii)

(iii)

STANDARD FORM 30 (REV. 10-83) BACK

(1) Accounting classification Net increase $

N00173-13-R-JH01

Amendment 1

The purpose of this amendment is to provide answers to the questions presented by potential offerors.

This amendment also provides modification to sections L & M that were made in response to the questions.

Questions and Answers

Q1. Since no reference is made in Section K-2 to the 541712 Exception C and the resulting size standard of 1000 employees for small business, please clarify NRL’s intention with respect to Exception C for the size standard of 1000 employees.

A1. Exception C is not relevant nor appropriate here because we are not designing space vehicles or guided missiles nor are we designing their propulsion units, propulsion unit parts or related auxiliary equipment.

Q2. It appears that instructions are missing in Section L-17 that provides direction for the Technical/Management proposal development with regard to the elements described in Section M: Factor 1 – Qualifications of Project Personnel, Factor 2 – Technical Key Performance Parameters, Factor 3 – Corporate Experience and Capability, and Factor 4 – Management Plan.

A2. Sections L and M have been edited see attachments for revised versions.

Q3. There are no instructions or references to the Labor Category Rate Tables in the cost proposal instructions of the solicitation. Is completion of these forms required in the business proposal, Volume II?

A3. Please include the Labor Category Rate Tables in the business proposal, Volume II.

Each of the labor categories have a related government site and contractor site (on and off site) rates that you are proposing. Please complete the tables with the corresponding labor rates for each category.

SECTION L

INSTRUCTIONS CONDITIONS AND NOTICES

TO OFFERORS OR RESPONDENTS

L-1 FAR 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY

REFERENCE (FEB 1998)

This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):

http://www.acqnet.gov/far http://heron.nrl.navy.mil/contracts/home.htm

FAR CLAUSE TITLE

52.215-1

Instructions To Offerors- Competitive Acquisition

(JAN 2004)

52.215-16

Facilities Capital Cost Of Money

(JUN 2003)

52.219-24

Small Disadvantaged Business Participation Program – Targets

(OCT 2000)

52.222-24

Preaward On-Site Equal Opportunity Compliance Evaluation

(FEB 1999)

52.237-1

Site Visit

(APR 1984)

52.237-10

Identification Of Uncompensated Overtime

(OCT 1997)

http://farsite.hill.af.mil/reghtml/regs/far2afmcfars/fardfars/far/52_246.htm#P2241_345857 http://www.acqnet.gov/far http://www.acqnet.gov/far http://farsite.hill.af.mil/reghtml/regs/far2afmcfars/fardfars/far/52_215.htm#P2_52 http://farsite.hill.af.mil/reghtml/regs/far2afmcfars/fardfars/far/52_215.htm#P273_43732 http://farsite.hill.af.mil/reghtml/regs/far2afmcfars/fardfars/far/52_215.htm#P1606_282574 http://farsite.hill.af.mil/reghtml/regs/far2afmcfars/fardfars/far/52_220.htm#P331_61445 http://farsite.hill.af.mil/reghtml/regs/far2afmcfars/fardfars/far/52_237.htm#P2_55 http://farsite.hill.af.mil/reghtml/regs/far2afmcfars/fardfars/far/52_237.htm#P90_16717

DFARS CLAUSE TITLE

252.209-7001 Disclosure Of Ownership Or Control By The Government Of A Terrorist Country

(JAN 2009)

252.211-7005

Substitutions For Military Or Federal Specifications And Standards

(NOV 2005)

252.225-7003 Report Of Intended Performance Outside The United States And Canada – Submission With Offer

(OCT 2010)

L-2 INSTRUCTIONS FOR SUBMISSION OF PROPOSALS/OFFERS

All proposals shall be submitted in accordance with FAR 52.215-1- Instructions to Offerors- Competitive Acquisition. Proposals/offers submitted in paper media through the United States Postal Service (USPS) or delivery services shall be addressed:

Contracting Officer, ATTN: Code3230 JH

RFP No. N00173-13-R-JH01

Closing Date: 03 June 2014

Time:12:00 PM

Naval Research Laboratory

4555 Overlook Avenue, S.W.

Washington, D.C. 20375

Proposals may be hand delivered to the Contracting Office, NRL, 4555 Overlook Avenue, S.W., Washington, D.C. 20375, Building 222, Room 115 between the hours of 8AM until 4PM, local time, excluding weekends and federal holidays. NRL is a controlled-access facility. Photo identification will be required. Report first to Building 72, Visitor Control for access to NRL.

