N0010426RK053 5W20.pdf

PDF 604 KB Posted

Attached to
1356-01-272-2372 5W20 Gas Generator Assembly
Solicitation number
N0010426RK053
Issued by

About this file

This is a Solicitation for a 5W20 Gas Generator Assembly, issued by the Department of the Navy Naval Supply Systems Command under solicitation number N0010426RK053. The procurement seeks 70 units as the base quantity with a one-year option for up to 121% of the base total using stepladder pricing. The product falls under Federal Supply Class (FSC) 1356 and NAICS Code 325920, with the National Item Identification Number 1356-01-272-2372.

This is a competitive procurement for an explosive item requiring a Safety Survey prior to contract award. The solicitation specifies that paper copies of drawings will not be provided, and drawings are not available on CD; however, competitive drawings are available through the solicitation package. The Technical Data Package (TDP) is available on FBO SAM.gov. Interested contractors should note the explosive weight and classification details contained within the formal solicitation documents and ensure compliance with all safety and regulatory requirements associated with explosive items.

View the file

Other files

File Type Posted
N0010426RK053 0005.pdf PDF
N0010426RK053 0004.pdf PDF
N0010426RK053 0003 5W20.pdf PDF
N0010426RK053 0002.pdf PDF
N0010426RK053 0001.pdf PDF
CDRLS Solic N0010526RK053.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION

15A. NAME AND

ADDRESS

OF OFFEROR

SOLICITATION, OFFER, AND AWARD 1. This Contract is a Rated Order under the Defense Priorities and Allocations System (DPAS) - Code of Federal Regulations - at 15 CFR 700.

RATING PAGE OF PAGES

2. CONTRACT NUMBER 3. SOLICITATION NUMBER 4. TYPE OF SOLICITATION 5. DATE ISSUED 6. REQUISITION/PURCHASE NUMBER

CODE7. ISSUED BY 8. ADDRESS OFFER TO (If other than item 7)

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SOLICITATION

9. Sealed offers in original and copies for furnishings the supplies or services in the Schedule will be received at the place specified in item 8, or if hand carried, in the depository located in until local time

CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision Number 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.

10. FOR

INFORMATION

CALL:

A. NAME B. TELEPHONE (NO COLLECT CALLS)

AREA CODE NUMBER EXTENSION

C. EMAIL ADDRESS

11. TABLE OF CONTENTS

(X) DESCRIPTION PAGE(S) (X) SECTION PAGE(S)DESCRIPTION

A B C D E F G H

I

J

K

L

M EVALUATION FACTORS FOR AWARD

INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS

REPRESENTATIONS, CERTIFICATIONS AND OTHER

STATEMENTS OF OFFERORS

PART IV - REPRESENTATIONS AND INSTRUCTIONS

LIST OF ATTACHMENTS

PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

CONTRACT CLAUSESSOLICITATION/CONTRACT FORM

SUPPLIES OR SERVICES AND PRICES/COSTS

DESCRIPTION/SPECIFICATIONS/WORK STATEMENT

PACKAGING AND MARKING

INSPECTION AND ACCEPTANCE

DELIVERIES OR PERFORMANCE

CONTRACT ADMINISTRATION DATA

SPECIAL CONTRACT REQUIREMENTS

NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

OFFER (Must be fully completed by offeror)

12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the set opposite each item, delivered at the designated point(s), within the time specified in the schedule.

13. DISCOUNT FOR PROMPT PAYMENT

(See Section I, Clause Number 52.232-8)

14. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the SOLICITATION for offerors and related documents numbered and dated):

10 CALENDAR DAYS (%) 20 CALENDAR DAYS (%) 30 CALENDAR DAYS (%) CALENDAR DAYS (%)

DATEAMENDMENT NUMBERAMENDMENT NUMBER DATE

CODE FACILITY 16. NAME AND THE TITLE OF PERSON AUTHORIZED TO SIGN OFFER

(Type or print)

15B. TELEPHONE NUMBER

AREA CODE NUMBER EXTENSION

15C. CHECK IF REMITTANCE ADDRESS IS

DIFFERENT FROM ABOVE - ENTER

SUCH ADDRESS IN SCHEDULE.

17. SIGNATURE 18. OFFER DATE

AWARD (To be completed by Government)

19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION

22. AUTHORITY FOR USING OTHER THAN FULL OPEN COMPETITION UNDER THE

UNITED STATES CODE AT:

10 U.S.C. 3204(a) ( )41 U.S.C. 3304(a)

24. ADMINISTERED BY (If other than Item 7)

26. NAME OF CONTRACTING OFFICER (Type or print)

IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.

AUTHORIZED FOR LOCAL REPRODUCTION

Previous edition is unusable

23. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

25. PAYMENT WILL BE MADE BY

27. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

28. AWARD DATE

CODE

ITEM

STANDARD FORM 33 (REV. 12/2022)

Prescribed by GSA - FAR (48 CFR) 53.214 (c)

SEALED BID (IFB) INVITATION FOR BID

NEGOTIATED (RFP) REQUEST FOR

PROPOSAL

(Hour) (Date)

PART I - THE SCHEDULE PART II - CONTRACT CLAUSES

DO-A6 1 111

N0010426RK053 23 Apr 2026

NAVSUP WEAPON SYSTEMS SUPPORT MECH

P O BOX 2020, 5450 CARLISLE PIKE

MECHANICSBURG, PA 17050-0788

UNITED STATES

Alison Maine, Email: alison.s.maine.civ@us.navy.mil Telephone: 771-229-0502

N00104 electronically 02:00 PM 26 May 2026

Alison Maine 771 229-0502 alison.s.maine.civ@us.navy.mil

1-2 3-5 6-13 14-16 17-21 22-24 25-27 28-31

32-73

75-89

90-104 105-11

Section A - Solicitation/Contract Form 5W20

N0010426RK053

Section B - Supplies or Services & Prices or Costs Additional Information/Notes

Section B - Solicitation Notes:

1. This item is a CSI - Critical Safety Item.

2. See Section L for proposal submission instructions. Electronic submission of an offer may be accomplished by attaching your offer to an email directed to alison.s.maine.civ@us.navy.mil.

