15RJR40_0001.pdf

PDF 107 KB Posted

Attached to
MK 79 MOD 2 and MK 80 MOD 2 SIGNALS
Solicitation number
N0016415RJR40
Issued by

About this file

15RJR40_0001

View the file

Other files

File Type Posted
15RJR40_0005.pdf PDF
15RJR40_0004.pdf PDF
15RJR40_0003.pdf PDF
15RJR40_0002.pdf PDF
15RJR40_sol.pdf PDF
15RJR40_syn.doc DOC document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The reason for this amendment is to update the CLIN descriptions for CLIN 0002 and 0004, update the price matrices, IDC constraints, clause 52.216-19, list of attachments, clause CNIN-M-0011, and to provide responses to industry questions. The closing date of the solicitation is extended from 07 April 2015 at 2:00 pm EDT to 21 April 2015 at 2:00 pm EDT.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 12

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 02-Apr-2015

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N00164-15-R-JR40

X 9B. DATED (SEE ITEM 11)

06-Mar-2015

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

03-Apr-2015

CODE

NAVAL SURFACE WARFARE CENTER CRANE DIV

K. WAGONER (812-854-3990)

BLDG 3373

300 HIGHWAY 361

CRANE IN 47522-5001

N00164 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N00164-15-R-JR40

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

The following items are applicable to this modification:

SUMMARY OF CHANGES (REV)

SUMMARY OF CHANGES

SECTION B - SUPPLIES OR SERVICES AND PRICES

CLIN 0002

The CLIN extended description has changed From:

First Article Test Units for MK 79 MOD 2 Personnel Distress Signal Kit in accordance with automated data list 53711-6136004K, specifications, drawings, QAP, SQAP, and all associated documents in Section J. The MK 79 MOD 2 First Article shall consist of 85 each MK 80 MOD 2 Signals and 35 each Flare Cup Assemblies as well as examples of marking and boxes for the MK 79 MOD 2 Kit. *See Pricing Matrix Below for CLIN 0002.

To: First Article Test Units for MK 79 MOD 2 Personnel Distress Signal Kit in accordance with automated data list 53711-6136004K, specifications, drawings, QAP, SQAP, and all associated documents in Section J. The MK 79 MOD 2 First Article shall consist of 200 each MK 31 Projectors, 85 each MK 80 MOD 2 Signals and 35 each Flare Cup Assemblies as well as examples of marking and boxes for the MK 79 MOD 2 Kit. *See Pricing Matrix Below for CLIN 0002.

CLIN 0004

The CLIN extended description has changed From:

First Article Test Units for the Improved MK 79 Personnel Distress Signal Kit in accordance with automated data lists, specifications, drawings, QAP, SQAP, and all associated documents in Section J. The Improved MK 79 First Article shall consist of 85 each MK 80 Signals and 35 each Flare Cup Assemblies as well as examples of marking and boxes for the Improved MK 79 Kit. *Do not price this CLIN at this time, pricing to be determined when/if an Improved MK 79 is developed.

To: First Article Test Units for the Improved MK 79 Personnel Distress Signal Kit in accordance with automated data lists, specifications, drawings, QAP, SQAP, and all associated documents in Section J. The Improved MK 79 First Article shall consist of 200 each MK 31 Projectors, 85 each MK 80 Signals and 35 each Flare Cup Assemblies as well as examples of marking and boxes for the Improved MK 79 Kit. *Do not price this CLIN at this time, pricing to be determined when/if an Improved MK 79 is developed.

The following have been modified:

IDC CONSTRAINTS

CONTRACT MINIMUM/MAXIMUM QUANTITY AND CONTRACT VALUE

The minimum quantity and contract value for all orders issued against this contract shall not be less than the minimum quantity and contract value stated in the following table. The maximum quantity and contract value for all orders issued against this contract shall not exceed the maximum quantity and contract value stated in the following table.

MINIMUM

QUANTITY

MAXIMUM

QUANTITY

4,000 each MK 80 MOD 2 0 each MK 79

130,000 each MK 80 and 27,000 each MK 79

Note: The contract minimum and maximum do not apply to First Article Test units.

DELIVERY/TASK ORDER MINIMUM/MAXIMUM QUANTITY AND ORDER VALUE

The minimum quantity and order value for each Delivery/Task Order issued shall not be less than the minimum quantity and order value stated in the following table. The maximum quantity and order value for each Delivery/Task Order issued shall not exceed the maximum quantity and order value stated in the following table.

