15RJR40_0004.pdf

PDF 20 KB Posted

Attached to
MK 79 MOD 2 and MK 80 MOD 2 SIGNALS
Solicitation number
N0016415RJR40
Issued by

About this file

15RJR40_0004

View the file

Other files

File Type Posted
15RJR40_0005.pdf PDF
15RJR40_0003.pdf PDF
15RJR40_0002.pdf PDF
15RJR40_0001.pdf PDF
15RJR40_sol.pdf PDF
15RJR40_syn.doc DOC document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The reason for this amendment is to provide an update to specification WS25510E.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 23-Apr-2015

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N00164-15-R-JR40

X 9B. DATED (SEE ITEM 11)

06-Mar-2015

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

24-Apr-2015

CODE

NAVAL SURFACE WARFARE CENTER CRANE DIV

K. WAGONER (812-854-3990)

BLDG 3373

300 HIGHWAY 361

CRANE IN 47522-5001

N00164 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N00164-15-R-JR40

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

The following items are applicable to this modification:

SUMMARY OF CHANGES (REV)

SUMMARY OF CHANGES

Paragraph 4.5.1.1 of Specification WS 25510E is changed as follows:

4.5.1.1 Candlepower Test. The flare cup assembly shall be mounted in a test fixture, drawing 6824664 and positioned in the fireplace of the photometric tunnel in a vertical position with the ignition end up and 2 inches +/- 1/2 inch below the photometric axis. Ignition of the flare cup assembly shall be by means of an M-100 Atlas Match, manufactured by the Atlas Chemical Corporation, Wilmington 99, Delaware, or equal; secured to the ignition end of the flare cup assembly. Ignition of the flare cup assembly shall be initiated from outside the tunnel to assure safety of personnel. Light intensity and color shall be measured by the Tristimulus Photometer as described in the Journal of the Optical Society of America, Volume 41 (1951) pp 321-323, or equal. Calibration of the photometer shall be made using a projector lamp, calibrated for luminous intensity and color by the National Bureau of Standards, Washington D.C. Using the Tristimulus Photometer, the luminous intensity, dominant wave length and the percent of purity of the color produced by the burning signal shall be measured and calculated in accordance with I.C.I.

(International Commission of Illumination) Tristimulus Color System, Journal of the Optical Society of America, Volume 23 (1933) p 359; ASTM Symposium on Color (1941) and National Bureau of Standards Circular C-429.

Defectives are flare cup assemblies failing to meet the requirements of 3.5.1.1.

(End of Summary of Changes)