SOW_from_contract_specialist_KH_modified.pdf
PDF 61 KB Posted
- Attached to
- Machining Services Federal contract opportunity
- Solicitation number
- N00167-18-Q-0062
About this file
Statement of Work
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment__2_to_Solicitation_N00167-18-Q-0062.pdf | ||
| Amendment_to_Solicitation_N_00167-18-Q-0062_Machining_Vendors_Question_and_Answers.pdf | ||
| Solicitation_N00167-18-Q-0062_Machining_Services-with_cover_sheet.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work
1.0 SCOPE.
NSWCCD requires machining services contract to support VACL Class production. The Contractor shall deliver the plug components in the specified quantities as identified below. The Contractor's facility must be located within 100 miles of NSWCCD, Bethesda, MD, because of the quick turn-around required of the machining operations, and the requirement for NSWCCD coordination of the movement of Government Furnished Property (GFP) in order to meet the delivery schedules.
2.0 REQUIREMENTS.
A) The Contractor shall separate, mark, and secure all GFP for the duration of the contract. Any excess material is to be shipped back to the Government with the finished parts. All scrap metal not including shavings or chips shall also be returned to the Government.
B) All machined attributes of five consecutive parts of a production run shall be inspected by the Contractor and must meet the drawing tolerance requirements. The dimensions of all five consecutive parts as measured by the Contractor shall be recorded and provided as production certification. The Contractor shall Include these certs in a plastic bag inside the shipping container.
C) All remaining parts of the production run shall have 100% inspection of the three and four place decimal dimensions: diameters, thicknesses, lengths but the actuals shall not be recorded. Note: A dimensional deviation occurring during the production run shall require a process evaluation and repeating step 2B.
D) The Contractor shall provide a Certificate of Compliance in a plastic bag with the production cert1ticat1on documentation identified in paragraph 2B that states the following:
D.1 The parts meet purchase order and drawing requirements
D.2 The metrology equipment used to perform dimensional inspections is calibrated to a nationally recognized standard D.3 The measurement uncertainty associated with each device is within +/- 20% of the feature tolerance that it is being used to verify.
E) The Contractor shall clean all machined surfaces with acetone to remove residual cutting lubricants prior to packaging for shipping per the drawing requirements.
F) The Contractor shall pack the finished parts for delivery in accordance with the preservation and packaging notes in each drawing to the Government at the address provided below. The Contractor shall be responsible for the condition of all parts until receipt inspection and final acceptance at destination is completed. Shipping address to NSWCCD:
Naval Surface Warfare Center 9500 MacArthur Blvd West Bethesda, MD 20817
3.0 DELIVERABLES
CLIN 0001: The Contractor shall deliver the plug components in the specified quantities as identified in Table, utilizing Government Furnished Property (GFP) as identified in Table 2. The material to be provided as GFP will be of sufficient quality and quantity to allow the Contractor to complete the work detailed in this SOW. If additional raw material becomes necessary due to contractor error (i.e. mis-machining), the Contractor shall be responsible for providing the material required to complete the order. The Contractor shall be responsible for procuring all of the raw material (mild steel, ASTM A108) required to machine R4L shim rings identified via DWG PR15023, Items 1-7.
Table 1. Plug Component List Drawing Item Description Quantity Material
PR15006- 1 Sl Body Tube 800 3"X2" NAB Tube Stock PR15006-2 RlL Body Tube 280 3"X2" NAB Tube Stock PR15006-3 RlX Body Tube 425 3"X2" NAB Tube Stock PR15006-4 R2L Body Tube 320 3"X2" NAB Tube Stock PR15006-5 R2X Body Tube 475 3"X2" NAB Tube Stock PR15006-6 R3M Body Tube 165 3.5"X2.5" NAB Tube Stock PR15006-7 R3L Body Tube 165 3.5"X2.5" NAB Tube Stock PR15019 R4L Body Tube 108 6.575"X5.5" NAB Tube Stock PR15007- 1 Sl Top Cap 575 2.75" Diameter NAB Rod Stock
PR15007-2 RlTop Cap 700 2.75" Diameter NAB Rod Stock PR15007-3 R2 Top Cap 570 3" Diameter NAB Rod Stock PR15007-4 R3 Top Cap 300 3.5" Diameter NAB Rod Stock PR15018 R4 Top Cap 108 6.5'' Diameter NAB Rod Stock PR15008-1 Sl/Rl Bottom Cap 1200 2.5" Diameter NAB Rod Stock PR15008-2 R2 Bottom Cap 375 2.75" Diameter NAB Rod Stock PR15008-3 R3 Bottom Cap 300 3.5" Diameter NAB Rod Stock PR15020 R4 Bottom Cap 108 6” Diameter NAB Rod Stock
PR15009-1 SlL Mass 800 1.5" Diameter Tungsten Bar PR15009-2 R2L (1.5) Mass 230 1.5" Diameter Tungsten Bar PR15009-3 R2X (1.5) Mass 150 1.5" Diameter Tungsten Bar PR15009-4 R3M (1.9) Mass 90 1.9" Diameter Tungsten Bar PR15009-5 RlL/ R3L (1.9) Mass 360 1.9" Diameter Tungsten Bar PR15009-6 R1X/R2X (1.9) Mass 575 1.9" Diameter Tungsten Bar PR15009-7 R2L (2.2) Mass 45 2.2" Diameter Tungsten Bar PR15009-8 R2X (2.2) Mass 40 2.2" Diameter Tungsten Bar PR15009-9 R3M (2.7) Mass 42 2.7" Diameter Tungsten Bar PR15024 R4L Center Mass 108 3.41" Diameter Tungsten Bar PR15022 R4L End Mass 236 5.25" Diameter Tungsten Bar PR15023 1-7 Shim Ring Set 108 Mild steel, ASTM Al08
4. TRAVEL REQUIREMENTS - None.
5. GOVERNMENT FURNISHED PROPERTY:
Table 2. Government Furnished Property Material Quantity (ft)
3"X2" NAB Tube Stock 570 3.5"X2.5" NAB Tube Stock 70 6.575"X5.5" NAB Tube Stock 40
2.5" Diameter NAB Rod Stock 41 2.75" Diameter NAB Rod Stock 158 3" Diameter NAB Rod Stock 70 3.5" Diameter NAB Rod Stock 48 6.0" Diameter NAB Rod Stock 6 6.5" Diameter NAB Rod Stock 32
1.5" Diameter Tungsten Bar 198 1.9" Diameter Tungsten Bar 231 2.2" Diameter Tungsten Bar 19 2.7" Diameter Tungsten Bar 7 3.41" Diameter Tungsten Bar 18 5.25” Diameter Tungsten Bar 26
6. PERFORMANCE
a. Period of Performance. After contract award, the period of performance shall be 12 weeks upon receipt of GFP.
b. Place of Performance. The primary place of performance shall be at the Contractor's facility.
7. SECURITY REQUIREMENTS - The drawings are Distribution C limited to US Government Agencies and their Contractors.
File details come from the government source that posted it.