This document is a Request for Proposals (RFP) for the replacement of roll-up doors at two facilities operated by the Naval Surface Warfare Center Carderock Division (NSWCCD) Acoustic Research Detachment (ARD) in Bayview, Idaho.
The RFP requires the contractor to furnish all labor, supervision, materials, supplies, tools, and equipment to replace two 12' x 16' roll-up doors on Building 51 at the main ARD facility, and two 5' x 10' sliding wood doors on Building 46 at the Wigwam Winch Facility. The contractor must install, test, and inspect all doors prior to acceptance by the government. The period of performance is 60 days after award. The RFP is a sealed bid solicitation, with offers due by July 30, 2024. The government will evaluate quotes based on price and technical capability, and will award to the responsible offeror who submits the lowest-priced technically acceptable quote. The North American Industry Classification System (NAICS) code is 236220, with a small business size standard of $45 million. The RFP incorporates various FAR clauses and references a Davis-Bacon Act wage determination.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| N0016724Q00420001 Roll Up Door amend.pdf | ||
| SITE VISIT SIGNUP.xlsx | XLSX spreadsheet | |
| 02. Statement of Work Building 51 and 46 Roll Up Doors.docx | DOCX document | |
| Wage Determination.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1301171110
- Replace Building 46 and Building 51 Roll-Up Doors at Acoustic Research Development (ARD) Bayview , Idaho
- MAGNITUDE OF CONSTRUCTION PROJECT: Betw een $25,000 and $100,000
- The North American Industry Classif ication System (NAICS) code for this project is 236220
- Time for completion: All w ork shall be completed and accepted by the Government no later than 60 days after aw ard.
- All preproposal inquiries (PPIs) must be emailed to pamela.a.ganste.civ@us.navy.mil
PAMELA A GANSTER 757-781-9381
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
17-Jul-2024
(RFP)
(IFB)
CALL:
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
See Item 7
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance w ithin _______15 calendar days and complete it w ithin ________120 calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
YES X NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________30 Jul 2024 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee is, X is not required.
C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______120 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
NAVAL SURFACE WARFARE CENTER CARDEROCK
PAMELA A. GANSTER
PAMELA.A.GANSTER.CIV@US.NAVY.MIL
904 CORPORATE LANE
CHESAPEAKE VA 23320
N00167
PAGE OF PAGES
1 OF
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
02:00 PM (hour) Sealed envelopes containing offers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
8. ADDRESS OFFER TO (If Other Than Item 7)
FAX:TEL: 757-781-9381 TEL: FAX:
N0016724Q0223 52
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .
gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(M ust be fully completed by offeror)OFFER
N0016724Q0223
Section 00 10 00 - Solicitation
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Task 8'2"x10'1" Roll-up Door
FFP
The Contractor shall furnish all labor, supervision, materials, supplies, tools, and minor equipment to install one 10’ x 8’ insulated sectional door, mounting hardware and Motor Controller in accordance with the Statement of Work.
FOB: Destination
VENDOR PART NR: 300000191842-0020
PURCHASE REQUEST NUMBER: 1301171110
PSC CD: Z2HB
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0002 1 Task 12'x16' Roll-up Door
FFP
The Contractor shall furnish all labor, supervision, materials, supplies, tools, and minor equipment to install two 12’ x 16’ insulated metal rolling doors with electric drive motors and controllers in accordance with the Statement of Work.
FOB: Destination
VENDOR PART NR: 300000191842-0020
PURCHASE REQUEST NUMBER: 1301171110
PSC CD: Z2HB
NET AMT
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
0001 POP 20-JUL-2024 TO
30-SEP-2024
N/A NSWCCD, ACOUSTIC RESEARCH
DETACHMENT
GREG CARTER
33964 N. MAIN AVENUE
BAYVIEW ID 83803
208-683-2321 EXT 4510
FOB: Destination
N62182
0002 POP 20-JUL-2024 TO
30-SEP-2024
N/A (SAME AS PREVIOUS LOCATION)
FOB: Destination N62182
STATEMENT OF WORK
Statement of Work to Replace Building 51 and Building 46 Roll-Up Doors at Naval Surface Warfare Center Carderock Division (NSWCCD)
Acoustic Research Detachment (ARD) Bayview, Idaho
Table of Contents
1. General Information
2. Performance Requirements
3. Period of Performance
4. Warranty
5. Point of Contact
6. Security Requirements
7. Smoking Restrictions
8. Station Permits
9. Storm Protection
10. Asbestos and Lead Material
11. Environmental Protection Requirements
12. Transportation on Station
13. Storage of Materials and Equipment
14. Availability of Utility Services
15. Inspection
16. Oral Modification
17. Work Schedule
1. General Information ARD Bayview Building 51 roll-up doors are over 40 years old, surpassed their operational life expectancy and are operating in a degraded status. The Wigwam Winch Facility, (Building 46) has two barn style sliding doors that are inadequate for their intended purpose. The doors do not seal properly and allow weather and animals to access the facility. Building 51 has two 12’ x 16’ steel manually operated roll up doors. Building 46 has two 5’ x 10’ sliding, (barn style) wood doors. The Government's requirement is to replace the existing doors listed above located at Acoustic Research Detachment’s (ARD), Main facility and Wigwam. The goal of this effort is to remove the existing doors and install updated doors with electric openers that better serve the facilities. Upon project completion, the contractor shall test, inspect and commission the newly configured doors. All work shall be performed as specified complete and ready for use.