After receiving a Visitor Pass, proceed directly to Building 222, Room 115, Contracting Office Receptionist to deliver the proposal. All offerors shall allow sufficient time for delivery of their proposal to the Contracting Office prior to the closing date and time announced in the solicitation. Directions and additional information about NRL is available here.

L-3 FAR 52.211-14 - NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE,

EMERGENCY PREPAREDNESS, AND ENERGY PROGRAM USE (APR 2008)

http://farsite.hill.af.mil/reghtml/regs/far2afmcfars/fardfars/dfars/dfars252_000.htm#P1052_51398 http://farsite.hill.af.mil/reghtml/regs/far2afmcfars/fardfars/dfars/dfars252_000.htm#P1669_94458 http://farsite.hill.af.mil/reghtml/regs/far2afmcfars/fardfars/dfars/dfars252_220.htm#P649_39264 http://www.nrl.navy.mil/visitor-info/planning-a-visit/ http://farsite.hill.af.mil/reghtml/regs/far2afmcfars/fardfars/far/52_000.htm#P1348_187307

Any contract awarded as a result of this solicitation will be DX rated order; DO rated order certified for national defense, emergency preparedness, and energy program use under the Defense Priorities and Allocations System (DPAS) (15 CFR 700), and the Contractor will be required to follow all of the requirements of this regulation.

L-4 FAR 52.215-20 REQUIREMENTS FOR COST OR PRICING DATA OR

INFORMATION OTHER THAN COST OR PRICING DATA (OCT 2010)

(a) Exceptions from cost or pricing data. (1) In lieu of submitting cost or pricing data, offerors may submit a written request for exception by submitting the information described in the following subparagraphs. The Contracting Officer may require additional supporting information, but only to the extent necessary to determine whether an exception should be granted, and whether the price is fair and reasonable.

(i) Identification of the law or regulation establishing the price offered. If the price is controlled under law by periodic rulings, reviews, or similar actions of a governmental body, attach a copy of the controlling document, unless it was previously submitted to the contracting office.

(ii) Commercial item exception. For a commercial item exception, the offeror shall submit, at a minimum, information on prices at which the same item or similar items have previously been sold in the commercial market that is adequate for evaluating the reasonableness of the price for this acquisition. Such information may include--

(A) For catalog items, a copy of or identification of the catalog and its date, or the appropriate pages for the offered items, or a statement that the catalog is on file in the buying office to which the proposal is being submitted. Provide a copy or describe current discount policies and price lists (published or unpublished), e.g., wholesale, original equipment manufacturer, or reseller.

Also explain the basis of each offered price and its relationship to the established catalog price, including how the proposed price relates to the price of recent sales in quantities similar to the proposed quantities.

(B) For market priced items, the source and date or period of the market quotation or other basis for market price, the base amount, and applicable discounts. In addition, describe the nature of the market.

(C) For items included on an active Federal Supply Service Multiple Award Schedule contract, proof that an exception has been granted for the schedule item.

(2) The offeror grants the Contracting Officer or an authorized representative the right to examine, at any time before award, books, records, documents, or other directly pertinent records to verify any request for an exception under this provision, and the reasonableness of price. For items priced using catalog or market prices, or law or regulation, access does not extend to cost or profit information or other data relevant solely to the offeror’s determination of the prices to be offered in the catalog or marketplace.

(b) Requirements for certified cost or pricing data. If the offeror is not granted an exception from the requirement to submit certified cost or pricing data, the following applies:

http://farsite.hill.af.mil/reghtml/regs/far2afmcfars/fardfars/far/52_215.htm#P308_47513

(1) The offeror shall prepare and submit certified cost or pricing data, and data other than certified cost or pricing data, and supporting attachments in accordance with the instructions contained in Table 15-2 of FAR 15.408, which is incorporated by reference with the same force and effect as though it were inserted here in full text. The instructions in Table 15-2 are incorporated as a mandatory format to be used I this contract, unless the Contracting Officer and the Contractor agree to a different format and change this clause to use Alternate I.

(2) As soon as practicable after agreement on price, but before contract award (except for unpriced actions such as letter contracts), the offeror shall submit a Certificate of Current Cost or Pricing Data, as prescribed in FAR 15.406-2.

L-5 FAR 52.216-1 - TYPE OF CONTRACT (APR 1984)

The Government contemplates award of a Cost Plus Fixed Fee Term contract resulting from this solicitation.

