AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

Multiple Aw ard Task Order (MATOC)

- The purpose of this amendment is to provide Government response to Pre Proposal Inquiries (PPI) and to extend the solicitation due date to

Sept 2022.

- See continuation sheet for additonal details regarding other information included in this amendment.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 33

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 18-Aug-2022

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N0016722R0016

X 9B. DATED (SEE ITEM 11)

08-Jul-2022

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

18-Aug-2022

CODE

NAVAL SURFACE WARFARE CENTER CARDEROCK

RONALD V. SMILEY

757-639-2126 RONALD.SMILEY3@NAVY.MIL

904 CORPORATE LANE

CHESAPEAKE VA 23320

N00167 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N0016722R0016

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

AMENDMENT 0001

Inquiry GOVERNMENT RESPONSE

The SAM.gov posting for this opportunity notes the response deadline for this procurement as Monday, August 15th, 2022 at 2PM EDT, however, SF 1442 Block 13. A. does not list a deadline for bidder submissions. Please confirm the deadline for bidder submissions for

Phase 1 of this procurement.

15 SEPTEMBER 202

Would the Government consider extending the response deadline if a high volume of bidder questions is received and the Government is as a result unable to provide answers in a timely manner?

YES

SF 1442 Block 13.A. notes that the Government would like two (2) copies of each file that bidders submit for this procurement response.

Please confirm that bidders should submit two (2) copies of each electronic file that is submitted for this procurement.

YES

SF 1442, Block 13.D. identifies proposal validity period as 120 days, but RFP Section 3.1.f. (pg. 26) identifies validity period as 180 days.

Please confirm which validity period is required.

PLEASE FOLLOW INSTRUCTON ON

SF 1442 BLOCK 13A

Mary K. Garren is listed under the "Ship To Address" on Solicitation

Page 3, which indicates that she will be the COR for this contract.

Howeer, Ronald Castillo is identified on Solicitation Pages 109 and

117 as the COR for this procurement. Please clarify whether Ms.

Garren or Mr. Castillo is considered the COR relevant to this procurement.

MARY GARREN

The paragraph states that work will take place at eight (8) different site. Are contractors required to have offices and staff at all sites at the time of our response to this RFP? in order to respond to this BID?

NO

The paragraph states that work will take place at eight (8) different site. Post Award, are all MATOC contractors required to BID ALL work at ALL sites?

NO, BUT HIGHLY RECOMMENDED

Total contract value is identified in Section 3 as NTE $44M, however, the SF 1442 identifies the total "aggregate" contract value as $44M.

Please clarify if maxium value of $44M applies to each individual contract, or the total value of all of the awarded contracts together.

APPLIES TO TOTAL VALUE OF ALL

OF THE AWARDED CONTRACTS

TOGETHER.

Section states that joint scoping meetings shall be conducted with the government and the contractor. Please confirm if all contractors are providing joint scoping services with the government on every task order or are contractors providing joint scoping support on task orders that have been awarded to a specific contractor?

THIS ITEM WILL ONLY EXIST AT

THE TASK ORDER LEVEL IF THE

TASK ORDER DEEMED SO.

Section 5.1 states that contractors "shall appoint a Facility

Security Officer (FSO), in a cleared facility, and a Contractor

Security Representative (CSR) in a non-cleared facility, to provide security support for this contract." and "Classified contracts. The prime vendor, and all subcontractors, are required to possess a

Facility Clearance Level of Secret or above." In prior work of this nature for this Government entity, bidders have not been required to possess any form of FSO, CSR, or facility clearance. Would the

Government consider removing this requirement for the work required for this procurement?

send to marry and adam possible removing

Paragraph states that contractor shall appoint a FSO in a cleared facility and The prime vendor, and all subcontractors, are required to possess a Facility Clearance Level of Secret or above. Is this MATOC only for contractors that already possess a facility clearance or level of secret or above clearance?

NO, THIS MATOC IS NOT FOR

CONTRACTORS THAT ALREADY

POSSSESS A FACILITY

CLEARANCE OR LEVEL OF

SECRET. IT IS ANTICIPATED THAT

SOME PROJECTS AT THE TASK

ORDER LEVEL WILL REQUIRE

SOME FORM OF SECURITY

CLEARANCE. IT IS HIGHLY

RECOMMENDED THAT YOUR

COMPANY CAN ATTAIN A

CLEARANCE AT AWARD OF

MATOC.

Paragraph states that contractor shall appoint a FSO in a cleared facility and The prime vendor, and all subcontractors, are required to possess a Facility Clearance Level of Secret or above. If a contractor isn't currently facility or secret cleared, will the government provide a clearance under this MATOC for qualified contractors?

YES, PROVIDE THAT ALL

REQUIRED DOCUMENTATION IS

SUBMITTED BY THE CONTRACTOR

PRIOR TO AWARD.

A prime vendor shall not perform duties on the contract without an

Active Secret or above Facility Clearance Level. Is this contract only for contractors with an active secret or above facility clearance?

NO, THIS MATOC IS NOT FOR

CONTRACTORS THAT ALREADY

POSSSESS A FACILITY

CLEARANCE OR LEVEL OF

SECRET. IT IS ANTICIPATED THAT

SOME PROJECTS AT THE TASK

ORDER LEVEL WILL REQUIRE

SOME FORM OF SECURITY

CLEARANCE. IT IS HIGHLY

RECOMMENDED THAT YOUR

COMPANY CAN ATTAIN A

CLEARANCE AT AWARD OF

MATOC.

Page 4 states that this RFP covers 8 sites, while page 20 states "The contract shall provide for accomplishment of construction projects that will primarily consist of general building type projects (various maintenance, repair, alteration, renovation, minor construction projects and site restoration of operations) for the Naval Surface

Warfare Center Carderock (NSWCCD)." Please confirm if this

MATOC relates to 8 sites or solely NSWCCD?