Building 51 North Door (1 of 2)
Building 46 (Wigwam Facility)
Location:
Naval Surface Warfare Center, Carderock Division
Acoustic Research Detachment 33964 North Main Avenue Bayview, ID 83803-9750
Parking:
The Contractor is permitted to off-load materials, supplies, and equipment throughout the base; however, the Contractor must not block the facility exit/entry locations and park in reserved or handicap spaces. Contractors’ vehicles must be marked on the outside with the company name or logo or both. Failure to comply will result in ticketing and/or loss of vehicle privileges.
2. Performance Requirements The Contractor shall furnish all labor, supervision, materials, supplies, tools, and minor equipment to provide the desired services in accordance with this specification. This specification shall require the replacement of two Building 51 12’ x 16’ roll up doors and two 5’ x 10’ sliding wood doors on Building 46 at Wigwam Winch Facility. Additionally, the contractor shall install, test and inspect all doors prior to acceptance by the government.
2.1 Demolition:
a. Building 51, Main Base: The Contractor shall remove in their entirety two existing 12’ x 16” metal coiling doors, hoods, tracks and all associated mounting hardware from Building 51 and dispose of offsite.
b. Building 46, Wigwam Facility: The Contractor shall remove in its entirety existing 5’ x 10’ wood sliding, (Barn Style) doors, track and mounting hardware from Building 46 and dispose of offsite. The government shall provide transportation of demolition debris from Wigwam back to Main base for Contractor to dispose of offsite.
2.2 Construction
a. Building 51: Contractor shall provide all labor, tools, and equipment to install two 12’ x 16’ insulated metal rolling doors with electric drive motors and controllers. Measurements are approximate; Contractor is responsible to verify all measurements for proper fit prior to ordering materials.
b. Building 51 Doors and Operator Motors shall have the following minimum specifications:
i. Curtain shall be a minimum of 24 gauge galvanized metal slats front and back.
ii. Springs rated for 20,000 cycles.
iii. Insulated to a minimum R-value of 10
iv. Bottom weather seal and side guide brushes.
v. A UL approved Monitored Light Curtain installed for safety.
vi. Electric Hoist Motors with minimum of 1HP, adjustable limit switches and Push
Button control with Open/Close/Stop functionality, and a thermal overload protection system.
vii. Hoist Motors shall utilize 115/1Phase/60HZ Power for operation.
viii. Doors shall have a Flame Spread/Smoke Index of Class A or 1.
ix. Doors shall be able to withstand a wind load of 20 PSF.
x. Doors shall have a Chain Hoist installed as secondary method of operation in the event of motor/controller failure.
xi. Color to be specified by Government.
c. Building 46 Wigwam Facility: Contractor shall provide all labor, tools, and equipment to install one 10’ x 8’ insulated sectional door, mounting hardware and Motor Controller.
Measurements are approximate; Contractor is responsible to verify all measurements for proper fit prior to ordering materials.
d. Building 46 Door and Operator Motor shall have the following minimum specifications:
i. 5 Sections with 2” Ribbed Panels
ii. Metal Panels will be Galvanized Roll Formed Steel with a minimum thickness of
.015”.
iii. Springs rated for 10,000 cycles.
iv. Insulated to a minimum R-Value of 15.
v. Bottom weather seal
vi. Color to be specified by Government.
vii. Install a Universal Wireless Keypad Opener.
viii. Door shall have a pass door installed for ease of access.
ix. Operator Motor shall be belt driven, minimum of ½ HP, have adjustable limit switches, and thermal overload protection system.
x. Operator Motor shall utilize 115/1 Phase/60 HZ Power for operation.
2.3 Electrical
a. Government shall provide and install all conduit and electrical wiring from building electrical panels to the motors and controllers for all three doors.
b. Contractor shall make all electrical connections to the motors and controllers.
3. Period of Performance All work shall be completed and accepted by the Government no later than 60 days after award.
4. Warranty The Contractor shall guarantee all of the work that is performed under this contract, including all materials and workmanship, for a minimum period of one (1) year from the date of full acceptance of the work. Should any material be found defective, not meeting specifications, or that which has not been approved in writing by the owner shall, upon discovery (including any time within the period of the guarantee), be replaced with the specified equipment or material at no additional cost to the Government.
All work shall be performed and completed in a thorough, workmanlike manner and in accordance with the latest proven practices of the trade by thoroughly skilled and experienced tradespeople.