L-6 52.222-46 -- EVALUATION OF COMPENSATION FOR PROFESSIONAL

EMPLOYEES (FEB 1993)

(a) Recompetition of service contracts may in some cases result in lowering the compensation (salaries and fringe benefits) paid or furnished professional employees. This lowering can be detrimental in obtaining the quality of professional services needed for adequate contract performance. It is therefore in the Government’s best interest that professional employees, as defined in 29 CFR 541, be properly and fairly compensated. As part of their proposals, offerors will submit a total compensation plan setting forth salaries and fringe benefits proposed for the professional employees who will work under the contract. The Government will evaluate the plan to assure that it reflects a sound management approach and understanding of the contract requirements. This evaluation will include an assessment of the offeror’s ability to provide uninterrupted high-quality work. The professional compensation proposed will be considered in terms of its impact upon recruiting and retention, its realism, and its consistency with a total plan for compensation. Supporting information will include data, such as recognized national and regional compensation surveys and studies of professional, public and private organizations, used in establishing the total compensation structure.

(b) The compensation levels proposed should reflect a clear understanding of work to be performed and should indicate the capability of the proposed compensation structure to obtain and keep suitably qualified personnel to meet mission objectives. The salary rates or ranges must take into account differences in skills, the complexity of various disciplines, and professional job difficulty. Additionally, proposals envisioning compensation levels lower than those of predecessor contractors for the same work will be evaluated on the basis of maintaining program continuity, uninterrupted high-quality work, and availability of required competent professional service employees. Offerors are cautioned that lowered compensation for essentially the same professional work may indicate lack of sound management judgment and lack of understanding http://farsite.hill.af.mil/reghtml/regs/far2afmcfars/fardfars/far/52_215.htm#P406_66221 of the requirement.

(c) The Government is concerned with the quality and stability of the work force to be employed on this contract. Professional compensation that is unrealistically low or not in reasonable relationship to the various job categories, since it may impair the Contractor’s ability to attract and retain competent professional service employees, may be viewed as evidence of failure to comprehend the complexity of the contract requirements.

(d) Failure to comply with these provisions may constitute sufficient cause to justify rejection of a proposal.

(End of Provision)

L-7 FAR 52.233-2 - SERVICE OF PROTEST (SEP 2006)

Protests, as defined in Section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from the Control Desk, Code 3200, Bldg. 222, Rm. 115, Naval Research Laboratory, 4555 Overlook Ave., S.W., Washington DC 20375-5326.

The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.

L-9 DFARS 252.215-7009 – PROPOSAL ADEQUACY CHECKLIST (MAR 2013)

The offeror shall complete the following checklist, providing location of requested information, or an explanation of why the requested information is not provided. In preparation of the offeror’s checklist, offerors may elect to have their prospective subcontractors use the same or similar checklist as appropriate.

http://farsite.hill.af.mil/reghtml/regs/far2afmcfars/fardfars/far/52_232.htm#P1154_210583 http://farsite.hill.af.mil/reghtml/regs/far2afmcfars/fardfars/dfars/dfars252_215.htm#P262_14668

PROPOSAL ADEQUACY CHECKLIST

REFERENCES

SUBMISSION

ITEM

PROPOSAL

PAGE No.

If not provided EXPLAIN (may use continuation pages)

GENERAL INSTRUCTIONS

1. FAR 15.408, Table 15-2, Section I Paragraph A

Is there a properly completed first page of the proposal per FAR 15.408 Table 15-2 I.A or as specified in the solicitation?

2. FAR 15.408, Table 15-2, Section I Paragraph A(7)

Does the proposal identify the need for Government-furnished material/tooling/test equipment?

Include the accountable contract number and contracting officer contact information if known.

3. FAR 15.408, Table

Paragraph A(8)

Does the proposal identify and explain notifications of noncompliance with Cost Accounting Standards Board or Cost Accounting Standards (CAS);

any proposal inconsistencies with your disclosed practices or applicable CAS; and inconsistencies with your established estimating and accounting principles and procedures?

4. FAR 15.408, Table 15-2, Section I, Paragraph C(1) FAR 2.101, “Cost or pricing data”

Does the proposal disclose any other known activity that could materially impact the costs?

This may include, but is not limited to, such factors as—

(1) Vendor quotations;

(2) Nonrecurring costs;

(3) Information on changes in production methods and in production or purchasing volume;

(4) Data supporting projections of business prospects and objectives and related operations costs;

(5) Unit-cost trends such as those associated with labor efficiency;

(6) Make-or-buy decisions;

(7) Estimated resources to attain business goals; and

(8) Information on management decisions that could have a significant bearing on costs.

5. FAR 15.408, Table 15-2, Section I Paragraph B

Is an Index of all certified cost or pricing data and information accompanying or identified in the proposal provided and appropriately referenced?