THE WORK ON THIS MATOC WILL

PERSPECTIVELY BE PERFORMED

ON ALL 8 AOR'S

Solicitation states, "Offerors shall submit proposals via email to

Ronald V. Smiley at ronald.v.smiley.civ@us.navy.mil via DOD Safe at https://safe.apps.mil/ " - is it the Government's intent that offerors submit both via email and via DOD Safe? Please clarify which submission method is required.

IF YOUR FILES EXCEEDS 25MB'S

FOR GOVERNMENT EMAIL, YOU

WILL BE ABLE TO SEND YOUR

FILES THROUGH DOD SAFE,

WHICH HAS A 8 GIGS CAPACITY.

PLEASE CONTACT Ronald V. Smiley at ronald.v.smiley.civ@us.navy.mil FOR

ACCESS TO DOD Safe at https://safe.apps.mil/ WITHIN 5 DAYS

PRIOR TO DUE DATE OF PROPOSAL

OF 15 SEPTEMBER2022

The Government requires that at least one project used for experience references must have "a final construction cost of $4,000,000 or greater.". Would the Government consider revising this requirement to "$3,000,000 or greater"?

NO, $4,000,000.00 REMAINS THE

FINAL CONSTRUCTION COST OR

ATLEAST ONE PROJECT.

The Government requires that at least one project used for experience references must have been new construction. Would the Government consider allowing the substitution of the required one (1) new construction project for two (2) high value construction renovation or design-build projects?

PLEASE FOLLOW INSTRUCTON IN

PARAGRAPH 4.1.1

Please clarify what is meant by "..demonstrate specific capability and approach (both Prime and Subcontractors) to perform all requirements…". In what sense should bidders elucidate the capabilities and approach of our subcontractors, specifically? To detail specific capabilities for each subcontractor which bidders may utilize across each of the nine (9) locations required under this procurement with the current 3 page limit seems space-prohibitive.

PLEASE FOLLOW INSTRUCTION IN

PARAGRAPH 2.3.5 PAGE

LIMITATION

Section 4.3 states, "[...]Offerors shall submit information about one past effort for each major subcontractor, as defined in section 2.1. If no proposed subcontractors meet the threshold for major subcontractor at least one past effort shall be provided for each of the three subcontractors performing the largest portions of subcontracted work under this effort (or all subcontractors if fewer than three are proposed)." The term Major Subcontractor is indeed defined in

Section 2.1., but is not mentioned anywhere else in the Solicitation. Is it the Government's intention that bidders are to identify any major subcontractors that they might use over the nine (9) different locations in which work is to be performed as part of this contract and submit at least one past performance for each of those major subcontractors who will perform work at the nine (9) different locations? Conversely, is it the Government's intention that bidders are to instead identify any major subcontractors which might be used for the Seed Project which will be issued as part of Phase II (and which bidders have not yet been provided information for, and as such, would not be able to assess which subcontractors might be necessary)? In the event that none of bidders' identified subcontractors would be considered "major", how would bidders determine which subcontractors would qualify as

"performing the largest portions of subcontractor work under this effort", if bidders are not yet advised of specific work scopes? Please clarify.

PLEASE FOLLOW INSTRUCTION IN

PARAGRAPH 4.3 FACTOR 3 - PAST

PERFORMANCE.

Is it the Government's intention that bidders will have identified all subcontractors which might be required to perform work in each of the nine (9) locations required under this procurement, or does the

Government merely wish subcontractors to be mentioned in a general sense, to include anticipated responsibilities and contractual relationships, etc.?

YES, AT EACH TASK ORDER AND

OR AT EACT AOR

Is it the Government's intention that within this section bidders describe their "strategy for successful execution of work awarded under resulting contract, managing multiple concurrent projects, and managing the geographic coverage of the contract requirements." and

"plan for accomplishing both Design-Build and Design-Bid-Build projects under this CONTRACT." in a general sense, or specifically with regard to the Organizational Structure of the bidder's team, since this requirement is under the "Subfactor A - Organizational Structure" category?

IN GENERAL SENSE

Bullets a, d, and e seem to specify the same information, please clarify how each is different?

PLEASE FOLLOW INSTRUCTIOIN IN

PARAGRAPH 5.2 FACTOR 5 -

SAFETY.

Wording in this paragraph states, "Offerors shall ensure that all price information is contained within Volume III". Is it the Government's intention that pricing should be included within Volume III (Past

Performance), during Phase One of proposal submissions, or should this wording instead read "Volume VI"?

IT SHOULD STATES VOLUME VI IN

PHASE II

Please confirm which volume bidders should insert "Additional

Required Information" into (i.e. completed SF 1442, proof of bonding capacity, etc.).

VOLUME VI IN PHASE II

The following locations identify different email addresses for Mr.

Smiley (some say "ronald.smiley3@navy.mil" and some say

"ronald.v.smiley.civ@us.navy.mil"), please confirm which is the correct email address.

Pg. 1 (SF 1442, Blocks 7 and 10), Pg. 22 (Sec. 2.2), Pg. 116 (G-242-

H001, C, ii).

PLEASE UTILIZE

ronald.v.smiley.civ@us.navy.mil

The provided Attachment 2A (Past Performance Questionnaire) only includes the first part of the PPQ form, it doesn't include the assessment pages (i.e. where our clients can input their assessment / evaluation of our work). Please advise.

ATTACHED NEW PPQ

Sections 4.1.1. (Pg. 29), 4.1.2. (Pg. 31), and 4.3 (Pg. 33) state that past performance references must have been completed within the last five

(5) years. However, Section 3.3.(a) (Pg. 44) states that recency for past performance is within the past three (3) years. Please confirm whether submitted past performance must have occurred within the past five (5) years, or within the past three (3) years.