3. Pursuant to FAR 52.29-3 the Government may waive the First Article Approval -- Contractor Testing, requirement for first article approval test where supplies identical or similar to those called for in the schedule have been previously furnished by the offeror/contractor and have been accepted by the Government. If the contracting officer waives the FAT requirement at the inception of the contract, the Government reserves the right to require FAT during contract performance, at the discretion of the contracting officer.

Item Supplies/Service Quantity Unit Unit Price Amount

0001 5W20 GAS GENERATOR ASSEMBLY

National Stock Number: 1356012722372

0001AA

Contract Data Requirements List Technical Data, See DD Form 1423 Data items A001 through A005

National Stock Number: 1356012722372 Pricing Arrangement: Firm Fixed Price

1 Lot

Additional Descriptive Data:

This item is NOT SEPARATELY PRICED (NSP)

First Article (Preproduction) Test Samples (See FAR 52.209-3).

0001AB

4 Assembly level units, 100% meet drawing requirements as provided in DWG 5624018 and WS26374. Sample Disposition: Perform failure analysis if discrepant. DCMA:

source inspection of all dimensions prior to assembly.

NOTE: Test requirements of 5816508 notes 22 & 23 are required if grain assembly manufacturer is different than gas generator assembly manufacturer.

National Stock Number: 1356012722372 Pricing Arrangement: Firm Fixed Price

4 Each

Additional Descriptive Data:

This item is NOT SEPARATELY PRICED (NSP)

0001AC

Production Lot (Periodic) Test Samples.

Consists of: 1st Lot of 70 EA net, plus an additional 7 EA for test per WS256374, Figure 10.

NOTE: Test requirements of 5816508 notes 22 & 23 are required if grain assembly manufacturer is different than gas generator assembly manufacturer.

National Stock Number: 1356012722372 Pricing Arrangement: Firm Fixed Price

7 Each

Additional Descriptive Data:

This item is NOT SEPARATELY PRICED (NSP)

0001AD

NSN: 4T-1356-01-272-2372-5W20

NOMEN: Gas Generator Assembly

ACRN: AA

RX: TBD

TAC: NSTS

FOB: Origin

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item.

The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

National Stock Number: 1356012722372 Pricing Arrangement: Firm Fixed Price

70 Each

Option Line Item

5W20

NOMEN: Gas Generator Assembly

FOB: ORIGIN

PURCHASE REQUEST NUMBER: TBD

May purchase up to 121% of FY27 requirement

Stepladder:

38 - 53

54 - 69 70 - 85

National Stock Number: 1356012722372

Section C - Description/Specifications/Statement of Work

SECTION C

PROCUREMENT SPECIFICATION

I. NSN: 4T-1356-01-272-2372-5W20

NOMENCLATURE: Gas Generator Assembly

Assembly Level Baseline - Sequential

Drawing Revision Nomenclature

5624004 D MIXING MANIFOLD ASSY-GAS GENERATOR

5624004-PL C MIXING MANIFOLD ASSY-GAS GENERATOR

5624005 E BURST DISC ASSY-GAS GENERATOR

5624006 A ADHESIVE EPOXY

5624018 J GAS GENERATOR ASSY-BUOYANCY SUBSYSTEM

5624018-PL F GAS GENERATOR ASSEMBLY

5624019 C GAS GENERATOR SUBASSEMBLY

5624019-PL C GAS GENERATOR SUBASSEMBLY

5816491 B WASHER, SPACER

5816493 L CONTAINER, CO2-FORWARD END (GFE)

5816494 K CONTAINER, CO2-AFT END (GFE)

5816495 G CONTAINER, CO2-AFT FORGING (GFE)

5816499 F CONTAINER, CO2-FORWARD FORGING (GFE)

5816504 E SHIELD, GRAIN-GAS GENERATOR

5816505 J END CAP-GAS GENERATOR

5816508 H GRAIN ASSEMBLY-GAS GENERATOR

5816512 E RETAINER, GRAIN-GAS GENERATOR

5816513 F BODY-GAS GENERATOR

5816514 G BODY, FORMED-GAS GENERATOR

5816539 D ORIFICE, INLET-CO2 CONTAINER

5816547 D WASHER, FRICTION GAS GENERATOR

5816562 E ORIFICE-MIXING MANIFOLD

5816566 D SHIELD, BURST DISC-MIXING MANIFOLD

5816567 H BURST DISC ASSY-MIXING MANIFOLD

6717016 B CAP, NON-PROPULSIVE

6717017 C BASE, HUMIDITY INDICATOR

6717019 B INDICATOR, HUMIDITY, PLUG

7517104 E S/P COND GAS GENERATOR ASSY

8601830 A TRACEABLE SEAL, WEATHERPROOF

WS26374 F+SCN1 GENERAL SPECIFICATION FOR GAS GENERATOR ASSEMBLY

Reference Documents for Assembly (References with Approved Replacements in Parentheses)

DOCUMENT NUMBER

49 CFR 172.407

49 CFR 178.602

5624003 REV E

5816541 REV K

A-A-59135

AMS 2374

AMS 2375

AMS 5030

AMS 5540

AMS 5617

AMS 5643

AMS 5646

AMS 5665

AMS 7819

ANSI Y14.5-1973

ANSI Y14.5-1979

ANSI Y14.5M-1982

ASME B46.1

ASME B46.1-2019

ASME Y14.24

ASME Y14.34M

ASME Y14.35M

ASME Y14.5-2009

ASME Y14.5-2018

ASME Y14.100

ASME Y14.100-2017

ASTM A317 (ASTM E381)

ASTM A514

ASTM D1002

ASTM D5118

ASTM D740

ASTM D5330

ASTM E8

ASTM E10

ASTM E1417

ASTM E1444

ASTM E18

AWS A5.9

AWS A5.14

AWS D17.1

BB-N-411 (A-A-59503, A-A-59155)

DOD-D-1000 (DOD-STD-100C NOTICE 4)

DOD-D-1000 (MIL-STD-100E)

DOD-STD-2101

FED-STD-H28

IL7446729 REV B

MIL-A-46104 (ASTM B221)

MIL-A-46106

MIL-D-3464

MIL-DTL-117

MIL-H-6875 (SAE AMS-H-6875)

MIL-I-6866 (ASTM E1417)

MIL-I-26860 (SAE AS26860)

