25Q0594_sol_0001_att1.pdf
PDF 1 MB Posted
- Attached to
- B3330W Office Renovations
- Solicitation number
- N0016425Q0594
About this file
This Statement of Work (SOW) details a construction and renovation project for Naval Surface Warfare Center Crane Division at Building 3330W in Crane, Indiana. The project involves comprehensive office renovations in Rooms 129 and 132, including removal of existing vinyl composite tile flooring, cove base, and wall sections, construction of a new metal door and frame, installation of new drywall and carpet, electrical work, HVAC modifications, and procurement and installation of new furniture.
The scope includes specific requirements for 10 new workstations, 4 new kiosks, and 14 new task chairs, with detailed specifications for cubicle dimensions, fabric walls, worksurfaces, pedestals, and electrical provisions. The contract is set aside for small businesses, with a Contract Required Completion Date of 1 August 2025. Contractors must have 10 years of experience performing construction or construction design work with government properties and submit two self-performed projects completed within the last 3 years. Proposals will be evaluated on technical capability, past performance, schedule, and cost, with technical factors being significantly more important than price.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 25Q0594_SOL_0002.pdf | ||
| 25Q0594_SOL_0002_att1.pdf | ||
| 25Q0594_sol_0001.pdf | ||
| 25Q0594_SOL_ATT1.zip | ZIP file | |
| 25Q0594_SOL.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Acquisition & Construction Management Branch Code 1022
Statement of Work (SOW) Building 3330W Construct Office, Procure and Install Furniture
1.0 SCOPE
The scope of this effort is to provide all management, labor, material, equipment, transportation, supervision, and environmental and quality controls, to accomplish the construction of a new office and the procurement and installation of new furniture in B-3330W Rooms 129 and 132 at Naval Support Activity (NSA) Crane, located in Crane, Indiana. Project consists of the removal and disposal of vinyl composite tile (VCT) floor; removal and disposal of existing cove base; removal of existing wall section to allow the installation of new metal door and frame; construction of new drywall, patch and paint walls, installation of new carpet floor and cove base; removal and disposal of existing Furniture, Fixtures & Equipment (FF&E); disconnect and re-connect electrical cables; installation of light switch to existing lights; realignment of existing lights; installation of emergency light; ceiling tiles; removal of existing electrical bus bars; installation of new HVAC return vent; relocation of blue light; procurement and installation of new Furniture, Fixtures & Equipment (FF&E). These renovations are required to provide a new private office for a branch manager, improve the workspace area and building conditions.
2.0 ACRONYM TABLE
Acronym Table
SOW
Statement of Work
HVAC&R Heating, Ventilation, Air- Conditioning, & Refrigeration
CFR Code of Federal Regulations ODS Ozone Depleting Substance
ASHRAE
American Society of Heating, Refrigerating and Air-Conditioning Engineers
RTA
Requiring Technical Activity
ASNRDA Assistant Secretary of the Navy for Research and Development Acquisition
HPSB High Performance and Sustainable Building
DoD Department of Defense SOP Standard Operating Procedure DoDD Department of Defense Directive PPE Personal Protective Equipment
DoDI Department of Defense Instruction
OSHA Occupational Safety and Health Administration
HDBK Handbook NSWC Naval Surface Warfare Center
Code 1022 SOW (Building 3330W)
NSA Naval Surface Activity QASP Quality Assurance Surveillance Plan
POV Privately Owned Vehicle Vols. Volumes
SOH Safety and Occupational Health UFGS Unified Facilities Guide Specification
UFC Unified Facilities Criteria USC United States Code
DON
Department of the Navy
DBIDS Defense Biometric Identification System
SECNAV Secretary of the Navy DFOW Definable Feature of Work AHA Activity Hazard Analysis PAK Post Award Kickoff SLP Standard Lift Plan COR Contracting Officer Representative APP Accident Prevention Plan SDS Safety Data Sheet
ACM
Asbestos Containing Material
ACBM Asbestos Containing Building Material
NLT
No Later Than
CRCD Contract Required Completion Date
VOC Volatile Organic Compound NTP Notice to Proceed
FF&E Furniture, Fixtures & Equipment DOR Designer of Record ADA The American with Disabilities Act STC Sound Transmission Class PAK Post Award Kick-off Meeting
3.0 APPLICABLE DOCUMENTS
Unless otherwise specified, the revision level and date for each specification or standard cited within the solicitation/contract (including any specifications or standards cited in any drawing, handbook, or referenced specification or standard contained within this solicitation), shall be that listed in the Department of Defense Index of Specifications and Standards (DODISS) and supplement thereto. The following documents of the revision or issue in effect at the date of award form a part of this SOW for reference. In the event of a conflict between the documents referenced herein and the contents of this SOW, the contents of this SOW shall prevail.