6. FAR 15.403-1(b) Are there any exceptions to submission of certified cost or pricing data pursuant to FAR 15.403-1(b)? If so, is supporting documentation included in the proposal? (Note questions 18-20.)

7. FAR 15.408, Table

Paragraph C(2)(i)

Does the proposal disclose the judgmental factors applied and the mathematical or other methods used in the estimate, including those used in projecting from known data?

8. FAR 15.408, Table

Paragraph C(2)(ii)

Does the proposal disclose the nature and amount of any contingencies included in the proposed price?

9. FAR 15.408 Table 15-2, Section II, Paragraph A or B

Does the proposal explain the basis of all cost estimating relationships (labor hours or material) proposed on other than a discrete basis?

10. FAR 15.408, Table

Paragraphs D and E

Is there a summary of total cost by element of cost and are the elements of cost cross-referenced to the supporting cost or pricing data?

(Breakdowns for each cost element must be consistent with your cost accounting system, including breakdown by year.)

11. FAR 15.408, Table

Paragraphs D and E

If more than one Contract Line Item Number (CLIN) or sub Contract Line Item Number (sub-CLIN) is proposed as required by the RFP, are there summary total amounts covering all line items for each element of cost and is it cross-referenced to the supporting cost or pricing data?

12. FAR 15.408, Table

Paragraph F

Does the proposal identify any incurred costs for work performed before the submission of the proposal?

13. FAR 15.408, Table

Paragraph G

Is there a Government forward pricing rate agreement (FPRA)? If so, the offeror shall identify the official submittal of such rate and factor data.

If not, does the proposal include all rates and factors by year that are utilized in the development of the proposal and the basis for those rates and factors?

COST ELEMENTS

MATERIALS AND SERVICES

14. FAR 15.408, Table 15-2, Section II Paragraph A

Does the proposal include a consolidated summary of individual material and services, frequently referred to as a Consolidated Bill of Material (CBOM), to include the basis for pricing? The offeror’s consolidated summary shall include raw materials, parts, components, assemblies, subcontracts and services to be produced or performed by others, identifying as a minimum the item, source, quantity, and price.

SUBCONTRACTS (Purchased materials or services)

15. DFARS 215.404-3 Has the offeror identified in the proposal those subcontractor proposals, for which the contracting officer has initiated or may need to request field pricing analysis?

16. FAR 15.404-3(c)

FAR 52.244-2

Per the thresholds of FAR 15.404- 3(c), Subcontract Pricing Considerations, does the proposal include a copy of the applicable subcontractor’s certified cost or pricing data?

17. FAR 15.408, Table 15-2, Note 1;

Section II Paragraph A

Is there a price/cost analysis establishing the reasonableness of each of the proposed subcontracts included with the proposal?

If the offeror’s price/cost analyses are not provided with the proposal, does the proposal include a matrix identifying dates for receipt of subcontractor proposal, completion of fact finding for purposes of price/cost analysis, and submission of the price/cost analysis?

EXCEPTIONS TO CERTIFIED COST OR PRICING DATA

18. FAR 52.215-20

FAR 2.101,

“commercial item”

Has the offeror submitted an exception to the submission of certified cost or pricing data for commercial items proposed either at the prime or subcontractor level, in accordance with provision 52.215-20?

a. Has the offeror specifically identified the type of commercial item claim (FAR 2.101 commercial item definition, paragraphs (1) through (8)), and the basis on which the item meets the definition?

b. For modified commercial items (FAR 2.101 commercial item definition paragraph (3)); did the offeror classify the modification(s) as either—

i. A modification of a type customarily available in the commercial marketplace (paragraph (3)(i)); or

ii. A minor modification (paragraph (3)(ii)) of a type not customarily available in the commercial marketplace made to meet Federal Government requirements not exceeding the thresholds in FAR 15.403-1(c)(3)(iii)(B)?

c. For proposed commercial items “of a type”, or “evolved” or modified (FAR 2.101 commercial item definition paragraphs (1) through (3)), did the contractor provide a technical description of the differences between the proposed item and the comparison item(s)?

19. FAR 15.408, Table

Paragraph A

Does the proposal include a price analysis for all commercial items offered that are not available to the general public?

20. FAR 15.408, Table

Does the proposal support the degree of competition and the basis for

Paragraph A(1) establishing the source and reasonableness of price for each subcontract or purchase order priced on a competitive basis exceeding the threshold for certified cost or pricing data?

