AMENDMENT 0001

View the file

Other files

File Type Posted
14TGP81_0002.pdf PDF
14TGP81_0001_att.docx DOCX document
14TGP81_att.zip ZIP file
14TGP81_sol.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The reason for this amendment is to address vendor questions and to incorporate Statement of w ork changes and to extend the proposal due date.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 8

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 18-Apr-2014

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N00164-14-T-GP81

X 9B. DATED (SEE ITEM 11)

25-Mar-2014

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

18-Apr-2014

CODE

NAVAL SURFACE WARFARE CENTER CRANE DIV

D. MARKS (812-854-8203)

BLDG 121

300 HWY 361

CRANE IN 47522-5001

N00164 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N00164-14-T-GP81

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

The following items are applicable to this modification:

SECTION 4.0 - CLAUSES & OTHER FULL TEXT INFORMATION

SUMMARY OF CHANGES(REVISED)

The proposal due date has been extended to 5/2/2014 at 4:00 pm local time.

Questions

200 Ton:

1. Do you need to ramp pressure and temperature or do you just want to enter a single set-point through the interface and save recipes?

Answer: Only the pressure needs to be variable for a cycle. Please see the revised section 3.1 of the Statement of Work.

2. What is your minimum pressure requirement?

Answer: Five (5) tons is the minimum requirement. The Statement of work was updated to include this information. Please see the revised section 3.1 of the Statement of Work.

3. Are there cables extending out the front of the clamp area? Our guarding will need to be modified to accommodate.

Answer: Yes, there cables extending out the front of the clamp area. There is no requirement to modify the guarding. The SOW remains unchanged.

4. Do you want an adjustable daylight from 16"-24" or a fixed daylight at 24" with 16" stroke?

Answer: Adjustable would be preferred, but not required. The SOW remains unchanged.

5. Is there a specific height requirement for operator interfaces, gauges etc?

Answer: There is no specific height requirement. The SOW remains unchanged.

6. Do you want the pump to shut off when the set-point is achieved or hold for a time and then turn off?

Answer: Adjustable would be preferred, but not required. The SOW remains unchanged

7. Our "heat Platens" are usually a separate item from the Moving and Fixed platens, they are insulated as well , as to not transfer heat into the rest of the machine.

They are also smaller than the platen area.

The specification says the platen size 30x30"do you have a spec for the heat platen? Is the heat platen to be 30x 30?

Answer: We are referring to the heated working surface size in the Statement of Work. So, in their case, the 'heat platen' is 30x30 minimum. Please see Section 3.1 of the Statement of Work.

75 Ton:

1. What do you mean by "automated closing"

Answer: Automated means motorized as opposed to manually operated. Please see the revised section 3.2 of the Statement of Work.

2. What is our minimum pressure requirement?

Answer: One (1) ton is the minimum requirement. The Statement of work was updated to include this information.

Please see the revised section 3.2 of the Statement of Work.

3. On your last 100 ton press there were two pressure ranges, do you want similar to this?

Answer: Two ranges would be preferred, but not required. The SOW remains unchanged.

a. The pump turns off for final cure at a lower pressure

Answer: Yes, this was the intent of the noise reduction statement. The Statement of work was updated to include this information. Please see the revised section 3.1 and 3.2 of the Statement of Work.

4. Do you need to ramp pressure and temperature or do you just want to enter a single set-point through the interface and save recipes? OR Do you want discreet control to set pressure and temperature?

Answer: Only the pressure needs to be variable for a cycle. The SOW remains unchanged.

5. Are there cables extending out the front of the clamp area? Our guarding will need to be modified to accommodate.

Answer: Answer: Yes, there cables extending out the front of the clamp area. There is no requirement to modify the guarding. The SOW remains unchanged.

6. Do you want an adjustable daylight from 12"-22" with 12" of stroke or a fixed daylight at 12" with 12" stroke?

Answer: Adjustable would be preferred, but not required. The SOW remains unchanged.

7. Is there a specific height requirement for operator interfaces, gauges etc?

Answer: There is no specific height requirement. The SOW is unchanged.

8. Is the 75 ton press to be a 4 post press also?

Answer: It is not required to be a 4-post. The SOW remains unchanged.

9. Our "heat Platens" are usually a separate item from the Moving and Fixed platens, they are insulated as well , as to not transfer heat into the rest of the machine.

They are also smaller than the platen area.

The specification says the platen size 18x18"do you have a spec for the heat platen? Is the heat platen to be 18x18"?

Answer: We are referring to the heated working surface size in the Statement of Work. So, in their case, the 'heat platen' is 18x18 minimum. Please see Section 3.2 of the Statement of Work.

STATEMENT OF WORK

FOR THE

PROCUREMENT, DELIVERY, TRAINING, AND

MAINTENANCE

OF COMPRESSION MOLDING PRESSES

16 JANUARY 2014

DISTRIBUTION STATEMENT A: Approved for public release; distribution unlimited.

Prepared by:

Naval Surface Warfare Center Crane Division Platform and Launch Systems Division, GXP

Crane, IN 47522

STATEMENT OF WORK

FOR THE PROCUREMENT, DELIVERY, TRAINING, AND MAINTENANCE

OF COMPRESSION MOLDING PRESSES

1.0 SCOPE. This Statement of Work (SOW) sets forth the requirements for the procurement, delivery, installation, training, and maintenance services per the specifications herein of hydraulic compression molding presses for the Polymer Engineering & Underwater Sensors Branch, GXPS, Naval Surface Warfare Center (NSWC) Crane Division.

1.1 Background. Compression molding presses are required in the manufacture and repair of molded rubber products used on a variety of platforms and systems for the U.S. Navy.

2.0 APPLICABLE DOCUMENT. N/A

3.0 TASK REQUIREMENTS. The contractor(s) shall deliver compression molding presses per individual Delivery Orders (DOs) to the Government per the following specifications:

3.1 200-Ton Hydraulic Press. The following are the minimum salient characteristics and requirements for a 200-Ton Hydraulic Press:

Capacity: Adjustable up to at least 200 tons, capable of holding minimum 5 tons Press type: 4-post Motion: Up-acting Electrically heated platens capable of maintaining up to 500°F Heated platen size: 30” x 30” Cylinder bore: 14” minimum Cylinder stroke: 16” minimum Daylight opening: 24” minimum Touchscreen programmable controller pressure Adjustable temperature control Noise reduction – pump only runs to build programmed pressure during closing and maintain minimum level during cure cycle

3.2 75-Ton Hydraulic Press. The following are the minimum salient characteristics and requirements for a 75-Ton Hydraulic Press:

Capacity: Adjustable up to at least 75 tons, capable of holding minimum 1 ton Motion: Up-acting, motorized closing Electrically heated platens capable of maintaining up to 500°F Heated platen size, minimum: 18” x 18” Adjustable temperature control Daylight opening: 12” minimum Noise reduction – pump only runs to build pressure during closing and maintain minimum level during cure cycle

3.3 Equipment Diagrams and Manuals. The contractor shall provide electrical and hydraulic diagrams for each press upon delivery. The contractor shall provide the Government with operating manuals for each press upon delivery. (CDRL A001)

3.4 Shipment. The contractor shall ship each press to the following address:

Naval Surface Warfare Center Crane Division Roger Dickerhoof Building 41NE 300 Highway 361 Crane, IN 47522-5001 Tel: 812-854-1041

3.5 Installation. The contractor shall install each of the presses upon delivery. The contractor shall notify the Government five (5) days in advance of the delivery/installation. The contractor shall unload, move, set in place, and level each press. The Government will ensure the contractor has access to the installation location, ensure the proper utilities are in place and the final connection(s) to the facility are made, and ensure all preparations are made to facilitate these installations.

3.6 Training. The contractor shall provide training to Government employees on the operation and controller programming for each press by instructors qualified in their operation and maintenance. The training shall be conducted concurrently with the installation or within 1 to 2 weeks after the installation. The time and date of the training will be mutually agreed upon between the Government and the contractor. Training shall include hands-on instruction and all applicable training materials. Training materials shall be submitted to the Government at the time of the training. An estimated six (6) Government employees will require this training.

(CDRL A002)

3.7 Maintenance Agreement. The contractor shall provide annual preventative maintenance service calls by technicians qualified in the repair and maintenance of each press for the 5-year life of the contract. The first preventative maintenance service calls will be one (1) year after the delivery of each press. The contractor shall notify the Government five (5) days prior to the service calls. The contractor shall provide 24/7 telephone technical support. The contractor shall provide on-site technical service calls and provide an on-site representative within three (3) days of Government notification of a repair or maintenance requirement. Travel expenses and all replacement parts shall be the responsibility of the contractor.

4.0 GOVERNMENT FURNISHED PROPERTY. There will be no Government furnished property to accomplish the tasking in this SOW.

5.0 DATA DELIVERABLES. All data deliverables shall be submitted to the referenced address stated on the DD Form 1423, Contract Data Requirements Lists (CDRLs). The contractor shall provide electrical and hydraulic diagrams and operating manuals for each press upon delivery.

CDRL: A001

DID Number: DI-MISC-80557

DID Title: Commercial Support Documentation (Electrical and Hydraulic Diagrams and Operating Manuals) Applicable SOW Paragraph: 3.3

CDRL: A002

DID Number: DI-MISC-80557 DID Title: Commercial Support Documentation (Training Materials) Applicable SOW Paragraph: 3.6

6.0 SPECIAL CONSIDERATIONS.

6.1 Security. Tasking under this SOW is unclassified.

6.3 Points of Contacts. The GXPS Technical Points of Contact for this contract are:

Roger Dickerhoof

Code GXPS, Building 41NE Phone: 812-854-1041 Email: roger.dickerhoof@navy.mil

Mandy Schaeffer Code GXPS, Building 41NE Phone: 812-854-8987 Email: manda.schaeffer@navy.mil