3.1 Specifications and Applicable Documents:
ER 415-1-10 Submittal Register UFGS 01 33 00 Submittal Procedures UFGS 06 10 00 Rough Carpentry UFGS 06 20 00 Finish Carpentry UFGS 08 11 13 Steel Doors/Frames UFGS 08 71 00 Door Hardware UFGS 09 29 00 Gypsum Board UFGS 09 51 00 Acoustical Ceilings UFGS 09 90 00 Paints/Coatings UFGS Division 26 Electrical UFGS 09 68 00 Carpeting
3.2 Standards:
MIL-STD-461F DoD Interface Standard- Requirements for the Control of Electromagnetic Interference Characteristics of Subsystems and Equipment
EM385-1-1 U.S. Army Corps of Engineers Safety and Health Requirements Manual
10 CFR 435 Energy Conservation Voluntary Performance Standards for Commercial and Multi-Family High Rise Residential Buildings
29 CFR 1910 Occupational Safety and Health Standards 29 CFR 1926 Safety and Health Regulations for Construction 40 CFR 300 National Oil and Hazardous Substances Pollution
Contingency Plan 40 CFR 355 Emergency Planning and Notification 40 CFR 763.99 Asbestos-Containing Materials Exclusions
3.3 Other Publications and Regulations:
TITLE 40 Code of Federal Regulations UFGS 01 74 19 Construction and Demolition Waste Management UFGS 01 33 29 Sustainability Reporting USC42, Chapter 55 National Environmental Policy; Section 4321-
4370d ASN (RDA) MEMO DoN Policy on Digital Product/Technical Data w/Attachment "Guidance on Acquisition and Conversion of Product / Technical Data to Digital Form"
DoD 5000.04-M-1 Cost and Software Data Reporting Manual, Cost Analysis Improvement Group (CAIG)
USC42, Chapter 55 National Environmental Policy; Section 4321- 4370d
UFC 4-010-01 DoD Minimum Antiterrorism Standards for Buildings
UFC 1-300-08 Transfer and Acceptance of DOD Real Property NFPA 70E Electrical Safety in the Workplace UFGS 01 45 00.10 10 Quality Control CR-1022-ACQ-FM-11000-000002 CDRL Submittal Form
3.4 Instructions and Directives:
NSACRANEINST 08020.1E Explosive Safety Program At NSA Crane NSACRANEINST 08020.1E CH-11 Explosive Safety Program Chapter 11 HERO
Program NSACRANEINST 08020.1E CH-2 Explosive Safety Program Chapter 2 Safety
Requirement in Explosive Areas NSACRANEINST 08020.1E CH-4 Explosive Safety Program Chapter 4 Parking of
POV in Explosive Magazine Areas NSACRANEINST 08020.1E CH-5 Explosive Safety Program Chapter 5 Wildfire
Prevention & Control NSACRANEINST 08020.4B Hazards of Electromagnetic Radiation to
Ordnance Emission Control Bill NSACRANEINST 11200.7C Motor Vehicle and Pedestrian Traffic Control and
Enforcement NSACRANEINST 11262.1A Management of Weight Handling Equipment NSACRANEINST 5530.4A CH-1 Installation Access Control NSACRANEINST 5100.13A NSA Crane Smoking and Tobacco Use NSWCCRANEINST 05090.2D Hazardous Waste Management Plan NSWCCRANEINST 05100.7 Hazardous Material Control and Management
Program
NSWCCRANEINST 12000.3 COVID-19 Face Covering Policy NSWCCRANEINST 12735.1A Workplace Violence Prevention NSWCCRANEINST 12792.2 Drug-Free Workplace Program NSWCCRANEINST 5100.1B Occupational Health and Safety Program NSWCCRANEINST 5100.2A Contractor Health and Safety Program NSWCCRANEINST 5500.1A Portable Electronic Devices, Photography, and
Audio Visual Recording
NSWCCRANEINST 5104.1 Radiological Affairs Support Program OPNAVINST 1500.76B Naval Training System Requirements, Acquisition, and Management OPNAVINST 5100.19E Vols. I, II, and III: Navy Safety and Occupational
Health (SOH) Program Manuel for Forces Afloat OPNAVINST M-5102.1 Navy Safety and Occupational Health (SOH)
Program Manual OPNAVINST 5102.1 Navy and Marine Corps Mishap and Safety
Investigation, Reporting, and Record Keeping SECNAVINST 5370.2J Standards of Conduct and Government Ethics DoDI 5000.02 Operation of the Defense Acquisition System DoDD 4140.1 Supply Chain Materiel Management Policy DoDD 5000.01 The Defense Acquisition System
4.0 PERFORMANCE REQUIREMENTS
The Contractor shall furnish the required material, equipment and labor to construct a new office in Building 3330W Room 132. The Contractor shall procure and install new furniture and a modular wall in Building 3330W Rooms 129 and 132. The Contractor shall utilize new material; no postconsumer or recovered material will be authorized for use.
The Contractor shall adhere to all State and Federal building codes. The Contractor shall provide Build Drawings for approval. (CDRL A007)
4.1 REQUIREMENTS
The scope of this project will be performed in B-3330W Rooms 129, 132, 132A (Lab) and 132B (new office).
4.1.1 Room 132
A) Demolition:
-Existing cove base and existing vinyl composite tile (VCT) shall be removed and discarded from Room 132B (new office). There is no asbestos containing material identified.
-The Contractor shall remove and discard existing cove base and wall section in Room 129/132B to allow the installation of a new metal door and door frame for the new office.
-The Contractor shall install a plastic barrier in Room 129 (new access door area for Room 132B new office) to avoid any dust from demolition and construction in this room.
-The Contractor shall provide protection on the existing carpet floor in Room 129 (new access door area for Room 132B new office).
- Existing airline process piping coming out of the ceiling in Room 132A (lab) shall be removed and capped off above the ceiling tiles.
B) Electrical:
-The Contractor shall remove and dispose of existing power outlet, wiring and conduits from the wall to allow the removal of the wall section where the new metal door with frame will be installed in Room 132 B (new office).
- The Contractor shall remove existing electrical bus bars and overhead conduits and piping from Room 132.
- The Contractor shall relocate existing blue light from existing location in Room 132 B (new office) to the new location in Room 132 A (Lab).
C) Flooring:
- New 24”x 24” tufted nylon carpet tiles shall be installed in Room 132B (new office).
- Flooring shall be prepared as per manufacturers requirements prior to the new carpet installation.
- Transition strips shall be installed in the doorway.
- The Contractor shall install new 4” vinyl cove base in Room 132B (new office).
-The Contractor shall provide carpet tile, cove base, and transition strip samples for selection after award. (CDRL A016)
D) Walls:
-The Contractor shall provide for the construction of a new wall to divide Room 132A (lab) and Room 132B new office). New wall shall be 3-5/8”metal stud with R-13 fiberglass batt insulation and 5/8” drywall (Hang, tape, and skim coated to level 4 finish) up to the ceiling tiles/grid.