MINIMUM

QUANTITY

MAXIMUM

QUANTITY

3,201 each MK 80 or 500 each MK 79

35,000 each MK 80 and/or 7,500 each MK 79

Note: The delivery order minimum and maximum do not apply to First Article Test units.

PRICE MATRICES

CLIN 0001

First Article Test Units for

MK 80 MOD 2

Year One Year Two Year Three Year Four Year Five

1 lot

CLIN 0002

First Article Test Units for

MK 79 MOD 2

Year One Year Two Year Three Year Four Year Five

1 lot

CLIN 0005

MK 80 MOD 2 Hand

Fired (Red) Signal Year One Year Two Year Three Year Four Year Five

3,201 - 5,000

5,001 - 10,000

10,001 - 20,000

20,001 - 35,000

CLIN 0006

MK 79 MOD 2 Personnel

Distress Signal Kit Year One Year Two Year Three Year Four Year Five

500 - 1,000

1,001 - 2,500

2,501 - 5,000

5,001 - 7,500

Note: The term “Year” in the tables above refers to a contract year. Year One will commence on the effective date of the basic contract and will expire one day prior to the first anniversary date of the contract and the subsequent years will follow suit.

Note: Offerors may propose economic purchase quantities in accordance with FAR 52.207-4 included in Section K of this solicitation.

SECTION I - CONTRACT CLAUSES

52.216-19 ORDER LIMITATIONS. (OCT 1995)

(a) Minimum order. When the Government requires supplies or services covered by this contract in an amount of less than 500 each, the Government is not obligated to purchase, nor is the Contractor obligated to furnish, those supplies or services under the contract.

(b) Maximum order. The Contractor is not obligated to honor:

(1) Any order for a single item in excess of 35,000 each;

(2) Any order for a combination of items in excess of 42,500 each; or

(3) A series of orders from the same ordering office within 30 days that together call for quantities exceeding the limitation in subparagraph (1) or (2) above.

Note: The quantities listed in (a) and (b) above do not apply to First Article Test units.

(c) If this is a requirements contract (i.e., includes the Requirements clause at subsection 52.216-21 of the Federal Acquisition Regulation (FAR)), the Government is not required to order a part of any one requirement from the Contractor if that requirement exceeds the maximum-order limitations in paragraph (b) above.

(d) Notwithstanding paragraphs (b) and (c) above, the Contractor shall honor any order exceeding the maximum order limitations in paragraph (b), unless that order (or orders) is returned to the ordering office within 10 days after issuance, with written notice stating the Contractor's intent not to ship the item (or items) called for and the reasons.

Upon receiving this notice, the Government may acquire the supplies or services from another source.

(End of clause)

SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

ATTACHMENTS

Exhibit “A” - Contract Data Requirements List (CDRL):

Description Date No. of Pages CDRL A001 (Ammunition Data Card – Ammunition and Explosive Technical Data)

5 January 15 1

CDRL A002 (Management Plan - SPC) 5 January 15 1 CDRL A003 (Management Plan - Quality Program Requirements) 5 January 15 1 CDRL A004 (Engineering Change Proposal - ECP) 5 January 15 1 CDRL A005 (Request for Deviation - RFD) 5 January 15 1 CDRL A006 (Critical Safety Item, Characteristice – and Critical Defect Report)

22 January 15 1

CDRL A007 (Failure Analysis and Corrective Action Report) 5 January 15 1

Exhibit “B” - Specification:

Description Date No. of Pages Specification – WS1903 Rev F 19 December 90 10 Specification – WS25510 Rev E 15 March 94 14

Exhibit “C” - Drawings:

Description No. of Pages Drawings for ADL 10001-2112951M 2112951 Rev V 1 2113651 Rev E 1 2113652 Rev E 1 2128452 Rev K 1 2150424 Rev D 1 2150425 Rev E 1 2150427 Rev E 1 2150428 Rev F 1 2150432 Rev E 1 2150433 Rev F 1 2150434 Rev G 1 2150463 Rev H 1 2150690 Rev D 1 2151422 Rev G 1

