Amendment3-N00167-17-T-0030.pdf

PDF 117 KB Posted

Attached to
Winches Federal contract opportunity
Solicitation number
N00167-17-T-0030
Issued by
Department of the Navy Naval Sea Systems Command

View the file

Other files for this federal contract opportunity

Other files attached to Winches, newest first.
File Type Posted
Amendment2FINAL-N00167-17-T-0030-Winches.pdf PDF
Amended_Solicitation-N00167-17-T-0030.pdf PDF
New_Solicitation-N00167-17-T-0030-Winches.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to answ er questions that have been asked by industry, provide clarification, and to revise the specif ications. All other terms and conditions remian unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 14

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 10-Mar-2017

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N00167-17-T-0030

X 9B. DATED (SEE ITEM 11)

24-Feb-2017

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

10-Mar-2017

CODE

NAVAL SURFACE WARFARE CENTER CARDEROCK

CODE 0221, SHELBY O'NEILL

301-557-5782, SHELBY.O'NEILL@NAVY.MIL

9500 MACARTHUR BLVD.

WEST BETHESDA MD 20817

N00167 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N00167-17-T-0030

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

The following items are applicable to this modification:

SUMMARY OF CHANGES

The following have been modified:

ANSWERS AND CLARIFICATION

ANSWERS AND CLARIFICATION

Answers and Clarification

1. Q: What is the reason for the re‐solicitation?

A: There are several reasons why the original solicitation (no. N00167‐17‐T‐0019) was canceled and re‐released as the present solicitation, including that the original solicitation did not adequately define the Government's minimum requirements.

2. Q: Please confirm that “Any quote that does not meet each of the specifications listed in Table 5 will be deemed technically unacceptable and unacceptable for award” also includes lead time, delivery date of August 11, 2017.

A: Yes, a quote that does not offer a delivery date of August 11, 2017 (or earlier) will be considered technically unacceptable.

3. Q: Please confirm that this solicitation is a 100% Small Business Set‐aside.

A: Confirmed that this solicitation is a 100% Small Business Set‐aside. Only quotes received from offerors that are small businesses under the applicable NAICS code (333923; size standard 1,250 employees) will be evaluated and considered for award.

4. Q: Do the questions and answers from the prior solicitations still apply?

A: The questions and answers from the prior solicitation do not apply as this is a new solicitation.

5. Q: When is quote due?

A: The quote is due 3/13/2017 by 4:00 PM EST.

6. Q: What ambient temperatures can we expect during start‐up and operations?

A: Operation in a marine environment in Ketchikan, Alaska includes expected ambient temperatures ranging from ‐5° to 30° C during start‐up and operations.

7. Q: The anchor winch will be extremely wide due to storage capacity and layer limitations.

(a) Can it be fabricated where as it can be broken down for transport and lift, such as the power unit being separated from winch for transport?

(b) Can it be totally separate with quick connects at hosing and electrical feeds.

A: (a) Yes, an anchor winch that is fabricated to allow the unit to be broken down for transportation and lifting, with a power unit that may be separated from the winch for transport is acceptable, provided that all pieces can be mounted on a single foundation for lifting, handling and installation, and that the final assembly meets all of the requirements in RFQ Section B, paragraph 2.1 [now paragraph 3.1]. During shipment, the assembly can be broken down as long as it will be re-assembled on a single consolidated foundation.

(b) Yes, the anchor winch may be totally separate with quick connects at hosing and electrical feeds, so long as the final assembly meets all of the requirements in RFQ Section B, paragraph 3.1.

8. Q: The positioning winch spec mentions constant tension and tension limiting by the operator. Are these the same functionality? Or as defined below?

A) Static tension whereas the operator only limits what the winch can pull with a knob.

In this case the operator would have total control over line speed with a joystick and a line tension cap provided through a knob. Over hauling would limited.

B) Is it a true dynamic constant tension whereas the load cell provides an input to the system and the system automatically hauls in and pays out the winch to maintain a desired rope tension? Under these circumstances in most cases the line speed would not be controlled by the operator. If the winch is below tension setting it would retrieve or payout line as fast as possible until the desired tension is achieved.

(a) If the answer is "B" a PLC control system could be required. Is this acceptable and if so is AC power available?

(b) What accuracy of constant line tension would be required?

A: (a) The answer is "B" above. A PLC control system is acceptable, provided that its operations are incorporated into the local winch control station (see RFQ Section A, paragraph 3.2.4). AC power will be available to provide power for electronics, but not to provide primary power to the winch (see RFQ Section A, paragraph 3.2.1). The Government can provide AC power to power the PLC control system, if the PLC control system requires a power source other than the positioning winch’s diesel engine.

(b) As noted in the RFQ (Section A, paragraph 3.2.4), the positioning winch’s controls shall allow for the winch to be configured to maintain a constant line tension at an operator-adjusted tension setting. For the control station’s constant line tension reading, accuracy of plus or minus 10% (or better) of the displayed reading is required.

9. Q: Regarding the level wind being capable of spooling two rope sizes. Is changing a sprocket an acceptable means to meet this requirement or would a drive ratio that falls between the two sizes acceptable?

A: Yes, changing a sprocket is an acceptable means to meet this requirement.

10. Q: For the position winches, maximum speeds for pay in and pay out are 100 and 300 ft/min respectively. Can we assume that the higher speed payout is for line handling and not to be performed under full load? This will significantly reduce the cost and size of the system.

A: Yes, offerors may assume that the higher speed payout is for line handling and not to be performed under full load.

11. Q: Similarly for the anchor winch can you confirm whether the 100 ft/min speed is required at maximum linepull? Typically for class standards (Lloyd's, abs, DnV) 30 ft/min is required at full load. We could offer a dual speed winch with 100 ft/min at reduced load if that is acceptable.

A: The 100 ft/min is not required at full load but is expected at about 50% load.

12. Q: Is the intent to have separate diesel power units for each winch, 4 total?

A:Yes, each winch will have its own diesel power unit.

13. Q: The current amendment # 2 and also # 1 are using the same line number for description of the specifications. For example, positioning winch power is 3.2.1 and anchor winch power is using the same numbering system (3.2.1) but has different specifications. Should this be numbered differently?

A: The paragraph numbering reflected in the previous amendment (Amendment 2) was correct. The specifications are divided into four sections (Sections A - D), and the paragraph numbering begins anew in each Section. Therefore, in the example provided, positioning winch power requirements are specified in Section A, paragraph 3.2.1, while anchor winch power requirements are specified in Section B, paragraph 3.2.1. Table 5, in Section D, follows this Section and Paragraph numbering paradigm as well, and the Section (A, B, or C) is indicated above the "Specification Section" heading for each Section in Table 5.

Please note that there was an error in Table 5 as it appeared in Amendment 2, in that the Section C specifications are repeated in Table 5. This error is corrected by this amendment (Amendment 3).

14. Q: Please confirm the only requirement for this solicitation to be classified as a small business is to have less than 1250 employees.

A: The Government cannot confirm as stated. For the purposes of this solicitation, an offeror must meet all of the applicable U.S. Small Business Administration (SBA) requirements for a small business concern (under NAICS code 333923, the NAICS code applicable to this procurement), as set forth in the SBA's regulations at 13 C.F.R. Part 121.

15. Q: If we are a Canadian based company are we eligible to bid for this contract?

A: The Government will not advise individual offerors or concerns as to their eligibility to bid for this contract. The Government does note, however, that it is unaware of any authority that would restrict an entity's elibigibility for an award for this specific solicitation based solely on the fact that the entity is based in Canada.

Additionally, the Government hereby notifies potential offerors of the percentages that may be invoiced for each CLIN:

CLINs 0001 and 0002 shall be no more than 5% each of the total value of the contract.

CLINs 0003 and 0004 shall be no more than 10% each of the total value of the contract.

CLINs 0005, 0006, and 0007 shall be priced as necessary.

The RFQ has been revised to correct errors in the Section/Paragraph numbering. The RFQ has also been revised to remove the duplicated rows of Section C listed in Table 5.

The Government has received a comment regarding difficulty opening solicitation documents.

Any potential offeror that this unable to open any document uploaded to FBO for this solicitation may contact shelby.o’neill@navy.mil for copies of solicitation documents. No additional time will be provided to respond.

SPECIFICATIONS

Specifications

Document Overview

This document details the specifications for the design and fabrication of positioning winches and an anchor winch. These winches will be used in the Operation and Maintenance of the Southeast Alaska Acoustic Measurement Facility (SEAFAC) located in Ketchikan, AK on Behm Canal. These specifications are comprised of four sections, as follows:

Section A: Positioning Winch Specifications Section B: Anchor Winch Specifications

Section C:

Instructions and References (including

Deliverables, Deliverables Format, Deliverable Schedule, and Applicable Reference)

Section D:

Requirements Matrix (listing the requirements that must be addressed in offerors’ quotes)

A. Positioning Winch Specification for Three Point Mooring System

1. Purpose

This specification is for the design and fabrication of three positioning winches.

The winches will be used SEAFAC as part of the Operation and Maintenance program. The positioning winches are part of a three point mooring positioning system for a barge during the handling of underwater equipment.

2. General

The winches will be used in a marine environment in Ketchikan, Alaska. The winches shall be designed, fabricated, and tested to DNV GL Rules, Reference (A), or to an equivalent classification society. Factory Acceptance Testing (FAT) shall be completed and accepted per approved FAT plans (two FAT plans shall be delivered to the Government; a preliminary FAT plan and a final FAT plan. See Section C.1, Tables 1 and 2) CDRL 0001 before the winches are delivered to the Government. The contractor shall also provide a preliminary and final list of recommended spare parts to maintain on hand for the operation and maintenance of the winches (spare parts list) CDRL 0002, and preliminary and final winch operations and maintenance manuals CDRL 0003.

The positioning winches will be part of a barge positioning system which is used on a temporary basis. A winch (specified in Section B, below) will be used for anchor handling, and three positioning winches (specified below) will be used for positioning. The positioning winches will be connected to a surface float and will not be used for anchor handling.

All winches shall be delivered FOB: Alaska Marine Lines (AML), Seattle, WA

The winches are required to be delivered to AML for barge departure to Ketchikan, Alaska on (or before) August 11, 2017.

3. Positioning Winch

3.1. Positioning Winch Configuration

The positioning winch is not an anchor handling winch. The positioning winch shall include the following:

1. Levelwind

2. Diesel Engine Power with hydraulically driven winch drum

3. Control System

4. Support frame work and foundation.

5. Lifting and handling components

6. Line tension and payout monitoring and control

7. Powered payout capability

Foundations shall be designed and fabricated to support associated equipment and hardware. The positioning winches shall be self-supporting on a foundation that can be bolted to a fabricated foundation on the barge. The framework shall have lifting pad eyes. The positioning winches shall be designed for the marine environment. Equipment shall have an appropriate coating system.

Fasteners shall be selected to allow easy assembly and disassembly in the marine environment.

The positioning winches shall have a brake that can only be operated when power is available to the winch, and the brake shall be automatically set when the power is secured.

3.2. Positioning Winch Design

3.2.1. Winch Power

A diesel engine shall be the primary power source. The engine shall be battery start. The battery shall be sized for at least six cold starts. The engine shall be Tier 3 marine rated. The winch drum shall be hydraulically powered.

The engine shall be able to run for at least 12 hours without refueling. The full drum line pull shall be 18,000 pounds. The bare drum pay-in line speed shall be 100 feet per minute minimum with variable speed control, and the bare drum payout line speed shall be 300 feet per minute minimum with variable speed control.

3.2.2. Winch Drum

The winch shall be designed for 3,000 feet of one inch Dynice Winch Warp line made by Hampidjan (or equivalent). The Dynice line shall have a minimum D/d ratio of 20. The number of layers shall not exceed seven. The winch drum shall have a freeboard of two inches. The line shall be connected to a clamp on the outside of the flange. Note: The Dynice line shall be terminated with a thimbled eye splice, which shall pass through the flange.

The Dynice line wraps tighter than wire rope, resulting in higher stresses in the drum core and flange. The

Contractor’s preliminary and final winch designs shall include calculations for the design of the winch drum showing the stress, strain, and displacement of the drum during its highest loading.

3.2.3. Levelwind

The winch shall be equipped with a levelwind. For design purposes, assume the minimum distance from the levelwind to the first sheave is 20 feet. The levelwind will be operated with either a 0.875 inch or a 1.000 inch diameter line and shall be designed to accommodate both sizes. The levelwind shall be designed to allow a thimbled eye to pass through, which may be accomplished by either staggering the rollers or via a quick dis-assembly procedure.

3.2.4. Controls

The winch shall have a local control station. The control station shall contain all of the engine and hydraulic instruments necessary to safely operate the winch. The diesel engine start/stop and winch controls shall be located at the control station.

The winch controls shall be electrical. The controls shall allow for:

1. Setting the maximum line tension for the winch.

2. Configuring the winch to maintain a constant line tension at an operator-adjusted tension setting.

3. Controlling the haul-in and payout speed of the line.

The winch control station shall also include the tension and line payout controls. The control station shall be designed to be operated from a seated position.

B. Anchor Winch Specification for Three Point Mooring System

This specification is for the design and fabrication of one anchor handling winch. The winch will be used at the SEAFAC as part of the Operation and Maintenance program. The anchor winch is part of a three point mooring positioning system for a barge during the handling of underwater equipment.

2. General

The anchor winch will be used in a marine environment in Ketchikan, Alaska. The anchor winch shall be designed and fabricated to DNV GL Rules, Reference (A), or to an equivalent classification society.

FAT shall be completed and accepted per approved FAT plans (two FAT plans shall be delivered to the Government; a preliminary FAT plan and a final FAT plan. See Section C.1, Tables 1 and 2) (CDRL 0001) before the winch is delivered to the Government. The contractor shall also provide a preliminary and final list of recommended spare parts to maintain on hand for the operation and maintenance of the winch (spare parts list) (CDRL 0002), and preliminary and final winch operations and maintenance manuals (CDRL 0003).

The anchor winch will be part of a barge positioning system which is used on a temporary basis. The anchor winch will be used for anchor handling, and three other winches (specified in Section A, above) will be used for positioning only.

The winch shall be delivered FOB: AML, Seattle, WA

The winch is required to be delivered to AML for barge departure to Ketchikan, Alaska on (or before) August 11, 2017

3. Anchor Winch

3.1. Anchor Winch Configuration

The winch shall include the following:

1. Levelwind

2. Diesel Engine Power

3. Control System

4. Support framework and foundation.

5. Lifting and handling components

6. Line tension and payout

7. Power out capability

Foundations shall be designed and fabricated to support associated equipment and hardware. The anchor winch shall be self-supporting on a foundation that can be bolted to a fabricated foundation on the barge.

The framework shall have lifting pad eyes. The anchor winch shall be designed for the marine environment. Equipment shall have an appropriate coating system. Fasteners shall be selected to allow easy assembly and disassembly in the marine environment.

The anchor winch shall have a brake that can only be operated when power is available to the winch, and the brake shall be automatically set when the power is secured.

3.2. Anchor Winch Design

3.2.1. Winch Power

A diesel engine shall be the primary power source. The engine shall be battery start. The battery shall be sized for at least six cold starts. The engine shall be Tier 3 marine rated. The winch drum shall be hydraulically powered. The engine shall be able to run for at least 12 hours without refueling. The full drum line pull shall be 62,000 pounds or more. The bare drum line speed shall be at least 100 feet per minute, with variable speed control.

3.2.2. Winch Drum

The winch shall be designed for 2,500 feet of 1.375 inch Dynice Winch Warp line made by Hampidjan (or equivalent). The Dynice line shall have a minimum D/d ratio of 20. The number of layers shall not exceed seven. The winch drum shall have a freeboard of three inches. The Dynice line shall be connected to a clamp on the outside of the flange. Note: The Dynice line shall be terminated with a thimbled eye splice, which shall pass through the flange.

The Dynice line wraps tighter than wire rope, resulting in higher stresses in the drum core and flange. The Contractor’s preliminary and final FAT plans shall include calculations for the design of the winch drum showing the stress, strain, and displacement of the drum during its highest loading.

3.2.3. Levelwind

The winch shall be equipped with a levelwind. For design purposes, assume the minimum distance from the levelwind to the first sheave is 20 feet. The levelwind will be operated with either a 1.375 inch or a 1.500 inch diameter line and shall be designed to accommodate both sizes. The levelwind shall be designed to allow a thimbled eye to pass through, which may be accomplished by either staggering the rollers or a quick dis-assembly procedure.

3.2.4. Controls

The winch shall have a local control station. The control station shall contain all of the engine and hydraulic instruments necessary to safely operate the winch. The diesel engine start/stop and winch controls shall be located at the control station.

The winch controls shall be electrical. The winch control station shall also include the line tension and payout controls. The control station shall be designed to be operated from a seated position.

C. Instructions and References

1. Deliverables and Schedule

The Contractor shall deliver the items in Table 1, in accordance with the schedule provided in Table 2. The Contractor shall deliver two sets of each deliverable listed in Table 1: one set of deliverables for the positioning winches and a separate set for the anchor winch.

Any exceptions to deliverables shall be identified in the quote provided in response to this RFQ.

Table 1 – Deliverables

No. Deliverable CLIN/CDRL

Winch designs – preliminary (including drum load calculations per sections A.3.2.2 and B.3.2.2)

CLIN

FAT plan – preliminary NOTE: The FAT plan shall address all test requirements in Reference (A), specifically including, but not limited to, Chapter 2, Section 4, Paragraph 12.9, Table 6. All tests, including load testing, shall be completed and accepted before winch delivery.

CDRL

Winch designs – final (including drum load calculations per sections A.3.2.2 and B.3.2.2)

CLIN

4 Winch operation and maintenance manual ‐ preliminary CDRL 0003 5 List of spares ‐ preliminary CDRL 0002

FAT plan – final NOTE: The FAT plan shall address all test requirements in Reference (A), specifically including, but not limited to, Chapter 2, Section 4, Paragraph 12.9, Table 6. All tests, including load testing, shall be completed and accepted before winch delivery.

CDRL 0001

Winches, winch operations and maintenance manual, and list of spares

Table 2 – Schedule

Deliverable or Action Schedule Responsibility

Fabrication Schedule and estimated shipping time/costs for delivery to the AML terminal in Seattle, WA

To be included with quote

Contractor

Winch designs ‐ preliminary Per Fabrication Schedule Contractor

FAT plan ‐ preliminary Per Fabrication Schedule

Contractor

Review of winch preliminary designs After Government receipt of preliminary designs

Government

Review of preliminary FAT plan After Government receipt of preliminary FAT plan

Government

Winch designs – final

One week after return of Government preliminary design review comments

Review of winch final designs and “Release for Fabrication”

After Government receipt of final designs

Government

Winch operation and maintenance manual ‐ preliminary List of spares ‐ preliminary

To be submitted with final design

FAT Plan ‐ final

One week after return of Government preliminary FAT plan review comments

Winches fabrication Per Fabrication Schedule Contractor Winches FAT Per Fabrication Schedule Contractor

FAT approval After Government receipt of FAT results

Government

Winches, winch operation and maintenance manual, and list of spares

Two weeks after FAT approval Contractor

Any fabrication started prior to “Release for Fabrication” shall be at the Contractor’s risk unless approved in writing by the Government.

2. Description of Deliverables and Formats

A description of the information to be included in the deliverables is listed in Table 3. Document formats are listed in Table 4.

Table 3 - Document Description

Item Description

Preliminary Design

Assembly drawings Purchased parts description (Vendor name and part number)

Final Design Preliminary design information with Customer comments incorporated Reason for not including a customer comment

FAT Plan Test Method of meeting test requirement Approval criteria for test requirement

Table 4 - Document Format

Item File Type Preliminary Drawings PDF Final Drawings PDF Preliminary Documents PDF Final Documents PDF

3. References

(A) Offshore Standard DNVGL-OS-E301, “Position Mooring,” DNV GL, July 2015.

D. Requirements Matrix

Table 5, below, lists requirements to be addressed in quotes provided in response to this RFQ. All quotes will be evaluated for their compliance with each of the requirements listed in Table 5. Quotes that propose alternative requirements or that fail to specifically address all requirements in Table 5 may be considered non-responsive and technically unacceptable for award. All quotes must include a filled-in copy of Table 5, indicating where in the quote each of the Specification requirements are addressed.

Table 5: Requirements Matrix for Positioning and Anchor Winches

A. Positioning Winch Specification

Specification Section Requirement to be Evaluated Quote Section where Requirement is Addressed

2. General Design, fabrication, and test per Reference (A) or equivalent

Operation in marine environment in Ketchikan, Alaska Delivery FOB AML, Seattle WA Delivery by 11 Aug 2017

3. Positioning Winch

3.1 Positioning Winch Configuration

Self‐supporting frame and foundation Lifting and handling components Appropriate coating system Winch brake

3.2. Positioning Winch Design

3.2.1 Winch Power Battery sized for minimum six cold starts

Tier 3 marine‐rated diesel engine 12‐hour operation w/out refueling 100 ft./min. ‐ bare drum, pay‐in line speed 300 ft./min. ‐ bare drum payout line speed 18,000 lbs. design load ‐ full drum Variable speed control Hydraulically powered winch drum system

3.2.2 Winch Drum Capacity for 3,000 ft. of 1.0 inch Dynice line Minimum core diameter for 20 D/d ratio 2 inch freeboard Line termination, via thimbled eye splice outside flange Drum calculations to be provided w/ design deliverables

3.2.3 Levelwind Both 0.875 inch and 1.000 inch line size accommodation Thimbled eye splice pass‐through accommodation

3.2.4 Controls Local control station

Control station contains all engine/hydraulic instruments necessary for safe operation.

Diesel engine start/stop and winch controls located at control station

Maximum line tension control Adjustable line tension control Constant line tension control Haul‐in and payout speed controls Designed for operation from a seated position

B. Anchor Winch Specification

Specification Section Requirement to be Evaluated Quote Section where

Requirement is Addressed

2. General Design, fabrication, and test per Reference (A) or equivalent Operation in marine environment in Ketchikan, Alaska Delivery FOB AML, Seattle WA Delivery by 11 Aug 2017

3. Anchor Winch

3.1 Anchor Winch Configuration

Self‐supporting frame and foundation Lifting and handling components Appropriate coating system Winch brake

3.2. Anchor Winch Design

3.2.1 Winch Power

Battery sized for minimum six cold starts Tier 3 marine‐rated diesel engine 12‐hour operation w/out refueling 100 ft./min. ‐ bare drum speed 62,000 lbs. design load ‐ full drum Variable speed control Hydraulically powered winch drum system

3.2.2 Winch Drum

Capacity for 2,500 ft. of 1.375 inch Dynice line Minimum core diameter for 20 D/d ratio 3 inch freeboard Line termination, via thimbled eye splice outside flange Drum calculations to be provided w/ design deliverables

3.2.3 Levelwind

Both 1.375 inchand1.500 inch line size accommodation Thimbled eye splice pass‐through accommodation

3.2.4 Controls

Local control station Control station contains all engine/hydraulic instruments necessary for safe operation.

Diesel engine start/stop and winch controls located at control station

Line tension control Payout speed control Seated position

Designed for operation from a seated position

C. Instruction and References

Requirement to be Evaluated Quote Section where

Requirement is Addressed Fabrication Schedule Schedule provided with proposal

Winch designs - preliminary

Other Deliverables to be Provided

FAT Plan - preliminary Winch designs – final Winch operation and maintenance manuals - preliminary List of Spares - preliminary FAT Plan - final Winches FAT completed (before delivery) Winches FAT acceptance (before delivery) List of spares - final Winch operation and maintenance manuals - final Delivered Winches

(End of Summary of Changes)