INTERORGANIZATIONAL TRANSFERS

21. FAR 15.408, Table 15-2, Section II Paragraph A.(2)

For inter-organizational transfers proposed at cost, does the proposal include a complete cost proposal in compliance with Table 15-2?

22. FAR 15.408, Table

Paragraph A(1)

For inter-organizational transfers proposed at price in accordance with FAR 31.205-26(e), does the proposal provide an analysis by the prime that supports the exception from certified cost or pricing data in accordance with FAR 15.403-1?

DIRECT LABOR

23. FAR 15.408, Table 15-2, Section II Paragraph B

Does the proposal include a time phased (i.e.; monthly, quarterly) breakdown of labor hours, rates and costs by category or skill level? If labor is the allocation base for indirect costs, the labor cost must be summarized in order that the applicable overhead rate can be applied.

24. FAR 15.408, Table

Paragraph B

For labor Basis of Estimates (BOEs), does the proposal include labor categories, labor hours, and task descriptions, (e.g.; Statement of Work reference, applicable CLIN, Work Breakdown Structure, rationale for estimate, applicable history, and time-phasing)?

25. FAR subpart 22.10 If covered by the Service Contract Labor Standards statute (41 U.S.C.

chapter 67), are the rates in the proposal in compliance with the minimum rates specified in the statute?

INDIRECT COSTS

26. FAR 15.408, Table

Paragraph C

Does the proposal indicate the basis of estimate for proposed indirect costs and how they are applied? (Support for the indirect rates could consist of cost breakdowns, trends, and budgetary data.)

OTHER COSTS

27. FAR 15.408, Table 15-2, Section II Paragraph D

Does the proposal include other direct costs and the basis for pricing? If travel is included does the proposal include number of trips, number of people, number of days per trip, locations, and rates (e.g. airfare, per diem, hotel, car rental, etc)?

28. FAR 15.408, Table

Paragraph E

If royalties exceed $1,500 does the proposal provide the information/data identified by Table 15-2?

29. FAR 15.408, Table

Paragraph F

When facilities capital cost of money is proposed, does the proposal include submission of Form CASB-CMF or reference to an FPRA/FPRP and show the calculation of the proposed amount?

FORMATS FOR SUBMISSION OF LINE ITEM SUMMARIES

30. FAR 15.408, Table 15-2, Section III

Are all cost element breakdowns provided using the applicable format prescribed in FAR 15.408, Table 15-2 III? (or alternative format if specified in the request for proposal)

31. FAR 15.408, Table

Paragraph B

If the proposal is for a modification or change order, have cost of work deleted (credits) and cost of work added (debits) been provided in the format described in FAR 15.408, Table 15-2.III.B?

32. FAR 15.408, Table

Paragraph C

For price revisions/redeterminations, does the proposal follow the format in FAR 15.408, Table 15-2.III.C?

OTHER

33. FAR 16.4 If an incentive contract type, does the proposal include offeror proposed target cost, target profit or fee, share ratio, and, when applicable, minimum/maximum fee, ceiling price?

34. FAR 16.203-4 and

FAR

15.408 Table 15-2, Section II, Paragraphs A, B, C, and D

If Economic Price Adjustments are being proposed, does the proposal show the rationale and application for the economic price adjustment?

35. FAR 52.232-28 If the offeror is proposing Performance-Based Payments did the offeror comply with FAR 52.232-28?

36. FAR 15.408(n)

FAR 52.215-22

FAR 52.215-23

Excessive Pass-through Charges– Identification of Subcontract Effort: If the offeror intends to subcontract more than 70% of the total cost of work to be performed, does the proposal identify: (i) the amount of the offeror’s indirect costs and profit applicable to the work to be performed by the proposed subcontractor(s); and (ii) a description of the added value provided by the offeror as related to the work to be performed by the proposed subcontractor(s)?

(End of provision)

L-10 DFARS 252.227-7017 - IDENTIFICATION AND ASSERTION OF USE,

RELEASE, OR DISCLOSURE RESTRICTIONS (JAN 2011)

The terms used in this provision are defined in following clause or clauses contained in this solicitation—

(1) If a successful offeror will be required to deliver technical data, the Rights in Technical Data- -Noncommercial Items clause, or, if this solicitation contemplates a contract under the Small Business Innovation Research Program, the Rights in Noncommercial Technical Data and Computer Software--Small Business Innovation Research (SBIR) Program clause.

(2) If a successful offeror will not be required to deliver technical data, the Rights in Noncommercial Computer Software and Noncommercial Computer Software Documentation clause, or, if this solicitation contemplates a contract under the Small Business Innovation Research Program, the Rights in Noncommercial Technical Data and Computer Software--Small Business Innovation Research (SBIR) Program clause.

