SEAFAC Operations Support DRAFT SOW INDUSTRY DAY.pdf
PDF 493 KB Posted
- Solicitation number
- N00167-24-SEAFAC-OPS
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Industry Day Slide Deck_SEAFAC FINAL.pptx | PPTX presentation | |
| DD-5512 Blank.pdf | ||
| DISS Visit Request Guide (Bangor -SEAFAC)_2023 01 30.xlsx | XLSX spreadsheet | |
| SEAFAC Industry Day Map.pdf | ||
| Attachment 1_Work Outline_SEAFAC Operations Support_Sources Sought Announcement-POSTING.docx | DOCX document | |
| Attachment 2_Draft Personnel Qualifications_SEAFAC Operations Support_Sources Sought Announcement.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Section C - Descriptions and Specifications
STATEMENT OF WORK
SEAFAC Operations Support
1.0 SCOPE
Except where otherwise stated, the Contractor shall furnish all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items necessary to provide the services outlined below and described in this Statement of Work (SOW) at the Southeast Alaska Acoustic Measurement
Facility (SEAFAC) located at Back Island, Alaska approximately 12 mile north of Ketchikan, AK. This SOW outlines requirements for site maintenance, logistics, operations, technical integration services, and program management, in support of signature silencing programs for naval ships and undersea systems. In general, this work includes:
Operational, vessel, and logistical support for full scale signature measurement trials and other signature assessment tests.
Operation, maintenance, integration, installation, and repair of facilities and equipment that are required to support the mission of performing signature measurements and analysis at SEAFAC.
Special project support for full scale signature measurements and other signature assessments.
1.1 Background
The Signatures Department (Code 70) of the Naval Surface Warfare Center Carderock Division (NSWCCD) is responsible for development of stealth technology to support Navy surface ship and submarine program goals. As part of its mission, Code 70 develops, operates, and maintains major acoustic research, development, test, and evaluation (RDT&E) facilities at the SEAFAC.
Code 70 provides services and facilities to accomplish signature data acquisition and analysis in support of surface ship and submarine R&D projects funded by the Naval Sea Systems Command (NAVSEA), other Navy and Federal sponsors, state, and non-Government organizations. Non-government organizations are efforts funded and conducted through the Work for Private Parties (WFPP) Act. Periodically, NSWCCD conducts acoustic trials on ships of the cruise ship industry and the University of Alaska-Fairbanks. The primary objective of the technical efforts described in this SOW is to support NAVSEA, NSWCCD, and Code 70 signature measurement, integration, installation and assessment testing, acoustic stealth technology development, and related research programs.
SEAFAC has two major test sites – a static site where the test vessel is suspended at various depths for specific noise investigations and an underway site for performing noise investigations at various speed conditions and depths. The SEAFAC Underway Site was upgraded in 2008 to measure and characterize submarine signatures through all operationally significant speed and depth combinations.
2.0 APPLICABLE DOCUMENTS
2.1 General
The regulations and standards listed below are not necessarily all those required for compliance, but are the ones needed in order to fully understand the SEAFAC requirements:
1. Federal Acquisition Regulation (FAR)
2. Defense Federal Acquisition Regulation Supplement (DFARS)
3. Code of Federal Regulations (CFR)
4. Occupational Safety and Health Act (OSHA) Regulations
5. Environmental Protection Agency (EPA) Laws & Regulations
6. Alaska Administrative Code Laws & Regulations
7. United States Coast Guard (USCG) Regulations
8. Joint Travel Regulations
9. Federal Communications Commission (FCC) Regulations
10. American Society of Mechanical Engineers (ASME) Standards
11. American National Standard Institute (ANSI) Standards
12. International Organization for Standardization (ISO) Standards
13. Society of Automotive Engineering (SAE) Standards
14. American Society for Testing and Materials (ASTM) Standards
15. Military Standards (MIL-STD)
16. National Fire Protection Agency (NFPA)
17. National Electric Code
18. American Society of Civil Engineers (ASCE) Standards
19. American Society of Heating, Refrigeration, and Air Conditioning Engineers (ASHRAE)
20. Sheet Metal and Air Conditioning Contractors' National Association (SMACNA)
21. Unified Facilities Criteria (UFC)
2.2 Government Documents
Specifications, standards, and other Government documents:
