20RJN81_0005_sol.pdf
PDF 150 KB Posted
- Solicitation number
- N0016420RJN81
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 20RJN81_00007.pdf | ||
| 20RJN81_0006.pdf | ||
| 20RJN81_0004.pdf | ||
| 20RJN81_0003.pdf | ||
| 20RJN81_sol_0001.pdf | ||
| 20RJN81_sol.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to 1) clarify instructions for requesting access to Draw ing Package Rev 4; and 2) address questions recieved from industry in response to the Request For Proposal.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 13-Mar-2020
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N0016420RJN81
X 9B. DATED (SEE ITEM 11)
26-Dec-2019
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
13-Mar-2020
CODE
NAVAL SURFACE WARFARE CENTER CRANE DIV
M. MUESSEL (812-854-5099)
BLDG 3373
300 HWY 361
CRANE IN 47522-5001
N00164 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N0016420RJN81
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
The following items are applicable to this modification:
SUMMARY OF CHANGES
SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS
The following have been added by full text:
0005 QUESTIONS FROM INDUSTRY
Amendment 0005 Questions From Industry:
1) Q. How do we request access to, “Drawing Package Rev 4?”
A. To access, “Drawing Package Rev 4,” vendors shall request explicit access to the controlled document titled, “20RJN81_0005_att1,” found in the, “Attachments/Links,” section on the beta.SAM website posting for Solicitation N0016420RJN81 and all associated amendments.
2) Q. What action should we take if we submitted our proposal but an amendment was issued after we made our submission?
A. As stated in the RFP Instructions to Offerors, as contained in Amndment 0004, completed proposals shall include signed copies of all amendments. It is the vendor’s responsibility to read each amendment and ensure proposal submissions incorporate the changes prescribed in each amendment.
3) Q. Were there any changes to the product sample submission or assembly requirements as a result of changes to the drawing package or RFP Instructions to Offerors?
A. There have been no changes to the drawings needed to build the product sample or the instructions for submitting the product sample as a result of any posted amendment.
4) Q. Are electronic submissions accepted?
A. No. See RFP Instructions To Offerors, as contained in Amendment 0004.
(End of Summary of Changes)
File details come from the government source that posted it. Updated .