The identification and assertion requirements in this provision apply only to technical data, including computer software documents, or computer software to be delivered with other than unlimited rights. For contracts to be awarded under the Small Business Innovation Research Program, the notification requirements do not apply to technical data or computer software that will be generated under the resulting contract. Notification and identification is not required for restrictions based solely on copyright.

Offers submitted in response to this solicitation shall identify, to the extent known at the time an offer is submitted to the Government, the technical data or computer software that the Offeror, its subcontractors or suppliers, or potential subcontractors or suppliers, assert should be furnished to the Government with restrictions on use, release, or disclosure.

http://farsite.hill.af.mil/reghtml/regs/far2afmcfars/fardfars/dfars/dfars252_227.htm#P1180_92227

The Offeror's assertions, including the assertions of its subcontractors or suppliers or potential subcontractors or suppliers shall be submitted as an attachment to its offer in the following format, dated and signed by an official authorized to contractually obligate the Offeror:

Identification and Assertion of Restrictions on the Government's Use, Release, or Disclosure of Technical Data or Computer Software.

The Offeror asserts for itself, or the persons identified below, that the Government's rights to use, release, or disclose the following technical data or computer software should be restricted:

Technical Data or Computer Software to be Furnished Basis for Rights Asserting With Restrictions*

Basis for Assertion**

Asserted Rights Category***

Name of Person Asserting Restrictions****

(List)*****

(List)

* For technical data (other than computer software documentation) pertaining to items, components, or processes developed at private expense, identify both the deliverable technical data and each such items, component, or process. For computer software or computer software documentation identify the software or documentation.

** Generally, development at private expense, either exclusively or partially, is the only basis for asserting restrictions. For technical data, other than computer software documentation, development refers to development of the item, component, or process to which the data pertain. The Government's rights in computer software documentation generally may not be restricted. For computer software, development refers to the software. Indicate whether development was accomplished exclusively or partially at private expense. If development was not accomplished at private expense, or for computer software documentation, enter the specific basis for asserting restrictions.

*** Enter asserted rights category (e.g., government purpose license rights from a prior contract, rights in SBIR data generated under another contract, limited, restricted, or government purpose rights under this or a prior contract, or specially negotiated licenses).

**** Corporation, individual, or other person, as appropriate.

***** Enter "none" when all data or software will be submitted without restrictions. Date Insert description

Printed Name and Title Insert description

Insert description

Signature

(End of identification and assertion)

An offeror's failure to submit, complete, or sign the notification and identification required by paragraph (d) of this provision with its offer may render the offer ineligible for award.

If the Offeror is awarded a contract, the assertions identified in paragraph (d) of this provision shall be listed in an attachment to that contract. Upon request by the Contracting Officer, the Offeror shall provide sufficient information to enable the Contracting Officer to evaluate any listed assertion.

L-11 DFARS 252.227-7028 - TECHNICAL DATA OR COMPUTER SOFTWARE

PREVIOUSLY DELIVERED TO THE GOVERNMENT (JUN 1995)

The Offeror shall attach to its offer an identification of all documents or other media incorporating technical data or computer software it intends to deliver under this contract with other than unlimited rights that are identical or substantially similar to documents or other media that the Offeror has produced for, delivered to, or is obligated to deliver to the Government under any contract or subcontract. The attachment shall identify - -

The contract number under which the data or software were produced;

The contract number under which, and the name and address of the organization to whom, the data or software were most recently delivered or will be delivered; and

Any limitations on the Government's rights to use or disclose the data or software, including, when applicable, identification of the earliest date the limitations expire.

L-12 GOVERNMENT-FURNISHED PROPERTY

No material, labor, or facilities will be furnished by the Government unless requested by the Contractor and provided for in the contract. If Government-Furnished Property is required for the performance of this effort, the Contract shall clearly identify what is required and the time it is necessary for uninterrupted performance of the effort.

L-13 INQUIRIES CONCERNING THE RFP

Any questions concerning the RFP must be submitted in writing to the Contracting Officer at the location noted in blocks 7 and 10 of the Standard Form 33, Solicitation, Offer and Award, no less than fifteen(15) days before closing The Government will not consider questions received after this date. Offerors are cautioned against directing any questions concerning this RFP to technical personnel at the Naval Research Laboratory.