MIL-P-15035 (MIL-I-24768/13 THRU MIL-I-24768/16)

MIL-P-22241 (ASTM D3294, ASTM D3308)

MIL-P-46994 (INACTIVE FOR NEW DESIGN)

MIL-P-47158 (MIL-STD-1907)

MIL-PRF-61002

MIL-PRF-81705

MIL-STD-105 (MIL-STD-1916 AND ASQ Z1.4)

MIL-STD-129

MIL-STD-130

MIL-STD-1512 (MIL-HDBK-1512)

MIL-STD-1907

MIL-STD-1949 (ASTM E1444)

MIL-STD-6866 (ASTM E1417)

MIL-STD-810

MIL-W-8611 (AWS D17.1)

MS18013 (SAE AS18013)

MS33649 (SAE AS5202)

NAS 1611

NAVSUP P805

QQ-A-225/8 (ASTM B211, AMS 4115, AMS 4116, AMS 4117, AMS 4128)

QQ-P-35 (AMS 2700, ASTM A967)

QQ-S-763 (SAE AMS-QQ-S-763)

SAE AMS-STD-2154

SAE AS478-35

TR5624413 REV G

TT-M-261 (ASTM D740)

WS26374 REV F WITH SCN 1

ZZ-R-765 (A-A-59588)

DESCRIPTION AND SPECIFICATIONS

NOTE 1: NON-ANTICIPATION OF INITIAL DEVIATIONS ON AWARDS

Offerors are reminded that any resultant contract will require performance in strict compliance with the specifications set forth therein, and that prices offered should not be predicated upon contractor anticipation of government authorization of deviations, even though such deviations may have been granted previously under other contracts for the same item.

CONFIGURATION CONTROL - ANSI/EIA-649

1. Any Engineering Change Proposal (ECP) or Request for Variation (RFV) affecting an item being procured under this contract shall be in accordance with ANSI/EIA-649. Final approval of any ECP and/or RFV shall be in writing, by the Contracting Officer, NAVSUP Weapon Systems Support. If any such approval affects the cost of Performance of this contract, an equitable adjustment shall be made in the contract price in accordance with the provisions of the "Changes" clause of this contract.

2. RFVs shall be issued using information outlined in ANSI/EIA-649 section 5.3.4.1. The use of DD Form 1694 is a required form for RFV submissions. MIL-HDBK-61 provides additional guidance for preparation of RFVs.

3. ECPs shall be issued using information outlined in ANSI/EIA-649 section 5.3.1.4. The use of DD Form 1692 is a required form for ECP submissions. MIL-HDBK-61 provides additional guidance for preparation of ECPs.

4. The contractor's assigned RFV number shall use the following numbering format:

a. The last four alpha-numeric characters of the contract number followed by a dash ().

b. The letter "V", followed by consecutively assigned numeric characters beginning with 001.

5. The contractor's assigned ECP number shall use the following numbering format:

a. The last four alpha-numeric characters of the contract number followed by a dash ().

b. The letters "ECP", followed by consecutively assigned numeric characters beginning with 001.

6. The contractor shall submit an electronic copy of any ECP or RFV to the Contracting Officer, Administrating Contracting Officer, and the activity below:

A. Contract Administration Office (CAO), (for review and comment to PCO)

B. NAVSUP WSS Contracting Officer N772, Email: (See Section H)

C. NAVSUP ALC, Code A151, Email: (See Section H)

7. Technical approval authority for RFVs and ECPs is NUWC Keyport (See Section H).

8. Authorization to accept non-conforming supplies is specifically retained by the Contracting Officer.

Requirements 1356-01-272-2372 5W20 Gas Generator Assembly

Section D - Packaging and Marking

SECTION D

Packaging, Packing, Preservation and Transportation

1. Preservation, Packaging, and Packing shall be in accordance with all associated drawings and specification listed herein.

2. Transportation Data:

a. NSN/NALC: 4T-1356-01-272-2372-5W20

b. Nomenclature: GENERATOR ASSEMBLY, GAS F/BUOYANCY SUBSYSTEM F/MK50 & MK54 EXERCISE ONLY.

c. GBL Freight Description: EXPLOSIVE POWER, DEVICES, CLASS B EXPLOSIVES

(MOTOR: EXPLOSIVES, NOI RAIL: JET THRUST UNITS)

d. NMFC Number: 064300

e. UFCC Number: 35715

f. Hazard Classification (Class, Division and Storage Compatibility): 1.3, C

g. UN Number: 0275

Competent Authority Approval (CAA): N/A

Exemption number: EX1987100463

h. Container Markings: IAW all associated drawings and specifications as listed herein.

i. Performance Oriented Packaging Certification Marking: N/A

j. Label: IAW all associated drawings and specifications as listed herein.

k. CIIC (Controlled Inventory Item Code): 7

l. Hazardous materials shall be offered for transportation in full compliance with Title 49 Code of Federal Regulations (49 CFR).

m. GFM is hazardous: Hazardous GFM is identifiedin Section I.

Remarks: For hazardous and explosive material the above transportation data must be updated within 30 days prior to marking and labeling because of the lead-time between the initiation of the procurement and the actual shipping timeframe. Please contact the contracting officer (See Section H) at the NAVSUP Weapon Systems Support, Mechanicsburg, PA for updated data.

MIL-STD-1168C - AMMUNITION LOT NUMBERING & AMMUNITION DATA CARD

Ammunition lot numbers shall be formatted in accordance with the current version of MIL-STD 1168 and include all lot number elements as reflected in the standard. The lot number shall be documented on the Ammunition Data Card and include associated data in accordance with the current version of MIL-STD 1168:

(1) Manufacturer's Identification symbol: Only the approved Manufacturer's Identification symbol for the contractor or manufacturer is to be used in the lot number. Requests for approval of a Manufacturer's Identification symbol are to be submitted via the Government Inspector. Refer to MIL-HDBK-1461 for guidance, which is available on the WARP Website (https://mhpwarp.redstone.

army.mil).

SERIAL/REGISTER NUMBER REQUEST

Serial Numbers Required. Contractor to complete the request form as provided below. Submit completed form to NUWC Keyport.