5. Point of Contact The Contractor shall be in contact with the following individual in performance of this contract. If the Contractor has any performance questions during the duration of the contract, the Contractor shall contact the Government representative below.
Gregory Carter NSWCCD Acoustic Research Detachment Gregory.s.carter.civ@us.navy.mil 208-683-2321
6. Security Requirements Contract Clause "FAR 52.204-2, Security Requirements and Alternate II," "FAC 5252.236-9301, Special Working Conditions and Entry to Work Area," and the following apply.
a. At NSWCCD-ARD, access is restricted to contractors on the visitors list. All contractors must be US
Citizens and will be subject to a background check upon their arrival at the ARD. No persons with a felony conviction that is less than (10) years old, a registered sex offender, or on a terrorist watch list will be allowed admittance to the base. The background check will require that all vendors present an active passport, or a combination of a driver’s license and a birth certificate with the embossed state seal. No photocopies will be accepted.
b. Vehicles and Equipment - Shall be in good working order with no leaks.
c. Contractor Responsibility for Employees - The Contractor is responsible for employees under their employment. Ensure that employees are familiar with and obey station traffic, safety, and security regulations.
d. Motor Vehicle Operation - Ingress and egress of personnel will be subject to the security regulations of the Station.
e. All personnel entering the installation are subject to random vehicle inspections. The purpose of these inspections is to detect the theft of Government and private property, and to detect contraband or illegal drugs.
f. Required Information on Privately Owned Vehicles - Advise company employees who desire to use their privately owned vehicles to personally bring the vehicle, vehicle registration, copy of vehicle insurance policy, valid state inspection documentation, and driver's license.
g. Access to Restricted Areas - Base entry passes allow access to designated areas on the installation only. Entry into off limits areas is prohibited unless the contract requires it.
h. Current Information - Contractors will be responsible for keeping the vehicle and employee lists current, and for securing and returning identification cards belonging to terminated employees to the Command Manager's Officer.
i. All contractor and all associated sub-contractors employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative). The contractor shall also provide all information required for background checks to meet installation/facility access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any installation or facility change, the Government may require changes in contractor security matters or processes.
j. The Contractor must pre-screen Candidates using the E-verify Program (http://www.uscis.gov/e-verify) website to meet the established employment eligibility requirements. The Vendor must ensure that the Candidate has two valid forms of Government issued identification prior to enrollment to ensure the correct information is entered into the E-verify system. An initial list of verified/eligible Candidates must be provided to the COR no later than 3 business days after the initial contract award.
7. Smoking Restrictions The bearing and use of lighted cigarettes, cigars, pipes, or any tobacco product is prohibited in the following areas:
a. All buildings including private offices, lobbies, and restrooms.
b. Stairways and ramps leading to building entries and exits.
c. Within 20 feet of building entries and exits.
d. Within 20 feet of heating, ventilation, and air conditioning intake ducts.
e. Hazardous areas containing flammable liquids, gases, vapors, and all other locations here there is a collection of readily ignitable combustible material.
8. Station Permits Permits are required for, but not necessarily limited to, welding and burning. Permits must be requested by the Contractor and approved by the Government Representative.
9. Storm Protection If a warning of gale force winds is issued, take precautions to minimize any danger to persons, and protect the work and any nearby Government property. Precautions shall include, but not be limited to, closing openings, removing loose materials, tools, and equipment from exposed locations, and removing or securing scaffolding and other temporary work. Close openings in the work if storms of lesser intensity pose a threat to the work or any nearby Government property.
10. Asbestos and Lead Material If material is encountered which may contain asbestos and or lead and must be disturbed, do not touch the material. Should the discovery of such suspected material affect the Contractor's planned work schedule, the Contractor shall redirect the work crew to other portions of the unaffected work and modify the schedule at no additional cost to the Government. The Contracting Officer, PM, and the COR shall be notified immediately, in writing, regarding the discovery of the suspected material and of any adverse impact the Contractor may expect to incur due to this situation. Within 14 calendar days, the Contracting Officer or the Project Manager will perform laboratory tests to determine if there is asbestos or lead. If asbestos or lead is not a danger, the Contracting Officer will direct the Contractor to proceed in the identified area without change.
11. Environmental Protection Requirements Provide and maintain, during the life of the contract, environmental protection. Plan for and provide environmental protective measures to control pollution that develops during normal construction practice. Plan for and provide environmental protective measures required to correct conditions that develop during the construction of permanent or temporary environmental features associated with the project. Comply with Federal, state, and local regulations pertaining to the environment, including but not limited to, water, air, soil, and noise pollution.
a. Preserve the natural resources within the project boundaries and outside the limits of permanent work. Restore to an equivalent or an improved condition upon completion of work.