SA2522955- 2

SA2522957- 7

Drawings for ADL 53711-6136000K 19-48-4116_105B_12 2 2113649 Rev H 1 2113650 Rev H 1 2114096 Rev J 1 2151330 Rev P 1 2151430 Rev M 1 6135951 Rev F 1 6135953 Rev D 1 6135954 Rev D 1 6135955 Rev C 1

6135958 Rev E 1 6135960 Rev C 1 6135961 Rev G 1 6135962 Rev F 1 6135963 Rev E 1 6135964 Rev C 1 6135965 Rev E 1 6135969 Rev J 3 6136000 Rev J 1 6136001 Rev F 1 6136002 Rev J 1 6824664 Rev B 1 8324675- 1 8324676- 1 8794342 Rev AL 1 Drawings for ADL 53711-6136004K 19-48-4116_12 10 19-48-4116_105B_12 2 2151430 Rev M 1 6135965 Rev E 1 6136004 Rev D 1 6136005 Rev D 1 6136006 Rev F 1 6136007 Rev J 1 8794342 Rev AL 1 Drawings for LD256003 Rev F 329497 Rev J 1 584273 Rev F 1 584275 Rev H 1 584276 Rev G 1 B 584274 001 Rev H 1 B 1124247 001 Rev A 1 C 1211588 001 Rev D 1 D 330104 001 Rev E 1 D 982439 001 Rev F 1 D 982440 001 Rev F 1 D 982441 001 Rev D 1 D 982442 001 Rev J 1 D 982443 001 Rev E 1

Exhibit “D” - Quality Assurance:

Description No. of Pages Quality Assurance Provisions (QAP) – QAP-JXRT-01 Revision 1 14 Supplementary Quality Assurance Provisions (SQAP) – SQAP-JXRT-

Exhibit “E” - Automated Data List (ADL):

Description No. of Pages

ADL 10001-2112951M 7

ADL 53711-6136000K 8

ADL 53711-6136004K 5

LD256003 Rev F 2

Exhibit “F” - Hazardous Component SafetyData Statement (HCSDS):

Description No. of Pages 4 Rev G 3 8 Rev E 4 10 Rev C 2 11 Rev C 2 12 Rev E 3 20 Rev L 11 32 Rev F 4 53 Rev E 3 96 Rev E 2 102 Rev C 1 230 Rev D 2 522 Rev B 2 991 Rev A 2 40132 Rev A 1 40138 Rev A 2 40307 Rev A 2 40719 Rev A 2 40747- 2 40748- 2 40749- 2 41105 Rev A 1 41106 Rev A 1

Attachment 1 – Past Performance Questionnaire Description No. of Pages Past Performance Questionnaire 4

Associated Documents Data Item Descriptions (DIDs)

(1) DI-MISC-80043B

(2) DI-MGMT-80004A

(3) DI-QCIC-81722

(4) DI-CMAN-80639C

(5) DI-CMAN-80640C

(6) DI-SAFT-80970A

(7) DI-SESS-81315A

SECTION M - EVALUATION FACTORS FOR AWARD

CNIN-M-0011 BEST VALUE EVALUATION – PAST PERFORMANCE (APR 2014)

a) The contract resulting from this solicitation will be awarded to that offeror whose offer, conforming to the solicitation requirements, is determined to be technically acceptable and provide the “best value” to the Government. The “best value” determination will be based on the merits of the offer and the offeror’s capability. The “best value” may not necessarily be the proposal offering the lowest cost, nor receiving the highest past performance rating. As specified in the FAR 52.215-1 “Instructions to Offerors--Competitive Acquisition” provision, the Government intends to evaluate proposals and award a contract without discussions.

An offer must be acceptable for the offeror to be eligible for award. OFFERS THAT DO NOT CONFORM

TO THE REQUIREMENTS STATED HEREIN MAY BE DETERMINED UNACCEPTABLE AND

MAY BE REJECTED WITHOUT FURTHER EVALUATION.

b) Proposals will be evaluated for technical acceptability/unacceptability and rated and ranked on past performance and price as listed in the factors below. It should be noted that cost/price does not have a finite numerical weight. Evaluation factors (other than cost/price) are more important than cost/price. However, cost is an important factor and should be considered when preparing proposals. The Government reserves the right to award to a lower cost offeror when the offers are considered essentially equal in terms of past performance or when specific past performance associated with a superior offer do not support any associated cost or price premium. In summary, cost/price/past performance tradeoffs will be made.

c) The offeror’s proposal shall be in the format prescribed by, and shall contain a response to, each of the areas identified in Section L. The order of relative importance for the evaluation factors is established as follows:

FACTOR I – PAST PERFORMANCE

FACTOR II – PRICE

d) Factor I (Past Performance) is more important than Factor II (Price). Factor II, Price will not be rated but will be considered in determining the “Best Value” to the Government. Past Performance information may be evaluated upon receipt prior to the closing date of the solicitation.

e) Offerors must meet the standard for FAR 9.104 for responsibility to be eligible for award. The Government may conduct a Pre-Award Survey as part of this source selection. Results of any survey will be evaluated to determine each Offeror’s capability to meet the requirements of the solicitation. Any such survey may also be used to verify statements and representations made in the Offeror’s proposal. The purpose of a pre-award survey is to obtain information not available to the contracting officer to make a responsibility determination prior to contract award.

STANDARDS FOR EVALUATION:

Technical Acceptability:

a. The technical information submitted as Volume I in accordance with CNIN-L-0011 will be reviewed to determine the technical acceptable/unacceptable rating based on the technical and delivery requirements of the solicitation.

b. The following ratings for Technical Evaluation will apply as set forth below.

Technically Acceptable – Proposal clearly meets the minimum requirements of the solicitation.

Technically Unacceptable – Proposal does not clearly meet the minimum requirements of the solicitation.

FACTOR I: PAST PERFORMANCE

The Government will assess each offeror’s and proposed significant subcontractor’s past performance. The assessment will be an unbiased judgment about the quality of an offeror’s past performance. The Government will use its subjective assessment to make a comparative assessment of an offeror’s capability. Past performance is a measure of the degree to which an offeror satisfied its customers in the past and complied with the Specification, Drawings, Statement of Work, Performance Work Statement, contract schedule and contract terms and conditions.

Past performance is also a measure of the risk of performance associated with the offeror.

The Government will assess the offeror's past performance in the areas of:

(1) Quality of Product or Service

(2) Schedule

(3) Customer Satisfaction

The Government may base its judgment about the quality of an offeror’s past performance on:

(1) Records of objective measurements and subjective ratings of specified performance attributes, if available, and

(2) Statements of opinion about the quality of specific aspects of an offeror’s performance, or about the quality of an offeror’s overall performance.

The Government may solicit information from an offeror’s customers and business associates; Federal, state and local government agencies and databases; and from other persons and organizations. The Government reserves the right to limit the number of references it decides to contact and to contact references other than those provided by the offeror. The evaluation will take in account the same type of information regarding significant subcontractors proposed in the offeror’s proposal.

The Contracting Officer is not responsible for locating or securing any information not furnished with the offer.

The SSA/Contracting Officer may, however, utilize all available information, including information not provided by the offeror, in the past performance evaluation. The Government reserves the right to review less than all information submitted, and to only analyze sufficient information to make a reasonable determination of each offeror’s past performance rating. If insufficient information regarding the offeror’s corporate history is available, the offeror is encouraged to submit for evaluation, evidence of relevant past performance on the part of the offeror’s key/principal employees, as either a prime- or sub-contractor.

Past performance is assessed by the SSA/Contracting Officer and is assigned adjectival ratings in the evaluation.

There are two aspects to the past performance evaluation:

The first is to evaluate the offeror’s past performance to determine how relevant a recent effort accomplished by the offeror is to the effort to be acquired through the source selection. The criteria to establish what is recent and relevant shall be unique to each source selection and shall be stated in the solicitation. In establishing what is relevant for the acquisition, consideration should be given to those aspects of an offeror’s contract history that would give the greatest ability to measure whether the offeror will satisfy the current procurement. Common aspects of relevancy include similarity of service/support, complexity, dollar value, contract type, and degree of subcontract/teaming. Each offeror will be given an adjectival rating on past performance relevance: relevant or not relevant.

The second aspect of the past performance evaluation is to determine how well the contractor performed on the contracts. The past performance evaluation performed in support of a current source selection does not establish, create, or change the existing record and history of the offeror’s past performance on past contracts; rather, the past performance evaluation gathers information from customers on how well the offeror performed those past contracts. The Past Performance information will be reviewed to determine the quality and usefulness as it applies to performance confidence assessment. Each offeror will be given an adjectival rating on past performance confidence: substantial confidence, satisfactory confidence, limited confidence, no confidence, unknown confidence. Offerors who do not have recent/relevant performance record available to the Contracting Officer will be rated Unknown Confidence (Neutral).

Offerors that have no record of past performance (i.e., new businesses) must submit a signed and dated statement to that effect. If an offer submits a certification statement and the Government has no information available regarding the offeror’s past performance, that offeror will receive a neutral rating (i.e., the offeror is evaluated neither favorably nor unfavorably) for past performance. If offerors (prime and significant subcontractors) provide reference information that is deemed not relevant and current as defined in Section L, the offeror will receive a neutral past performance rating for those contracts.

FACTOR II: COST/PRICE

A Cost/Price Proposal shall be submitted for the supplies/services set forth in Section B of this solicitation.

Evaluation of an offeror’s proposal shall be based on the information presented in the proposal and information available to the Contracting Office from sources deemed appropriate. Sources typically considered include Defense Contract Audit Agency office, Defense Contract Management Command, other contracts with the same firms for similar items or services, known commercial sources such as Global Insight Inc. (formally Data Resources, Inc.), Standard and Poor, etc. Proposals which are unrealistic in terms of technical or schedule commitments, or unrealistically high or low in terms of cost/price, may be deemed reflective of an inherent lack of technical competence, or indicative of a failure to comprehend the complexity of risks of the proposed work and may be grounds for rejection of the proposal. The quality of organization and attention to detail reflected in the business proposal will be considered to be an indication of the quality of organization and level of capability during contract performance. Subjective judgment on the part of the government evaluators is implicit in the entire process.

a) Proposals will be evaluated for price reasonableness. Cost/Price evaluation will be based on the total cost offered for all line items. Estimated ordering quantities will be used to develop an evaluated total price for the comparison to the government estimate, when applicable, and other offers in the competitive range.

b) Price: CLINS 0001 – 0002 and CLINs 0005 – 0006 pricing will be evaluated for price reasonableness. Price (CLINS 0005 & 0006) will be evaluated by finding the total evaluated price (TEP) for each CLIN. The TEP for each CLIN will be determined by applying proposed unit prices against estimated ordering quantities for each item over the five year ordering period. The total evaluated prices for each CLIN will then be added to the First Article totals (CLINS 0001 & 0002) to determine an overall evaluated price for the proposal. The overall evaluated price will be used for the comparison to other offers.

INDUSTRY QUESTIONS

QUESTION 1:

Seems to be a conflict between "max lot size" and "required deliveries." Max lot size includes test units. For an LAT 80 each is required which would leave 9,920 for delivery. This is less than the required 10,000 every 120 days.

It would require two lots, with associated testing, to achieve the 10,000 unit delivery. Should the delivery lot size be 9,920 or should require test units be in excess of the 10,000 units needed for a Lot delivery, increasing max lot size allowance?

ANSWER:

The maximum lot size is dictated by WS 25510E, paragraph 4.4. The maximum lot size of 10,000 units does include the 80 signals for LAT, leaving a deliverable qty of 9,920 ea. for each lot. Each follow-on lot will also require LAT and will be a maximum of 10,000 units including 80 signals for LAT testing. Each lot will have a maximum deliverable qty of 9,920 units.

QUESTION 2:

Please clarify the MK 79 FAT requirements. Isn't it a duplication of the MK 80 FAT for the same MK 80 portion of the requirement as specified?

ANSWER:

The MK 79 FAT requirements will consist of verifying packaging and marking of the units and containers as well as the functional requirements set forth in WS 25510E for the MK 80 Signal. It is different from the MK 80 requirements from the packaging and marking standpoint.

QUESTION 3:

The MK 31 specification references a FAT for the MK 31. The solicitation / contract specifies a MK 79 FAT and a MK 80 Signal FAT with no mention of a MK 31. Is there an independent FAT required for the MK 31 Projector (launcher)?

ANSWER:

Yes, the MK 31 Projector must be subjected the FAT requirements set forth in WS 1903F. The MK 31 projectors for FAT have been added to the MK 79 FAT units CLIN descriptions.

QUESTION 4:

Specification WS25510E (Prime Item Fabrication Specification Signal, Hand Fired, Mark 80 Mod 2), , Table 1.

shows no candle power sample for LAT, although the note located under 4.4b states to "note the inclusion of flare cup assemblies for candle power testing".. but there are none so noted. Can you confirm there is no candle power testing required in the LAT? Is there a specific color requirement (measurement) for FAT?