Form is as follows:

NUWC Keyport C323 Serial Number Assignment NUWC_KYPT_SerialNumber@navy.mil

*Please note: one form is required for each PN. For contracts with multiple part number deliveries on CLINs, please submit one form per part number.

For NUWC Keyport C323 Input Only

**SERIAL NUMBERS ARE ONLY VALID FOR USE WHEN APPROVED BY C323 TECHNICAL POC**

Assigned by: Approved by:

UMM/NIIN assigned to PN (enter all that apply):

ITEM: 4T-1356-01-272-2372-5W20; Gas Generator Assembly

DWG: 5624018 REV J

Forward completed form to:

NUWC_KYPT_SerialNumber@navy.mil

Questions should be directed to:

Adam Vogt

360-315-0613

Adam.j.vogt.civ@us.navy.mil

Section E - Inspection and Acceptance

SECTION E

52.246-15 -- Certificate of Conformance.

(a) When authorized in writing by the cognizant Contract Administration Office (CAO), the Contractor shall ship with a Certificate of Conformance any supplies for which the contract would otherwise require inspection at source. In no case shall the Government's right to inspect supplies under the inspection provisions of this contract be prejudiced. Shipments of such supplies will not be made under this contract until use of the Certificate of Conformance has been authorized in writing by the CAO, or inspection and acceptance have occurred.

(b) The Contractor's signed certificate shall be attached to or included on the top copy of the inspection or receiving report distributed to the payment office or attached to the CAO copy when contract administration (Block 10 of the DD Form 250 sequence ) is A005 performed by the Defense Contract Administration Services. In addition, a copy of the signed certificate shall also be attached to or entered on copies of the inspection or receiving report accompanying the shipment.

(c) The Government has the right to reject defective supplies or services within a reasonable time after delivery by written notification to the Contractor. The Contractor shall in such event promptly replace, correct, or repair the rejected supplies or services at the Contractor's expense.

(d) The certificate shall read as follows:

I certify that on ______ the ____ furnished the supplies or services called for by [insert date], [insert Contractor's name] Contract No._____ via ____ on ________ in accordance with all [Carrier] [identify the bill of lading or shipping document] applicable requirements. I further certify that the supplies or services are of the quality specified and conform in all respects with the contract requirements, including specifications, drawings, preservation, packaging, packing, marking requirements, and physical item identification (part number), and are in the quantity shown on this or on the attached acceptance document.

Date of Execution: _____________________________

Signature: _____________________________________

Title: _________________________________________

PRODUCTION LOT TEST SAMPLES (CONTRACTOR TESTING)

1. Test samples are required from each production lot and are to be tested in accordance with the approved test plan. A production lot shall consist of net deliverable quantity, LOT test sample units, and any retained sample units for investigative purposes as may be required by Section B.

2. The production lot(s) must be manufactured and presented to the Government Quality Assurance Representative (QAR) with all documentation required by section B. The documentation (WAWF-RRs and Ammunition Data Card printed from WARP) accompanying the production lot test samples shall contain the contract number, item, lot number identification, DODIC, NSN, and serial numbers. The presentation of the lot shall be made to the QAR calendar days after date of contract to select the production test samples. If FAT is required then presentation of lot samples 90 shall be made IAW timetable in Section F. The samples shall be selected, at random, from each production lot, by the QAR within 48 hours for resident QARs, or 7 calendar days for non-resident QARs after presentation of the lot.

3. Sample units removed for testing from different lots shall not be commingled.

4. Production lot testing shall be performed by the Contractor within calendar days of production lot sample selection. Production 30 lot testing shall be witnessed by a representative of the engineering activity and/or the cognizant QAR. The Contractor shall provide written notification to the Contracting Officer, with concurrent notification to the engineering activity, and the QAR, at least 20 calendar days prior to the planned testing date.

NOTE: If a failure occurs during testing and an engineering activity representative is not present, all testing shall be halted and the engineering activity and contracting officer shall be notified within 24 hours. A government representative shall be allowed to participate in the failure investigation in accordance with applicable CDRLs.

Contractor testing shall resume upon notification by the Contracting Officer.

5. - Disposition of Production Lot Test Samples

Production Lot Testing Samples are subject to destructive testing. These units cannot be used to meet the total contract quantity.

6. Retained samples, if applicable, shall be sent to the address shown in Section F after lot release.

7. A production lot test report required and shall be forwarded in accordance with the DD 1423 sequence number requirements to the address is A002 shown in Block 14. The test report shall include all results of testing conducted in accordance with the approved test plan.

8. Acceptance, shipment, and payment shall not be accomplished until the production lot test samples have been tested, the required report approved, and the lot has been released for service use. The retained samples, if applicable, shall be shipped to the address provided in Section F of the contract after the lot has been released for service use.

9. The only valid and contractually binding notification of production lot approval, conditional approval, or disapproval shall be in writing and issued by the Contracting Officer. This notification may be made to the Contractor within calendar days after the Contracting Officer receives the 30 production lot test report(s) and all applicable CDRL requirements. Upon receipt of the written approval accepting a production lot(s), the Contractor shall ship the production lot(s) as soon as possible and no later than calendar days after receipt of such notice. Final acceptance of the production 15 lot(s) shall be the responsibility of the cognizant DCMA QAR, but shall not occur unless and until the production lot approval has been issued in writing by the Contracting Officer.

a) Any notice of approval or conditional approval shall not relieve the Contractor from complying with all requirements of the specifications and all other terms and conditions of this contract.

b) A notice of conditional approval shall state any further action required of the Contractor. In the event the test sample fails to meet the requirements of the specification or drawing, the Contractor shall submit a Failure Analysis and Corrective Action Report (DD Form 1423, sequence number, ) with all associated costs and expenses to be borne solely by the Contractor.A003

c) A notice of disapproval may cite reasons for such. If the production lot test report(s) is disapproved by the Contracting Officer, the QAR may be required to select an additional production lot test sample(s) for testing. This direction may be given by the Contracting Officer in the notice of disapproval. The Contractor shall furnish such additional test sample(s) under the terms and conditions and within the time specified in the notification. The cost of each additional approval test, and all costs related to such test(s), shall be borne by the Contractor. Upon approval of the production lot test sample(s) and report(s), the Contracting Officer may equitably adjust the delivery schedule of the contract for only the lot represented by such sample(s). The Government reserves the right to require an equitable decrease of the contract price for any extension of the delivery schedule necessitated by additional test(s) or for any additional costs incurred by the Government due to the need for additional approval test (s).

10. If the Contractor fails to deliver any production lot test sample(s) within the time or times specified, or if the Contracting Officer disapproves any production lot test report(s), the contract may be deemed to have failed to make delivery within the meaning of the "Default" clause of this contract, and this contract may be subject to termination for default. In such an event, failure of the Government to terminate this contract for default shall not relieve the Contractor of the responsibility to meet the delivery schedule for production quantities.

SECTION E - PRODUCTION LOT TEST SAMPLES (CONTRACTOR TESTING)

1. Supplies/services will be inspected/accepted at:

CLIN INSPECT

AT

INSPECT

BY

ACCEPT

AT

ACCEPT

BY

0001AA Technical Data See DD1423 See DD1423 See DD1423 See DD1423

0001AB First Article Testing Contractor Government Contractor Government

0001AC Lot Acceptance Testing Contractor Government Contractor Government

0001AD - 0001XX Production Units Contractor Government Contractor Government

If supplies will be packaged at a location different from the offeror address indicated on the solicitation, the offeror shall provide the name and street address of the packaging location:

Packaging House

Address

INSPECTION AND ACCEPTANCE OF TEST PLANS / PROCEDURES

1. The Contractor shall submit a test plan/procedure for Government approval/disapproval as specified in the Contract Data Requirements List (DD Form 1423, sequence number, ). The test plan shall be submitted within calendar days after contract award date. The Acceptance Test Plan A001 60 shall identify that test fixtures are available for use at the Contractor's Facility.

2. Notification of test plan approval, conditional approval, or disapproval shall be be provided via IRAPT. This notification may be made within 30 calendar days after receipt of the Production plan/procedure.

3. The notice of approval or conditional approval shall not relieve the Contractor from complying with all requirements of the specifications and all other terms and conditions of this contract.

4. A notice of conditional approval shall state any further action required of the Contractor.

5. A notice of disapproval shall cite the reasons for such. If the plan or procedure is disapproved by the Government, the Contractor may be required, at the option of the Government, to submit a revised plan or procedure for evaluation. After each notification by the Government to submit a revised plan or procedure, the Contractor shall, at no additional cost to the Government, make any necessary revisions or modificathttp://www.identrust.com /warp/index.html

The WARP login website is: https://mhpwarp.redstone.army.mil

2. Lot numbers for all explosive components and explosive subassemblies shall be in accordance with MIL-STD-1168 (Ammunition Lot Numbering and Ammunition Data Card), and shall be included in the components section of the Ammunition Data Card.

3. In accordance with the DFAR clause at 252.246-7000, Material Inspection and Receiving Report, the Contractor shall prepare and furnish to the Government a WAWF Receiving Report (WAWF-RR) at the time of each delivery (test and production). Preparation instructions are found in the DFAR Supplement Appendix F.

If the date cited in WAWF-RR is an estimated "ship date", the Contractor shall make distribution of a corrected WAWF-RR indicating the "actual ship date" within 24 hours after actual shipment. The following additional data shall be furnished on the WAWF-RR:

a. Complete lot number

b. Total lot size (consists of net, test, and investigative).

c. Serial numbers of units shipped to consignee.

d. Net quantity shipped to destination.

1) Item quantity shipped to consignee

2) Total item quantity shipped to consignee

3) Item quantity due consignee

4. The contractor shall make distribution of the ADC and WAWF-RR in accordance with the information provided in Section H no later than 24 hours after shipment. When Item 0001, 0002, etc. is indicated under the designator, the Contractor shall furnish all shipping documents for all SUBCLINs under that line item.

FAR Clauses Incorporated by Reference

Number Title Effective Date

Alternate/ Deviation

Variation Effective Date

52.246-2 Inspection of Supplies-Fixed-Price. Aug 1996 52.246-16 Responsibility for Supplies. Apr 1984

FAR Clauses Incorporated by Full Text

52.246-11 Higher-Level Contract Quality Requirement. (Dec 2014)

Higher-Level Contract Quality Requirement (Dec 2014)

(a) The Contractor shall comply with the higher-level quality standard(s) listed below.

___ISO - 9001:2015

(b) The Contractor shall include applicable requirements of the higher-level quality standard(s) listed in paragraph (a) of this clause and the requirement to flow down such standards, as applicable, to lower-tier subcontracts, in-

(1) Any subcontract for critical and complex items (see 46.203(b) and (c)); or

(2) When the technical requirements of a subcontract require-

(i) Control of such things as design, work operations, in-process control, testing, and inspection; or

(ii) Attention to such factors as organization, planning, work instructions, documentation control, and advanced metrology.

(End of clause)

Section F - Deliveries or Performance

SECTION F

(a) The Government requires delivery to be made according to the following schedule:

FIRST ARTICLE REQUIRED

DELIVERY SCHEDULE

Item Quantity Days Item Quantity Days

0001AB 4 EA (FAT) 180

DADC

A001 (Test Procedure) 1 Set 60

DADC

0001AC 7 EA (LAT) 90

DAFATA A002 (Test Report) 1 Set A/R

0001AD 70 EA (LOT 1) 150

DAFATA

A003 (Failure Analysis) 1 Set A/R

0002 (OPTION) TBD A004 (ADC) 1 Set Per Lot

A005 (Certificate of Compliance) A/R Monthly

KEY: DADC = ays fter ate of ontract = D A D C DAFATA D ays fter irst rticle est pprovalA F A T A

FIRST ARTICLE

WAIVED DELIVERY

SCHEDULE

Item Quantity Days Item Quantity Days

0001AC 7 EA (LAT) 90

DADC

A001 (Test Procedure) 1 Set 60

DADC

0001AD 70 EA (LOT 1) 150

DADC

A002 (Test Report) 3 Sets A/R

0002 (OPTION) TBD A003 (Failure Analysis) 1 Set A/R

A004 (ADC) 1 Set Per Lot

A005

(Certificate of Compliance)

A/R Monthly

KEY:

DADC = ays fter ate of ontract = ays fter irstD A D C DAFATA D A F A rticle est pproval ays fter otification ofT A DANLATA = D A N LAT A pproval

