23RGP75_SOL_0002.pdf
PDF 380 KB Posted
- Solicitation number
- N0016423RGP75
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 23RGP75_SOL_0003.pdf | ||
| 23RGP75_SOL_ATT2.pdf | ||
| 23RGP75_Sol_0001.pdf | ||
| 23RGP75_Sol.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
This Amendment is hereby issued to include the follow ing:
1.) Update Section J Attachment 4 - GFI List 2.) Adding Questions and Responses 2 note in Section L
See Summary of Changes
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 16-Feb-2023
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X N0016423RGP75
X 9B. DATED (SEE ITEM 11)
27-Jan-2023
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
16-Feb-2023
CODE
NAVAL SURFACE WARFARE CENTER CRANE DIV
E. SHERFIELD (812-854-0000)
BLDG 3373
300 HWY 361
CRANE IN 47522-5001
N00164 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N0016423RGP75
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
The Table of Contents has changed from:
Exhibit/Attachment Table of Contents
DOCUMENT TYPE DESCRIPTION PAGES DATE
Exhibit A CDRLS A001through
A018
18 13-SEP-2022
Attachment 1 Past Performance Questionnaire
2 26-JAN-2023
Attachment 2 Past Performance Matrix 4 26-JAN-2023 Attachment 3 DD254 8 05-AUG-2022 Attachment 4 GFI List 8 14-DEC-2022 to:
Exhibit/Attachment Table of Contents
DOCUMENT TYPE DESCRIPTION PAGES DATE
Exhibit A CDRLS A001through
A018
18 13-SEP-2022
Attachment 1 Past Performance Questionnaire
2 26-JAN-2023
Attachment 2 Past Performance Matrix 4 26-JAN-2023 Attachment 3 DD254 8 05-AUG-2022 Attachment 4 GFI List - REV 1 9 15-FEB-2023
SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS
The following have been added by full text:
QUESTIONS AND RESPONSES 2
Questions and Responses 2
Questions Received: Government Responses:
Can the government provide the following drawings? They do not appear to be in the provided TDP.
a) 8873587
b) 8873586
Yes. The Government will provide these drawings to all Offerors who have already requested the drawing package.
These drawings will be identified as Drawings 127 and 128 on an update GFI List – Section J Attachment 4 – to be provided per this Amendment.
Can the government provide the following cable assembly NORs?
a) ECP 4029/1125 R5 NOR N1124-1 R3
b) ECP 93700152 R4
No. The Government will not be providing the NORs listed.
The NORs listed are part of the revision history identified on Drawing 21 of the GFI List - Section J Attachment 4.
N0016423RGP75
c) ECP 4062 NOR 4062-001
The Bill of Material lists the rectifier drawing number as TBD, does that mean the rectifier specification has not been finalized?
Drawing 92 is in the process of being revised to replace “TBD” with Part Number “7845598”. No other changes are being made to this drawing at this time. An updated copy of the drawing will be provided when it is approved.
Can the Navy supply the current source for the following items?
a) Protective cover (8829054)
b) Insert Assembly, Receptacle (8829043)
No, the Government will not be providing the sources.
Find# 41 of the 8829039 TR-343A Connectorized Transducer P/L calls for a GXPS15135P6 Cap Screw. However the GXPS15135 DWG provided with the Solicitation only includes specifications for P1-thru-P5 versions of the DWG. Could the Navy please supply the specifications for the P6 version of the Screw?
The Government will provide an updated copy of Drawing 28 of the GFI List - Section J Attachment 4 to Offerors who have requested drawings thus far.
This drawing is a redline version currently going through approval levels.
In which part of the Solicitation can the required qualification testing for the Connectorized TR- 343A be found? Ultra has not be able to find any definition of how many units, nor what kind of Tests those units are required to undergo; nor what reporting requirements need to be submitted before the contractor can begin delivering CLIN 0004 & 0005 Transducers.
Alternatively, does the government wish for the Contractor to propose this scope IAW FAR 52.204-22?
First Article Testing is not required for the Connectorized TR-343A (CLINs 0004/0005).
Offerors may elect to propose an alternative solution to the solicited CLINs IAW FAR clause 52.204-22. Regardless of the proposed solution, the contract type shall remain firm-fixed-price (FFP). The Government will not consider any other contract type.
(End of Summary of Changes)
File details come from the government source that posted it. Updated .