1. U.S. Army Corps of Engineers Safety and Health Requirements Manual, EM 385-1-1
2. GSA Federal Management Regulation (FMR) § 102-34.
3. OPSEC Requirements (Section J Attachment 2)
4. Naval Ships' Technical Manual (NSTM)
5. OPNAVINST 11320.23 (Section J Attachment 3)
6. OPNAV M-5090.1 (Section J Attachment 4)
7. NAVSEAINST 2200.1 (Section J Attachment 5)
8. NAVSEANOTE 2200 (Section J Attachment 6)
9. COMNAVREGNWINST 11320.2 (Section J Attachment 7)
10. CARDEROCKDIVNOTE 5239 (Section J Attachment 8)
11. CARDEROCKDIVINST 5510.12 (Section J Attachment 9)
12. NAVFAC MO-206 (Section J Attachment 10)
13. NAVFAC MO-209 (Section J Attachment 11)
14. NAVFAC MO-230 (Section J Attachment 12)
15. NAVFAC P-300 (Section J Attachment 13)
16. NAVFAC P-307 (Section J Attachment 14)
17. Internet Naval Facilities Assets Data Store (iNFADS) SEAFAC Facility Data (Section J Attachment 15)
18. Naval Supply Systems Command (NAVSUP) P-538 (Section J Attachment 16)
19. NAVSUP P-558 (Section J Attachment 17)
20. NSWCCD-71-TRAcoustic Trial Facility User’s Manual (available after award)
21. SEAFAC SOP 101 Organizational Structure (available after award)
22. SEAFAC SOP 102 Facility User’s Manual (available after award)
23. SEAFAC SOP 103 SEAFAC/STAFAC FCO, TD, & SSS SOP (available after award)
24. SEAFAC SOP 104 Test Planning (available after award)
25. SEAFAC SOP 105 Test Execution (available after award)
26. SEAFAC SOP 106 Continuity of Operations and Reduced Operating Status (available after award)
27. SEAFAC SOP 107 Critical Facility Capabilities (available after award)
28. SEAFAC SOP 108 Meal and Hotel Services (available after award)
29. SEAFAC SOP 109 List of Current and Cancelled Documents (available after award)
30. SEAFAC SOP 201 Minimum Manning (available after award)
31. SEAFAC SOP 202 Personal Protective Equipment (available after award)
32. SEAFAC SOP 203 Waterfront Operations (available after award)
33. SEAFAC SOP 204 Confined Spaces (available after award)
34. SEAFAC SOP 205 Fall Protection (available after award)
35. SEAFAC SOP 206 Emergency Response Plans (available after award)
36. SEAFAC SOP 207 Visitor Orientation (available after award)
37. SEAFAC SOP 208 Heavy Weather (available after award)
38. SEAFAC SOP 209 Fire Warden Book (available after award)
39. SEAFAC SOP 210 Lock Out Tag Out (available after award)
40. SEAFAC SOP 211 Exercise Equipment (available after award)
41. SEAFAC SOP 301 Alarm Monitoring and Response (available after award)
42. SEAFAC SOP 302 Physical Security and Access Control (available after award)
43. SEAFAC SOP 303 Information Security including PED & Camera policy (available after award)
44. SEAFAC SOP 304 Emergency Destruction Plan (available after award)
45. SEAFAC SOP 305 Antiterrorism and Force Protection (available after award)
46. SEAFAC SOP 306 Restricted Areas (available after award)
47. SEAFAC SOP 307 Classified Material Accountability (available after award)
48. SEAFAC SOP 401 Environmental Management System (available after award)
49. SEAFAC SOP 402 Comprehensive Environment Response Plan (available after award)
50. SEAFAC SOP 403 Wastewater Sampling and Quality Assurance Project Plan (available after award)
51. SEAFAC SOP 501 Critical Infrastructure (available after award)
52. SEAFAC SOP 502 Weight Handling Equipment (available after award)
53. SEAFAC SOP 503 Material Handling Equipment (available after award)
54. SEAFAC SOP 504 Small Boat Maintenance and Configuration Control (available after award)
55. SEAFAC SOP 505 Service Craft Maintenance and Configuration Control (available after award)
56. SEAFAC SOP 506 Shipping and Receiving (available after award)
57. SEAFAC SOP 507 Property Management (available after award)
58. SEAFAC SOP 508 Fueling Operations (available after award)
59. SEAFAC SOP 509 Test Equipment (available after award)
60. SEAFAC SOP 510 List of Drawings (available after award)
61. SEAFAC Facility Master Plan (available after award)
2.3 Data Deliverables
Technical documentation and reporting will be required by the Contractor in support of the tasking outlined in the
SOW.
Contract Data Requirements List (CDRLs) – DD Form 1423
Data Item
Number
Title or Subtitle of Data Item SOW
Section
A001 PHASE-IN TRANSITION PLAN 3.0
A002 MANAGEMENT PLAN 3.1
3.1.6
3.1.9
3.1.10
A003 MONTHLY STATUS REPORT 3.1.2
A004 FACILTIES MAINTENANCE REPORT 3.1.2
A005 PROJECT PLANNING CHART 3.1.2
A006 QUALITY PROGRAM PLAN (QPP) 3.1.3
A007 QUALITY STATUS REPORT 3.1.3
A008 ENVIRONMENTAL, SAFETY, AND OCCUPATIONAL HEALTH (ESOH) PLAN 3.1.4
3.1.5
A009 MISHAP AND NEAR MISS REPORT 3.1.4
A010 GOVERNMENT FURNISHED PROPERTY INVENTORY AND FORECASTING REPORT 3.1.6
A011 CONFERENCE AGENDA 3.1.11
A012 PRESENTATION MATERIAL 3.1.11
A013 REPORT, RECORD OF MEETINGS/MINUTES 3.1.11
A014 PROJECT PLANNING CHART 3.2
A015 TECHNICAL REPORT–STUDY/SERVICES 3.2.1.1
3.2.3
3.3.2.4
3.3.2.5
3.3.2.2
3.3.2.16
A016 PRODUCT ENGINEERING DESIGN DATA AND ASSOCIATED LISTS 3.2.3
A017 REVISIONS TO EXISTING GOVERNMENT DOCUMENTS 3.2.3
A018 REQUEST FOR ENGINEERING OR TECHNICAL ASSISTANCE 3.2.3
A019 CONTRACTOR’S MAINTENANCE PROGRAM PLAN 3.3
3.4
A020 ELECTRONIC COST REPORTING AND FINANCIAL TRACKING (eCRAFT) REPORT C-237-
W001
3.0 REQUIREMENTS
The prospective contractor shall be a US owned company, and provide capable US Citizen personnel with qualifications, experience levels, security clearances, and necessary licenses, certifications, and training required by
Federal, state and local laws and regulations. Any required licenses, certifications, or proof of training shall be available upon request of the Government. Training necessary to ensure that personnel performing under this contract maintain the knowledge and skills to successfully perform the required functions is the responsibility of the
Contractor. The specific tasks to be performed in support of NSWCCD Code 70 facilities and its detachments are provided in the subsequent paragraphs.