Line Item Delivery Schedule Quantity Address and POC Special Handling/Notes

0001AA

1 Lot FoB Details

Contractor Destination

0001AB

4 Each FoB Details

Contractor Destination

0001AC

7 Each FoB Details

Contractor Destination

0001AD

Delivery Schedule From date of lead time event to beginning of performance 150 Calendar Days Date of First Article Test Approval

70 Each Ship To DoDAAC: N00253 CountryCode: USA

NUWC DIVISION KEYPORT

NAVAL SEA LOGISTICS CENTER, 610

DOWELL STREET, BLDG 893

KEYPORT, WA 98345-7610

UNITED STATES

Adam Vogt, Logistics Email: adam.j.vogt.civ@us.navy.mil Telephone: 360-315-0613

FoB Details Government Origin (Shipping Point)

FAR Clauses Incorporated by Reference

Number Title Effective Date

Alternate/ Deviation

Variation Effective Date

52.242-15 Stop-Work Order. Aug 1989 52.242-17 Government Delay of Work. Apr 1984 52.247-29 F.o.b. Origin. Feb 2006 52.247-30 F.o.b. Origin, Contractor's Facility. Feb 2006 52.247-34 F.o.b. Destination. Jan 1991

DFARS Clauses Incorporated by Full Text

252.223-7003 Change in Place of Performance--Ammunition and Explosives. (Dec 1991)

CHANGE IN PLACE OF PERFORMANCE AMMUNITION AND EXPLOSIVES (DEC 1991)--

(a) The Offeror shall identify, in the "Place of Performance" provision of this solicitation, the place of performance of all ammunition and explosives work covered by the Safety Precautions for Ammunition and Explosives clause of this solicitation. Failure to furnish this information with the offer may result in rejection of the offer.

(b) The Offeror agrees not to change the place of performance of any portion of the offer covered by the Safety Precautions for Ammunition and Explosives clause contained in this solicitation after the date set for receipt of offers without the written approval of the Contracting Officer. The Contracting Officer shall grant approval only if there is enough time for the Government to perform the necessary safety reviews on the new proposed place of performance.

(c) If a contract results from this offer, the Contractor agrees not to change any place of performance previously cited without the advance written approval of the Contracting Officer.

(End of clause)

Section G - Contract Administration Data

DFARS Clauses Incorporated by Reference

Number Title Effective Date

Alternate/ Deviation

Variation Effective Date

252.204-7002 Payment for Contract Line or Subline Items Not Separately Priced. Apr 2020 252.231-7000 Supplemental Cost Principles Dec 1991 252.232-7003 Electronic Submission of Payment Requests and Receiving Reports. Dec 2018

DFARS Clauses Incorporated by Full Text

252.232-7006 Wide Area WorkFlow Payment Instructions. (Jan 2023)

WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)

(a) As used in this clause- Definitions.

"Department of Defense Activity Address Code (DoDAAC)" is a six position code that uniquely identifies a unit, activity, or organization.

"Document type" means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).

"Local processing office (LPO)" is the office responsible for payment certification when payment certification is done external to the entitlement system.

"Payment request" and "receiving report" are defined in the clause at 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.

(b) The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as Electronic invoicing.

authorized by Defense Federal Acquisition Regulation Supplement (DFARS) 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.

(c) To access WAWF, the Contractor shall- WAWF access.

(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and

(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.

(d) The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice WAWF training.

Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the "Web Based Training" link on the WAWF home page at https://wawf.eb.mil/

(e) Document submissions may be via web entry, Electronic Data Interchange, or File Transfer WAWF methods of document submission.

Protocol.

(f) The Contractor shall use the following information when submitting payment requests and receiving reports in WAWF payment instructions.

WAWF for this contract or task or delivery order:

(1) The Contractor shall submit payment requests using the following document type(s): Document type.

(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.

(ii) For fixed price line items-

(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer.

Combo unless Contractor's business systems do not allow. In that event an "invoice" (stand-alone) and "receiving report" (stand-alone) may be used.

(Contracting Officer: Insert applicable invoice and receiving report document type(s) for fixed price line items that require shipment of a deliverable.)

(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the Contracting Officer.

See Section E Inspection and Acceptance

(Contracting Officer: Insert either "Invoice 2in1" or the applicable invoice and receiving report document type(s) for fixed price line items for services.)

(iii) For customary progress payments based on costs incurred, submit a progress payment request.

(iv) For performance based payments, submit a performance based payment request.

(v) For commercial financing, submit a commercial financing request.

(2) ) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.

[Note: The Contractor may use a WAWF "combo" document type to create some combinations of invoice and receiving report in one step.]

(3) The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF Document routing.

when creating payment requests and receiving reports in the system.

Routing Data Table*

Field Name in WAWF Data to be entered in WAWF

Pay Official DoDAAC TBD

Issue By DoDAAC N00104

Admin DoDAAC TBD

Inspect By DoDAAC TBD

Ship To Code TBD

Ship From Code TBD

Mark For Code TBD

Service Approver (DoDAAC) TBD

Service Acceptor (DoDAAC) TBD

Accept at Other DoDAAC TBD

LPO DoDAAC N/A

DCAA Auditor DoDAAC N/A

Other DoDAAC(s) N/A

(*Contracting Officer: Insert applicable DoDAAC information. If multiple ship to/acceptance locations apply, insert "See Schedule" or "Not applicable.")

(**Contracting Officer: If the contract provides for progress payments or performance-based payments, insert the DoDAAC for the contract administration office assigned the functions under FAR 42.302(a)(13).)

(4) The Contractor shall ensure a payment request includes documentation appropriate to the type of payment request in Payment request.

accordance with the payment clause, contract financing clause, or Federal Acquisition Regulation 52.216-7, Allowable Cost and Payment, as applicable.

(5) The Contractor shall ensure a receiving report meets the requirements of DFARS Appendix F. Receiving report.

(g) WAWF point of contact.

(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity's WAWF point of contact.

navsupwawf.wss.fct@navy.mil

(Contracting Officer: Insert applicable information or "Not applicable.")

(2) Contact the WAWF helpdesk at 866-618-5988, if assistance is needed.

