19RK122_amend4.pdf

PDF 47 KB Posted

Attached to
M867, M3A3 Cartridge Actuated Thruster
Solicitation number
N0010419RK122
Issued by

About this file

This amendment modifies a solicitation for the M867, M3A3 Cartridge Actuated Thruster. The modification extends the response date to September 23, 2019. It also increases the number of days allowed for first article testing to 270 days after contract award. Delivery schedules and locations are provided for first article samples as well as production quantities, with destination for first article items and origin for production items. The solicitation seeks 26 units with an estimated cost of $83,965 for government first article testing. Accompanying documentation such as first article testing plans, lot testing, and contractor data requirement lists are required. Special handling for explosives also applies.

19RK122_amend4.pdf

View the file

Other files

File Type Posted
19RK122_amend7.pdf PDF
19RK122_amend6.pdf PDF
19RK122_amend5.pdf PDF
19RK122_amend3.pdf PDF
19RK122_amend2.pdf PDF
19RK122_amend1.pdf PDF
ADC_MASTER_ADC_SOW_together.pdf PDF
CDRL_Marking_Instructions_RFV.pdf PDF
19NB109__M867__SGFP_(Scheduled_GFM)_from_PDREP_May_27.pdf PDF
19RK122_solicitation.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N0010419NB109

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

1. Amend FAT to 270 DADC.

2. Extend due date to 09/23/2019.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 6

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 10-Sep-2019

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N0010419RK122

X 9B. DATED (SEE ITEM 11)

12-Jun-2019

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

10-Sep-2019

CODE

NAVSUP WEAPON SYSTEMS SUPPORT

LESLEY COOMES, CODE N772.01

5450 CARLISLE PIKE SUITE 410

MECHANICSBURG PA 17050-2411

N00104 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N0010419RK122

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION A - SOLICITATION/CONTRACT FORM

The required response date/time has changed from 10-Sep-2019 02:00 PM to 23-Sep-2019 02:00 PM.

SECTION F - DELIVERIES OR PERFORMANCE

The following have been modified:

52.211-8 TIME OF DELIVERY (JUN 1997)

(a) The Government requires delivery to be made according to the following schedule or sooner at no additional cost to the Government. :

Delivery Schedule (With FAT - Gov Testing)

Item Quantity Days

A003 (Radiographic Test Technique RTT) 1 SET 75 DADC

A006 (First Article FAR) 1 SET A/R

A002 (LAT Failure Report) 1 SET A/R

FAT

0001AB (FAT) 1 SET 270 DADC

A004 (Radiographic Report and Film) 1 SET 270 DADC

A005 (Configuration Marriage Record) 1 SET 270 DADC

A007 (Incoming Inspection Summary Report - Metal Parts) 1 SET 270 DADC

Lot 1

0001AC (LAT) 9 EA 360 DADC

0001AD (Investigative Units) 2 EA 360 DADC

A001 (POP) 1 SET 360 DADC

A008 (Ammo Data Card, Provisional) 1 SET 360 DADC

A008 (Ammo Data Card, Final) 1 SET 425 DADC

0001AE (Deliverable Units) 8 EA 435 DADC

0001AF (Deliverable Units) 18 EA 435 DADC

KEY:

DADC = Days after Date of Contract

DAFATA = Days after First Article Test Acceptance

The Government will evaluate equally, as regards time of delivery, offers that propose delivery of each quantity within the applicable delivery period specified above. Offers that propose delivery that will not clearly fall within the applicable required delivery period specified above, will be considered nonresponsive and rejected. The

Government reserves the right to award under either the required delivery schedule or the proposed delivery schedule, when an offeror offers an earlier delivery schedule than required above. If the offeror proposes no other delivery schedule, the required delivery schedule above will apply.

OFFEROR'S PROPOSED DELIVERY SCHEDULE

Delivery Schedule (With FAT - Gov Testing)

Item Quantity Days

A003 (Radiographic Test Technique RTT) 1 SET

A006 (First Article FAR) 1 SET A/R

A002 (LAT Failure Report) 1 SET A/R

FAT

0001AB (FAT) 1 SET

A004 (Radiographic Report and Film) 1 SET

A005 (Configuration Marriage Record) 1 SET

A007 (Incoming Inspection Summary Report - Metal Parts) 1 SET

Lot 1

0001AC (LAT) 9 EA

0001AD (Investigative Units) 2 EA

A001 (POP) 1 SET

A008 (Ammo Data Card, Provisional) 1 SET

A008 (Ammo Data Card, Final) 1 SET

0001AE (Deliverable Units) 8 EA

0001AF (Deliverable Units) 18 EA

(b) Attention is directed to the Contract Award provision of the solicitation that provides that a written award or acceptance of offer mailed, or otherwise furnished to the successful offeror, results in a binding contract. The

Government will mail or otherwise furnish to the offeror an award or notice of award not later than the day award is dated. Therefore, the offeror should compute the time available for performance beginning with the actual date of award, rather than the date the written notice of award is received from the Contracting Officer through the ordinary mails. However, the Government will evaluate an offer that proposes delivery based on the Contractor's date of receipt of the contract or notice of award by adding (1) five calendar days for delivery of the award through the ordinary mails, or (2) one working day if the solicitation states that the contract or notice of award will be transmitted electronically. (The term "working day" excludes weekends and U.S. Federal holidays.) If, as so computed, the offered delivery date is later than the required delivery date, the offer will be considered nonresponsive and rejected.