-All holes and imperfections within the existing walls in Room 132B (new office) shall be patched or filled and skim coated to a level 4 finish.
-The Contractor shall repair the existing wall to allow for the installation of new metal door frame and access door in Room 129/132B.
-The Contractor shall remove and re-install all wall mounted items in Room 132B (new office).
-The Contractor shall apply at least 2 coats of new high quality paint and 1 coat of primer for all existing walls in
Room 132B (new office).
- The Contractor shall apply at least 2 coats of new high quality paint and 1 coat of primer for the new wall in Room
132 A (Lab) and Room 132B (new office).
-The Contractor shall apply at least 2 coats of new high quality paint and 1 coat of primer on the wall section in
Room 129 where the new metal door with frame shall be installed.
- The Contractor shall provide protection for the existing carpet floor in Room 129.
- The Contractor shall install a wall bumper stop for the new metal door in Room 132B (new office).
- Paint color to match existing wall colors in Room 129 and Room 132. The Contractor shall provide paint color samples for selection after award. (CDRL A016)
E) Doors and frames:
-The Contractor shall provide and install a new 7’ height, 36” wide ≥STC 40 rated ADA metal door with door frame for Room 132B (new office). The Contractor shall install the door with a handle the NSWC Lock Shop will put a core in it. NSWC RTA and Building POC will coordinate the service request with the NSWC Lock Shop.
-Contractor to provide metal door color samples for selection after award. (CDRL A016)
F) Ceiling and Grid System:
-The Contractor shall remove and re-install the existing ceiling tiles in Room 132B (new office) to allow the existing lights to be relocated and realigned.
-The Contractor shall remove and re-install the existing ceiling tiles in Room 132A (lab) to allow the installation of the new HVAC return vent.
-The Contractor shall remove and re-install the existing ceiling tiles to allow the removal of existing electrical bus bars and existing overhead airline process piping.
-The Contractor shall replace damaged existing ceiling tiles where existing electrical bus bars and existing blue light are located in Room 132.
-The contractor shall replace damaged existing ceiling tile in Room 132 where an existing airline process piping was located.
H) Lighting:
-The Contractor shall relocate and realign existing lights and fixtures to provide lighting in Room 132B (new office) to meet new office configuration. The Contractor shall install a new emergency light and fixtures in Room 132B.
-The Contractor shall install a new lighting switch with separate circuit, new conduits and conductors to existing lights for Room 132B (new office).
- The Contractor shall install a wall pack emergency lighting in Room 132B (new office).
- New lighting switch/cover plate shall be labeled. All labeling shall match with the appropriate lighting panel.(CDRL A016)
I) Furniture, Fixtures & Equipment:
-The Contractor shall move and provide protection to the existing FF&E in Room 132 to allow the removal of the existing electrical bus bar and overhead airline process piping, relocation of blue light, and the installation of new HVAC return vent and conduits. All existing FF&E shall be move back to their original location in Room 132A (lab).
J) Data/Phone:
- All existing data (NMCI, NIPER and SIPER) and phone jacks located on the wall in Room 132 will be disconnected and removed by Others prior to demolition of existing wall section and are not part of this Contract.
K) HVAC:
- The Contractor shall install a new HVAC return vent and ductwork in Room 132A (lab). New ductwork shall be connected to the existing HVAC return ductwork system.
4.1.2 Room 129
A) Electrical:
-The Contractor shall disconnect all electrical connections for all existing FF&E in Room 129.
-The Contractor shall re-connect all electrical connections in Room 129 after all new FF&E have been installed.
B) Existing Furniture, Fixtures & Equipment:
- All existing FF&E in Room 129 shall be disassembled, removed and disposed by the Contractor.
C) New Furniture, Fixtures & Equipment:
Requirements
1.1 Building 3330W Room 129: 10 new workstations, 4 new kiosks, 14 new task chairs
i. Footprint: Workstations 6’x 6’ Interior Dimensions Minimum
ii. Power: Power poles required. NSWC is requesting vendor recommendations on location of those power poles based on their product offerings. Furniture shall be powered and fed through the use of power poles.
iii. Electrical/power drawings showing location of infeed/duplex/power pole locations is required and must be approved by NSWC before order is placed. (CDRL A007)
iv. Each workstation should have:
Item Description Image QTY
Cubicle (A)
· Overall footprint per user: 6’-0” x 6’-0” (See layout)
· Fabric Walls Approx 5’-6” High or Similar
· Fabric Walls MUST be tackable
· Fixed Height Worksurface- Laminate
· Approx 18”W Box/Box/File Pedestal- Metal (Locking)
· Approx 18”W File/File Pedestal- Metal (Locking)
· 36"W Overhead Unit- Metal (Locking)
· Customer to Decide Finishes After Vendor is Awarded
· Knockouts for phone, data, and power
· Grommets as Applicable
· 2-3 Duplexes Per User
· Power/data to go through raceway at base AND Wire Management to be additionally placed near work surface (must be 3’ apart from base raceway to meet special network requirements) All of the components within a cube that require locking shall be keyed alike.
Cubicle (B)
· Overall footprint per user: 6’-0” x 6’-0” (See layout)
· Fabric Walls Approx 4’-0” High or Similar
· Fabric Walls MUST be tackable
· Fixed Height Worksurface- Laminate
· Approx 18”W Box/Box/File Pedestal- Metal (Locking)
· Approx 18”W File/File Pedestal- Metal (Locking)
· 36"W Overhead Unit- Metal (Locking)
· Customer to Decide Finishes After Vendor is Awarded
· Knockouts for phone, data, and power
· Grommets as Applicable
· 2-3 Duplexes Per User Power/data to go through raceway at base AND Wire
Management to be additionally placed near work surface (must be 3’ apart from base raceway to meet special network requirements)
The Contractor is not responsible for the following tasks:
A) Existing data, phone cables and jacks in Rooms 129 and 132 will be disconnected by Others and are not part of this contract.