(End of clause)

Section H - Special Contract Requirements

SECTION H - GOVERNMENT FURNISHED PROPERTY (FEB 2025)

1. The Government will furnish the following property to the Contractor for use in performance of this contract:

2. Attachment 1, Consolidated Listing of Government Furnished Property, shall be completed by the Contracting Officer and uploaded to Electronic Document Access (EDA) as an attachment. Additional information can be found at DFARS PGI (245.103 & 245.201-70).

PROPERTY

Description

Part Number

Quantity Required per Test

Quantity Required

(note 1)

Cost

(Unit Price)

Total Date

GFM

Initiator 5816541 1 10 $800.00 $8,000.00

O-Ring for Mixing Manifold MS9068-016 1

$0.15 $1.50

O-Ring for Closure to GG face seal MS9068-216 1 10 $0.21 $2.10

O-Ring for Closure to Housing Seal MS9068-249 1 10 $1.46 $14.60

Back Up Rings for Mixing Manifold MS28774-016 2 20 $0.15 $3.00

Back Up Rings for Closure 5816563

(or 8-249-N300-90) 2 20 $2.55 $51.00

O-Ring for Safety Burst Disk

MS9068-014

(or 2-014/S70) 1 10 $0.15 $1.50

Back Up Ring for Safety Burst Disk

MS28774-014

(or 8-014SD/T)

(Note 2) 10 $1.65 $16.50

O-Ring for Initiator and Adapter NAS1612-3 2 20 $1.06 $21.20

Government Furnished

5624003 Container Assembly, Co2 1 1 $10,000.00 $10,000.00

Note 1 - the values shown under the "Qty Required" for each test series includes additional parts to cover 1 "extra" test (for contingencies).

Note 2 - these Backup Rings are assembled onto the Safety Burst Disk at the beginning of the testing, and are not replaced between each test.

Delivery of such property will be made by NUWC, Keyport, GFP or NUWC Newport. GFP will be available for delivery no earlier than 30 Days prior to test..

3. The property will be delivered, at the Government's expense, at or near:

POC:

Address:

4. The Contractor shall notify the Contracting Officer, in writing, with a concurrent copy to the cognizant DCMA office and NUWC KEYPORT, 610 Dowell Street Keyport WA 98345-7610, at least ninety (90) days prior to the need for the Government Furnished Property (GFP).

The GFP request shall clearly indicate the following information:

a. Contract Number

b. End Item Nomenclature and DODIC

c. Quantity of GFP required

d. Complete address to which GFP is to be delivered

e. Date GFP is required

5. Only the property listed above, in the quantity shown, will be furnished by the Government. The total quantity of GFP provided will include First Article/Preproduction Testing, if required, lot acceptance, and normal attrition.

6. The Contractor shall notify the Contracting Officer, in writing, within thirty (30) days after GFP is determined to be lost, damaged, destroyed, no longer usable, or no longer needed for the performance of the contract.

7. All other property required for performance of this contract shall be furnished by the Contractor.

8. The contractor shall use a DD Form 1149, Requisition and Invoice Shipping Document for transfer of GFP.

9. - The Contractor shall request disposition instructions from the Contracting Officer for any residual GFP. Any residual GFP DISPOSITIONING must be in a container clearly marked with the NSN and lot number. It must also be free from any hazardous waste. Contents and marking shall be verified by the Government QAR.

Residual GFP be dispositioned within thirty (30) days after acceptance of the final production lot. Additionally, the Contractor shall notify shall the receiving activity, in writing, at least thirty (30) days prior to shipment. A detailed list of material being returned shall be provided. Failure to comply may result in rejection of the material at the destination. Any costs associated with return of unauthorized shipments shall be borne by the Contractor.

SECTION H

SPECIAL DISTRIBUTION

NOTE 1: Use of the Wide Area Work Flow Receipt and Acceptance (WAWF-RR) electronic form is required. See clause 252.246-7000 Material Inspection and Receiving Report (MAR 2008) and 252.232-7003 Electronics Submission of Payment Requests and Receiving Reports (JUN 2012).

NOTE 2: When using WAWF-RR to submit Contract Data Requirements List (CDRL) data and "Not Separately Priced" items, the following information shall be listed in the "Comments" field of the WAWF electronic form: . Shipping company, shipment tracking number, and date shipped

WAWF-RR documents accompanying the shipment are to be attached as follows (Type of Shipment - Location):

1. Carload or truckload - Affix to the shipment where it will be readily visible and available upon request.

2. Less than carload or truckload - Affix to container number one or container bearing lowest number.

3. Mail, including parcel post - Attach to outside or include in the package. Include a copy in each additional package of multi-package shipments.

Activity Number of Copies

Commanding Officer 1

NAVSUP Weapon Systems Support

Attn: Code N772

5450 Carlisle Pike

P.O. Box 2020

Mechanicsburg, PA 17055-0788 alison.s.maine.civ@us.navy.mil

Officer In Charge 1

NAVSUP Ammunition Logistics Center

Attn: Code A151

5450 Carlisle Pike

Bldg. 407N

STE. 407N, WS B3

Mechanicsburg, Pa 17055-0735

NAVSUP_NALC_LWT_IS@us.navy.mil

NUWC Keyport Division

Attn: Code C323

610 Dowell Street

Keyport, WA 98325 angelica.j.santosluty.civ@us.navy.mil adam.j.vogt.civ@us.navy.mil

FAR Clauses Incorporated by Full Text

52.234-4 Earned Value Management System. (Deviation 2026-O0038) (Feb 2026)

EARNED VALUE MANAGEMENT SYSTEM (FEB 2026) (DEVIATION 2026-O0038)

(a) The Contractor must use an earned value management system (EVMS) that has been determined by the Cognizant Federal Agency (CFA) to be compliant with the guidelines in Electronic Industries Alliance Standard 748 (EIA-748) (current version at the time of award) to manage this contract.

If the Contractor's current EVMS has not been determined compliant at the time of award, see paragraph (b) of this clause. The Contractor must submit EVMS reports as required by the contract.

(b) If the Contractor's EVM System is not compliant with the requirements in paragraph (a) of this clause, or the Contractor's existing cost /schedule control system is not compliant with the guidelines in EIA-748 (current version at time of award), the Contractor must-

(1) Apply the current system to the contract; and

(2) Take necessary actions to meet the milestones in the Contractor's approved EVMS plan.

