19RK084_Amend_0002.pdf

PDF 139 KB Posted

Attached to
NSN: 4T-1355-00-193-5056-TW92COIL, WIRE, SUBMARINE FY19
Solicitation number
N0010419RK084
Issued by

About this file

This document consists of an amendment to a federal solicitation and the related solicitation details. The amendment extends the response deadline to May 22, 2019 and incorporates Drawing 2642925 Revision L into the solicitation requirements. The solicitation is for 968 each of NSN 4T-1355-00-193-5056-TW92 COIL, WIRE, SUBMARINE for fiscal year 2019. The Department of the Navy Naval Supply Systems Command is the issuing agency. Products required include wire coils for submarines. Respondents must meet requirements for safety surveys, production lot testing, first article testing, contractor data requirement lists, and FOB origin shipping. A drawing package is available for viewing online requiring a digital certificate.

Amend 0002:Solicitation extended until 22 MAY 2019

View the file

Other files

File Type Posted
19RK084_Amend_0004.pdf PDF
19RK084_Amend_0003.pdf PDF
19RK084_Amend_0001.pdf PDF
N0010419RK084.pdf PDF
CDRLs.pdf PDF
N0010419RK084.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TW92

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

1) Per FAR 15.206(a), the hour and date specif ied for receipt of offers is extended to 22 May 2019.

2) Draw ing 2642925 Revision L incorporated into solicitation

3) All other terms and conditions remain unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 4

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 02-May-2019

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N0010419RK084

X 9B. DATED (SEE ITEM 11)

18-Mar-2019

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

03-May-2019

CODE

NAVSUP WEAPON SYSTEMS SUPPORT

AARON HEIT, CODE N772.08

5450 CARLISLE PIKE SUITE 410

MECHANICSBURG PA 17050-2411

N00104 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

x

N0010419RK084

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION C - DESCRIPTIONS AND SPECIFICATIONS

The following have been modified:

SECTION C

SECTION C

PROCUREMENT SPECIFICATION

NSN: 4T-1355-00-193-5056-TW92

WIRE COIL, TORPEDO

Assembly Level Baseline – Sequential

Drawing Revision Nomenclature

2074368 E TAPE, PLASTIC

2240462 E1 PLATE, IDENTIFICATION ALUMINUM FOIL

2473274 C COVER

2642925 L ANTISTATIC SOLUTION

3014055 - SHIPPING CONDITION FOR COIL, WIRE (SHIPBOARD)

3014056 - CONTAINER, SHIPPING AND STORAGE FOR COIL, WIRE SHIPBOARD

3014057 - SHELL, UPPER

3014058 - SHELL, LOWER

3014059 N COIL, WIRE, SUBMARINE, SHIPBOARD

3014060 D PLATE, END, STUDDED

3014061 C PLATE, END

3014062 - TUBE

3014063 B STUD, SELF-CLINCHING

3014065 B STUD, DRIVE

DL3014056 - CONTAINER, SHIPPING AND STORAGE FOR COIL, WIRE SHIPBOARD

OD45373 1 MANUFACTURING AND TESTING PROCEDURES FOR SUBMARINE WIRE COIL

WS15153 D FOAM, PLASTIC MOLDING OF WIRE DISPENSER

Reference Documents for Assembly (References with Approved Replacements in Parentheses)

DOCUMENT NUMBER

MIL-STD-129R Marking for Shipment and Storage MIL-STD-31000 Technical Data Packages ASTM-D3955 and ASTM-D295 Varnish, Moisture and Fungus Resistant DOD-STD-2101 Classification of Characteristics MIL-R-24243/1E Rivets, Blind, Nonstructural, Aluminum Alloy MIL-W-82599 Wire, Insulated, Hard Drawn Alloy of Copper-Cadmium, NO.23 AWG MIL-DTL-459813D Nut, Self-locking Hexagon Prevailing Torque MIL-C-22770 – Military Specification Coils, Wire (INA)

SECTION C

DESCRIPTION AND SPECIFICATIONS

NOTE 1: NON-ANTICIPATION OF INITIAL DEVIATIONS ON AWARDS

Offerors are reminded that any resultant contract will require performance in strict compliance with the specifications set forth therein, and that prices offered should not be predicated upon contractor anticipation of government authorization of deviations, even though such deviations may have been granted previously under other contracts for the same item.

SECTION C

CONFIGURATION CONTROL – ANSI/EIA–649

1. Any Engineering Change Proposal (ECP) or Request for Variance (RFV) affecting an item being procured under this contract may be in accordance with ANSI/EIA-649. Final approval of any ECP and/or RFV shall be in writing, by the Contracting Officer, NAVSUP Weapon Systems Support. If any such approval affects the cost of Performance of this contract, an equitable adjustment shall be made in the contract price in accordance with the provisions of the "Changes" clause of this contract.

2. RFVs shall be issued using information outlined in ANSI/EIA-649 section 5.3.4.1. The use of DD Form 1694 is a required form for RFV submissions. MIL-HDBK-61 provides additional guidance for preparation of RFVs.

3. ECPs shall be issued using information outlined in ANSI/EIA-649 section 5.3.1.4. The use of DD Form 1692 is a required form for ECP submissions. MIL-HDBK-61 provides additional guidance for preparation of ECPs.

4. The contractor's assigned RFV number shall use the following numbering format:

a. The last four alpha-numeric characters of the contract number followed by a dash (-).

b. The letter "V", followed by consecutively assigned numeric characters beginning with 001.

5. The contractor's assigned ECP number shall use the following numbering format:

a. The last four alpha-numeric characters of the contract number followed by a dash (-).

b. The letters "ECP", followed by consecutively assigned numeric characters beginning with 001.

6. The contractor shall submit an electronic copy of any ECP or RFV to the Contracting Officer, Administrating Contracting Officer, and the activity below:

a. Contract Administration Office (CAO), (for review and comment to PCO)

b. NAVSUP WSS Contracting Officer N772.13

Email: aaron.heit@navy.mil

c. NAVSUP ALC, Code A112 Email: chris.capasso@navy.mil

7. Technical approval authority for RFVs and ECPs is NUWC Newport (doreen.cornellier@navy.mil and patrick.faerber@navy.mil).

8. Authorization to accept non-conforming supplies is specifically retained by the Contracting Officer.

mailto:aaron.heit@navy.mil mailto:chris.capasso@navy.mil mailto:doreen.cornellier@navy.mil mailto:patrick.faerber@navy.mil

(End of Summary of Changes)

SECTION C
PROCUREMENT SPECIFICATION

File details come from the government source that posted it. Updated .