L-14 PROPOSAL ORGANIZATION

http://farsite.hill.af.mil/reghtml/regs/far2afmcfars/fardfars/dfars/dfars252_227.htm#P2003_166371

(1) Information for the technical/management proposal shall be placed in Volume I and be completely separate from the business proposal (Volume II).

(2) Proposal Format and Length - No attempt is made to restrict the proposal format and style.

However, the proposal should be written and organized so as to be compatible with the RFP, the Statement of Work, company's organization and accounting structure, and proposed cost estimate. Offerors are encouraged to use recycled paper and maximize the use of double sided copying when preparing responses to solicitations.

L-15 SECURITY REQUIREMENTS

Access to classified information is not required to submit a proposal for this statement of work.

However, prospective offerors shall have the required facility clearance in accordance with attached DD254 at the time of proposal and personnel available with final DoD granted personnel security clearances required for performance of the contract.

L-16 ANTICIPATED DISTRIBUTION OF DIRECT LABOR HOURS BY LABOR

CATEGORIES

The anticipated distribution by labor category of the estimated level of effort is discussed in section H. This distribution shall be used by the offeror in preparing the cost proposal. If the offeror uses labor category terminology other than that used in this provision, the offeror must provide a matrix clearly relating their proposed labor categories to those in this provision.

L-17 VOLUME I - TECHNICAL/MANAGEMENT PROPOSAL

REQUIRED COPIES: 1 ORIGINAL AND 5 COPIES.

(1) The offeror must propose the labor categories in accordance with the Level of Effort Breakdown in Section H. If the offeror uses labor category terminology other than that used in Section H, the offer must provide a matrix clearly relating their proposed labor categories to those stated.

(2) The following information is required for evaluation of your technical/management proposal:

Factor 1 – Qualifications of Project Personnel

The contractor shall submit sufficient information, including resumes, to support key personnel experience in managing and executing programs similar in nature, size, scope and complexity to those contained in the SOW with industry or Government Agencies. The proposal’s information shall support their key personnel commitment and include key personnel names along with the labor category which they are proposing them for. Please note, that while the pricing sheets will not be provided to the technical evaluators, the pricing sheets shall include the names of the key personnel committed to the project per labor category. These names, labor categories and labor hours will be submitted to the technical evaluators, once sanitized of price, for technical evaluation purposes. Commitment proof may include but is not limited to commitment letters for all key personnel or proof of current employment with the company. While not required, these commitment documents (commitment letter and corporate commitment letter) will help solidify a favorable rating.

Factor 2: Technical Key Performance Parameters

The offerer shall demonstrate that they have the technical expertise to meet the requirements outlined in the SOW. The offerer shall also propose an approach towards meeting those requirements. Such an approach may include specific software and hardware tools that the offeror will apply to accomplish the research.

Specific examples of how these tools can be, or have been, used to solve similar problems shall be evaluated. This Factor also includes the ability to meet specific research and engineering deadlines in a timely fashion.

Factor 3 – Corporate Experience and Capability

(a) Management, Control and Reporting – The offeror shall provide a discussion that demonstrates prior experience in supporting R&D efforts such as concept development, and the development of technical documentation associated with the development process.

(b) Systems Engineering The offeror shall provide a discussion that demonstrates prior experience in developing scientific objectives, mission requirements and technical concepts for instruments systems, flight systems, ground systems and launch systems

(c) Hardware Engineering -- The offeror shall provide a discussion that demonstrates prior experience in hardware engineering, including interface and data handling electronics, circuit card design, optical design services and detector design and development services.

(d) Software Engineering-- The offeror shall provide a discussion that demonstrates prior experience in providing software engineering support and technical assistance including flight, ground software and modeling and simulation software, ground data analysis software (GDAS) and mission planning, scheduling and display software.

(e) – Laboratory and Operations Support-- The offeror shall provide a discussion that demonstrates experience in testing and characterizing new instrumentation and experimental payloads under ambient and stressing conditions. This includes calibration, payload processing and mission operations and data analysis.

(f) Mission Assurance, The offeror shall provide a discussion that demonstrates experience in establishing requirements for a mission assurance program commensurate with flight instrumentation and experimental payload mission requirements. This includes electronic parts assurance, quality assurance, reliability assurance, material and processes control, contamination control and experience will all major reviews for flight electronics and ground support equipment.

(g) Other Related Experience - - Proposals may provide a discussion demonstrating experience other than that given above that the offeror believes is specifically applicable to these NRL requirements. Offerors are cautioned not to include standard capability packages not applicable in the proposal. All applicable experience shall be described in detail and the sponsoring organization(s) shall be identified.

Factor 4 – Management Plan

The offeror shall provide a detailed transition plan that outlines his strategy for assuring a smooth and effective transition. The Transition Plan shall describe how the offeror`s organization will be staffed, trained, managed and ready to meet the requirements of the SOW at the end of the transition period. NOTE: The plan shall be submitted with the technical proposal.

(a) The Transition Plan shall identify, via a network schedule and a milestone chart, the proposed approach to the phase-in of management and technical personnel and the implantation of control procedures and methods. The offeror shall indicate major interrelationships between transition events on the network schedule. The impact of these interrelationships on the transition schedule, as well as a description of how transition delays will be mitigated, shall be explained in the offeror's Transition Plan. All transition activities shall be completed within six months after contract award (ACA).

(b) Management Transition Phasing -- A smooth and effective transition of ongoing management tasks are of critical importance. The offeror shall establish the management controls, procedures and methods necessary to assure the accomplishment of procurement, subcontracting, status reporting, security and personnel staffing. The offeror shall provide convincing evidence that complete transition can be completed within 45 days after contract award (ACIA).

(c) In-house Priority -- The offeror shall discuss how he will treat this requirement in relation to the company's other commitments' that compete for the same company resources.

PAST PERFORMANCE INFORMATION

(a) Offerors shall submit the following information as part of their proposal. (Offerors are encouraged to submit the information prior to other parts of the proposal to assist the government in reducing the length of the evaluation period.) List the last 5 contracts or subcontracts completed by the offeror or predecessor companies during the past 3 years years for services similar in nature to this requirement. Include in the 5 any current contracts or subcontracts for similar services that were awarded at least one year prior to the date of this solicitation. Offerors that have no similar previous or current contracts should provide the requested information for proposed subcontractors that will perform major or critical aspects of the requirement or for the proposed project manager or key personnel responsible for major or critical aspects of the requirement.

1. Name of contracting organization.

2. Contract number

3. Contract type

4. Total contract value

5. Description of the contract work

6. Contracting Officer and telephone number

7. Contracting Officer’s representative, program manager, or similar official’s name and telephone number

(b) Offerors shall contact the contracting organizations identified pursuant to paragraph (a) as soon as possible and request them to send past performance information on the identified contracts to the address in Block 7 of the face page of this solicitation. The past performance report which is available electronically in full text at http://heron.nrl.navy.mil/contracts/4335_1.pdf is to be provided to the contracting organization for this purpose. If the contracting organization has already collected past performance information on the contract pursuant to FAR Subpart 42.15, the format used to collect the information may be used instead of the past performance report.

(c) Offerors may include in their proposals specific information relating to problems encountered in performing the identified contracts and any corrective actions by the offeror. Offerors should not provide general information on their performance on the identified contracts as this will be obtained from the contracting organizations.

L-18 VOLUME II - BUSINESS PROPOSAL

REQUIRED COPIES: 1 ORIGINAL AND 2 ** COPIES, AS WELL AS AN ELECTRONIC

COPY COMPATIBLE WITH MICROSOFT OFFICE.

(1) COST PROPOSAL

The offeror shall submit a business proposal that includes a cost proposal with supporting information for each cost element consistent with offeror's cost accounting system. The supporting breakdown should include such elements as materials, direct labor, indirect cost, and other costs such as travel. The offeror shall provide exhibits as necessary to substantiate each cost element. Should rates be used in the proposal which are not DCAA approved, the offeror shall provide complete documentation and the rationale for their use at time of proposal submission. However, offerors are advised to use actual labor rates of proposed personnel as the basis for estimating labor costs when practicable.

The contractor shall furnish a copy of the cost proposal to their cognizant DCAA office. The cover page of the proposal shall clearly indicate the RFP Number, the Contracting Officer’s name and phone number and the following statement:

“The Contracting Officer has directed that this advance copy be sent to you in anticipation of the RATE CHECK that will be requested in order to determine cost realism in accordance with FAR 15.305 and 15.404(d).”

(2) SMALL BUSINESS PARTICIPATION

(a) In addition to complying with the clause at FAR 52.219-9, Small Business Subcontracting Plan with its Alternate II, proposals must include information to permit evaluation of the extent http://heron.nrl.navy.mil/contracts/4335_1.pdf of participation of small businesses and historical black colleges or universities and minority institutions in performance of the contract. Participation to be identified may be in the form of a joint venture, teaming arrangement, or subcontract. Small business concerns that are not required by FAR 52.219-9 to submit a subcontracting plan must indicate the extent to which proposed joint ventures, teaming arrangements, or subcontracts are with historically black colleges or universities and minority institutions.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .