3.04_Amendment_N0010426RU050.pdf
PDF 549 KB Posted
- Attached to
- Type 3R tiles - Requirement LTC - Solicitation
- Solicitation number
- N00104-26-R-U050
About this file
This is a Standard Form 30 (Amendment of Solicitation/Modification of Contract) issued by NAVSUP Weapon Systems Support Mech to modify solicitation N0010426RU050 dated July 23, 2026. The amendment, numbered 0001 and effective August 19, 2026, adds two option years and relevant option-related contract clauses to the existing contract structure.
The modification extends the contract term by adding Option Year 1 (Ordering Year 4) and Option Year 2 (Ordering Year 5), each with twelve-month ordering periods. The affected contract line items (CLINs) include items 0001AD, 0001AE, 0002AD, 0002AE, 0003AD, 0003AE, 0004AD, and 0004AE, which are now designated as optional items rather than base ordering period items. The amendment incorporates FAR clauses 52.217-6 (Option for Increased Quantity), 52.217-9 (Option to Extend the Term of the Contract), and 52.217-5 (Evaluation of Options), with a total contract duration not to exceed 10 years including all options. All other terms and conditions of the original contract remain unchanged and in full force and effect.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
R
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBE
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
Created On:
19 Aug 2026, 20:14 PM Greenwich Mean Time
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
Section B - Supplies or Services & Prices or Costs
The following CLIN(s) / SLIN(s) / ELIN(s) were modified:
Option Line Item 0001AD
INFORMATION FROM TO
Description
Same as item 0001Estimated quantities based on quarterly demandInspection and Acceptance at SourceYear Four (4) Base Ordering PeriodTwelve (12) months in length; thirty-six (36) to forty-eight (48) months after contract award
Same as item 0001Estimated quantities based on quarterly demandInspection and Acceptance at SourceOption Year 1 - Ordering Year 4 Twelve (12) months in length; thirty-six (36) to forty-eight (48) months after contract award
Option No Yes
Option Line Item 0001AE
INFORMATION FROM TO
Description
Same as item 0001Estimated quantities based on quarterly demandInspection and Acceptance at SourceYear Five (5) Base Ordering PeriodTwelve (12) months in length; forty-eight (48) to sixty (60) months after contract award
Same as item 0001Estimated quantities based on quarterly demandInspection and Acceptance at SourceOption Year 2 - Ordering Year 5Twelve (12) months in length; forty-eight (48) to sixty (60) months after contract award
Option No Yes
Option Line Item 0002AD
INFORMATION FROM TO
Description
Same as item 0002Estimated quantities based on quarterly demandInspection and Acceptance at SourceYear Four (4) Base Ordering PeriodTwelve (12) months in length; thirty-six (36) to forty-eight (48) months after contract award
Same as item 0002Estimated quantities based on quarterly demandInspection and Acceptance at SourceOption Year 1 - Ordering Year 4Twelve (12) months in length; thirty-six (36) to forty-eight (48) months after contract award
Option No Yes
Option Line Item 0002AE
INFORMATION FROM TO
Description
Same as item 0002Estimated quantities based on quarterly demandInspection and Acceptance at SourceYear Five (5) Base Ordering PeriodTwelve (12) months in length; forty-eight (48) to sixty (60) months after contract award
Same as item 0002Estimated quantities based on quarterly demandInspection and Acceptance at SourceOption Year 2 - Ordering Year 5 Twelve (12) months in length; forty-eight (48) to sixty (60) months after contract award
Option No Yes
Option Line Item 0003AD
INFORMATION FROM TO
Description
Same as item 0003Estimated quantities based on quarterly demandInspection and Acceptance at SourceYear Four (4) Base Ordering PeriodTwelve (12) months in length; thirty-six (36) to forty-eight (48) months after contract award
Same as item 0003Estimated quantities based on quarterly demandInspection and Acceptance at SourceOption Year 1 - Ordering Year 4Twelve (12) months in length; thirty-six (36) to forty-eight (48) months after contract award
Option No Yes
Option Line Item 0003AE
INFORMATION FROM TO
Description
Same as item 0003Estimated quantities based on quarterly demandInspection and Acceptance at SourceYear Five (5) Base Ordering PeriodTwelve (12) months in length; forty-eight (48) to sixty (60) months after contract award
Same as item 0003Estimated quantities based on quarterly demandInspection and Acceptance at SourceOption Year 2 - Ordering Year 5Twelve (12) months in length; forty-eight (48) to sixty (60) months after contract award
Option No Yes
N0010426RU0500001
Option Line Item 0004AD
INFORMATION FROM TO
Description
Same as item 0004Estimated quantities based on quarterly demandInspection and Acceptance at SourceYear Four (4) Base Ordering PeriodTwelve (12) months in length; thirty-six (36) to forty-eight (48) months after contract award
Same as item 0004Estimated quantities based on quarterly demandInspection and Acceptance at SourceOption Year 1 - Ordering Year 4Twelve (12) months in length; thirty-six (36) to forty-eight (48) months after contract award
Option No Yes
Option Line Item 0004AE
INFORMATION FROM TO
Description
Same as item 0004Estimated quantities based on quarterly demandInspection and Acceptance at SourceYear Five (5) Base Ordering PeriodTwelve (12) months in length; forty-eight (48) to sixty (60) months after contract award
Same as item 0004Estimated quantities based on quarterly demandInspection and Acceptance at SourceOption Year 2 - Ordering Year 5Twelve (12) months in length; forty-eight (48) to sixty (60) months after contract award
Option No Yes
Section I - Contract Clauses
Additional Information/Notes
The following clauses were added:
FAR Clauses Incorporated by Full Text
52.217-6 Option for Increased Quantity. (Mar 1989)
OPTION FOR INCREASED QUANTITY (MAR 1989)
The Government may increase the quantity of supplies called for in the Schedule at the unit price specified. The Contracting Officer may exercise the option by written notice to the Contractor within 364 days. Delivery of the added items shall continue at the same rate as the like items called for under the contract, unless the parties otherwise agree.
(End of clause)
52.217-9 Option to Extend the Term of the Contract. (Mar 2000)
OPTION TO EXTEND THE TERM OF THE CONTRACT (MAR 2000)
(a) The Government may extend the term of this contract by written notice to the Contractor within 364 days of contract expiration; provided that the Government gives the Contractor a preliminary written notice of its intent to extend at least 364 days. The preliminary notice does not commit the Government to an extension.
(b) If the Government exercises this option, the extended contract shall be considered to include this option clause.
(c) The total duration of this contract, including the exercise of any options under this clause, shall not exceed 10 (years).
(End of clause)
Section M - Evaluation Factors for Award
The following clauses were added:
FAR Clauses Incorporated by Reference
Number Title Effective Date Alternate/ Deviation
Variation Effective Date
52.217-5 Evaluation of Options. (Deviation 2026-O0038) Feb 2026
| IDCode: J |
| Page: 1 |
| Pages: 5 |
| AmendNo: 0001 |
| EffDate: 19 Aug 2026 |
| ReqNo: See Continuation Sheet |
| ProjNo: |
| IssCode: N00104 |
| AdmCode: |
| IssuedBy: NAVSUP WEAPON SYSTEMS SUPPORT MECH |
P O BOX 2020, 5450 CARLISLE PIKE
MECHANICSBURG, PA 17050-0788
UNITED STATES
KATE HEIDELBERGER, Email: kate.c.heidelberger.civ@us.navy.mil AdminBy:
SCD: PAS:
| ContractorNameAdd: |
| Code: |
| FacCode: |
| SolChg: 1 |
| SolNo: N0010426RU050 |
| SolDate: 23 Jul 2026 |
| AwardChg: Off |
| AwardNo: |
| AwardDate: |
| Amended: 1 |
| OffrExt: Off |
| OffrNoEx: 1 |
| NoCopies: 1 |
| ApprData: See Section G - Contract Administration Data |
| ChgeOrd: Off |
| ChgeOrder: |
| Modify: Off |
| SuppAgre: Off |
| SuppAuth: |
| ModOthr: Off |
| OthrSpec: |
| NoReq: Off |
| Require: Off |
| Copies: |
| Descript: To add two option years and relevant option provisions/clauses. |
| ContNameTitle: |
| CoNameTitle: |
| ContDate: |
| CODate: |
File details come from the government source that posted it. Updated .