N0016720Q0219_U0001.docx
DOCX document 33 KB Posted
- Attached to
- LENEL® SECURITY SYSTEM MAINTENANCE & SUPPORT Federal contract opportunity
- Solicitation number
- N0016720Q0219
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| N0016720Q0219_U0003.pdf | ||
| N0016720Q0219_U0002.pdf | ||
| SAP Brand Name - Lenel__Redacted.pdf | ||
| N0016720Q0219_CSS.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N0016720Q0219
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 1449 - CONTINUATION SHEET
SOLICITATION/CONTRACT FORM
The required response date/time 24-Aug-2020 12:00 PM has been added.
The following have been modified:
52.212-2 EVALUATION--COMMERCIAL ITEMS (OCT 2014)
(a) Basis for Award
The Government has determined that an award to the responsible Quoter that submits the Lowest-Priced, Technically Acceptable (LPTA) quote in response to this solicitation will represent the best value to the Government. Quotes will be evaluated to determine the LPTA quote based on the following factors:
Factor 1 Price Factor 2 Technical Capability/Approach
A quote must be rated "ACCEPTABLE" for each non-price factor to be eligible for award. An "UNACCEPTABLE" rating for any non-price factor will result in the entire quote being rated "UNACCEPTABLE" overall; an overall rating of "UNACCEPTABLE" makes a quote ineligible for award. A quote must contain sufficient information to enable evaluators to determine acceptability; if there is insufficient information to determine acceptability of the quote, the quote will be rated “UNACCEPTABLE” overall. Each of the evaluation factors will be rated as set forth below. Technical tradeoffs will not be made and no additional credit will be given for exceeding acceptability.
The Government will evaluate the lowest priced quote for technical acceptability. If it is not acceptable, the Government will evaluate the next lowest quote for technical acceptability, and so forth, to determine the lowest-priced, technically acceptable quote, at which point all evaluations will stop.
(b) Evaluation Factors
Factor 1: Price
Quotes must include a proposed price for each Contract Line Item Number (CLIN). The Government will determine prices by adding the total proposed price for all CLINS, including all options. Quotes will be ranked from lowest- to highest-priced.
Factor 2: Technical Capability
The Government will evaluate the lowest priced Quoter for acceptability of Technical Capability. If the quote is not found to be acceptable, the Government will evaluate the next lowest quote for acceptability of technical capability, and so forth, to determine the lowest-priced quote that is acceptable for Technical Capability, at which point evaluators will evaluate of the acceptability of that quoter’s Past Performance.
Technical Capability evaluations will result in one of the following ratings:
TABLE 1 - TECHNICAL RATINGS
| Rating |
| Description |
| Acceptable |
| Quote clearly meets the minimum requirements of the solicitation. |
| Unacceptable |
| Quote does not clearly meet the minimum requirements of the solicitation. |
Minimum Requirements.
The following are the minimum requirements a quote must meet to be deemed acceptable for the Technical Capability factor:
1) The quoted parts shall meet the solicitation requirements including required parts, delivery dates, and terms and conditions stated in the solicitation.
PRICE
The quoter’s proposed price will be evaluated on the basis of price reasonableness. The evaluation may include, but is not limited to:
a. Price comparison with other quoters;
b. Comparison with Independent Government Estimates.
Quoters responding to this solicitation are advised that, prior to award, the government may request quoters to submit information/data to support price reasonableness such as copies of paid invoices for the same or similar items, sales history for the same or similar items, price list with effective date and/or copies of catalog pages along with any applicable discounts.
QUESTIONS: Any questions in relation to this solicitation shall be submitted to George DelMoral by email at george.delmoral@navy.mil. The cut-off date for questions is 12:00 pm on 18 August 2020.
(c) Contract Award
The Government shall mail or email a written notice of award to the successful quoter. Upon receipt, the quoter shall either commence performance, or have an authorized representative sign the award and return it to the Contracting Officer; a binding contract is formed upon the earlier of either of those actions. The Government requests that the awardee return a signed copy, or notify the Contracting Officer by email that it will deliver the items, within 3 days of receiving the award notice.
(End of provision)