B) Existing data, phone cables and jacks in Room 129 will be re-connected by Others and are not part of this contract.
Additional Notes:
A) Contractor shall provide a daily report (CDRL A009).
B) Contractor shall provide a schedule at PAK meeting and provide updated schedule if any deviation over five (5) days of the approved schedule (CDRL A017).
C) Contractor shall clean the worksite at the end of each workday. Contractor shall dispose of any scrap material and clean any spills that may occur.
Kiosk (C)
· Overall footprint per user: 6’-0” x 2’-0” (See layout)
· Fabric Walls Approx 4’-0” High or Similar
· Fabric Walls MUST be tackable
· Fixed Height Worksurface- Laminate
· Approx 18”W Box/Box/File Pedestal- Metal (Locking)
· Customer to Decide Finishes After Vendor is Awarded
· Knockouts for phone, data, and power
· Grommets as Applicable
· 2-3 Duplexes Per User
· Power/data to go through raceway at base AND Wire Management to be additionally placed near work surface (must be 3’ apart from base raceway to meet special network requirements)
Task Chair
· Finishes and Textiles TBD Post Award
· 4D Arms- Adjustable
· Lumbar Support
· High Back
· Mesh Back
· Upholstered Seat (Mid-grade)
· Fully Assembled
· 300lb-400lb Weight Capacity
· Desk Height Adjustments
· Casters for Carpet
· Synchro Tilt with Side Tension Knob Control
D) The Contractor shall hold weekly status meeting and provide meeting minutes two days after weekly meeting is held. (CDRL A022)
E) Contractor shall be responsible for field verification of actual conditions prior to commencement of work.
F) Contractor shall coordinate and schedule underground utility marking prior to digging. Proof of utility marking shall be submitted to the COR within two (2) business days of receipt. Proof may be an email with a date and time stamp of schedule marking and/or a receipt after completion.
G) The Contractor is responsible for securing their worksite, staged materials and safeguarding all communications.
H) Contractor is responsible for all applicable permits related to the prosecution of the work required (CDRL A018).
I) Contractor shall provide Furniture Drawings and Electrical Drawings including the power pole locations for the new FF&E to be installed in Rooms 129 and 132. (CDRL A007)
J) Contractor shall provide Build Drawings for the new drywall in Room 132A (Lab) and Room 132B (New office).
(CDRL A007)
K) Contractor shall provide as-built drawings. (CDRL A015) L) Contractor shall label the new lighting switch in Room 132B (new office). All labeling shall match with the appropriate lighting panel. (CDRL A016) M) Contractor shall label all power poles. All labeling shall match with the appropriate electrical panel (CDRL A016) N) Contractor shall provide for arc flash labels on all new disconnects or electrical panels. (CDRL A016) O) Circuit Directory shall need updated for all necessary panels. (CDRL A016) P) The Contractor shall provide 5 percent (%) of total square yards of each carpet installed which matches utilized product exactly in regard to carpet type, pattern, and color for future maintenance and repair. The extra carpet shall be wrapped and clearly labeled with manufacturer’s name, brand name, size and project related information including project name and room number. (CDRL A016).
Q) Contractor shall provide weekly Certified Payrolls for all employees working on the project on the Monday following the prior week. (CDRL A021)
R) Contractor shall check-in at front desk each day upon arrival, sign in, and receive visitor’s badge.
S) No cell phone, smart watches, tablets, or electronics of any kind will be authorized inside the building.
T) The Contractor shall coordinate with the Building 3330W POC to get access to Rooms 129 and 132.
U) See Figures #1 and #2 for B-3330W Rooms 129, 132, 132A (Lab) and 132B (new office).
Submittal Requirements A. Contractor is responsible for providing a Submittal Register utilizing form ER 415-1-10 (CDRL A016) for all anticipated submittal items.
B. Submittals are to be provided to the Government for review and acceptance by the COR prior to procurement of material.
C. The QCM shall follow processes set forth in the Quality Control plan and UFGS Spec 01 45 00.10 20 to ensure the products being submitted are contract compliant.
D. Submittals shall include the following where applicable:
a. Shop Drawings
b. Product Data
c. Samples
d. Design Data
e. Test Reports
f. Manufacturer’s Instructions
g. Manufacturer’s Field Reports
h. Operation and Maintenance Data
4.2 Installation Access
Physical access to the Government’s facility at Naval Support Activity (NSA), Crane shall be through the use of the Defense Biometric Identification System (DBIDS) and associated data processing/information services for purposes of protecting U.S./Coalition/allied government/national security areas of responsibility and information. The contractor shall obtain employee personal identity verification credentialing (badge) by submitting to the NSA Crane Visitor Center, form SECNAV 5512/1 (APR 2014), for each contractor employee. Upon Base Registrar authorization of form 5512/1 the contractor shall submit form NSA Crane 5512/47 DBIDS Badge Application Record to the NSWC Crane Security Division. The Contractor shall retrieve badges of employed personnel upon separation.
Each employee shall affix their badge on their person above the waist at all times while on the Activity. Badges may only be removed for safety reasons and must be reaffixed when work is completed.
DBIDS information can be found at the following website: http://dbids.dmdc.mil/
For Contract employees or subcontractors requiring infrequent access to the Activity, one day temporary passes MAY be authorized. Requests for temporary passes shall be submitted, including the completed SECNAV 5512/1 form, to the COR at least 5 working days prior to the requested base access day. Employees shall also be prepared to provide a completed SECNAV 5512/1 form to the authorizing individual the day of their visit. Temporary passes MAY be authorized up to and including a 28 day duration. A base pass request DOES NOT guarantee base access. Approved base access will be communicated to the Contractor by the NSWC Construction Manager, or their designee.
