This Statement of Work (SOW) details a landscaping project for the Naval Sea Systems Command (NAVSEA) Crane Division in Crane, Indiana. The scope involves comprehensive landscaping services for buildings 38, 3173, 3330S, 3330C, and 3330N, including specific requirements such as removing existing rock/plants, installing new rock borders and edging, adding weed barriers, planting new vegetation, and tree removal/trimming. Key specifications include: no mulch usage, contractor-recommended plant selections, maintaining aesthetic appeal, and adhering to safety regulations including OSHA requirements and proper handling of hazardous materials. The project requires the contractor to provide all necessary labor, equipment, and expertise to complete the landscaping modifications across multiple building locations.
The solicitation (N0016425Q0579) is a small business set-aside for landscaping services, with a closing date of 09 April 2025 at 12:00 PM Eastern Time. Quotes must be submitted via email to jenae.l.burkhart.civ@us.navy.mil. The project is being issued under FAR Part 13 procedures, and all potential changes will be posted on https://sam.gov/. The primary point of contact is Dennis Mounce, who can be reached at dennis.mounce@navy.mil or 812-854-6214.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Statement of Work Revision 2.pdf | ||
| Solicitation Amendment N0016425Q05790002 SF 30.pdf | ||
| Solicitation Amendment N0016425Q05790001 SF 30.pdf | ||
| N0016425Q0579.pdf | ||
| SF 1449 - N0016425Q0579.pdf | ||
| A5_SOWLandscaping.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DISTRIBUTION STATEMENT A: Approved for public release: Distribution Unlimited
NSWC Crane Facilities 1021 Statement of Work (SOW)
Landscaping 38, 3173, 3330S, 3330C and 3330N Ticket 108857 Landscaping
1.0 Scope
The scope of this effort is to have a contractor install landscaping at buildings 38, 3173, 3330S, 3330C and 3330N. This project is in support of Naval Sea Systems Command (NAVSEA), Crane Division, Crane, Indiana.
2.0 Applicable Documents
The following documents of the revision or issue in effect at the date of award, form a part of this SOW for reference. In the event of conflict between the documents referenced herein and the contents of this SOW, the contents of this SOW shall prevail.
2.1 Specification – Mandatory Compliance
NAVAL SUPPORT ACTIVITY CRANE Defense Biometrics
Identification System Standard Operating Procedures 10 May 2017
2.2 Standards – Mandatory Compliance
MIL-STD-46855A Human Engineering Requirements for Military Systems, Equipment, and Facilities
24 May 2011
2.3 Secretary of the Navy (SECNAV) and Office of the Chief of Naval Operations (OPNAV) Instructions
1910 General Industry and 1926 Construction
3.0 General Requirements
3.1 Landscaping
-NO MULCH to be used
3330 South Building:
Low-Maintenance Landscaping (figure 1): Update low-maintenance landscaping 3 feet from the building perimeter on the north side of B3330S, excluding any work on the east side of B3330S facing HWY-555. Contractor to remove existing river rock, add weed barrier, replace river rock, and replace metal edging. At entrance to 3330S, contractor to propose plant types and arrangement for optimal aesthetic appeal, incorporating height variations and complementing existing landscape patterns. Large plants at the south entrance may be removed at the contractor's discretion. The landscaped area extends to the corner of the building.
3330 Central Building:
Full Landscape Replacement (figure 2): Remove all existing plants, rock, and edging at the front of the Central/South building and replace with new rock of similar type and new metal edging. Remove metal edging and river rock from base trees in courtyard in 3330C and behind 3330C.
Side Building/ 2nd Stairwell (figure 3): Install new rock and edging along the side building up to the stairwell.
Handicap Spots/Stairwell (figure 4): Remove existing bushes and install new bushes at the handicap spots and stairwell. Install new rock and edging at the stairwell.
Tree Removal: Remove four trees located near the building/parking lot in the upper parking lot between the Central and North buildings.
Back of Central Building (figure 5): Remove existing gravel and edging and replace with new rock of similar type and new metal edging.
Tree Trimming: Trim trees near buildings after landscaping installation.
Plant Recommendations: Contractor to recommend plant selections.
3330 North Building:
Door 3 Area: Remove all existing shrubs in front of Door 3 and install new rock and edging.
Building Perimeter: Install new rock and edging around the North building perimeter, extending from Door 3 to Door 2. Install a weed barrier.
Tree Removal: Remove the tree to the right when facing the front of 3330N.
Side of North Building: Remove existing gravel and edging and replace with new.
Picnic Table Area: Remove existing grass and replace with rock in the area in front of the buildings with picnic tables.
Grass Removal and Corner Squaring: Remove grass alongside the North building and install new rock, edging and weed barrier, squaring the corner at Door 28.
Building 38:
Rock Border: Install a 2-foot-wide rock border around the entire perimeter of the B38 monument sign. No additional landscaping elements (plants, lights, etc.).
Building 3173:
Damage Repair and Landscaping: Restore the area to pre-damage condition. Plant 6-10 new plants in each of the three sections, maintaining a consistent design with the 3330-building landscaping. Trim trees away from buildings.
3.2 Government Furnished Information (GFI)
The Government will provide all applicable program technical documentation and information as GFI. This includes technical manuals, drawings, specifications, procedures, and processes required for the performance of this call. The government will provide access to mechanical rooms when needed.
3.3 Safety & Environmental
The Contractor shall abide by all applicable federal, local, and state occupational safety and health requirements. The Contractor shall ensure all employees have appropriate Personal Protection Equipment (PPE). The Contractor shall ensure employees have all required training and certifications related to Occupational Safety and Health Administration (OSHA) requirements.
Any Contractor employee exhibiting unsafe behavior may be removed from the NSWC Crane site. Such removal shall not relieve the Contractor from meeting its contractual obligations and shall not be considered an excusable delay as defined in FAR 52.249-14.
3.4 Hazardous Materials
The Contractor shall provide a responsible party for the handling of the hazardous materials and the respective SDS. This responsibility includes proper training in the handling and disposal of the hazardous materials.
4.0 Technical Data Deliverables
N/A
5.0 Technical Points of Contact
Project Manager: Dennis Mounce
Phone: 812-854-6214 Email: dennis.mounce@navy.mil
Landscaping will be done where the red, blue, and green lines are on the picture.