Confine construction activities to within the limits of the work indicated or specified.
b. Prevent oily or other hazardous substances from entering the ground, drainage areas, storm drainage system, or local bodies of water.
c. Pickup solid wastes daily and place in covered containers which are regularly removed by the Contractor from Government property. Do not prepare or cook food on the project site. Prevent contamination of the site or other areas when handling and disposing of wastes. At project completion, leave the areas clean.
d. Handle generated hazardous waste in accordance with 40 CFR 262. Dispose of hazardous waste in accordance with Federal, State, and local regulations including 40 CFR 263 and 40 CFR
264. Take precautions to prevent spills of oils and hazardous material. In the event of a spill, immediately notify the Government representative, COR, and initiate containment operations utilizing personnel properly trained and protected for such situations.
e. Keep dust down at all times, including during nonworking periods. Sprinkle or treat, with dust suppressants, the soil at the site, and other areas disturbed by operations. Dry power brooming will not be permitted. Instead use vacuuming, wet mopping, wet sweeping, or wet power brooming. Only wet cutting will be permitted for cutting concrete, and bituminous concrete.
f. Make the maximum use of low-noise emission products, as certified by the EPA. Blasting or the use of explosives is prohibited.
g. Ozone Depleting Substances (ODS): The use on station or the removal off station of Class I ODS's is strictly prohibited without the prior knowledge and consent of the Contracting Officer.
ODS's are generally found in refrigerants, fire-fighting agents, and solvents. The Contractor shall use only those products that are approved and listed by the EPA Significant New Alternatives Program (SNAP). Any Class II ODS shall be used only when specified by the Government. When ODS's of any class are used or saved for reuse, the Contractor shall list this amount in pounds on the "Daily Report To Inspector" form and the Contractor's invoice. The Contractor shall not knowingly vent or otherwise dispose of any ODS in a manner which would permit their release into the environment. ODS's shall be captured and recycled in conformance with all applicable Federal, State, and local regulations. The Contractor shall furnish a material safety data sheet to the Government representative prior to use of any ODS or SNAP product on station.
12. Transportation on Station No employee of the Contractor shall be allowed to operate a privately owned vehicle on Station other than for ingress and egress. All private vehicles shall be parked in a designated area and remain until the end of the work shift at which time they shall be driven directly to the gate for exit from the station. Any desired transportation of personnel, supplies or equipment on station by the Contractor shall be accomplished by the use of one (1) registered vehicle furnished by the Contractor and operated by an assigned driver appointed by and responsible to his "Supervisor".
The Government will provide boat access, and crane and barge support to the Wigwam Facility and all transportation to and from the site for the contractors and their equipment. The Wigwam location is a remote facility located 8 miles up lake and only accessible via boat.
13. Storage of Materials and Equipment Government furnished storage facilities are available to the Contractor in the vicinity of the work site. The Government representative will provide guidance on storage location and duration. The security of the Contractor's property and his personnel's property shall be the full responsibility of the Contractor. The Government will accept no liability in case of loss due to fire or theft.
14. Availability of Utility Services The Government will furnish water, electric lights, and power in the quantity not to exceed the amount necessary for the normal prosecution of the work, at the nearest available outlet. The Contractor shall make all piping and wiring connections thereto and shall extend the services to the site of the work. On completion of the work, all such temporary connections shall be removed by the Contractor and any removed or damaged portions of the Government services at the points of connection shall be repaired or replaced.
a. Other Utilities: The Contractor shall make arrangements to obtain all utilities not furnished by the Government, at his/her own expense.
b. The Government will not provide refuse facilities. The Contractor will be required to dispose of all garbage and other waste materials generated by his work at a licensed off-site landfill.
15. Inspection All work is subject to inspection by a designated Government Representative and/or the COR during performance of specified work, and upon completion of the job. The Government will perform the pre-final inspection to verify that the work is complete and the facility ready to be occupied. A Government punch list will be developed as a result of this inspection. All items in the punch list shall be corrected in timely manner and shall be approved by the Government representative. Final acceptance of the installed doors will not be given until Contractor has successfully completed all testing operations, corrected all material and equipment defects, and made all proper operation adjustments.
16. Oral Modification No oral statement of any person other than the Contracting Officer, or their representative, as provided in the clause in the Contract entitled "Changes", shall in any manner of degree modify or otherwise affect the terms of this Contract.
17. Work Schedule All work shall be performed to minimize disruption to building occupants. It is recommended that the majority of the work be performed during normal working hours, starting 0730 – 1530 Monday – Friday. Incidental work may be completed after normal working hours.
Section 00 21 16 - Instructions to Proposers
INSTRUCTIONS TO PROPOSERS
INSTRUCTIONS TO QUOTER
The Government intends to award a contract to the responsible quoter who (1) is the Lowest Price Technically Acceptable quotation, (2) conforms to the solicitation, (3) proposes a price that is fair and reasonable, and (4) will be most advantageous to the Government, price and other factors considered.
The following factors shall be used to evaluate quotations:
Factor 1 Price Quotes must include a proposed price for each Contract Line Item Number (CLIN). The Government will determine prices to be fair and reasonable in accordance with FAR Part 13.106-3 based on, but limited to, market research, current or previous purchases, prices for similar performance in a related industry, and comparison to an independent Government estimate.
Quoters responding to this solicitation are advised that, prior to award, the Government may request quoters to submit information/data to support price reasonableness such as copies of paid invoices for the same or similar items, sales history for the same or similar items, price list with effective date and/or copies of catalog pages along with any applicable discounts.
Factor 2 Technical Capability/Approach The Government will evaluate the Quoter for acceptability of Technical Capability.
Minimum Requirements The following are the minimum requirements a quote must meet to be deemed acceptable for the Technical Capability factor:
(1) The quoted supplies/services shall meet the solicitation requirements including any required parts, delivery dates, and terms and conditions stated in the solicitation.
(2) Quoter shall provide a minimum of one prior project where the quoter performed installation work of a similar nature to the installation work described in Section 3 of the Statement of Work provided herein.
Technical Capability/Approach evaluations will result in one of the following ratings:
Table 1 – Technical Ratings
Rating Description Acceptable Quote clearly meets the minimum requirements of the solicitation Unacceptable Quote does not clearly meet the minimum requirements of the solicitation
A quote must be rated "ACCEPTABLE" for the quote to be eligible for award. An "UNACCEPTABLE" rating for Technical Capability/Approach factor will result in the entire quote being rated "UNACCEPTABLE" overall; an overall rating of "UNACCEPTABLE" makes a quote ineligible for award. A quote must contain sufficient information to enable evaluators to determine acceptability; if there is insufficient information to determine acceptability of the quote, the quote will be rated “UNACCEPTABLE” overall.
The Government reserves the right to request that the awardee reduce its total price, or adjust CLIN prices with no change to total price, in order to reduce administrative costs and avoid unnecessary burdens for the agency pursuant to FAR 13.002.
QUESTIONS
(a) Any questions in relation to this solicitation shall be submitted to by e-mail to pamela.a.ganster.civ@us.navy.mil. The cut-off date for questions is 2:00 PM EST on July 30, 2024.
(c) The Government shall mail or e-mail a written notice of award to the successful quoter. Upon receipt, the quoter shall either commence performance, or have an authorized representative sign the award and return it to the Contracting Officer; a binding contract is formed upon the earlier of either of those actions. The Government requests that the awardee return a signed copy, or notify the Contracting Officer by email that it will deliver the supplies and/or services, within 1 day of receiving the award notice.
mailto:pamela.a.ganster.civ@us.navy.mil
Section 00 70 00 - Conditions of the Contract
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 Destination Government Destination Government 0002 Destination Government Destination Government
CLAUSES INCORPORATED BY FULL TEXT
52.213-4 TERMS AND CONDITIONS--SIMPLIFIED ACQUISITIONS (OTHER THAN COMMERCIAL
PRODUCTS AND COMMERCIAL SERVICES) (MAY 2024)
(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses that are incorporated by reference:
(1) The clauses listed below implement provisions of law or Executive order:
(i) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (JAN 2017) (section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L.
113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).
(ii) 52.204-23, Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab Covered Entities (DEC 2023) (Section 1634 of Pub. L. 115-91).
(iii) 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment. (NOV 2021) (Section 889(a)(1)(A) of Pub. L. 115-232).
(iv) 52.204-27, Prohibition on a ByteDance Covered Application (JUN 2023) (Section 102 of Division R of Pub. L.
117-328), unless the agency grants an exception--see paragraph (b) of 52.204-27.
(v) 52.204-30, Federal Acquisition Supply Chain Security Act Orders--Prohibition. (DEC 2023) (Pub. L. 115-390, title II).
(vi) 52.222-3, Convict Labor (JUN 2003) (E.O. 11755).
(vii) 52.222-21, Prohibition of Segregated Facilities (APR 2015).
(viii) 52.222-26, Equal Opportunity (SEPT 2016) (E.O. 11246).
(ix) 52.225-13, Restrictions on Certain Foreign Purchases (FEB 2021) (E.O.s, proclamations, and statutes administered by the Office of Foreign Assets Control of the Department of the Treasury).
(x) 52.232-40, Providing Accelerated Payments to Small Business Subcontractors (MAR 2023) (31 U.S.C. 3903 and 10 U.S.C. 3801).
(xi) 52.233-3, Protest After Award (AUG 1996) (31 U.S.C. 3553).
(xii) 52.233-4, Applicable Law for Breach of Contract Claim (OCT 2004) (Pub. L. 108-77 and 108-78 (19 U.S.C.
3805 note)).
(2) Listed below are additional clauses that apply:
(i) 52.232-1, Payments (APR 1984).
(ii) 52.232-8, Discounts for Prompt Payment (FEB 2002).
(iii) 52.232-11, Extras (APR 1984).
(iv) 52.232-25, Prompt Payment (JAN 2017).
(v) 52.232-39, Unenforceability of Unauthorized Obligations (JUN 2013).
(vi) 52.233-1, Disputes (MAY 2014).
(vii) 52.244-6, Subcontracts for Commercial Products and Commercial Services (FEB 2024).
(viii) 52.253-1, Computer Generated Forms (JAN 1991).
(b) The Contractor shall comply with the following FAR clauses, incorporated by reference, unless the circumstances do not apply:
(1) The clauses listed below implement provisions of law or Executive order:
(i) 52.203-17, Contractor Employee Whistleblower Rights (NOV 2023) (41 U.S.C. 4712); this clause does not apply to contracts of DoD, NASA, the Coast Guard, or applicable elements of the intelligence community--see FAR 3.900(a).
(ii) 52.204-10, Reporting Executive Compensation and First-Tier Subcontract Awards (JUN 2020) (Pub. L. 109-
282) (31 U.S.C. 6101 note) (Applies to contracts valued at or above the threshold specified in FAR 4.1403(a) on the date of award of this contract).
(iii) 52.222-19, Child Labor--Cooperation with Authorities and Remedies (FEB 2024) (E.O. 13126) (Applies to contracts for supplies exceeding the micro-purchase threshold, as defined in 2.101 on the date of award of this contract).
(iv) 52.222-20, Contracts for Materials, Supplies, Articles, and Equipment (JUN 2020) (41 U.S.C. chapter 65) (Applies to supply contracts over the threshold specified in FAR 22.602 on the date of award of this contract, in the United States, Puerto Rico, or the U.S. Virgin Islands).
(v) 52.222-35, Equal Opportunity for Veterans (JUN 2020) (38 U.S.C. 4212) (Applies to contracts valued at or above the threshold specified in FAR 22.1303(a) on the date of award of this contract).
(vi) 52.222-36, Equal Employment for Workers with Disabilities (JUN 2020) (29 U.S.C. 793) (Applies to contracts over the threshold specified in FAR 22.1408(a) on the date of award of this contract, unless the work is to be performed outside the United States by employees recruited outside the United States). (For purposes of this clause, “United States” includes the 50 States, the District of Columbia, Puerto Rico, the Northern Mariana Islands, American Samoa, Guam, the U.S. Virgin Islands, and Wake Island.)
(vii) 52.222-37, Employment Reports on Veterans (JUN 2020) (38 U.S.C. 4212) (Applies to contracts valued at or above the threshold specified in FAR 22.1303(a) on the date of award of this contract).
(viii) 52.222-41, Service Contract Labor Standards (AUG 2018) (41 U.S.C. chapter 67) (Applies to service contracts over $2,500 that are subject to the Service Contract Labor Standards statute and will be performed in the United States, District of Columbia, Puerto Rico, the Northern Mariana Islands, American Samoa, Guam, the U.S.
Virgin Islands, Johnston Island, Wake Island, or the outer Continental Shelf).
(ix)(A) 52.222-50, Combating Trafficking in Persons (NOV 2021) (22 U.S.C. chapter 78 and E.O. 13627) (Applies to all solicitations and contracts).
(B) Alternate I (MAR 2015) (Applies if the Contracting Officer has filled in the following information with regard to applicable directives or notices: Document title(s), source for obtaining document(s), and contract performance location outside the United States to which the document applies).
(x) 52.222-55, Minimum Wages for Contractor Workers Under Executive Order 14026 (JAN 2022) (Applies when 52.222-6 or 52.222-41 are in the contract and performance in whole or in part is in the United States (the 50 States, the District of Columbia, Puerto Rico, the Northern Mariana Islands, American Samoa, Guam, the U.S. Virgin Islands, Johnston Island, Wake Island, and the outer Continental Shelf as defined in the Outer Continental Shelf Lands Act (43 U.S.C. 1331, et seq.))).
(xi) 52.222-62, Paid Sick Leave Under Executive Order 13706 (JAN 2022) (E.O. 13706) (Applies when 52.222-6 or 52.222-41 are in the contract and performance in whole or in part is in the United States (the 50 States and the District of Columbia.))
(xii) 52.223-5, Pollution Prevention and Right-to-Know Information (MAY 2024) (42 U.S.C. 11001-11050 and 13101-13109) (Applies to services performed on Federal facilities).
(xiii) 52.223-11, Ozone-Depleting Substances and High Global Warming Potential Hydrofluorocarbons (MAY 2024) (42 U.S.C. 7671, et seq.) (Applies to contracts for products as prescribed at FAR 23.109(d)(1)).
(xiv) 52.223-12, Maintenance, Service, Repair, or Disposal of Refrigeration Equipment and Air Conditioners (MAY 2024) (42 U.S.C. 7671, et seq.) (Applies to maintenance, service, repair, or disposal of refrigeration equipment and air conditioners).