PAST PERFORMANCE WITHIN THE

LAST FIVE (5) YEARS

Both Sections 5.3 (Pg. 36) and 3.4 (Pgs. 45-46) mention that any

"inconsistency between promised performance - e.g., the technical or management volumes and the identified personnel resources - and the proposed price must be explained in the proposal". However, the technical and management volumes read as though they are supposed to be written from the standpoint of the entire contract scope, instead of the seed project scope. Are bidders supposed to write the Technical and Management volumes from the perspective of the entire contract scope, or just the seed project scope? If the Government intends that bidders write the technical and management volumes fromt the perspective of the seed project, please provide seed project SOW for this use.

PLEASE UNDERSTAND THAT THIS

IS PHASE I AND THIS APPLIES

FROM THE STANDPOINT OF THE

ENTIRE CONTRACT SCOPE NOT

THE SEED PROJECT, WHICH IS IN

PHASE II.

This section mentions "identified personnel resources". Are bidders supposed to proposed specific key personnel in our response volumes.

If so, which resources, and in which volumes should resumes be presented?

SUBMIT RESUMES IN VOLUME IV

UNDER FACTOR 4

The government notes that an EMR rating of 1.0 is considered high risk. Is this typical? In our experience, an EMR rating of 1.0 is considered neutral by most entities.

IF YOUR EMR RATING IS AT 1 AND

BELOW YOU ARE CONSIDERED

MODERATE RISK AND ANYTHING

ABOVE 1 IS HIGH RISK.

Bidders are required to identify "all subcontractors" in the cover letter.

Does this mean that every single subcontractor for all locations proposed as part of this contract, for any and all construction trades that might perform work for a particular bidder should be listed?

Please clarify.

PLEASE FOLLOW INSTRUCTION IN

PARAGRAPH 3.1 COVER LETTER

Does the Government require a cover letter to be submitted for both phases, or only as part of Phase I?

PLEASE FOLLOW INSTRUCTION IN

PARAGRAPH 2.3.1 COVER PAGE

AND TABLE OF CONTENTS PAGE

Please advise if cover letter should be separate, or included in Volume

I. If the former, please provide your required naming convention for the file.

PLEASE FOLLOW INSTRUCTION IN

PARAGRAPH 2.3.1 COVER PAGE

AND TABLE OF CONTENTS PAGE

Please advise if our confirmation of SAM registration ("special notices") should be provided separately, or included within another

Volume. If the former, please provide your required naming convention for the file. We assume that a confirmation must be provided, because this item is given a 1 page limit noted in the Table in Section 2.3.5.

PLEASE FOLLOW INSTRUCTION IN

CLAUSE 252.204-7007 ON PAGE 95.

IT STATES IN PARAGRAPH E, The

Offeror has completed the annual representations and certifications electronically via the SAM website at https://www.acquisition.gov/. After reviewing the SAM database information, the Offeror verifies by submission of the offer that the representations and certifications currently posted electronically that apply to this solicitation as indicated in FAR

52.204-8(c) and paragraph (d) of this provision have been entered or updated within the last 12 months, are current, accurate, complete, and applicable to this solicitation

The page limitation table notes a 3 page limit for "Proposal

Organization and Content". Please advise what is included in this requirement, and where it should be placed (separately as its own document, or within one of the volumes). If the former, please provide naming convention.

PLEASE FOLLOW INSTRUCTION IN

PARAGRAPH 2.3.5 PAGE

LIMITATION

Please confirm whether the "Additional Required Information" should be placed into its own document, or within one of the other volumes.

If the former, please provide required naming convention for the file.

PLACE IT IN VOLUME VI IN PHASE

II

The Government has provided a limit of 3 pages for "Additional

Required Information", however, the items listed in Section 6 (pg. 37) will require more than 3 pages to provide. Please advise if the

Government is willing to remove the page limit for these items.

PLEASE FOLLOW INSTRUCTION IN

PARAGRAPH 2.3.5 PAGE

LIMITATION

How many awards does the government intend to make for this contract?

FIVE (5)

Was there a previous MATOC that has lapsed? If so, how many awards did you make on the previous contract?

NO THIS IS A NEW REQUIREMENT

Is a bid guarantee (bid bond) required for Phase 1 of this effort, or is the bid guarantee intended as a requirement for Phase 2? May we submit a bonding letter from surety in lieu of a bid guarantee?

INTENDED AS A REQUIREMENT

FOR PHASE 2, YES YOU MAY

SUBMIT A PERFORMANCE

PAYMENT BOND AT EACH TASK

ORDER. PLEASE FOLLOW

INSTRUCTION ON PAGE 37 PARA

6.0 ADDITIONAL REQUIRED

INFORMATION (B) BONDING.

The location of potential work is highly varied. Can you please provide estimated percentages of spending by location provided?

The Government cannot determine the anticipate volume of work at this time, due to each fiscal year it may change due to priorities.

Subfactor B design experience states a 5 year limitation for relevant project experience. Due to Covid impacting project continuity over the last 2 years, we would like to request to extend this limitation to 7 years.

PLEASE FOLLOW INSTRUCTION IN

PARAGRAPH 4.1.2

Do PPQ's have to be on the form provided and specific to this pursuit.

Or can recently filled out PPQ's be provided if the form is the same or similar.

No the PPQ, do not use form provide, but the Past Performance has to be specific to this procurement. If you have a recently filled out PPQ Form that is similar or same and is relevent. You may submit it.

The RFP states that we are to use 12-point Times New Roman Font text. The CONSTRUCTION & DESIGN EXPERIENCE PROJECT

DATA SHEET provided is in 10-point font. Please confirm that for the government provided data sheets, we may use 10-point font size.

please utilize the form as is provided by the Government.

Please confirm the date and time for submission as it is not specifically stated on the SF 1442.

15-Sep-22

Please confirm electronic submission is all that is required as the SF

1442 states that 2 copies must be provided.

One copy of you proposal will do.

This CONUS MACC covers 9 facilities throughout CONUS, can you please indicate anticipate volume of task activity at each location?

The Government cannot determine the anticipate volume of work at this time, due to each fiscal year it may change due to priorities.

Program only $44M or $11M per year, not a large program capacity.

Can you provide details on anticipate number and size of tasks?

The Government cannot determine the anticipate volume of work at this time, due to each fiscal year it may change due to priorities.

Is this a new program or a recompete? If recompete, can you please provide names of incumbents? Number, size, and locations of issued tasks on last contract?

THIS IS A NEW REQUIREMENT

Please confirm that Joint Scoping listed on page 6 of 120 is correct as historically joint scoping is reserved for single award JOC & SABER

Type contrasts and not multiple award contracts?

confirm this is correct

RFP requires bid bonds for all tasks, please confirm no bid bond or performance & payments bonds will be required for any task under

$150k

NO BID BOND OR PERFORMANCE

PAYMENT BONDS ARE REQUIRED

UNDER 150K, BUT IN PHASE II THE

PROCUREMENT MAY EXCEED

150K A PERFORMANCE PAYMENT

BOND WILL BE REQUIRED.

If the Offeror should be awarded a seat on this solicited MATOC, will the Awardees be required to respond to any and all RFP's under this

MACC regardless of where the subsequent RFP's place of performance is located? Or may an Awardee only respond to subsequent RFPs that have a place of performance where the Awardee has a team in place?

NO, YES AWARDEE MAY ONLY

RESPOND TO SUBSEQUENT RFP'S

The Standard Form 1442 shows an issuance date of 08-Jul-2022 however the public release of this Solicitation was 7/12/2022. Because this Solicitation provide due dates and past performance date requirements, would the Government please confirm the Solicitation date as 07/12/2022.

DATE IS 15 SEPTEMBER 2022

Given the required page limit restrictions, would the Government please consider allowing the use of 10-point Times New Roman font text as the currently required 12-point font may limit the Offeror's ability to provide necessary data within Phase One narratives, etc.

PLEASE FOLLOW INSTRUCTION IN

PARAGRAPH 3.1 COVER LETTER

Please clarify what is to be provided for "e) Names of All

Subcontractors" on the Cover Letter. Understanding how

Subcontractor is defined on pg 7 of 130, please further clarify

Subcontractor in relation to what exactly?

PLEASE FOLLOW INSTRUCTION IN

PARAGRAPH 3.1 COVER LETTER

The solicitation notes "The prime vendor, and all subcontractors, are required to possess a Facility

Clearance Level of Secret or above." Please clarify if this requirement is only for if a Classified Contract RFP should result from the awarded

MATOC, OR if companies may only respond to this MATOC

Solicitation if they possess a Secret Clearance.

NO, THIS MATOC IS NOT FOR

CONTRACTORS THAT ALREADY

POSSSESS A FACILITY

CLEARANCE OR LEVEL OF

SECRET. IT IS ANTICIPATED THAT

SOME PROJECTS AT THE TASK

ORDER LEVEL WILL REQUIRE

SOME FORM OF SECURITY

CLEARANCE. IT IS HIGHLY

RECOMMENDED THAT YOUR

COMPANY CAN ATTAIN A

CLEARANCE AT AWARD OF

MATOC.

Please clarify if the Letter of Commitment from proposed DoR Firm does not count against any page limitations

PLEASE FOLLOW INSTRUCTION IN

PARAGRAPH 2.3.5 PAGE

LIMITATION

Please clarify if there are page limitations associated with the required narrative describing relationship between Prime and DoR.

PLEASE FOLLOW INSTRUCTION IN

PARAGRAPH 2.3.5 PAGE

LIMITATION

Please clarify if required Oranizational Chart noted within the

Prime/DoR Narrative may be submitted on its own page separate from the narrative and will not count against any page limitations.

PLEASE FOLLOW INSTRUCTION IN

PARAGRAPH 2.3.5 PAGE

LIMITATION

The provided attachment

"PPQ+PAST+PERFORMANCE+QUESTIONNAIRE" has two (2) pages. Please provide additional pages with evaluation data.

ATTACHED NEW PPQ

Factor 3 Past Performance references Attachment 4. No attachment 4 has been provided to date. Please provide Attachment 4.

ATTACHED NEW PPQ

Factor 3 Past Performance does not appear to clarify how the

Solicitation is defining a past performance "effort" beyond duration of performance. Please clarify how solicitation defines these efforts ie:

final construction cost, scope of work, design-build/design-bid-build, etc.

The scope will provide for construction, revitalization, recapitalization

(restoration and modernization) and sustainment (maintenance and repairs) of systems and infrastructure

Factor 3 Past Performance continues to note providing experience of proposed subcontractors (major or not), however it does not explain what subcontractors related to what effort? How would this requirement be relevant and required by a General Contractor company (with no teaming arrangements, etc. with any subcontractors) that is submitting an offer on this solicitated MATOC?

See definiton in paragraph 2.1. Offerors are encouraged to provide contract reference information for efforts on which they are the Prime contract holder.

Offerors shall detail the extent to which they contributed as a subcontractor to the referenced contracts.

Depening how the Government responds to what Attachment 4 consists of, is the solicitation requesting 3 additional pages for each 3 submitted "past performance references"?

ATTACHED NEW PPQ

Given the solicitation's various references to proposed subcontractors

(major or not) is this solicitation suggesting that Offeror's must show a certain percentage or self-performance beyond what the requirements of FAR 125.6 state of 15% self-performance (236220)

No, Will offerors be required to hold a Secret or above facility clearance in order to perform on this contract?

NO, THIS MATOC IS NOT FOR

CONTRACTORS THAT ALREADY

POSSSESS A FACILITY

CLEARANCE OR LEVEL OF

SECRET. IT IS ANTICIPATED THAT

SOME PROJECTS AT THE TASK

ORDER LEVEL WILL REQUIRE

SOME FORM OF SECURITY

CLEARANCE. IT IS HIGHLY

RECOMMENDED THAT YOUR

COMPANY CAN ATTAIN A

CLEARANCE AT AWARD OF EACH

TASK ORDER.

Which requirements of Section 5, Contract Security Requirements are applicable to this contract?

Classified contracts. The prime vendor, and all subcontractors, are required to possess a Facility Clearance Level of

Secret or above.

Will the majority of work be performed at NSWC Carderock in

Bethesda, MD?

THE GOVERNMENT CANNOT

DETERMINE THE PERCENTAGE OF

ANTICIPATION OF WORK PER AOR

AT THIS TIME

Please provide an approximate division of work among the various locations.

THE GOVERNMENT CANNOT

DETERMINE THE PERCENTAGE OF

ANTICIPATION OF WORK PER AOR

AT THIS TIME

Please provide an estimate of the percentage of work below vs.

above $2 million.

THE GOVERNMENT CANNOT

DETERMINE THE PERCENTAGE OF

ANTICIPATION OF WORK PER AOR

AT THIS TIME

What percentage of projects are anticipated to be design build vs.

design bid build?

THE GOVERNMENT AT THE

MOMENT HAS NOT DETERMINED

THAT PERCENTAGE

May offerors elect to pass on bidding an individual task order? YES, BUT IT IS HIGHLY

ANTICIPATED THAT VENDORS BID

ON ALL WORK SILICITED.

Section 9, Task Order Process, paragraph titled “Preparation of

Proposal” references a detailed unit price estimate. Will pricing of the task orders under this contract be based on RS Means or other commercially available unit price book?

YES. PRICING OF THE TASK

ORDERS UNDER THIS CONTRACT

BASED ON RS MEANS

What is the basis of evaluation for future task order proposals? I.e.

Will it be low-price, low price/technically acceptable, best value, etc?

IT WILL BE LOWEST PRICE

TECHNICALLY ACCEPTABLE OR

BEST VALUE.

is there a size limitation for emailed attachments? If an offeror's proposal exceeds the limit, may they submit their proposal through multiple numbered emails(e.g. 1 of 3, 2 of 3, etc.)

PLEASE FOLLOW INSTRUCTION IN

PARAGRAPH 2.2 ELECTRONIC

SUBMISSION.

It is our experience that zipped/combined files may not allow for the length of document names needed to be compliant with the provided naming structure. Please provide guidance on the preferred approach should this be the case?

PLEASE FOLLOW INSTRUCTION IN

PARAGRAPH 2.2 ELECTRONIC

SUBMISSION.

May offerors include a brief introduction to the team as part of the response to Factor 1 Corporate Experience?

PLEASE FOLLOW INSTRUCTION IN

PARAGRAPH 2.2 ELECTRONIC

SUBMISSION.

Section 3.1, Cover Letter; Please clarify how offerors are to respond to Item e, names of subcontractors. As this is an IDIQ with work in multiple locations, we do not have subcontractors identified. Will the

Government remove this requirement? If not, will it be acceptable to list any key subcontractors performing major portions of the overall work or otherwise indicate that subcontractors will be identified on a task order basis?

PLEASE FOLLOW INSTRUCTION IN

PARAGRAPH 5.1 FACTOR 4 –

MANAGEMENT APPROACH

(VOLUME IV).

Please confirm that we do not need to provide DCAA/DCMA POC for subcontractors at this time as requested in Section 3.1, Cover

Letter, item J.

SUBMISSION OF DCA/DCMA POC

FOR SUB WILL BE SUBMITTED IN

PHASE II

Please clarify the following from Section 3.1 requirement L regarding participation of non-MAC Prime Offeror. It does not seem to be relevant to this contract since no contractor is yet a MAC contractor.

PLEASE FOLLOW INSTRUCTION IN

PARAGRAPH 3.1 COVER LETTER

Regarding relevant experience of both the designer and Prime, is there an upper size limitation to the submitted experience that would cause projects to be considered less relevant?

NO

Please confirm that a JV agreement would not be included in the page limitations of the experience subfactor.

PLEASE FOLLOW INSTRUCTION IN

PARAGRAPH 2.3.5 PAGE

LIMITATION

Factor 1, Subfactor B, Design experience includes a requirement for a narrative inclusive of a description of the relationship, roles and responsibilities, and an organization chart. This narrative does not seem to be addressed in the indication of page limitations of this

Subfactor provided in the table on page 25. Please clarify the page limitation of Factor 1, Subfactor B.

PLEASE FOLLOW INSTRUCTION IN

PARAGRAPH 2.3.5 PAGE

LIMITATION

May offerors submit a completed CPARS report rather than a PPQ for Factor 3, Past Performance? Some points of contact are no longer available to provide current PPQ.

YES, VENDORS MAY SUBMIT

CPARS IF POC FOR RELEVANT

PROJECTS ARE NO LONGER

AVAILABLE

Please confirm previously obtained PPQ using the same or substantially similar format will be accepted.

YES, PREVIOUSLY OBTAINED PPQ

USING THE SAME OR

SUBTANTIALLY SILMIAR FORMAT

IS ACCEPTABLE

May references provide the completed PPQ directly to the

Government if they so with, and if so, what is the contact information for the Government’s POC?

PLEASE FOLLOW INSTRUCTION IN

PARAGRAPH 2.2 ELECTRONIC

SUBMISSION.

In Section 4.3, Factor 3, are offerors allowed three additional pages per attachment 4 or a total of three additional pages within the factor to address additional information regarding their references?

PLEASE FOLLOW INSTRUCTION IN

PARAGRAPH 2.3.5 PAGE

LIMITATION

Please confirm it is the Government’s intent that offerors include PPQ for all of the Attachment 4 of both the Prime and Designer.

YES, IT IS THE GOVERNMENT

INTENT THAT OFFERS INCLUDE

PPQ FOR ALL OF THE

ATTACHEMENT 4 BOTH PRIME

AND DESIGNER

Please clarify the requirement for past performance references from subcontractors? Factor 3 indicates “Offerors shall submit information about one past effort for each major subcontractor, as defined in section 2.1. If no proposed subcontractors meet the threshold for major subcontractor at least one past effort shall be provided for each of the three subcontractors performing the largest portions of subcontracted work under this effort (or all subcontractors if fewer than three are proposed).” Although we anticipate using the services of subcontractors in the performance of the work, we are unable to provide any insight into those firms until we understand the scope and location of work being issued.

PLEASE FOLLOW INSTRUCTION IN

PARAGRAPH 4.3 FACTOR 3 - PAST

PERFORMANCE.

Please confirm that the SF1442 is only to be submitted with Phase II. SF 1442 IS TO BE SUBMITTED IN

PHASE II

To allow contractors the option of preliminary research into the subcontracting market in preparation for a potential Phase II selection, will the Government please provide the location of the Phase II Seed

Project?

THE SEED PROJECT WILL BE

SOLICITED IN PHASE II. THIS

PROJECT IS LOCATED IN

CARDEROCK FACILITY

The evaluation criteria for Past Performance listed on Page 44 states

“to be “recent” in the context of this evaluation, references must be for efforts performed for periods in excess of six months within the last three years prior to the due date of proposals; efforts that do not meet these criteria will not be considered.” However, the requirements for the Past Performance proposal inclusions on page 33 indicate that PPQ are to be submitted for projects submitted via Attachment A, which defines recency as “completed within the previous five (5) years.” Please clarify recency requirements for submitted experience.

THE RECENCY HAS BEEN CHANGE

TO STATE THE LAST 7 YEARS DUE

TO COVID 19.

Will the evaluations from Phase I be carried over and considered as part of the overall evaluation for award, or will each offeror begin anew in Phase II?

PLEASE SEE PARAGRAPH 1.0

INTRODUCTION

Please confirm PPQ are required for subcontracted designers separate from the requirements for other subcontractors.

YES, PPQ ARE REQUIRED

SEPARATE FROM

SUBCONTRACTOR

Page 69, in the clause 52.216, there are instructions for the “first page of the proposal”. Please confirm this instructions are superceded by the requirements for the cover letter on page 26. (i.e. offerors are to follow the instructions on page 26)

OFFEROR'S ARE TO FOLLOW

INSTRUCTION ON PAGE 26

For the Cover Letter, as a joint venture, our information as requested may exceed the 1 page allowed in the page limitation chart on page

25. Would the Government consider removing or expanding the page requirements for the cover letter?

PLEASE FOLLOW INSTRUCTION IN

PARAGRAPH 2.3.5 PAGE

LIMITATION

The order limitations in 52.216-19, page 72 states that The Contractor is not obligated to honor -(1) Any order for a single item in excess of

$250,000 (insert dollar figure or quantity); This is well below the threshold provided (up to $7.5 million). Will the Government confirm that the $250,000 order limitation is correct.

YES, CLAUSSE 52.216-196 ORDER

LIMITATION IS CORRECT

In accordance with the order limitation requirements, will the

Government please indicate what percentage of work is anticipated to fall above/below $250,000?

THE GOVERNMENT CANNOT

DETERMINE WHAT PERCENTAGE

OF PROJECTS THAT WILL FALL

BELOW SAT AKA $250,000.00

Clause 52.236-1 indicates The Contractor shall perform on the site, and with its own organization, work equivalent to at least “to be determined on each individual task order basis” percent of the total amount of work to be performed under the contract. How often does the Government expect this to exceed 20%?

PLEASE FOLLOW INSTRUCTION IN

PARAGRAPH 2.3.5 PAGE

LIMITATION

Could we request additional pages or an increase to the quantity of pages for FACTOR 2 – TECHNICAL CAPABILITIES AND

APPROACH (VOLUME II), 3 pages at 12 point font is not enough pages.

PLEASE FOLLOW PARAGRAPH 2.3.5

PAGE LIMITATION INCREASE TO 5

The form has 2A, is this attachment 4? YES, PROVIDE NEW PPQ

Since the Covid pandemic, it has been challenging to get our PPQ fill out. Other agencies were willing to accept previously filled out PPQ.

We would like to know if Navy will make the same exception. The documents are exactly like Attachment 4.

THE RECENCY HAS BEEN CHANGE

TO STATE THE LAST 7 YEARS DUE

TO COVID 19.

Are the proposed subcontractors the DOR? NO

Does the Offeror have to request access to SAFE five days before the proposal is due? Uploading Phase 1 Technical Proposal.

PLEASE FOLLOW INSTRUCTION IN

PARAGRAPH 2.2 ELECTRONIC

SUBMISSION.

Is this a separate Volume? It says in the tableit is 3 pages and the cover page 1. What must be included under this section?

PLEASE FOLLOW INSTRUCTION IN

PARAGRAPH 2.3.5 PAGE

LIMITATION

"The maximum number of offerors selected to submit Phase Two proposals shall not exceed five unless the Contracting Officer determines that a greater number is in the Government's best interests."

QUESTION: Please advise what is the anticipated number of MATOC contracts to be awarded after Phase II evaluation.

Bonding - Is a letter from the Prime Offeror's surety required, or is a statement defining current bonding limits acceptable?

IN PHASE II A LETTER FROM THE

PRIME OFFERORS SURETY IS

REQUIRED

FACTOR 3 - PAST PERFORMANCE - Will a Final CPARS be accepted in lieu of an Attachment?

AS LONG IT IS WITHIN THE LAST 7

YEARS

ELECTRONIC SUBMISSION - What is the last day to request the

DoD Safe link?

PLEASE FOLLOW INSTRUCTION IN

PARAGRAPH 2.2 ELECTRONIC

SUBMISSION.

SF 1442 - Confirm date of submission as 15AUG22 as posted on

SAM.gov. Block 13 does not define the required date of submission.

incorporated due date 15SEPT2022

SECTION 00 10 00 - SOLICITATION

The required response date/time 15-Sep-2022 02:00 PM has been added.

The offeror acceptance period has increased by 60 from 120 to 180.

The number of offeror copies required has decreased by 1 from 2 to 1.

SECTION 00 21 16 - INSTRUCTIONS TO PROPOSERS

The following have been modified:

INSTRUCTIONS TO PROPOSERS

Note: If there are any inconsistencies between this section and FAR 52.215-1, this section controls.

Section 00 21 16 – INSTRUCTIONS TO PROPOSERS

PROPOSAL SUBMISSION REQUIREMENT – INSTRUCTION TO PROPOSERS

1.0 INTRODUCTION

1.1 ELIGIBILITY

1.2 QUESTIONS

1.3 START DATE FOR USE IN COST/PRICE PROPOSAL

2.0 INSTRUCTIONS FOR SUBMISSIONS OF OFFERS

2.1 GENERAL

2.2 ELECTRONIC SUBMISSION

2.3 PROPOSAL FORMAT

2.3.1 COVER PAGE AND TABLE OF CONTENTS

2.3.2 PAGE NUMBERING SYSTEM

2.3.3 GLOSSARY OF ABBREVIATION AND ACRONYMS

2.3.4 FILE NAMING CONVENTION

2.3.5 PAGE LIMITATION

2.3.6 GENERAL CONTENT INSTRUCTIONS

3.0 PROPOSAL ORGANIZATION AND CONTENT

3.1 COVER LETTER

3.2 SPECIAL NOTICE

3.3 EVALUATION FACTORS

4.0 PHASE ONE EVALUATION FACTORS

4.1 FACTOR 1 – CORPORATE EXPERIENCE (VOLUME I)

4.1.1 SUBFACTOR A: CONSTRUCTION EXPERIENCE

4.1.2 SUBFACTOR B: DESIGN EXPERIENCE

4.2 FACTOR 2 – TECHNICAL CAPABILITIES AND APPROACH (VOLUME II)

4.3 FACTOR 3 - PAST PERFORMANCE (VOLUME III)

5.0 PHASE TWO EVALUATION FACTORS

5.1 FACTOR 4 – MANAGEMENT APPROACH (VOLUME IV)

5.1.1 SUBFACTOR A - ORGANIZATIONAL STRUCTURE

5.1.2 SUBFACTOR B - TECHNICAL APPROACH

5.2 FACTOR 5 – SAFETY (VOLUME V)

5.3 FACTOR 6 - TOTAL EVALUATED PRICE (VOLUME VI)

6.0 ADDITIONAL REQUIRED INFORMATION

1.0 INTRODUCTION

It is the intention of this solicitation to result in the award of a Firm-Fixed Price (FFP) contract/task order. This procurement is solicited as a Total Set Aside for Small Business under

NAICS 236220 – Commercial and Institutional Building Construction. The contract shall provide for accomplishment of construction projects that will primarily consist of general building type projects (various maintenance, repair, alteration, renovation, minor construction projects and site restoration of operations) for the Naval Surface Warfare Center Carderock

(NSWCCD). The predominant Product Service Code (PSC) for this requirement will be Y1HB

– Construction of Government - operated (GOGO) R&D facilities. This PSC aligns with the

DoD taxonomy associated with the acquisition of services and falls under the Knowledge Based

Services taxonomy. Based on the effort to be procured, to provide engineering and technical services.

In this solicitation, the Government will utilize the Two-Phase Design Build Selection

Procedures in accordance with FAR 36.303 and the Best Value Tradeoff Process for Source

Selection in accordance with FAR 15.101-1 to determine best value. The Government will evaluate both technical capability and price. The offerors selected in Phase One are invited to submit a Phase Two proposal as indicated below. Phase Two evaluation will be conducted in accordance with FAR Part 15. See Section 00 22 16, Supplementary Instruction to Proposers, for further details on the Government’s evaluation approach.

1.1 ELIGIBILITY

This solicitation is a Small Business Set-Aside. Offers from other than Small Business concerns are ineligible for award and will not be evaluated. The Small Business Offeror shall ensure its proposal complies with FAR 52.219-14 entitled “Limitations on Subcontracting” to be eligible for award.

1.2 QUESTIONS

It is the Offeror's responsibility to bring to the attention of the Procuring Contracting Officer

(PCO) at the earliest possible time, but prior to the solicitation closing date, any ambiguities, discrepancies, inconsistencies, or conflicts between the Statement of Work (SOW) and other solicitation documents attached hereto or incorporated by reference. All questions shall be submitted within 15 calendar days after issuance of the solicitation. Questions received after this date may be answered at the discretion of the Government.

1.3 START DATE FOR USE IN COST/PRICE PROPOSAL

In order to allow for procurement lead-time and a fair and equal evaluation of all proposals submitted under this competitive procurement, all proposals shall be based on an estimated start date of September 20, 2022. This date is only an estimate of the anticipated start date and will be used for the purpose of proposal evaluation only. The definitive start date will be stated in the contract award document.

2.0 INSTRUCTIONS FOR SUBMISSION OF OFFERS

The government reserves the right to reject any proposal that does not comply with these proposal preparation/submission instructions. Note: Information requested and submitted in one volume will not be considered for purposes of evaluation of information contained in another volume. Cost/price proposal submissions must reflect what is submitted in the technical volume.

2.1 GENERAL

Offerors shall comply with the instructions for the format and content of the proposal; proposals that fail to comply may be ineligible for award.

(a) Definitions. As used in this solicitation –

“In writing” or “written” means any worded or numbered expression which can be read, reproduced, and later communicated, and includes electronically transmitted and stored information.

Proposal modification is a change made to a proposal before the solicitation’s closing date and time, or made in response to an amendment, or made to correct a mistake at any time before award.

Proposal revision is a change to a proposal made after the solicitation closing date, at the request of or as allowed by a Contracting Officer.

Day is defined as a calendar day unless otherwise specified. If the last day of a specified period falls on a Saturday, Sunday, or Federal Holiday, the period shall be deemed to end on the next Federal work day.

Major Subcontractor is defined as a subcontractor performing 49% or more of total proposed burdened labor costs.

(b) Amendments to the solicitation. If this solicitation is amended, terms and conditions that are not amended remain unchanged. Offerors shall acknowledge receipt of any amendment to this solicitation by the date and time specified in the amendment(s). The

Offeror shall demonstrate that the proposal is in response to the latest amendment.

(c) Proposal submissions, modifications, revisions, and withdrawals shall be uploaded electronically.

Offerors may submit modifications to their proposals at any time before the solicitation closing date and time. In the event of an amendment to the solicitation that requires Offerors to submit proposal modifications, the Offerors will be notified in the same manner as the RFP was provided.

After the solicitation closing date and time, Offerors may submit revised proposals only if requested or allowed by the Contracting Officer.

Proposals may be withdrawn at any time before award. Withdrawals are effective upon receipt of notice by the Contracting Officer.

2.2 ELECTRONIC SUBMISSION

Offerors shall submit proposals via email to Ronald V. Smiley at ronald.v.smiley.civ@us.navy.mil via DOD Safe at https://safe.apps.mil/ and contain “N00167-22-R-0016” in the subject line to ensure that the proposal submission is received by the Contracting Officer no later than the solicitation’s closing date/time in order to be considered eligible for award. Failure to submit a complete proposal prior to the solicitation closing date and time will in almost all circumstances render the proposal late and unacceptable. If access to needed please submit request 5 business days prior to proposal due date of 15 September 2022.

Offerors are responsible for submitting proposals and any revisions by the time specified in the solicitation. Any proposal (including proposal modifications or revisions) the Government does not receive by the exact time specified for receipt of offers is “late” and will not be considered. The solicitation will close at the exact date and time specified in the solicitation and Offerors will be unable to submit/upload proposals after that time. Proposals may be withdrawn by written notice to the Contracting Officer provided such notice is received prior to contract award.

2.3 PROPOSAL FORMAT

All Offerors are required to submit proposals in accordance with the format and content specified herein. The requirements below apply equally to subcontractors. Proposals that do not meet the below requirements may be deemed unacceptable and may not be eligible for award. The electronic proposal shall be prepared with:

Microsoft Word, Excel, or (searchable) Adobe Acrobat software (note: instructions regarding use of certain electronic products (e.g., Microsoft Office, Excel, Adobe) listed herein shall not be construed as Government endorsement of specified products);

No hyperlinks to locations outside a document (certain hyperlinks to places within a document, such as table of contents numbers, section headings, and table or figure cross references are acceptable);

All files named with the Offeror’s company name and title/subject of file content;

All files named with the file extension .doc, .docx, .xls, .xlsx, or .pdf;

Spreadsheet files (workbooks) provided for all prime AND subcontractors shall include all formulas, functions, macros, computations, and equations used to compute the proposed amounts. There shall be no cell references to data or links to files not included in the Technical and Management volume and the Cost/Price volume, submissions, as appropriate. For each workbook, all rows, columns, cells, and worksheets shall be visible

(object. Visible=true). Zero height/zero width rows/columns in worksheets are not acceptable. Worksheet cells formatted with the font color equal to the fill color are not acceptable. Print image files or pictures (for example, a picture of an Excel spreadsheet embedded in a Word document) shall not be used;

mailto:ronald.v.smiley.civ@us.navy.mil https://safe.apps.mil/

Spreadsheets shall include all calculations in the cells (e.g., show all formulas). The

Government MUST be able to determine how all direct and indirect rates are calculated.

DO NOT hard enter data where formulas were used to calculate the entered value;

All files named with the file extension .doc or .docx shall be Microsoft Word 2010 compatible;

Prime /Subcontractor Cost Summaries shall be submitted using Microsoft Excel (2010 or compatible) in the Cost Summary Format provided as an attachment in Section B or

Section 00 15 01;

Narratives related to the cost/price summary data may be provided in Microsoft Word;

Any other attached documents requested herein shall be compatible with Microsoft

Office. Compression tools are limited to PKZip or WinZip;

Offerors shall propose to provide all items in order to be deemed eligible for this award;

and

Offerors shall submit proposals in response to this solicitation in English and in U.S.

dollars.

Restriction on disclosure and use of data. Offerors that include in their proposals data that they do not want disclosed to the public for any purpose, or used by the

Government except for evaluation purposes, shall mark the title page with the following legend:

"This proposal includes data that shall not be disclosed outside the Government and shall not be duplicated, used, or disclosed in whole or in part for any purpose other than to evaluate this proposal. If; however, a contract is awarded to this Offeror as a result of, or in connection with, the submission of this data, the Government shall have the right to duplicate, use, or disclose the data to the extent provided in the resulting contract. This restriction does not limit the Government’s right to use information contained in this data if it is obtained from another source without restriction. The data subject to this restriction is contained in sheets

[insert numbers or other identification of sheets]"; and

Mark each sheet of data it wishes to restrict with the following legend:

"Use or disclosure of data contained on this sheet is subject to the restriction on the title page of this proposal."

Additionally, the electronic proposal shall be prepared so that, if printed, the proposal meets the following requirements:

8.5 x 11-inch paper;

Single-spaced typed lines;

1-inch margins;

12-point Times New Roman Font text;

Only graphs/tables/charts as may be necessary to convey a response to the items/information requested in this solicitation.