(c) When an EVMS is required, the Government will conduct an Integrated Baseline Review (IBR). Agencies may require an additional IBR at-

(1) Exercise of significant options; or

(2) Incorporation of major modifications.

(d) Unless the CFA grants a waiver, Contractor-proposed EVMS changes require CFA approval prior to implementation.

(1) The CFA will notify the Contractor of its acceptance or rejection of the proposed EVMS changes within 30 days of receipt.

(2) If the CFA waives the advance approval requirements, the Contractor must disclose EVMS changes to the CFA at least 14 days prior to the effective date of implementation.

(e) The Contractor must provide the Government access to all pertinent records and data necessary to conduct surveillance and validate that the EVMS complies with the requirements in paragraph (a) of this clause for the duration of the contract.

(f) The Contractor must require the subcontractors specified below to comply with the requirements of this clause: [Insert list of applicable subcontractors.]

(End of clause)

Section I - Contract Clauses

SECTION I

FAR 52.242-2 PRODUCTION PROGRESS REPORTS DD Form 375 OR EQUIVALENT

(a) The contractor shall prepare and submit a Production Progress Report for the following contract items:

"ALL CONTRACT LINE ITEMS"

(b) The report shall be submitted via mailed or emailed on or before the 5th day of each month. The report shall be distributed as set forth in paragraph (c).

(c) The Production Progress Report shall be distributed as follows:

Addressee No. of Copies

NAVSUP Weapon Systems Support

Attn: Code N772 (Contracting Officer)

P.O. Box 2020

Mechanicsburg, PA 17055-0788

TBD

NAVSUP Ammunition Logistics Center (ALC)

Attn: Code A151

Bldg. 407N

Mechanicsburg, Pa 17055-0735

NAVSUP_NALC_LWT_IS@us.navy.mil

NUWC Keyport Division

Attn: Code N321

610 Dowell Street

Keyport, WA 98325 angelica.j.santosluty.civ@us.navy.mil adam.j.vogt.civ@us.navy.mil

(d) The report shall contain the following information:

(1) The problem, actual or potential and its cause;

(2) Items and quantities affected;

(3) When the delinquency started or will start;

(4) Action taken to overcome the delinquency;

(5) Estimated recovery date; and/or

(6) Proposed schedule revision.

FAR 52.209-3 FIRST ARTICLE APPROVAL - CONTRACTOR TESTING (Sep 1989)

(a) The Contractor shall test unit(s) of Lot/Item _____as specified in this contract. At least calendar days before the beginning of first article4 EA 30 tests, the Contractor shall notify the Contracting Officer, in writing, of the time and location of the testing so that the Government may witness the tests.

(b) The Contractor shall submit the first article test report within calendar days from the date of this contract to 180 NAVSUP WSS Code N742.13 marked " " Within calendar days after the Government receives the testFirst Article Test Report: Contract No. _______, Lot/Item No. _______ 30 report, the Contracting Officer shall notify the Contractor, in writing, of the conditional approval, approval, or disapproval of the first article. The notice of conditional approval or approval shall not relieve the Contractor from complying with all requirements of the specifications and all other terms and conditions of this contract. A notice of conditional approval shall state any further action required of the Contractor. A notice of disapproval shall cite reasons for the disapproval.

(c) If the first article is disapproved, the Contractor, upon Government request, shall repeat any or all first article tests. After each request for additional tests, the Contractor shall make any necessary changes, modifications, or repairs to the first article or select another first article for testing.

All costs related to these tests are to be borne by the Contractor, including any and all costs for additional tests following disapproval. The Contractor shall then conduct the tests and deliver another report to the Government under the terms and conditions and within the time specified by the Government. The Government shall take action on this report within the time specified in paragraph (b) of this subsection. The Government reserves the right to require an equitable adjustment of the contract price for any extension of the delivery schedule, or for any additional costs to the Government related to these tests.

(d) If the Contractor fails to deliver any first article report on time, or the Contracting Officer disapproves any first article, the Contractor shall be deemed to have failed to make delivery within the meaning of the Default clause of this contract.

(e) Unless otherwise provided in the contract, and if the approved first article is not consumed or destroyed in testing, the Contractor may deliver the approved first article as part of the contract quantity if it meets all contract requirements for acceptance.

(f) If the Government does not act within the time specified in paragraph (b) or (c) of this subsection, the Contracting Officer shall, upon timely written request from the Contractor, equitably adjust under the changes clause of this contract the delivery or performance dates and/or the contract price, and any other contractual term affected by the delay.

(g) Before first article approval, the acquisition of materials or components for, or the commencement of production of, the balance of the contract quantity is at the sole risk of the Contractor. Before first article approval, the costs thereof shall not be allocable to this contract for (1) progress payments, or (2) termination settlements if the contract is terminated for the convenience of the Government.

(h) The Government may waive the requirement for first article approval test where supplies identical or similar to those called for in the schedule have been previously furnished by the offeror/contractor and have been accepted by the Government. The offeror/contractor may request a waiver.

Alternate I (Jan 1997). As prescribed in 9.308-1(a)(2) and (b)(2), add the following paragraph (i) to the basic clause:

(i) The Contractor shall produce both the first article and the production quantity at the same facility.

Schedule.

DFAR 252.223-7007 SAFEGUARDING SENSITIVE CONVENTIONAL ARMS, AMMUNITION, AND

EXPLOSIVES (SEP 1999)

(a) Definition - as used in this clause, means those items within the scope (chapter 1, paragraph C 1.2) "Arms, ammunition, and explosives (AA&E)," of DoD 5100.76-M, Physical Security of Sensitive Conventional Arms, Ammunition, and Explosives.

(b) The requirements of DoD 5100.76-M apply to the following items of AA&E being developed, produced, manufactured or purchased for the Government, or provided to the Contractor as Government-furnished property under this contract:

NALC, NOMENCLATURE NATIONAL STOCK NUMBER SENSITIVITY RISK CATEGORY

5W20 Gas Generator Assembly, Buoyancy Subsystem 1356-01-272-2372 IV

(c) The Contractor shall comply with the requirements of DoD 5100.76-M, as specified in the statement of work.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .