This is Standard Form 30 Amendment 0001 to a small business set-aside solicitation issued by the Naval Surface Warfare Center Crane Division on 30 May 2026. The amendment extends the response due date from 05 May 2026 at 12:00 PM to 05 June 2026 at 05:00 PM and modifies key solicitation parameters and line item descriptions.
The solicitation was modified to change the NAICS code from 335312 to 811210, adjust the size standard from 1250 employees, and remove the 100 percent set-aside designation. The primary requirement involves evaluation and overhaul of six (6) DC motors (P/N 914104 with various serial numbers: VR06525KV, YN85756, NP85777, YM72223WS, QF54201UP, and XG88436PN) in accordance with a Statement of Work, drawings, specifications, and Contract Data Requirements Lists. An optional line item (CLIN 0003) covers repair of a single DC motor (P/N 914104, S/N YN85756) with a 12-month option exercise period. Award will be made using simplified acquisition procedures on a firm fixed-price basis to the lowest priced technically acceptable vendor. Evaluation employs a three-phase approach: responsiveness review, technical acceptance (based on technical approach, delivery schedule compliance per FAR 52.211-8, and past performance via the Supplier Performance Risk System), and pricing comparison. Quoters must provide a completed SF-1449, pricing for all CLINs, delivery schedule, technical evaluation matrix, current SAM.gov registration, and Cybersecurity Maturity Model Certification Level 2 self-status to be considered responsive.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
R
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBE
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
Section A - Solicitation/Contract Form
The following changes have been made:
INFORMATION FROM TO
Percent Set Aside 100 NAICS Code 335312 811210 Size Standard - Employees
Small Business Type Small Business Response Due Time 12:00 PM 05:00 PM Response Due Date 05 May 2026 05 Jun 2026
N0016426Q01310001
Section B - Supplies or Services & Prices or Costs
The following CLIN(s) / SLIN(s) / ELIN(s) were modified:
0001AA
INFORMATION FROM TO
Description
Evaluation of DC Motors (Radar Restoration) IAW a SOW, drawing & specifications, and CDRLsP/N 914104S/Ns: VR06525KV, YN85756, NP85777, YM72223WS, QF54201UP, XG88436PN
Evaluation of DC Motors (Radar Restoration) IAW a SOW, drawing & specifications, and CDRLsQty. 6, P /N 914104S/Ns: VR06525KV, YN85756, NP85777, YM72223WS, QF54201UP, XG88436PN
Option Line Item 0003
INFORMATION FROM TO
Description
Repair of Motor IAW a SOW, drawing & specifications, and CDRLsP/N 914104S/N VR06525KVOPTION #2Option Exercise Period: 12 months from date of purchase order awardNo work is authorized against CLIN 0003 until a bi-lateral modification is issued by the Government Contracting Officer to obligate funding
Repair of Motor IAW a SOW, drawing & specifications, and CDRLsP/N 914104S/N YN85756OPTION #2Option Exercise Period: 12 months from date of purchase order awardNo work is authorized against CLIN 0003 until a bi-lateral modification is issued by the Government Contracting Officer to obligate funding
Section M - Evaluation Factors for Award
The following clauses were modified:
52.212-2 Evaluation-Commercial Products and Commercial Services. (Deviation 2026-O0038) Feb 2026 hereby reads as follows:
Evaluation-Commercial Products and Commercial Services (Feb 2026) (Deviation 2026-O0038)
(a) Evaluation factors. The Government will award a contract resulting from this solicitation to the responsible Offeror whose offer conforming to the solicitation will be most advantageous to the Government, price and other factors considered. The following factors will be used to evaluate offers:
TECHNICAL APPROACH
DELIVERY
PAST PERFORMANCE
QUOTERS - PLEASE SEE THE FOLLOWING FOR EVALUATION CRITERIA
The following will be used to the Quotes using Evaluation Criteria - GO - NO GO Factors evaluate Low Price Technically Acceptable Criteria:
Technical Acceptance Factor #1: Technical Approach
Quoters will need to provide product literature or a capabilities document which outlines how the vendor will provide the Evaluation and Overhaul of Qty. 10 DC Motors IAW the Statement of Work (SOW), drawings & specifications, and Contract Data Requirements Lists (CDRLs). See below compliance matrix which has a GO (Acceptable)/NO GO (Unacceptable) section that will need filled out as part of technical acceptance. The product literature or capabilities document will be evaluated by the Requiring Technical Authority (RTA) in conjunction with the compliance matrix to ensure technical acceptance.
Technical Acceptance Factor #2: Delivery
Quoters will need to fill out the clause 52.211-8 for evaluation by the Government. All vendors who can meet the Governments required delivery date will be deemed technically acceptable.
Technical Acceptance Factor #3: Past Performance
Past performance will be evaluated based on the Supplier Performance Risk System (SPRS).
In accordance with (IAW) provision 252.204-7024(e) the Government will review the Quoter's Summary Report" for Product Service Code (PSC) information. IAW provision 252.204-7024(c)(3), the Government will also utilize the "Suppliers Risk Report" to assess the risk of unsuccessful performance and supply chain risk. Below is a snapshot of the supplier color legend listed in the report in each report. In addition, IAW provision 252.204-7024(c)(1) and (2) the Government will review the Quoter's "Item/Risk Report" to determine whether the procurement represents high performance risk to the Government as well as to ensure the quoted pricing is consistent with historical prices paid for the products or otherwise creates a risk for the Government.
SUPPLIER COLOR LEGEND
Blue Top 5%
Purple Next 10%
Green Next 70%
Yellow Next 10%
Red Lowest 5%
Summary Report: The Government will review the summary report score for the PSC(s) associated with this effort only.
Supplier Risk Report: The Government will review the supplier risk score as well as the suspected counterfeit area.
Item/Price Risk Report: The Government will review the item/price risk score utilizing the various search functions.
Past performance will be based on GO / NO GO basis. An unacceptable (NO GO) equals a yellow or red listing in the SPRS system for the PSC(s) in the summary report as well as the supplier risk score/suspected counterfeit area and the item/price risk report. A quoter with no past performance (scores in either summary or supplier risk report) will be evaluated as neutral.
SEE TECHNICAL ACCEPTANCE EVALUATION MATRIX BELOW:
Quoter's by checking a "GO" column you are certifying that your company meets technical acceptance evaluation factors.
Matrix must be filled out for consideration of award.
TECHNICAL ACCEPTANCE EVALUATION FACTOR
G O
N O G O
IF YOU CAN EXCEED ANY
TECHNICAL ACCEPTANCE
EVALUATION CRITERIA PLEASE
INDICATE HOW BELOW
CONFORMANCE TO TECHNICAL APPROACH
By checking GO in this box you are certifying you can provide the Evaluation and Overhaul of DC Motors required that meets all aspects outlined in the SOW, drawings & specifications and CDRL.
CONFORMANCE TO DELIVERY
By checking GO in this box you are certifying that your company meets the Governments required delivery schedule outline in 52.211-8.
CONFORMANCE TO PAST PERFORMANCE
By checking GO in this box you are certifying that your company will not be either yellow or red in the SPRS Summary or Supplier Risk
Report.
A RESPONSIVE QUOTE CONSISTS OF THE FOLLOWING
- SIGNED, DATED, AND FILLED OUT SF-1449 (ALL PAGES RETURNED)
- ALL PRICING MUST BE ENTERED ON EACH CLIN OF SOLICITATION
- 52.211-8 Time of Delivery schedule filled out with Quoters delivery dates - You will only be considered responsive to this section if you fill in the clause 52.211-8 and return with the solicitation pages noted above.
- Technical Evaluation Matrix completely filled out
- Must have a current SAM.gov account and not currently excluded.
- Must have Cybersecurity Maturity Model Certificate (CMMC) Level 2 (self) status
Additional documentation will be accepted, however, no quoter will be considered technically acceptable without the above mentioned documentation.
The Government will review in three (3) phases:
A. RESPONSIVENESS
If anything is not provided or in the manner addressed above (under a responsive quote consists of the following) you will not be considered responsive and your quote be evaluated for technical acceptance. Quoters are able to provide will not quotes on their own format and other documents they wish however, be in conjunction with the documents listed it must above (under a responsive quote consists of the following) and in the manner the Government has made clear or it will be considered non responsive. In order to move phase B responsiveness to the solicitation must be adhered to.
B. TECHNICAL ACCEPTANCE
To be considered technically acceptable all quoters must meet the above criteria, see technical acceptance factors one (1) to three (3). Once quoters have been deemed technically acceptable, .then and only then will price be evaluated
C. PRICING
Upon certifying responsiveness and technical acceptance, award will be made to the lowest priced vendor. Pricing will be evaluated for aggregate total for CLINs to include any option CLINs as well.
Quotes that are non-compliant with any material requirement of this solicitation may be rejected without further consideration for award. This will be a firm fixed price contract and will be awarded utilizing Simplified Acquisition Procedures.
(b) . The Government will evaluate offers for award purposes by adding the total price for all options to the total price for the Options (if applicable) basic requirement. The Government may determine that an offer is unacceptable if the option prices are significantly unbalanced. The evaluation of options does not obligate the Government to exercise the option(s).
(c) . A written notice of award or acceptance of an offer furnished to the successful Offeror within the time for acceptance specified in Notice of award the offer, shall result in a binding contract without further action by either party. Before the offer's specified expiration time, the Government may accept an offer (or part of an offer), whether or not there are negotiations after its receipt, unless a written notice of withdrawal is received before award.
(End of provision)
| IDCode: J |
| Page: 1 |
| Pages: 6 |
| AmendNo: 0001 |
| EffDate: 30 May 2026 |
| ReqNo: See Continuation Sheet |
| ProjNo: |
| IssCode: N00164 |
| AdmCode: |
| IssuedBy: NSWC CRANE |
WARFARE CENTER, 300 HIGHWAY 361
CRANE, IN 47522-5001
UNITED STATES
Shauna Pegg, Email: shauna.m.pegg.civ@us.navy.mil Telephone: 812-227-9645 AdminBy:
SCD: PAS:
| ContractorNameAdd: |
| Code: |
| FacCode: |
| SolChg: 1 |
| SolNo: N0016426Q0131 |
| SolDate: 28 Apr 2026 |
| AwardChg: Off |
| AwardNo: |
| AwardDate: |
| Amended: 1 |
| OffrExt: 1 |
| OffrNoEx: Off |
| NoCopies: 1 |
| ApprData: See Section G - Contract Administration Data |
| ChgeOrd: Off |
| ChgeOrder: |
| Modify: Off |
| SuppAgre: Off |
| SuppAuth: |
| ModOthr: Off |
| OthrSpec: |
| NoReq: Off |
| Require: Off |
| Copies: |
| Descript: The purpose of this amendment is to correct the NAICS, remove the small business set aside and include additional evaluation criteria. |
| ContNameTitle: |
| CoNameTitle: Andrew Ficklin |
| ContDate: |
| CODate: 30 May 2026 |
File details come from the government source that posted it. Updated .