(xv) 52.223-20, Aerosols (MAY 2024) (42 U.S.C. 7671, et seq.) (Applies to contracts for products that may contain high global warming potential hydrofluorocarbons as a propellant or as a solvent; or contracts for maintenance or repair of electronic or mechanical devices).
(xvi) 52.223-21, Foams (MAY 2024) (42 U.S.C. 7671, et seq.) (Applies to contracts for products that may contain high global warming potential hydrofluorocarbons or refrigerant blends containing hydrofluorocarbons as a foam blowing agent; or contracts for construction of buildings or facilities.
(xvii) 52.223-23, Sustainable Products and Services (MAY 2024) (E.O. 14057, 7 U.S.C. 8102, 42 U.S.C. 6962, 42 U.S.C. 8259b, and 42 U.S.C. 7671l) (Applies to contracts when the agency identifies in the statement of work, or elsewhere in the contract, the sustainable products and services that apply to the acquisition).
(xviii)(A) 52.225-1, Buy American--Supplies (OCT 2022) (41 U.S.C. chapter 67) (Applies to contracts for supplies, and to contracts for services involving the furnishing of supplies, for use in the United States or its outlying areas, if the value of the supply contract or supply portion of a service contract exceeds the micro-purchase threshold, as defined in 2.101 on the date of award of this contract, and the acquisition--
(1) Is set aside for small business concerns; or
(2) Cannot be set aside for small business concerns (see 19.502-2), and does not exceed $50,000).
(B) Alternate I (OCT 2022) (Applies if the Contracting Officer has filled in the domestic content threshold below, which will apply to the entire contract period of performance. Substitute the following sentence for the first sentence of paragraph (1)(ii)(A) of the definition of domestic end product in paragraph (a) of 52.225-1:
(A) The cost of its components mined, produced, or manufactured in the United States exceeds percent of the cost of all its components. [Contracting officer to insert the percentage per instructions at 13.302- 5(d)(4).])
(xix) 52.226-6, Promoting Excess Food Donation to Nonprofit Organizations (JUN 2020) (42 U.S.C. 1792) (Applies to contracts greater than the threshold specified in FAR 26.404 on the date of award of this contract, that provide for the provision, the service, or the sale of food in the United States).
(xx) 52.232-33, Payment by Electronic Funds Transfer--System for Award Management (OCT 2018) (Applies when the payment will be made by electronic funds transfer (EFT) and the payment office uses the System for Award Management (SAM) as its source of EFT information).
(xxi) 52.232-34, Payment by Electronic Funds Transfer--Other than System for Award Management (JUL 2013) (Applies when the payment will be made by EFT and the payment office does not use the SAM database as its source of EFT information.)
(xxii) 52.247-64, Preference for Privately Owned U.S.-Flag Commercial Vessels (NOV 2021) (46 U.S.C. 55305) (Applies to supplies transported by ocean vessels (except for the types of subcontracts listed at 47.504(d).)
(2) Listed below are additional clauses that may apply:
(i) 52.204-21, Basic Safeguarding of Covered Contractor Information Systems (NOV 2021) (Applies to contracts when the contractor or a subcontractor at any tier may have Federal contract information residing in or transiting through its information system.)
(ii) 52.209-6, Protecting the Government's Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment (NOV 2021) (Applies to contracts over the threshold specified in FAR 9.405-2(b) on the date of award of this contract).
(iii) 52.211-17, Delivery of Excess Quantities (SEP 1989) (Applies to fixed-price supplies).
(iv) 52.247-29, F.o.b. Origin (FEB 2006) (Applies to supplies if delivery is f.o.b. origin).
(v) 52.247-34, F.o.b. Destination (NOV 1991) (Applies to supplies if delivery is f.o.b. destination).
(c) FAR 52.252-2, Clauses Incorporated by Reference (FEB 1998). This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
(Insert one or more Internet addresses)
(d) Inspection/Acceptance. The Contractor shall tender for acceptance only those items that conform to the requirements of this contract. The Government reserves the right to inspect or test any supplies or services that have been tendered for acceptance. The Government may require repair or replacement of nonconforming supplies or reperformance of nonconforming services at no increase in contract price. The Government must exercise its postacceptance rights--
(1) Within a reasonable period of time after the defect was discovered or should have been discovered; and
(2) Before any substantial change occurs in the condition of the item, unless the change is due to the defect in the item.
(e) Excusable delays. The Contractor shall be liable for default unless nonperformance is caused by an occurrence beyond the reasonable control of the Contractor and without its fault or negligence, such as acts of God or the public enemy, acts of the Government in either its sovereign or contractual capacity, fires, floods, epidemics, quarantine restrictions, strikes, unusually severe weather, and delays of common carriers. The Contractor shall notify the Contracting Officer in writing as soon as it is reasonably possible after the commencement of any excusable delay, setting forth the full particulars in connection therewith, shall remedy such occurrence with all reasonable dispatch, and shall promptly give written notice to the Contracting Officer of the cessation of such occurrence.