(End of clause)

SECTION I - CONTRACT CLAUSES

52.209-4 FIRST ARTICLE APPROVAL--GOVERNMENT TESTING (SEP 1989)

(Contracting Officer shall insert details)

(a) The Contractor shall deliver Section B unit(s) of Lot/Item 0001AB within 270 calendar days from the date of this contract to the Government at N00174 Receiving Officer NSWC IHEODTD Indian Head, MD for first article tests.

The shipping documentation shall contain this contract number and the Lot/Item identification. The characteristics that the first article must meet and the testing requirements are specified elsewhere in this contract.

(b) Within 60 calendar days after the Government receives the first article, the Contracting Officer shall notify the

Contractor, in writing, of the conditional approval, approval, or disapproval of the first article. The notice of conditional approval or approval shall not relieve the Contractor from complying with all requirements of the specifications and all other terms and conditions of this contract. A notice of conditional approval shall state any further action required of the Contractor. A notice of disapproval shall cite reasons for the disapproval.

(c) If the first article is disapproved, the Contractor, upon Government request, shall submit an additional first article for testing. After each request, the Contractor shall make any necessary changes, modifications, or repairs to the first article or select another first article for testing. All costs related to these tests are to be borne by the Contractor, including any and all costs for additional tests following a disapproval. The Contractor shall furnish any additional first article to the Government under the terms and conditions and within the time specified by the Government. The

Government shall act on this first article within the time limit specified in paragraph (b) of this clause. The

Government reserves the right to require an equitable adjustment of the contract price for any extension of the delivery schedule or for any additional costs to the Government related to these tests.

(d) If the Contractor fails to deliver any first article on time, or the Contracting Officer disapproves any first article, the Contractor shall be deemed to have failed to make delivery within the meaning of the Default clause of this contract.

(e) Unless otherwise provided in the contract, the Contractor--

(1) May deliver the approved first article as a part of the contract quantity, provided it meets all contract requirements for acceptance and was not consumed or destroyed in testing; and

(2) Shall remove and dispose of any first article from the Government test facility at the Contractor's expense.

(f) If the Government does not act within the time specified in paragraphs (b) or (c) of this clause, the Contracting

Officer shall, upon timely written request from the Contractor, equitably adjust under the Changes clause of this contract the delivery or performance dates and/or the contract price, and any other contractual term affected by the delay.

(g) The Contractor is responsible for providing operating and maintenance instructions, spare parts support, and repair of the first article during any first article test.

(h) Before first article approval, the acquisition of materials or components for, or the commencement of production of, the balance of the contract quantity is at the sole risk of the Contractor. Before first article approval, the costs thereof shall not be allocable to this contract for (1) progress payments, or (2) termination settlements if the contract is terminated for the convenience of the Government.

(i) The Government may waive the requirement for first article approval test where supplies identical or similar to those called for in the schedule have been previously furnished by the Offeror/Contractor and have been accepted by the Government. The Offeror/Contractor may request a waiver.

(j) The Contractor shall produce both the first article and the production quantity at the same facility.

Note: In the event the First Article test sample fails to meet the requirements of the specification or drawing, the contractor may be required to submit a Failure Analysis and Corrective Action Report (DD Form 1423, sequence number, A006).

(End of clause)

SECTION M - EVALUATION FACTORS FOR AWARD

THE FOLLOWING NAVSUP LOCAL TEXT IS HEREBY MADE PART OF THE STATEMENT OF

WORK/PERFORMANCE WORK STATEMENT.

EVALUATION OF FIRST ARTICLE TESTING

(a) Offerors are advised that the contract awarded as a result of this solicitation will require first article testing.

This requirement may be waived by the Contracting Officer when supplies identical or similar to those called for have previously been delivered by the offeror and accepted by the Government. Therefore, offerors can submit alternative offers, one including testing and approval and the other excluding testing and approval. If the

Government waives the requirement for first article unit(s), test plans, testing and test report(s) for eligible offerors, the prices set forth in paragraph (g) will be used in evaluating offers. In addition, all provisions relating to first article testing will be deleted from the resulting contract.

(b) Offerors shall identify these identical or similar supplies by the contract number, agency, national stock number, contract award date, and contract delivery date.

CONTRACT AGENCY NSN CONTRACT CONTRACT NUMBER AWARD DATE DELIVERY

DATE

(c) The Government is responsible for first article testing under this contract. The cost to the Government of this testing will be a factor in the evaluation of offers, as it will be added to the offers requiring first article testing.

The estimated cost of this testing is $83,965.00 .

(d) The approved first article 0001AB serves as a manufacturing standard.

(e) Earlier delivery, if required in case of waiver of first article, shall not be a factor in the evaluation for award.

(f) The prices for first articles and first article tests in relation to production quantities shall not be materially unbalanced, if first article test items or tests are to be separately priced.

(g) Unit price offered if First Article is waived: $___________

(End of Summary of Changes)