The Contractor shall develop and implement a phase-in plan to efficiently and effectively transition into full execution of the requirements of this contract (CDRL A001).
3.1 Program Management Support: The Contractor shall develop and implement a Management Program to efficiently and effectively execute the requirements of this contract (CDRL A002). The Contractor shall manage the total work effort associated with the services required herein to meet the requirements. Such management includes but is not limited to planning, scheduling, cost accounting, report preparation, establishing and maintaining records, and quality assurance. The Contractor shall provide a staff with the necessary management expertise to ensure performance and quality standards are met. A clear line of project authority shall exist among all organizational elements supporting this requirement.
3.1.1 Program Manager (PM): The Contractor shall provide a PM for this contract and its associated task orders
(TO) who is responsible for accomplishment of all tasks required by this SOW and who is authorized to execute contract functions/actions on behalf of the company. The PM shall organize, plan, schedule, implement, control, analyze, and report on all elements of the contract. The PM shall have resources and authority to ensure efficient and timely program execution and shall be the Contractor's focal point for all required program tasks. The PM shall ensure that assignments are completed in a manner that is thorough and within schedule and document all accomplishments that are directly relevant to the individual TO’s schedule(s). The Contractor's PM shall be prepared at all times to present and discuss the status of contract activities, requirements, and issues.
The PM shall keep the Contracting Officer’s Representative (COR) informed of any performance issues, cost or financial concerns, and potential problems that, if unresolved, will adversely affect the Contractor’s performance, schedule, or costs, and take all appropriate measures to mitigate adverse impact to the TO performance.
The PM shall generate and publish the monthly technical, maintenance and progress reports in accordance with
CDRLs A003, A004, and A005. See each CDRL for the appropriate format for each report or document update.
The Program Manager shall interface with the COR and Site Director for all contract related tasks and efforts. The
PM shall review each subcontractor's technical progress on all assigned tasks and include such technical progress and status information in monthly Program Status Reports.
3.1.2 Quality Management System (QMS): The Contractor shall establish and maintain a complete QMS program in accordance with the provisions specified herein and in accordance with FAR Clause 52.246-5 Inspection of Services-Cost-Reimbursement (APR 1984) (CDRL A006). The Contractor’s QMS program shall provide an effective and efficient means of identifying and correcting problems throughout the entire scope of operations. The
Contractor shall submit a Quality Status report upon request of the COR (CDRL A007). The Contractor's QMS program shall address:
Accurate documentation of work processes, procedures, and output measures;
A systematic procedure for assessing compliance with requirements and quality standards;
Accurate documentation of quality inspections and surveillance conducted throughout the execution of work, including any external products and services, and well-defined records management process;
Assessment-driven corrective actions and process adjustments/ improvement as appropriate in a timely manner;
Oversight of subcontracted work; and
Communication with Government (customers).
3.1.3 Contractor Safety Program: The Contractor shall develop and implement a Safety Program detailing how the Contractor plans, staffs, performs, and controls all safety practices while delivering best value services to the
Government without any accidents or mishaps (CDRL A008). The Contractor’s safety program shall comply with all safety standards identified in the EM 385-1-1 U.S. Army Corps of Engineers Safety and Health Requirements
Manual; Public Law 91-596 Occupational Safety and Health Act; 29 CFR Regulations; and 46 CFR Part 197
Subpart B Commercial Diving Operations. All safety matters shall be coordinated with NSCWCD Code 1024 via the COR.
The Contractor shall treat near misses as mishaps and notify the Government within two hours of near misses and mishaps, unless otherwise specified. The Contractor shall provide a detailed report within five working days
(A009).
3.1.4 Environmental Protection Program: The Contractor shall develop and implement an Environmental
Protection Program detailing how the Contractor plans, staffs, performs, and controls all environmental and energy practices while delivering best value services to the Government without any non-compliance (CDRL A008). The
Contractor’s Environmental Protection Program shall comply with all applicable Federal, state, and local laws, regulations, and executive orders, and with base-wide instructions, standards, and permit requirements. All environmental protection matters shall be coordinated with NSCWCD Code 1023 via the COR.
As part of maintaining compliance with federal permits obtained by the Navy, all Contractor personnel involved in on-water activity shall complete Marine Species Awareness Training provided by the Navy. The Contractor shall implement appropriate SOPs to apply the training during on-water activity.
3.1.5 Property Management: The Contractor shall establish and maintain a Property Management Plan that meets the contract clause requirements of the contract (CDRL A002). This plan shall identify the Contractor’s policies, procedures, and practices in receiving and performing physical inventories, key control, repairing and maintaining, preserving and protecting, and reporting the disposition of accepted Government property in its possession and identify policies, procedures, and practices for Contractor’s property. All Government property matters shall be coordinated with NSCWCD Property Management Office via the COR. The Contractor shall submit a monthly report of Government property (A010).
3.1.6 Site Management: The Contractor shall provide a Site Manager whose primary duty and responsibility is to ensure proper execution of Contractor operations on site.
3.1.7 Deck Supervision: The Contractor shall provide a Deck Supervisor to supervise and coordinate all
Contractor mooring and waterborne support vessel activities.
3.1.8 Logistics Management: The Contractor shall provide support to the Site Director to manage logistics operations at SEAFAC (CDRL A002).