ANSWER:

There is no candlepower requirement for LAT, only FAT. There is no specific color requirement for FAT, just that the performance requirements of paragraph 3.5.1 are met.

QUESTION 5:

Drawing 6136000 Rev J (Signal, Hand Fired (Red) MK 80 MOD 2) - (C1) Note 9 - [Color coding shall be applied in accordance with MIL-STD-709], USING Item 8. Ink shall withstand 14 day Temperature and Humidity test per MIL-STD-331, Test 105, be legible and hold color after test. Question: How often is a T&H test required? As a critical, is it required of every signal? Or, is this requirement fulfilled during First Article and A Plan T&H testing?

ANSWER:

Typically, contractors would verify prior to submission of FAT and/or LAT that this requirement can be fulfilled, however this requirement is officially tested/verified during FAT and/or LAT. Each signal is not required to go through T&H, just the sample IAW the specification.

QUESTION 6:

Drawing 2112951 Rev V (Projector, Signal, Surface MK 31 MOD 0) - Note 7 - Ink shall withstand 14 day Temperature and Humidity test per MIL-STD-331, Test C1, be legible and hold color after test. Question: How often is a T&H test required? Is this requirement fulfilled during First Article and A Plan T&H testing?

ANSWER:

Typically, contractors would verify prior to submission of FAT and/or LAT that this requirement can be fulfilled, however this requirement is officially tested/verified during FAT and/or LAT. Each signal is not required to go

QUESTION 7:

Drawing 6136006 Rev F (Bag, Re-sealable)- Note 5 - Marking shall withstand 14 Day Temperature and Humidity Test per MIL-STD-331, Test C1, be legible and hold color after test. Question: How often is a T&H test required?

Typically, contractors would verify prior to submission of FAT and/or LAT that this requirement can be fulfilled, however this requirement is officially tested/verified during FAT and/or LAT. Each signal is not required to go

QUESTION 8:

Drawing SA-2522956 (Test Plug For Projector, Signal, Surface MK 31 MOD 1) is included in the ADL for MK 31 MOD 0. This is the drawing for the MK 31 MOD 1. Question: Shouldn't Drawing SA-2522955 (Test Plug For Projector, Signal, Surface MK 31 MOD 0) be in the ADL/Drawing package rather than SA-2522956?

ANSWER:

You are correct. SA2522956 is for use on the MK 31 MOD 1 Projector only and those were never produced. The correct reference is SA 2522955 (for the MK 31 MOD 0 Projector should be used in lieu of SA 2522956).

QUESTION 9:

WS 1903 Rev F (Prime Item Fabrication Specification Projector, Signal, Surface MK 31 MOD 0 MK 31 MOD 1) -

4.5.1.1 Four test plugs shall be tested with each projector. Question: Does the contractor supply the Test Plugs (per SA-2522955) for FAT (800 each) and LAT's (1,260 or 1,156 each)?

No, the Government has test plugs available. The contractor will only need to furnish projectors for FAT and LAT.

QUESTION 10:

Page 13 of Solicitation, HQ-C-2-0027 FIRST ARTICLE (GOVERNMENT TESTING) (NAVSEA) (SEP 1990) states "until after the Contractor has fully tested it, at its expense, to determine compliance with said requirements and it has been preliminarily accepted by the Contract Administration Office." Does this imply the full conducting of a FAT event at the Contractors facility (including all dimensional and functional testing) prior to sending the FAT sample for Government testing? Or, is does this statement just represent the standard dimensional inspection requirements associated with FAT (DCMA covered) prior to shipping to the Government for functional testing?

ANSWER:

The latter is correct. Preliminary inspection (dimensions, processes, etc.) will be performed by DCMA and functional testing will be performed by the Government at the Government facility.

QUESTION 11:

Request clarification if the MK2 MOD 0 , Box Ammunition, Dwg. 982439 will be GFM? If No, request drawing 9828439 and any sub drawings for this item.

ANSWER:

The contractor shall furnish the MK 2 MOD 0 Ammunition Box. The drawings have been added to the list of attachments in Section J and have been uploaded to FedBizOpps.

(End of Summary of Changes)