N0016724Q0255 0004 PWS Clarifications.docx
DOCX document 13 KB Posted
- Attached to
- Programmable Logic Controller Upgrade for LCC Federal contract opportunity
- Solicitation number
- N0016724Q0255
About this file
This document appears to be a set of clarification questions regarding the Performance Work Statement (PWS) for a Programmable Logic Controller Upgrade for the Large Cavitation Channel solicitation (Solicitation Number N0016724Q0255).
The key details are:
The government is requesting the vendor to specify if they will provide the Commissioning Plan, Installation Plan, and Installation Schedule as required CDRLs in the PWS. The vendor is also asked to provide a general overview of the project schedule to show it will meet the contract Period of Performance. Additionally, the vendor is asked to specify if they will conduct a site visit to verify the existing hardware and dimensions, and if they will provide technical documentation summarizing the as-built installed system.
The overall solicitation is for a Programmable Logic Controller Upgrade for a Large Cavitation Channel, issued by the Naval Surface Warfare Center Carderock Division on a small business set-aside basis. The NAICS code is 541519 with a $34 million size standard. Quotes are due by August 20, 2024.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| N0016724Q0255 0004.pdf | ||
| N0016724Q0255 0003.pdf | ||
| N0016724Q0255 0002.pdf | ||
| For Supporting Documents Reach Out by E-mail.docx | DOCX document | |
| N0016724Q0255 0001.pdf | ||
| Questions and Answers.docx | DOCX document | |
| N0016724Q0255.pdf | ||
| GPE Post.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Please address the following sections of document N0016724Q0255’s Performance Work Statement in detail when providing your quote.
1. Please specify if you will provide to the Government the Commissioning Plan (CDRL A001) specified in section 3.2.3.
1. Please specify if you will provide to the Government the Installation Plan (CDRL A002) specified in section 3.2.3.
1. Please specify if you will provide to the Government the Installation schedule (CLDR A003) specified in section 3.2.3. Please provide a general overview of the project schedule to show that it will meet the contract PoP.
1. Please specify if you will conduct a site visit to verify the hardware that is currently installed at the LCC, and the dimensions of the current enclosure and panels as specified in section 3.2.2.
1. Please specify if you will provide to the Government technical documentation that summarizes the as-built installed system including the electrical and mechanical interfaces (CRDL A005, A006) specified in section 3.2.9. If so, what documents will be provided.
File details come from the government source that posted it. Updated .