3.1.9 Security Management: The Contractor shall provide support to the Site Director to maintain site security at SEAFAC (CDRL A002).
3.1.10 Meetings: The Contractor shall prepare agendas and conference presentation materials, provide minutes, and provide reports following each meeting in accordance with CDRLs A011, A012, and A013. The Contractor shall attend meetings as requested and the following recurring meetings:
Kick-off Meeting: The Government will host a Post-Award Conference (PAC) at the Government facility within 15 days after contract award in accordance with NAVSEA Clause C-242-H002 (OCT 2018). The Contractor shall coordinate the specific date and time for the PAC with the COR. At the PAC, the Contractor shall provide critical path timeline for contract implementation, to include: meetings and actions for contract ramp-up, turnover, as well as key personnel.
Weekly COR/PM Teleconference: The COR will provide a weekly time to review and discuss open issues and plan as necessary and review documented contractor performance. The Contractor PM shall be prepared to provide status of ongoing and upcoming actions, including common access cards, network access, travel, security, funding, invoices, training, deliverables, reports, etc.
Monthly Operations Teleconference: The Contractor shall plan, host, attend, coordinate, support, and conduct meetings, formal reviews, and audits monthly. The Contractor shall provide an agenda that lists open and future actions by tasking. Reviews requiring demonstration and/or examination of equipment shall be conducted on site.
3.2 Operations: The Contractor shall develop and implement an operations support plan to efficiently and effectively execute of the requirements of this contract (CDRL A014). There are approximately nine regular trials spanning a five days and three long trials spanning eight days in a typical year. Operations continue 24 hours a day and include tracking all vessels and targets on the range, recording data according to the test plan, reducing data to meet trial objectives, and providing logistical support for the trial operations. Each trial is preceded by a two-day pretrial period where system operation is verified. Following each trial there is a one-day demobilization period.
Unless otherwise specified, services shall be completed within the timeframe specified in the Project Planning Chart.
3.2.1 Southeast Alaska Acoustic Measurement Facility Operations: The Contractor shall operate the
SEAFAC Measurement Systems to ensure the facility is operationally ready to conduct test events on schedule. The
Contractor shall operate SEAFAC in accordance with NCWCCD-71-TR SEAFAC Acoustic Trial Facility User’s
Manual and provide technical assistance to maintain measurement, communications, tracking, and power supply systems required for facility and event operations. The contractor shall provide the necessary vessels and technical support to maintain SONAR calibration noise sources and supporting equipment. During equipment installations and test operations, the Contractor shall operate in sensitive, including Restricted Data (RD) and Naval Nuclear
Propulsion Information (NNPI), areas aboard ships and in the facility data processing spaces.
3.2.1.1 Static Site Measurement System: The Contractor shall operate the SEAFAC Static Site Measurement
System to ensure test events are conducted properly. The Contractor shall provide the necessary personnel and services to operate the Static Site and physical hardware components. The Static Site Measurement System includes the barges, High Gain Measurement System (HGMS), other measurement systems, deployment and handling equipment, support systems, sheave buoys, corner buoys, spanning wires, barge interconnect cable, suspension system, suspension winches, power subsystem and all related support equipment. This support shall include direct operations of hardware and software. The Contractor shall operate the Static Site Barges and components to ensure equipment and components are properly deployed and ships are properly moored. The Contractor shall operate
Barge utility systems including generators, bilge pumps, control systems, alarm systems, and navigation aids. The
Contractor shall operate cranes to deploy and retrieve test support equipment and mooring buoys. The Contractor shall operate winches to deploy and retrieve mooring cables via the sheave buoys. The Contractor shall operate cable reels and support equipment to deploy and retrieve communication and test support cabling. During retrieval of cabling and equipment the Contractor shall inspect components for wear and damage, provide a report of component condition (CDRL A015), and conduct repairs or replacement as required.
3.2.1.2 Underway Site Measurement System: The Contractor shall support testing at the SEAFAC Underway
Site Measurement System to ensure test events are conducted properly. The Contractor shall provide the qualified personnel and services to support the operation of the Underway Site measurement systems and physical hardware components. The components of the Underway Site include the HGMS, measurement, tracking and communications equipment, subsurface buoys, suspension cables, anchors, signal and power cable, and all related support equipment.
3.2.1.3 Measurement System Support: The Contractor shall provide qualified Tracking Operators and other personnel and services to operate the SEAFAC tracking, navigation, and communications systems, including the associated underwater and trial communications, transducers, and warning systems. The Tracking Operator duties may be shared with the Government or filled by either party in whole. The Government primarily fills the Tracking
Operator roles. The Contractor shall provide engineering support for identification of faults and errors, troubleshooting, and corrections to electronic components of the communications, measurement, and tracking systems. The Contractor shall support updates and upgrades by the Government.
3.2.1.4 Sonar Calibration Support: During test events, the Contractor shall provide the necessary personnel and services to support sonar calibration operations at the Static or Underway Sites. The Contractor shall provide technical support to maintain, operate, and deploy SONAR calibration noise sources, and shall provide research vessels for this service. The FCO is the approving authority to commence Sonar Calibration operations.
3.2.1.5 Electronic Equipment Installation: Prior to trials, the Contractor shall assemble and install electronic equipment (tracking system hardware, Clearcoms, VHF Radio’s, etc.) on the test vessel. The Contractor shall provide the necessary personnel to assist in the installation of this equipment. Contractor personnel may be required to travel to other Navy installations.
3.2.1.6 Emergency Services: During test events, the Contractor shall provide personnel to affect repairs on any electronic or mechanical system that could cause delays or cancellation of the event. The Contractor shall provide on-call mechanical/electrical specialists during all acoustic trials. The on-call mechanical/electrical specialist shall be housed and fed on Back Island during all trials. The Contractor shall be responsible for conducting emergency repairs to or recovery of any component of the measurement systems. Though hard to predict, historically one major event every three years is reasonable.
3.2.2 Vessel Support Services: The Contractor shall provide vessel support services for all requirements that cannot be satisfied with Government owned or Government-controlled vessels to support operations conducted at
SEAFAC. During the period of performance of this contract, miscellaneous freight handling and barge mooring equipment will also be required to support maintenance and operations tasks at SEAFAC. This effort will require the use of equipment including winches, fairleads, air compressors, welders, light towers, line spoolers, forklifts, generators, and a crane. The Government will provide a preliminary schedule of ship visits within three months of visit.
The Contractor shall provide qualified operators and mechanics for daily operations and each trial. The operators shall be able to operate any of the Government-owned small boats for the transferring of personnel, material, and equipment and possess the applicable qualifications, licenses and certifications. The Contractor shall maintain all required licenses and certifications and shall be able to provide those licenses/certifications upon request of the
Government. The following is a list of vessels that will be provided GFE:
ITEM Name
36’ Crew Boat SEAFAC II
28’ Crew Boat Seachaser
28’ Research Vessel SeaArk
19’ Work Skiff Work Skiff #1
19’ Work Skiff Work Skiff #2
19’ Work Skiff Work Skiff #3
19’ Work Skiff Work Skiff #4
See Section J, Attachment 19 for detailed information and photos.
The Government reserves the right to use Government-owned, controlled, or time-chartered tugs or vessels, separately or jointly with the Contractor’s vessels in performance of the required services.
Specific areas of performance are identified as follow:
Zone Areas
A SEAFAC, Western Behm Canal, Clover Passage, Knudson Cove
B Tongass Narrows, City of Ketchikan, Ketchikan Gateway
C Dixon Entrance, Clarence Strait
3.2.2.1 Vessel Operations: The Government will furnish or make available to the Contractor support craft for conducting ship movements. If the Government requires more support craft than available, the Contractor shall augment support craft for ship movements. Support Craft Operations includes, but are not limited to, towing, twisting, docking, undocking, streaming, shifting, assisting, pulling, and escorting ships. The Contractor shall operate vessels necessary to support employment of the Static Site.
The Contractor shall provide the necessary services to charter passenger vessels to transfer personnel from the City of Ketchikan and the Ketchikan Airport to SEAFAC and back before, during and after all test events.
The Contractor shall provide the necessary services to charter research vessels to conduct sonar calibrations, special tests, and other scientific research during all test and research events at SEAFAC.
The Contractor shall arrange and schedule all trial and non-trial vessel, aircraft, and vehicle charters for providing logistics, transportation of personnel, equipment, food, dry goods, and other support materials.
The Contractor shall provide the necessary services to charter barge and tug services to support the movement of large freight between the City of Ketchikan and SEAFAC.
3.2.2.2 Estimated Schedule: While the information provided herein is representative of the type of services required by the Government, the actual amount of work is anticipated to fluctuate due to site event schedules. The
Contractor shall anticipate providing call-outs in the number and areas identified below during each period of contract performance. The average is four hours per call-out.
Zone A B C
Estimated # of Call-outs 50 30 10
The Contractor shall respond within six hours notification time for the vessel/equipment to be on-site ready and perform. The Contractor shall respond to emergencies with utmost dispatch.
3.2.2.3 Vessel Performance Requirements: Vessel(s) may be ordered to any berth, dock, anchorage, wharf, place, open roadstead, submarine line, or alongside any vessel, barge, lighter, craft, hull, derrick, or object as required by the Government; provided the vessel can lie safely afloat, except in harbors or waters where groundings are custom of the port.
The Contractor shall provide the necessary personnel to provide and operate the types of vessels and equipment identified herein. The Contractor shall also be responsible for performing all required maintenance and obtaining necessary licenses/certifications associated with the vessels, equipment, and personnel to be utilized in the performance of this contract in accordance with applicable regulations to ensure readiness to meet Government requirements/schedules.
The Contractor shall perform the following services:
Towing, twisting, mooring, berthing, docking, streaming, shifting, assisting, pulling, and escorting the identified vessel types and miscellaneous other vessels, barges, submarines, crafts, hulls, sleds, derricks, lighters, and associated objects or carried freight. The Government reserves the right to use Government- owned, controlled, or time chartered Tugs or vessels separately or jointly with
Owner's Vessels in the performance of any services listed in this Contract.
Transfers of pilots and Government personnel.
Emergency support services including responses to weather conditions threatening vessels, piers, static site barges, or shore facilities; shipboard fires; vessels aground; vessel equipment failures; oil spills;
missions of mercy; collisions; search-and-rescue operations; shipboard casualty; and National Defense
Emergency.
Routine transfers of normally assigned and visiting personnel between Ketchikan, Ketchikan Airport, Knudson Cove and Back Island, Alaska, and vessels are required.
Deployment of U.S. Navy noise sources for submarine acoustic sonar calibration trials.
Line handling.
Provision of personnel (other than a riding crew) to go aboard a towed vessel.
Provision of adequate staff and communications necessary to promptly respond to Government requests for the required services on a 24 hour per day basis.
3.2.2.4 Vessel General Requirements: The Contractor shall warrant that all vessels and equipment are in full compliance with any/all applicable laws, regulations, and specified Government requirements associated with each required vessel/equipment type performing this type of work. The Contractor further warrants that the vessel shall have all certificates, records, or other documents on board during the performance of this effort, as required by law, regulation, and requirements.
The vessels shall be properly manned, fitted, and equipped for the services intended and shall be in seaworthy condition. All vessel hulls, machinery and equipment shall be in efficient operating condition to perform the required services. The Contractor shall indemnify the Government against, and hold them harmless from, all loss, damage, or liability resulting from the Contractor’s failure to exercise due diligence to make seaworthy the vessel, its machinery, equipment or personnel on board. The Contractor shall have the resources available to effect emergency vessel repairs locally, so that lapse of vessel services is minimized in the event of vessel casualties.
The Contractor warrants that each vessel shall have an efficient and legally sufficient complement of vessel master and crew with adequate training and experience in operation of all of the vessels/equipment.
3.2.2.5 Vessel/Equipment Minimum Specifications:
The minimally required specifications for all tugs/charter vessels to perform work under the subject contract are identified below. In addition, the general characteristics in the table below apply to all required vessels under the subject contract:
VESSEL CHARACTERISTICS
FLAG: USA
SURFACE CONFIGURATION: Configured to prevent metal-to-hull contact with surface or submarine vessels.
LINES:
Sufficient for services required under this contract. Lines shall have a minimum workload capability of 7,500 pounds.
WINCHES: Sufficient for services performed under this contract.
NAVIGATION EQUIPMENT: Minimum required by the USCG for inland & international waters. Shall include radar and navigation equipment to support safe navigation in reduced visibility escort assignments (e.g. GPS and SATNAV).
COMMUNICATION
EQUIPMENT:
Minimum required by the USCG and FCC for inland & international waters.
Systems shall include one two-way radio for communication on the following frequencies: 156.6 MHZ (Monitor Channel #12). Shall be equipped with one external loudhailer.
Small Tugs: Single screw propulsion type or better, minimum 900 Horsepower, 28,000-pound Bollard pull in forward direction at full-rated engine RPM. Shall have sufficient fire monitors to provide 360 degree coverage.
Large Tugs: Twin screw propulsion type or better, minimum 2,200 Horsepower, 55,000-pound
Bollard pull in forward direction at full-rated engine RPM. Shall have sufficient fire monitors to provide 360 degree coverage.
Tractor Tugs: Twin screw propulsion type or better, minimum 4,000 Horsepower, 75,000-pound
Bollard pull in forward direction at full-rated engine RPM. Shall have sufficient fire monitors to provide
360 degree coverage.
Utility Work Boats: Single or twin screw propulsion type or better, minimum 180 Horsepower.
Research Vessel: Single or twin screw propulsion type or better, minimum 180 Horsepower.
Barge: Barges of varying size and capacity suited for the assigned task. Typical barge size would be
150 foot length and 35 foot beam. Larger and smaller barges may be required.
Small Crew Boats: Single screw propulsion type or better, minimum 650 Horsepower.
Minimum passenger capacity of 10 people.
Large Crew Boats: Single screw propulsion type or better, minimum 900 Horsepower.
Minimum passenger capacity of 30 people. Must include one 15-foot aluminum brow for personnel transfers.
Landing Craft: Single screw propulsion type or better, minimum 400 Horsepower. Capable of at least transporting 5 ton vehicles to and from shore as needed.
Equipment: In support of onsite and on-water freight handling and mooring operations, various support equipment will be required. The equipment provided by the Contractor to perform the work identified must meet the following characteristics, at a minimum.
EQUIPMENT MINIMUM CHARACTERISTICS
TYEE or equivalent type Winch Capable of conducting a 60,000-pound line pull
MADILL or equivalent type Winch Capable of conducting a 20,000-pound line pull
Fairleads Fixed and swivel type, capable of supporting services on this contract.
Roller Fairleads Capable of supporting 50 tons
Air Compressor Capable of producing 185 cubic feet per minutes of compressed air
Welder Miller 500 or equivalent type unit
Light Tower Capable of producing 6 Kilowatts of light
Line Spooler Sufficient for services performed under this contract
Forklift Capable of picking up a 20,000-pound load.
Generator Capable of supplying a 14.4-Kilowatt power output
Crane Up to 150-ton capacity, capable of being mounted and operated on a barge.
Must meet the requirements set forth in NAVFAC Instruction P-307 for cranes and operators of cranes.
3.2.2.6 Substitution of Vessels/Equipment: In the event that a necessary substitution of vessels/equipment is identified, the Contractor shall provide a written request to the COR no later than 48 hours prior to non-availability of the contract vessel/equipment, except where urgency precludes written notice. If urgency precludes written notice, the Contractor shall provide an oral request/notice to the COR and shall confirm in writing within 48 hours of receipt of Government's determination. Such requests shall identify the cause of the substitution and shall include any/all information necessary to allow the Government to determine as to if the substitute meets the minimum requirements of the contract to perform the work. The COR will notify the Contractor of acceptance/rejection of the substitute vessel/ equipment within 24 hours of request receipt, provided that sufficient information on which to base such a determination is provided.
Any vessel/equipment nominated as a substitute shall result in no additional cost to the Government unless the
Contracting Officer provides prior written approval, shall meet the same characteristics, and shall be similarly fitted and otherwise equal or superior in performance to the vessel/ equipment for which it is being substituted. The COR has no authority to approve additional costs. Any additional costs not approved in advance and in writing by the
Contracting Officer, will be unallowable. The use of the substituted vessel/ equipment shall result in no operational delay and shall not excuse failure to perform the requirements of the contract requirements.
3.2.3 Project Support: The Contractor shall provide personnel and services to support those activities necessary for the logistical support of facilities, marine vessels, and support equipment employed in research, development, test and evaluation (RDT&E). The scope shall include activities relating to management and support of infrastructure preservation. The Contractor shall provide engineering, technical, integration, logistics and installations, material and related services to deliver and execute and/or assist with Project Support as outlined below (CDRLs A015, A016, A017, and A018):
Configure facilities test platforms
Develop, implement, and maintain configuration plans for facilities and equipment
Operate vessels and logistics equipment to support operations and material movement
Provide miscellaneous welding (licenses/certifications as applicable), metal fabrication, and machine shop support
Operation and maintenance of cable handling systems and rigging equipment
Design, fabricate, construct, assemble, integrate, and install components, devices and facility systems to support test projects.
3.2.4 Security Support
3.2.4.1 General Security: The Contractor will assist to ensure that facility access is limited to authorized personnel and to perform fire watch duties during the normal workday. After hours, the SEAFAC security system, fire alarms, static site alarms, and other site alarms provide site security. The Contractor shall support the Site Director to provide a team to receive and respond to alarms within two hours of notification. Any response actions will be coordinated with the Site Director. The support shall be provided up to the point where intrusion is verified. After that point, site security and response shall be obtained from Alaska State Highway Patrol.
3.2.4.2 Visitor and Document Control: The Contractor shall assist the Government in meeting the security requirements for the site. The Contractor shall receive, accept, store, handle, package, and ship classified, pre- and post-trial, material. The Contractor shall ensure that all security regulations regarding classified document and medium handling, storage, disposal and transportation, Contractor personnel clearances, official visit requests, and site security are conducted in accordance with the DD 254 of this contract (Section J, Attachment 1). The
Contractor shall be able to obtain the ability to handle Naval Nuclear Propulsion Information (NNPI) both physically and within information technology (IT) systems.
3.2.4.3 Range Control Support: During acoustic trials, the Contractor shall provide the necessary personnel to assist the FCO in keeping the range and pier clear of all unauthorized vessels and personnel.
3.2.5 Logistics Support: The Contractor shall provide the necessary personnel and services to support the Site
Director in providing logistics services in support of mission readiness at SEAFAC. The Contractor shall ensure that supplies, materials, and personnel are delivered in time to meet operational schedules. This function includes shipping and receiving equipment, coordinating transportation for mission support personnel and visitors, and coordinating support services to the site. This support shall be continuous during trials or extended maintenance operations.
3.2.5.1 Shipping and Receiving: The Contractor shall provide the necessary services for the shipment and receipt of all materials, both classified and unclassified. The Contractor shall provide secure off-site receiving and holding locations in Ketchikan Gateway Borough for unclassified shipments until arrangements for the shipment can be made for transfer to the site. The Contractor shall provide the necessary services to charter a barge and tug to support the movement of large freight between Ketchikan, AK and SEAFAC. All items shipped shall use the
Government Shipping account whenever possible.
3.2.5.2 Charters: The Contractor shall arrange and schedule all trial and non-trial vessel, aircraft, and vehicle charters for transportation of personnel, equipment, food, dry goods, and other support materials.
3.2.5.3 Storage: The Contractor shall arrange for offsite storage and mooring for equipment, vessels, and material when storage or transportation to SEAFAC cannot be immediately scheduled and for long term storage.
3.2.5.4 Inventory: The Contractor shall maintain an inventory of all material and equipment at SEAFAC to assist the Government with its annual inventory of equipment.
3.2.6 Vehicle and Equipment Operation: The Contractor shall provide qualified operators for daily operations and each trial. The operators shall be able to operate any of the GFE for the transferring of personnel, material, and equipment and possess the applicable qualifications, licenses and certifications. The Contractor shall maintain all required licenses and certifications and shall be able to provide those licenses and certifications upon request of the
Government. Some items, Weight Handling Equipment (WHE), Material Handling Equipment (MHE), rigging gear, etc. have special qualifications required under various state and federal regulations, such as OSHA 29 CFR
1910 Safety and Health Standards; OSHA 29 CFR 1918 Longshoring; and OSHA 29 CFR 1926.106 Working over or near water. All weight handling systems and personnel shall be in compliance with Naval Facilities Engineering
Systems Command (NAVFAC) P-307 standards. All vehicles, Civil Engineer Support Equipment (CESE), and personnel shall be in compliance with NAVFAC P-300 standards. All MHE and personnel shall be in compliance with Naval Supply Systems Command (NAVSUP) P-538 standards. The Contractor shall support Navy audits to verify compliance. The following is a list of vehicles, WHE, MHE, and CESE that will be provided as GFE:
ITEM TYPE CAPACITY (lbs.) LOCATION
Crane “A” Pedestal 20,000 Pier
Crane “B” JIB 20,000 Pier
Crane “C” Pedestal 27,600 Pier
Overhead Trolley Bridge 10,000 Utility Bldg.
Grove Mobile 30,000 Rolling Stock
Knuckle boom #1 Boom 6,000 IX-527
Knuckle boom #2 Boom 6,000 IX-528
IX-527-2 Barge Pedestal 3,600 IX-527
IX-528 Gantry Barge Gantry 4,000 IX-528
Electric Forklift Mobile 6,000 Warehouse
Diesel Forklift Mobile 6,000 Warehouse
Loader Mobile 10,000 Rolling Stock
Rigging Gear Various Various Various
GGTE Scout #1 Electric Pickup Rolling Stock
GGTE Scout #2 Electric Pickup Rolling Stock
GSA Van 15-passenger Rolling Stock
LMTV M-1078 Troop Carrier 10,000 Rolling Stock
ITEM TYPE CAPACITY (lbs.) LOCATION
Stake Bed Truck Cargo Carrier Rolling Stock
See Section J, Attachment 19 for detailed information and photos.
3.2.7 Environmental: The Contractor shall comply with all applicable Federal, state, and local laws, regulations, and executive orders, and with base-wide instructions, standards, and permit requirements. The Contractor is responsible for ensuring that its employees receive applicable environmental and occupational health and safety training, and are kept up to date on all required regulatory and specific training for the type of work to be conducted onsite, including, but not limited to, hazardous material handling and storage, hazardous waste handling and storage, handling, spill response, and disposal procedures.
The Contractor shall provide spill response services to ensure oil and hazardous substance spills are properly contained and recovered. The Contractor shall comply with OPNAV M-5090.1, NAVREGNWINST 5090.1
Integrated Spill Contingency Plan, and SEAFAC Comprehensive Environmental Response Plan (CERP). The
Contractor shall properly dispose of the recovered oil and hazardous substance. The Contractor shall remove, clean, and store recovery material and equipment within two days after cleanup is complete. The Contractor shall participate in periodic spill drills and table top exercises.
The Contractor shall support audits of the site’s environmental requirements, at a schedule determined by NSWCCD
Government Site Director.
3.3 Facility Support: The Contractor shall develop and implement a Facility Support Plan to efficiently and effectively execute of the requirements of this contract (CDRL A019).
The Contractor shall provide on-call mechanical/electrical crew during specified on site events. The Contractor shall conduct emergency repairs to or recovery of any component of the facilities, acoustic measurement, and tracking systems. The on-call mechanical/electrical specialist shall be housed and fed on Back Island during these events. Historically, there are 12-15 events per year.
3.3.1 Facility Management: The Contractor shall provide the necessary personnel to inspect and maintain
(regular and recurring) site structures and buildings prior to mission events to ensure all structures are suitable for conducting the mission. SEAFAC consists of six buildings (Range Operations Center, Administration, Utility, ClearSpan, Warehouse and Pier Locker) and other site infrastructure and improvements listed in iNFADS data base.
The Range Operations Center houses the acoustic lab, computer room, electronics lab, kitchen and common area, berthing and security. The Administration Building houses the Government and Contractor Site Managers offices.
The Utility Building houses the HVAC, Backup Power System, Machine Shop, Fire Fighting System, and Water
Supply Systems. The ClearSpan Building houses special project work or rolling stock as needed. The Warehouse houses the material handling equipment, recycling program and other spare parts and systems needed for acoustic trials. The Pier Locker is a waiting shelter that holds Personal Protective Equipment (PPE), Personal Floatation
Devices (PFD) and rain gear for operations on the pier. The Contractor shall make the appropriate repairs to ensure mission events can be conducted safely and securely.
The Contractor shall assess the condition of structures, facilities, and equipment annually. The Contractor shall develop project documentation for the sustainment, repair, or modernization of facilities and infrastructure. The
Contractor shall support the review of and execution of the Government’s Facility Master Plan.
This contract excludes renovation and construction of the buildings.
3.3.2 Facility Investment: The intent of Facility Investment is to specify the requirements for Sustainment, Restoration, and Modernization (SRM) functions. The Facility Investment requirements primarily consist of infrastructure sustainment and minimal restoration and modernization work. Sustainment is the maintenance and repair necessary to keep an inventory of facilities and other assets in good working order. Restoration and modernization normally consists of major rehabilitation and capital improvements that are accomplished through other Navy programs. Some major repair, upgrade and alteration may be accomplished as part of Facility
Investment.
The Contractor shall be responsible for maintaining all facilities, systems, and equipment, identified in this section, to a standard that prevents deterioration beyond that which results from normal wear and tear and corrects deficiencies in a timely manner to assure full life expectancy of the facilities, systems, and equipment. Best commercial practices shall be applied in the performance of work. All work shall be completed per approved and accepted industry and equipment manufacturers’ standards and shall comply with building and safety codes, applicable activity, local, state, and federal regulations, and other technical requirements identified within this technical sub-annex. Services shall be completed within the timeframe and frequency specified in the approved
Facility Support Plan.
Workmanship for maintenance and repair shall include all work necessary to complete facility and system restoration, including touch-up painting and operational checks. Upon completion of work, the Contractor shall ensure all facilities, systems, and equipment are free of missing components or defects which would affect the safety, appearance, or habitability of the facilities and structures or would prevent any electrical, mechanical, plumbing or structural system from functioning in accordance with design intent. Repairs shall be made in accordance with the manufacturers’ specifications and guidelines, and standard building codes. The quality of repairs shall meet the applicable standards and shall prevent any malfunction reoccurrences caused by poor workmanship or other Contractor inadequacies. The quality of the repaired areas shall be fully compatible with adjacent surfaces or equipment. Except where otherwise specified, replacements shall match existing in dimensions, finish, color, design, and functionality and shall have an appearance similar to the original finished appearance with only minor unobjectionable deterioration resulting from normal use.
The Contractor shall not allow debris to spread unnecessarily into adjacent areas nor accumulate in the work area.
All such debris, excess material, and parts shall be cleaned up and removed at the completion of the job and at the end of each day work is in progress. Upon completion of work, any stains and other unsightly marks shall be removed.
The Contractor shall perform preventive maintenance (PM), corrective maintenance (CM), upgrades, and alteration for all site infrastructure including, but not limited to,…