Be advised that the DBIDS process and temporary pass process both involve a background check. Persons with a Felony conviction in the last 10 years will not be issued badges or passes.
Individuals supporting these efforts shall comply with the latest security regulations applicable to the government facility/installation.
a. Depending on the facility/installation regulations, contractor personnel shall present a proper form of identification(s) and vehicle proof of insurance or vehicle rental agreement.
b. All contractor persons engaged in work while on government property shall be subject to inspection of their vehicles at any time by the government, and shall report any known or suspected security violations to the local host Security Department.
Failure to obtain entry approval will not affect the contract price or the time of completion.
4.3 Program Management
The Contractor shall comply with the manufacturer’s recommendations in installation of all materials and equipment.
The Contractor shall provide a copy of installation instructions and maintenance manuals 5 days prior to BOD (CDRL A020). The Contractor shall be responsible for field verification of actual conditions prior to commencement of work.
The Contractor shall be responsible for quality control of all work that is performed via this task order. The Contractor is responsible for compliance with the U.S. Army Corps of Engineers Safety and Health Requirements Manual, EM 385- 1-1, and shall maintain a safe working environment at all times during the performance of this task order. Although this document is intended to identify all significant features of work to be accomplished in the performance of this task order, it should not be considered absolutely inclusive of all minor tasks required for completion of the major work described herein.
4.3.1 Design and Construction Quality Control Plan
The Contractor shall establish and maintain a Quality Control program that is administered by a Design and Construction Quality Control organization, using Quality Control (Design and Construction) Plans, (CDRL A008) Commissioning Plans and Reports, meetings, a Coordination and Mutual Understanding Meeting, three phases of control, submittal review and approval, testing, completion inspections, and QC certifications, Inspections in accordance with Section 01 45 00.00 10 QUALITY CONTROL and documentation necessary to provide design, materials, equipment, workmanship, fabrication, construction and operations which comply with the requirements of this Contract. The QC program must cover on-site and off-site work. (CDRL A008) No construction work or testing may be performed unless the Contractor’s QC Manager is on the work site. QC Manager must be an individual with a minimum of 10 years combined experience as a superintendent, inspector, QC Manager, project manager, or construction manager on similar size and type construction contracts which included the major trades that are part of this contract.
4.3.2 Inspection Benchmarks
A) Periodic quality / safety checks at Government determined frequency. The Government may or may not provide notification to the Contractor prior to quality and safety checks.
B) Electrical disconnections (Existing cubicles ready to be disassembled and removed from the workplace)
C) Pre-carpeting installation (Existing vinyl composite tiles (VCT) removed and concrete surface flooring completion prior to install new carpet)
D) Pre-painting (Walls repaired, patched, filled and skim coated prior to applying paint)
E) Electrical connections (After new FF&E being installed)
F) "QC/QA" inspection for the new FF&E: The Government and the Contractor will perform this inspection collectively to verify that the furniture is complete and ready to be occupied. A Government "QC/QA inspection" will be documented by the Contractor as a result of this inspection list.
The Contractor will ensure that all items on this list are corrected prior to notifying the COR that a "Pre-Final" inspection with Contracts Department and the Building POC can be scheduled. Any items noted on the "QC/QA" inspection must be corrected before the Pre-Final Inspection can be scheduled.
G) Pre-Final
The Contractor shall notify the COR when pre-final inspection is ready. The COR will schedule the Pre-Final with the construction manager, Contracts Department and Building POC.
The Government and QC Manager will perform this inspection collectively to verify that the facility is complete and ready to be occupied. A Government "Pre-Final Punch List" will be documented by the QC Manager as a result of this inspection. The QC Manager will ensure that all items on this list are corrected prior to notifying the Government that a "Final" inspection with the Building POC can be scheduled. Any items noted on the "Pre-Final" inspection must be corrected in a timely manner and be accomplished before the contract completion date for the work or any particular increment thereof, if the project is divided into increments by separate completion dates.
H) Final (At completion) Inspection
The Contractor shall notify the COR at least 5 working days prior to the requested date for the final acceptance inspection. The Contractor shall state within the notice that all items previously identified on the pre-final punch list will be corrected and acceptable, along with any other unfinished contract work, by the requested date of the Final Acceptance Inspection. The Contractor must be represented by the QC Manager, the Project Superintendent, and others deemed necessary. Attendees for the Government may include the COR, Construction Management personnel, and personnel representing the building POC.
4.4 Safety and Health
The requirements of this order may require Contractor personnel to come in contact or be exposed to hazardous conditions. The Contractor shall abide by all applicable federal, local, and state occupational safety and health requirements. The Government will provide Standard Operating Procedures (SOP) when applicable. The Contractor must have on record a corporate safety plan and shall provide a copy to the COR when instructed. The Contractor shall ensure all employees have appropriate Personal Protection Equipment (PPE). The Contractor shall ensure employees have all required training and certifications related to Occupational Safety and Health Administration (OSHA) requirements.
Any Contractor employee exhibiting unsafe behavior may be removed from the NSWC Crane site. Such removal shall not relieve the Contractor from meeting its contractual obligations and shall not be considered an excusable delay as defined in FAR 52.249-14.
4.4.1 Activity Hazard Analysis (AHA)
Before beginning each activity, task, or Definable Feature of Work (DFOW) involving a type of work presenting hazards not experienced in previous project operations, or where a new work crew or subcontractor is to perform the work, the Contractor(s) performing that work activity must prepare an AHA. Format the AHA in accordance with EM 385-1- 1, Section 1 or as directed by the COR. Submit the AHA for review, at maximum, ten (10) working days after the PAK meeting. (CDRL A002) The Government reserves the right to require the Contractor to revise and resubmit the AHA if it fails to effectively identify the work sequences, specific anticipated hazards, site conditions, equipment, materials, personnel and the control measures to be implemented.