(f) Termination for the Government's convenience. The Government reserves the right to terminate this contract, or any part hereof, for its sole convenience. In the event of such termination, the Contractor shall immediately stop all work hereunder and shall immediately cause any and all of its suppliers and subcontractors to cease work. Subject to the terms of this contract, the Contractor shall be paid a percentage of the contract price reflecting the percentage of the work performed prior to the notice of termination, plus reasonable charges that the Contractor can demonstrate to the satisfaction of the Government, using its standard record keeping system, have resulted from the termination.
The Contractor shall not be required to comply with the cost accounting standards or contract cost principles for this purpose. This paragraph does not give the Government any right to audit the Contractor's records. The Contractor shall not be paid for any work performed or costs incurred that reasonably could have been avoided.
(g) Termination for cause. The Government may terminate this contract, or any part hereof, for cause in the event of any default by the Contractor, or if the Contractor fails to comply with any contract terms and conditions, or fails to provide the Government, upon request, with adequate assurances of future performance. In the event of termination for cause, the Government shall not be liable to the Contractor for any amount for supplies or services not accepted, and the Contractor shall be liable to the Government for any and all rights and remedies provided by law. If it is determined that the Government improperly terminated this contract for default, such termination shall be deemed a termination for convenience.
(h) Warranty. The Contractor warrants and implies that the items delivered hereunder are merchantable and fit for use for the particular purpose described in this contract.
(End of clause)
WAGE DETERMINATION
"General Decision Number: ID20240107 03/29/2024
Superseded General Decision Number: ID20230107
State: Idaho
Construction Type: Building
Counties: Kootenai and Nez Perce Counties in Idaho.
BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).
Note: Contracts subject to the Davis-Bacon Act are generally required to pay at least the applicable minimum wage rate required under Executive Order 14026 or Executive Order 13658.
Please note that these Executive Orders apply to covered contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but do not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(1).
|If the contract is entered |� Executive Order 14026 | |into on or after January 30, | generally applies to the | |2022, or the contract is | contract. | |renewed or extended (e.g., an |� The contractor must pay | |option is exercised) on or | all covered workers at | |after January 30, 2022: | least $17.20 per hour (or | | | the applicable wage rate | | | listed on this wage | | | determination, if it is | | | higher) for all hours | | | spent performing on the | | | contract in 2024. | |If the contract was awarded on|� Executive Order 13658 | |or between January 1, 2015 and| generally applies to the | |January 29, 2022, and the | contract. | |contract is not renewed or |� The contractor must pay all| |extended on or after January | covered workers at least | |30, 2022: | $12.90 per hour (or the | | | applicable wage rate listed| | | on this wage determination,| | | if it is higher) for all | | | hours performing on that | | | contract in 2024. |
The applicable Executive Order minimum wage rate will be adjusted annually. If this contract is covered by one of the Executive Orders and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must still submit a conformance request.
Additional information on contractor requirements and worker protections under the Executive Orders is available at http://www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/05/2024 1 02/16/2024 2 03/01/2024 3 03/29/2024
BRIC0001-001 06/01/2022
Rates Fringes
BRICKLAYER.......................$ 35.53 19.85
CARP0196-001 06/01/2021
Rates Fringes
CARPENTER........................$ 44.98 17.84
ELEC0073-008 08/01/2023
Rates Fringes
ELECTRICIAN......................$ 47.55 16.03
ENGI0302-012 06/01/2022
Rates Fringes
POWER EQUIPMENT OPERATOR
Forklift....................$ 33.74 17.65 Loader......................$ 33.74 17.65
IRON0014-007 07/03/2023
Rates Fringes
IRONWORKER.......................$ 38.11 31.82
LABO0155-012 06/01/2022
Rates Fringes
LABORER
Grade Checker...............$ 34.97 13.80 Mason Tender - Cement/Concrete.............$ 34.86 13.80
LABO0238-018 06/01/2021
Rates Fringes
LABORER (Common or General)......$ 29.44 14.50
* SHEE0103-005 06/01/2023
Rates Fringes
SHEET METAL WORKER...............$ 32.27 21.57
* SUID2021-008 04/27/2023
Rates Fringes
CEMENT MASON/CONCRETE FINISHER...$ 22.21 3.80
OPERATOR:
Backhoe/Excavator/Trackhoe.......$ 28.92 10.39
PAINTER..........................$ 17.11 ** 1.25
ROOFER...........................$ 19.80 2.06
TRUCK DRIVER: Dump Truck........$ 25.06 8.81
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
** Workers in this classification may be entitled to a higher minimum wage under Executive Order 14026 ($17.20) or 13658 ($12.90). Please see the Note at the top of the wage determination for more information. Please also note that the minimum wage requirements of Executive Order 14026 are not currently being enforced as to any contract or subcontract to which the states of Texas, Louisiana, or Mississippi, including their agencies, are a party.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at https://www.dol.gov/agencies/whd/government-contracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (iii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate
(weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .