This document appears to be a Preventive Maintenance and Repair Checklist for the Cronos-11, GEM-5, and GEM-5N radiation monitoring systems maintained by the U.S. Navy. The checklist outlines the annual maintenance procedures to be performed by Mirion Technologies field service engineers, including visual inspections, mechanical checks, system updates, performance evaluations, and documenting any repairs or replacement parts used. The checklist indicates this maintenance is to be performed at a Navy site, but does not provide any additional details about a specific contract or procurement opportunity.

View the file

Other files

Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Contamination Monitor Navy Maintenance and Repair Check Sheet

Annual Procedure Distribution: One copy of completed form (per reader) as well as the main field service record should be left with the customer.

Also, one copy of each form to Field Service dispatcher.

Mirion Technologies Field Service Engineer Name_______________________________ DATE____/____/____ Navy Site _________________________ Building No.___________________ S/N_________________ Report/Case No._________________________ Computer S/N.________________________ Operating System ________________ Software Version ______

GEM GEM-5N GEM-5N SIM Cronos

THIS MACHINE ENTERED SERVICE _____/_____

Maintenance Activities

Preliminary Review

Discuss any existing performance issues with the customer.

Review the system history via customer maintained logs or existing Mirion service reports.

Verify current operation

Comments:

Visual Inspection

Review the status of any Uninterruptible Power Supply (UPS) and power surge protectors used with AC-powered system components.

Check condition of all accessible/visible power cords, cables, hoses, and connectors.

Check unit and detectors for possible signs of damage

Comments:

Mechanical Maintenance & Operational Checks

Clean exterior of instrument, controller, monitor, HID hardware, etc.as access permits.

Check operation of all sensors

Verify all indicating lights function and verify system audio quality

Check Cronos-11 scale tray

Check door alignment and latch operation.

Comments:

Appendix D

Instrument Controller

Check the computer ventilation fan then secure power. Open the computer (if allowed) then inspect, clean out dust, and measure the motherboard battery voltage.

Clean fan filter.

Archive files from the system.

System Updates & Repairs

Cognizant Code (sign for approval for changes/upgrades) Date

Install Software Changes/Upgrades (if applicable)

Cognizant Code (sign for approval to perform repairs) Date

Repairs were performed

System Performance

Perform alarm check on all detectors

Perform Rate Meter Check

Perform Counter Test

Perform Amplifier Pulse Test

• Error below 1% is acceptable

Performance Evaluation

Comments & Recommendations

Discuss with the customer their overall satisfaction with and concerns about the counting system performance.

Discuss upgrade options and benefits with the customer especially if the current operating platform or hardware is obsolete.

Advise the customer of additional available support options (training and consulting).

Discuss any beneficial setup changes with the customer that might improve quality or work efficiency and implement those that are agreed upon.

Notify the customer about any software updates that have not been performed due to incompatibilities.

Comments:

System Status & Evaluation

System has been performance tested and validated to meet and/or exceed customer procedural specifications and requirements.

Other (see comments section below)

Repair Parts Used and Non-Routine Repair Detail

Item Part Number Detail

Service Order #: ______________ Next Verification Due Date: /__/__

(SIGNED) (DATED) (SIGNED) (DATED)

FIELD SUPPORT ENGINEER ________________________________

MIRION TECHNOLOGIES, INCORPORATED ________________________________

THIS MACHINE ENTERED SERVICE _____/_____
Maintenance Activities
Preliminary Review
Visual Inspection
Mechanical Maintenance & Operational Checks
Instrument Controller
System Updates & Repairs
_______________________________________________ ____________
Cognizant Code (sign for approval to perform repairs) Date
System Performance
Performance Evaluation
Comments & Recommendations
System Status & Evaluation
Name:
Navy Site:
Building No:
SN:
ReportCase No:
Computer SN:
Operating System:
Software Version:
THIS MACHINE ENTERED SERVICE:
undefined_3:
undefined_5: Off
undefined_6: Off
Comments:
undefined_7: Off
undefined_8: Off
undefined_9: Off
Comments_2:
undefined_10: Off
undefined_11: Off
undefined_12: Off
undefined_13: Off
undefined_14: Off
Comments_3:
undefined_15: Off
undefined_16: Off
undefined_17: Off
Comments_4:
Cognizant Code sign for approval for changesupgrades:
Date:
undefined_18: Off
Comments_5:
Cognizant Code sign for approval to perform repairs:
Date_2:
undefined_19: Off
Comments_6:
undefined_20: Off
undefined_21: Off
undefined_22: Off
undefined_23: Off
Comments_7:
undefined_24: Off
undefined_25: Off
undefined_26: Off
undefined_27: Off
undefined_28: Off
Comments_8:
undefined_29: Off
undefined_30: Off
Comments_9:
ItemRow1:
Part NumberRow1:
DetailRow1:
ItemRow2:
Part NumberRow2:
DetailRow2:
ItemRow3:
Part NumberRow3:
DetailRow3:
ItemRow4:
Part NumberRow4:
DetailRow4:
ItemRow5:
Part NumberRow5:
DetailRow5:
ItemRow6:
Part NumberRow6:
DetailRow6:
ItemRow7:
Part NumberRow7:
DetailRow7:
ItemRow8:
Part NumberRow8:
DetailRow8:
ItemRow9:
Part NumberRow9:
DetailRow9:
ItemRow10:
Part NumberRow10:
DetailRow10:
ItemRow11:
Part NumberRow11:
DetailRow11:
ItemRow12:
Part NumberRow12:
DetailRow12:
ItemRow13:
Part NumberRow13:
DetailRow13:
ItemRow14:
Part NumberRow14:
DetailRow14:
ItemRow15:
Part NumberRow15:
DetailRow15:
ItemRow16:
Part NumberRow16:
DetailRow16:
ItemRow17:
Part NumberRow17:
DetailRow17:
ItemRow18:
Part NumberRow18:
DetailRow18:
ItemRow19:
Part NumberRow19:
DetailRow19:
ItemRow20:
Part NumberRow20:
DetailRow20:
ItemRow21:
Part NumberRow21:
DetailRow21:
ItemRow22:
Part NumberRow22:
DetailRow22:
ItemRow23:
Part NumberRow23:
DetailRow23:
Service Order:
SIGNED:
SIGNED_2:
1:
2:
undefined_31:
undefined_4: Off
MONTH:
DAY:
YEAR:
Text1:

File details come from the government source that posted it. Updated .