4.4.2 Accident Prevention Plan
Contractor shall provide a site-specific Accident Prevention Plan (APP), including Activity Hazard Analyses (AHA), in accordance with EM 385-1-1 Appendix A, paragraph 3.k for the construction team to follow during design, each DFOW, site visits, testing, and investigations. Update the APP if there are changes in the personnel, or the tasks to be performed. Submit the APP for review and acceptance by the Government at maximum, ten (10) days after the PAK meeting. (CDRL A003) Plan must be accepted by the COR before work can begin. SSHO may also be designated the role of the QCM and Superintendent if deemed acceptable by Government personnel.
4.5 Waste Management Plan
The Contractor shall submit a waste management plan within 10 days after the PAK meeting. In accordance with UFGS 01 74 19 Construction and Demolition Waste Management. The plan must demonstrate how the project waste diversion goal is met and plan must include the following: (CDRL A010)
The Contractor shall maintain records to document the quantity of waste generated. The contractor shall make the records available to the COR during construction, and a copy of the records must be delivered to the COR upon completion of the construction. (CDRL A012)
Ensure Hazardous Waste is labeled, handled and stored in accordance with the Safety Data Sheets (SDS) and regulations.
The Contractor shall contact the COR to set up a temporary hazardous waste storage area. This storage area shall not exceed 60 days.
The Contractor shall immediately (within 10 minutes) call Emergency Dispatch at 911, and COR for any hazardous material spillage.
The Contractor shall be responsible for clean-up efforts in accordance with 40 CFR 300 and shall provide verbal and written notifications to the COR (CDRL A011) as required by 40 CFR 355.
Any unforeseen hazardous material is found or suspected to be hazardous material, the contractor shall notify the COR. (CDRL A004) Stop work and wait for the government for instructions.
4.6 Environmental
4.6.1 The Contractor shall not use any Asbestos Containing Material (ACM) at any time during the construction. The Contractor shall verify that all materials, including those supplied by third parties, are asbestos free.
A written certification letter shall be provided by the Contractor to the Contract Officer certifying that the finished work is asbestos free. A signed letter-head stating, “to the best of my knowledge, no Asbestos Containing Building Material (ACBM) was used as a building material in the building” may suffice, per 40 CFR part 763.99 (a)(7). (CDRL A014)
The Contractor shall submit SDS for any suspect materials to the COR.(CDRL A019)
4.6.2 Provide protection of areas and spaces not to be painted. Prior to surface preparation and coating applications, remove, mask, or otherwise protect such items not to be coated that are in contact with surfaces to be coated. Following completion of painting, reinstall removed items by workmen skilled in the trades. Restore surfaces contaminated by coating materials, to original condition and repair damaged items.
4.6.3 Comply, at minimum, with manufacturer recommendations for space ventilation during and after paint application. Isolate area of application from rest of building when applying high-emission paints or coatings.
4.6.4 Do not apply coating when air or substrate conditions are:
Less than 3 degrees C 5 degrees F above dew point;
Below 10 degrees C 50 degrees F or over 35 degrees C 95 degrees F, unless specifically pre-approved by the
COR and the product manufacturer.
4.6.5 Do not use materials having a lead content over 0.6 percent by weight of nonvolatile content.
4.6.6 All coatings containers used to apply the contents therein to a surface directly from the container by pouring, siphoning, brushing, rolling, padding, ragging, or other means shall be closed when not in use.
4.6.7 Containers of any Volatile Organic Compound (VOC) containing materials used for thinning and cleanup shall be closed when not in use.
4.6.8 Compliance with the VOC content limits shall not exceed the following limits: flat coatings (0.835 lb VOC/gal), non-flat coatings (1.25 lb VOC/gal), non-flat-high-gloss coatings (2.09 lb VOC /gal) and floor coatings (2.09 lb VOC/gal), as per coating category identified in 326 IAC 8-14-3. The Contractor shall provide chemical products Safety Data Sheets (SDS) to show compliance with VOC content limit (CDRL A019).
4.6.9 Do not, under any circumstances, violate the manufacturer’s application recommendations.
4.6.10 All technicians conducting work on Heating, Ventilation, Air-Conditioning, & Refrigeration (HVAC&R) systems that could result in a release of refrigerant must be certified as a Section 608 Technician. Copies of technician certifications must be provided to the COR at least 14 days prior to working on equipment containing refrigerant.
(CDRL A016) Products containing Ozone Depleting Substance (ODS) and non-exempt substitute refrigerants in a sealed, self-contained system shall be disposed of in accordance with 40 CFR 82. The full refrigerant charge, in pounds, of the installed HVAC&R systems must be provided to the RTA. This full charge value must also be permanently marked at the system.
4.6.11 For HVAC equipment being demolished, submit to the COR a record of the technician name, date of refrigerant recovery, the full refrigerant charge, the system location, make, model, and serial number, type and amount of refrigerant recovered, to where and whom the material was transferred, date of transfer, and if refrigerant will be reclaimed or destroyed. (CDRL A016) Recovered Class I ODS and Hydrochlorofluorocaron (HCFC-22) is property of the government and must be returned to the Navy’s ODS reserve. The Contractor must notify the RTA to arrange for delivery of the refrigerant to Crane’s repository at B2748.
4.7 Closeout Submittals
As-built drawings are developed and maintained by the Contractor and depict actual conditions, including deviations from the Contract Documents. These deviations and additions may result from coordination required by, but not limited to: contract modifications; official responses to Contractor submitted Requests for Information; direction from the Contracting Officer; designs, which are the responsibility of the Contractor, and differing site conditions. Maintain the as-built throughout construction as redlined hard copies on site. These files serve as the basis for the creation of the record drawings. Other closeout submittals may include, but not limited to, warranty documentation, operation and maintenance manuals, manifests, testing results, equipment training report, as applicable. The as-built drawings shall be submitted for COR approval, at a minimum, five (5) working days following the Final Inspection. (CDRL A015)
4.8 Warranty Management Plan
Develop a warranty management plan, which contains information relevant to FAR 52.246-21. At least 10 working days before the planned pre-warranty meeting, submit one set of the warranty management plan. (CDRL A013) Include within the warranty management plan all required actions and documents to assure that the Government receives all warranties to which it is entitled. The plan must be in narrative form and contain sufficient detail to render it suitable for use by future maintenance and repair personnel, whether tradesmen, or of engineering background, not necessarily familiar with this contract. The construction warranty period will begin on the date of project acceptance and continue for the full product warranty period. A joint 6 month and 11 month warranty inspection will be conducted, measured from time of acceptance, by the Contractor, COR, and the Customer Representative.
5.0 TECHNICAL DATA DELIVERABLES
All CDRL’s that are sent to the COR for approval shall use CR-1022-ACQ-FM-11000-000002, CDRL transmittal form as a cover page.
CDRL DID Number DID Title Applicable
SOW
Paragraph
Deliverable Schedule
A001 DI-MGMT-81834 Contractor’s Personnel Roster 6.14 Post Award Kickoff
A002 DI-SAFT-81841 Operating, Support, Health, & Safety (OSH&S) Hazard Analysis Report
4.4.1 Within 10 Days
Post Award Kickoff
A003 DI-MISC-80508B Accident Prevention Plan 4.4.2 Within 10 Days Post Award Kickoff
A004 DI-MISC-80508B Severe Hazard Exposure 4.5 As Required A005 DI-SAFT-82188 Accident/Incident Report 6.5 As Required A006 DI-SAFT-82188 Damage Reporting 6.7 As Required A007 DI-MISC-80508B Build Drawings 4.0, 4.1.2 Prior to NTP
A008 DI-MISC-80508B Quality Control Plan 4.3.1 Within 10 Days Post Award Kickoff
A009 DI-MISC-80508B Production Report 4.1 Daily
A010 DI-MISC-80508B Waste Management Plan 4.5 Within 10 Days Post Award Kickoff
A011 DI-MISC-80508B Hazardous Material Clean-Up 4.5 As Required A012 DI-MGMT-82372 Certificate of Disposal 4.5 As Required A013 DI-MISC-80508B Warranty Management Plan 4.8 10 days prior to pre-warranty conference
A014 DI-MISC-80508B Asbestos Containing Building Material Report
4.6.1 NLT 5 working
days prior to BOD
A015
DI-MISC-81489B Real Property Facilities As- Built Drawings
4.1, 4.7 Within 5 days of Final Inspection
A016 DI-MISC-80508B Submittal Register 4.1, 4.6 As Required
A017 DI-MGMT-80507B Schedule 4.1 Post Award Kickoff
A018 DI-MISC-80508B Permits 4.1 As Required A019 DI-SAFT-82112 Material Safety Data, Transportation Data and Disposal Data for Hazardous Materials Furnished to Government Activities
4.6 As Required
A020 DI-MISC-80508B Manufacturer Installation Instruction and Maintenance Manuals
4.3 5 working days prior to BOD
A021 DI-MISC-81508B Weekly Certified Payroll 4.1 Weekly A022 DI-ADMN-81250C Meeting Agenda and Meeting
Minutes
4.1 Weekly
6.0 SPECIAL CONDITIONS
6.1 Contracting Officer’s Representative (COR)
The COR is the point of contact for non-substantiated communications of a technical nature. Only the Contracting Officer has the authority to change the requirements of this order(s).
6.2 Requiring Technical Activity (RTA)
The RTA contacts are Functional Managers, Task Managers, and project leads. RTAs do not have the authority to direct Contractor personnel or change the requirements of this order(s) or change the requirements of any TO(s).
RTA’s shall be copied on each CDRL deliverable identified.
6.3 Hazardous Materials
6.4.1 The Contractor will provide a responsible party for the handling of the hazardous materials and the respective SDS. This responsibility includes proper training in the handling and disposal of the hazardous materials.
6.4.2 Smoke detectors containing Americium-241 or other commodities that contain radioactive material shall be turned over to the NSWC Crane Radiation Safety Office (phone 812-854-6839 or 812-854-1888) for disposal through the Navy Low Level Radioactive Waste program.
6.4 Control of Contractor Personnel
Contractor personnel shall physically access government facilities and installations for purposes of site visitation, meeting attendance, supervisory and work performance within government spaces (either temporary or permanent).
Individuals supporting these efforts shall comply with the latest security regulations applicable to the government facility/installation.
a) Depending on the facility/installation regulations, Contractor personnel shall present a proper form of identification(s) and vehicle proof of insurance or vehicle rental agreement.
b) All Contractor persons engaged in work while on government property shall be subject to inspection of their vehicles at any time by the government, and shall report any known or suspected security violations to the local host Security Department.
c) All persons engaged in work while on Government property shall be subject to search of their persons (no bodily search) and vehicles at any time by the Government, and shall report any known or suspected security violations to the NSWC Crane Security Department.
d) Assignment, transfer, and reassignment of Contractor personnel shall be at the discretion of the Contractor. However, when the Government directs, the Contractor shall remove from contract performance any person who endangers life, property, or national security through improper conduct.
e) All Contractor personnel engaged in work while on Government property shall be subject to the Standards of Conduct contained in SECNAVINST 5370.2J (Standards of Conduct and Government Ethics).
f) Prior to conducting work under this contract, the Contractor shall provide a list of employees that will be working on site. The employee list shall contain full names, security clearance levels, social security numbers, job titles, and official birth certificates. This list shall be updated within forty-eight hours after changes occur.
g) Any photography on base is not permitted without prior approval and photography permit request submitted to the COR. Permit request must be approved and signed by the COR prior to any photos being taken. All photos taken, after approval, must be analyzed and approved prior to release.
h) Restricted Areas - visitor control and surveillance of personnel in a restricted area requires security consciousness and is the responsibility of all personnel working in the area.
6.5 Accident Reporting
The Contractor shall maintain an accurate record of and shall report all accidents to the COR within 10 minutes after incident occurs. (CDRL A005)
For Navy Projects, complete a near miss report (CDRL A005). Near miss reports are considered positive and proactive Contractor safety management actions.
6.6 Smoking Regulations
Smoking on NSWC Crane, Crane, IN premises shall be in approved areas only in accordance with NSACRANEINST 5100.13A (NSA Crane Smoking and Tobacco Use). Smoking in vehicles is prohibited.
6.7 Damage Reporting
The Contractor shall maintain an accurate record of and shall report to the COR (within 10 minutes) all damages to Government Owned Equipment and Facilities as prescribed by OPNAVINST 5102.1. (CDRL A006)
6.8 Investigations
Contractor employees shall cooperate with Government investigative agencies conducting criminal or administrative investigations.
6.9 Government Observations
Government personnel, such as Inspector General or higher headquarters staff, are authorized to observe Contractor operations. Efforts will be made to minimize the degree of disturbance on Contractor performance.
6.10 Hours of Operation
NSWC Crane core duty hours for on-site Contractor personnel and the Contractor’s liaison facility personnel assigned to this effort are 0900 to 1430 hours, Monday through Friday, during regular Government workdays.
Government personnel are afforded a flextime schedule that allows a starting time between the hours of 0600 and 0900, with a quitting time between the hours of 1430 and 1800 depending on the applicable work schedule.
Contractors are required to work during Government work hours in accordance with company timekeeping policies.
The RTA will need to coordinate individually with each building POC where work is to be performed to arrange contractor available working times. Exceptions may be approved by the COR if requested by the Contractor.
6.11 Closed Days
All closed days will be designated by the Commander, NSA Crane. Closed days will be associated with holidays, National Security, and/or inclement weather/dangerous conditions. The Contractor will not be allowed to work on NSA Crane during designated closed days.
6.12 Inclement Weather
When the Government Agency is closed by the Commander because of inclement weather conditions and/or dangerous conditions, notification of the closing will be broadcast over local radio and television stations.
6.13 Licenses, Certifications, and Training
The Contractor shall provide capable personnel with qualifications, experience levels, security clearances, and necessary licenses, certifications, and training required by Federal, State, and Local laws and regulations. Training necessary to ensure that personnel performing under this contract maintain the knowledge and skills to successfully perform the required functions is the responsibility of the Contractor. Training necessary to maintain professional certification is the responsibility of the Contractor.
6.14 Contractor Identification
This contract is for non-personal services as defined by FAR Subpart 37.104. As such, Contractor employees shall identify themselves as Contractor personnel by introducing themselves or being introduced as Contractor personnel and displaying distinguishing badges or other visible identification for meetings with Government personnel. In addition, Contractor personnel shall appropriately identify themselves as Contractor employees in telephone conversations and in formal and informal written correspondence. Contractor shall provide a Contractors Personnel Roster. (CDRL A001)
6.15 Post Award Meetings
A Post Award Meeting with the successful offeror will be conducted within 15 working days after award of the contract. The meeting will be held at (to be identified at award). The Contractor will be given at least five working days’ notice prior to the date of the meeting by the Contracting Officer. The requirement for a Post Award meeting shall, in no event, constitute grounds for excusable delay by the Contractor in performance of any provisions of the contract. A second post award meeting may, if necessary, be held after the receipt of the first invoice to assure that adequate documentation has been received to substantiate the validity of the invoice for the stated period of performance, in accordance with C-242-H002. The Contractor will be given at least five (5) working days’ notice prior to the date of the meeting by the Contract Specialist.
7.0 Place of Performance
The primary work site will be Naval Surface Warfare Center Crane Division, Bldg. 3330W, Crane, IN.
8.0 Performance Standards
All contractor proposals submitted for the contract effort will be evaluated based on the following criteria:
Sec on M Evalua ons Factors for Award
52.212-2, Evalua on - Commercial Items (OCT 2014), significant evalua on factors are technical capability, past performance, schedule and cost. Technical capability shall include a design narra ve that must demonstrate the
Offeror's understanding of the requirements and the feasibility of the approach to meet those requirements. Technical capability, past performance and schedule are significantly more important than cost. Quality, delivery, and customer service will be evaluated under past performance. The Government may make award without discussions; therefore, the offeror’s ini al offer should contain their best pricing. Award will be based on the best value to the Government considering the evalua on factors listed above. Best value may be determined using tradeoffs among the evalua on factors, so that award may be made to other than the lowest-priced or highest technically-rated proposal. Please note that all offers which fail to furnish required representa ons and cer fica ons or past performance informa on or reject the terms and condi ons of the solicita on may be excluded from considera on for award;
TECHNICAL CAPABILITY: Contractor shall submit proof of capability to perform the work involved in within scope of work. The design narra ve must demonstrate the Offeror's understanding of the requirements and the feasibility of the approach to meet those requirements. (MAXIUM THREE PAGES)
PAST PERFORMANCE – Contractor must have 10 years of experience plus performing construc on or construc on design work with federal, state, or local government property. Contractors must iden fy previous federal, state, and local governments and private contracts that they have completed and that are similar size, value, and type to the contract being evaluated. Contractor shall submit two projects executed that have similar features of work. The two projects submi ed must be self-performed and within the last 3 years.
for evalua on.
SCHEDULE: Should include all milestones referred to in the statement of work.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .