CDRLs.pdf

PDF 173 KB Posted

Attached to
Cylinder, Pressure CO2 Bottle, Modified F / Torpedo
Solicitation number
N0010418RK078
Issued by

About this file

CDRLs

View the file

Other files

File Type Posted
RK078_Amend_01.pdf PDF
Updated_CDRLs.pdf PDF
Solicitation_N0010418RK078.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item) Form Approved OMB No. 0704‐0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0704‐0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202‐4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

C. CATEGORY:

TDP ☐ TM ☐ OTHER ☐

D. SYSTEM/ITEM

4T‐1356‐00‐415‐6713‐TW58

4T‐1356‐01‐123‐4744‐YW09

E. CONTRACT/PR NO.

F. CONTRACTOR

1. DATA ITEM NO.

A001

2. TITLE OF DATA ITEM

Test Procedure

3. SUBTITLE

17. PRICE GROUP

4. AUTHORITY (Data Acquisition Document No.)

DI‐NDTI‐80603A

5. CONTRACT REFERENCE

ALL DRAWINGS

6. REQUIREING OFFICE

NUWC DIV KEYPORT CODE 423

18. ESTIMATED TOTAL

PRICE

7. DD 250 REQ

DD

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

ONE TIME

12. DATE OF FIRST SUBMISSION

30 DAC

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. ADP CODE

A

11. AS OF DATE

13. DATE OF SUBSEQUENT

SUBMISSION

Draft

Final

Reg Repro

16.REMARKS

THE PLAN IS TO SPECIFY PROCESS CONTROL INSTRUCTIONS AND INSPECTION PROCEDURES NEEDED

TO ENSURE PRODUCT CONFORMANCE TO DRAWINGS, SPECIFICATIONS, AND CONTRACT

REQUIREMENTS IAW ANSI/ASQC Q9000‐2000 OR EQUIVALENT. THE PLAN IS TO INCLUDE FIRST ARTICLE AND PRODUCTION LOT QUALITY CONFORMANCE INSPECTION PROCEDURES IAW DI‐NDTI‐ 80603A ALONG WITH ALL APPLICABLE DATA ENTRY SHEETS TO BE USED TO DOCUMENT PROCESS

INSPECTIONS.

BLK 14: DISTRIBUTION ADDRESS

N00104

COMMANDING OFFICER

NAVSUP WEAPON SYSTEMS SUPPORT

ATTN: CODE N772.08

5450 CARLISLE PIKE

P.O. BOX 2020

MECHANICSBURG, PA 17055‐0788

aaron.heit@navy.mil

SEE BLOCK 16 0 1 0

15. TOTAL 0 1 0

G. PREPARED BY

Margaret Bowerman

H. DATE

30 January 2018

I. APPROVED BY

Jeremy Hilliker

J. DATE

DD FORM 1423‐1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 1 of 5 Pages

Form Approved OMB No. 0704‐0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0704‐0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202‐4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

D. SYSTEM/ITEM

4T‐1356‐00‐415‐6713‐TW58

A002

Test/Inspection Report

3. SUBTITLE

Pre‐Production & Production Test

DI‐NDTI‐80809B

ALL DRAWINGS

NUWC DIV Keyport CODE 423

DD

PER LOT

SEE BLOCK 16

8. ADP CODE

Reg Repro

16.REMARKS

THE REPORT IS TO VERIFY PRODUCTION LOT CONFORMANCE TO THE APPLICABLE DRAWINGS,

SPECIFICATIONS, AND CONTRACT REQUIREMENTS. THE REPORT CONSISTS OF THE PLAN (A001)

CONTAINING ALL REQUIRED INSPECTION RESULTS DOCUMENTED ON THE PLAN’S DATA ENTRY

SHEETS. IN ADDITION, THE REPORT IS TO INCLUDE MATERIAL CERTIFICATIONS AND ALL OTHER PERTINENT OBJECTIVE QUALITY EVIDENCE. DCMC REVIEWIS REQUIRED PRIOR TO SUBMITTAL TO NUWC DIVISION KEYPORT. THE REPORT MUST BE APPROVED BY NAVSEA KEYPORT BEFORE FINAL

ACCEPTANCE OF THIS LOT IN WAWF.

BLK 12: DATE OF PRE‐PRODUCTION TEST REPORT SUBMISSION – NLT 15 DAYS AFTER FIRST ARTICLE

TEST COMPLETION.

BLK 13: DATE OF SUBSEQUENT SUBMISSION – NLT 15 DAYS AFTER PRODUCTION LOT TESTING OF

SECOND LOT AND BEYOND.

BLK 14: DISTRIBUTION ADDRESS

N00104

COMMANDING OFFICER

NAVSUP WEAPON SYSTEMS SUPPORT

ATTN: CODE N772.08

5450 CARLISLE PIKE

P.O. BOX 2020

MECHANICSBURG, PA 17055‐0788

NUWC Keyport; N00253 0 1 0

DD FORM 1423‐1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 2 of 5 Pages

Form Approved OMB No. 0704‐0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0704‐0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202‐4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

D. SYSTEM/ITEM

4T‐1356‐00‐415‐6713‐TW58

A003

Failure Analysis/Corrective Action Report

DI‐SESS‐81315B

Section E

LT

Reg Repro

16.REMARKS

BLK 5: INCLUDE AND TAKE ACTION ON SECTION I IF FAT IS REQUIRED.

BLK 10: FREQUENCY ‐ IS DETERMINED BY NUMBER OF FAT/LAT FAILURES.

BLK 12: DATE OF FIRST SUBMISSION – NLT AN INTERIM REPORT IS DUE NLT 10 DAYS AFTER NOTIFICATION OF LOT FAILURE. A FINAL REPORT IS DUE 30 DAYS AFTER NOTIFICATION OF LOT

FAILURE.

BLK 13: DATE OF SUBSEQUENT SUBMISSION – NLT 10 DAYS AFTER FAT COMPLETION OF SECOND

FAILED LOT AND BEYOND.

BLK 14: DISTRIBUTION ADDRESS

N00104

COMMANDING OFFICER

NAVSUP WEAPON SYSTEMS SUPPORT

ATTN: CODE N772.08

5450 CARLISLE PIKE

P.O. BOX 2020

MECHANICSBURG, PA 17055‐0788

DD FORM 1423‐1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 3 of 5 Pages

Form Approved OMB No. 0704‐0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0704‐0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202‐4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

D. SYSTEM/ITEM

4T‐1356‐00‐415‐6713‐TW58

A004

Contractor’s Progress, Status and Management Report

DI‐MGMT‐80227

NAVSEA PMS‐404L

MNTHLY

Reg Repro

16. REMARKS

BLK 11, 12, 14: THE DD‐375 REPORT SHALL BE SUBMITTED VIA MAIL OR EMAIL ON OR BEFORE THE

5TH DAY OF EAC MONTH AFTER CONTRACT AWARD.

BLK 14: DISTRIBUTION ADDRESS

N00104

COMMANDING OFFICER

NAVSUP WEAPON SYSTEMS SUPPORT

ATTN: CODE N772.08

5450 CARLISLE PIKE

P.O. BOX 2020

MECHANICSBURG, PA 17055‐0788

15. TOTAL

DD FORM 1423‐1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 4 of 5 Pages

Form Approved OMB No. 0704‐0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0704‐0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202‐4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

D. SYSTEM/ITEM

A005

Certificate of Compliance

3. SUBTITLE

COC

DI‐MISC‐81345A

Drawing 7021661 Rev B

One for FAT One for PLT

Reg Repro

16.REMARKS

CERTIFICATES OF CONFORMANCE ARE TO BE PROVIDED TO SHOW CONFORMANCE TO ALL

DRAWINGS AND ALL SPECIFICATIONS NOTED, AND CONTRACT REQUIREMENTS AS PROVIDED IN

TECHNICAL DATA PACKAGE. SHALL BE SUBMIITED WITH THE FIRST ARTICLE (IF REQUIRED) AND

PRODUCTION LOT, AND ANY SUBSEQUENT OPTION LOTS THAT GET EXERCISED.

BLK 12: DATE OF PRE‐PRODUCTION TEST REPORT SUBMISSION – NLT 15 DAYS AFTER FIRST ARTICLE

TEST COMPLETION.

BLK 13: DATE OF SUBSEQUENT SUBMISSION – NLT 15 DAYS AFTER LOT ACCEPTANCE TESTING OF

SECOND LOT AND BEYOND.

BLK 14: DISTRIBUTION ADDRESS

N00104

COMMANDING OFFICER

NAVSUP WEAPON SYSTEMS SUPPORT

ATTN: CODE N772.08

5450 CARLISLE PIKE

P.O. BOX 2020

MECHANICSBURG, PA 17055‐0788

15. TOTAL

DD FORM 1423‐1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 5 of 5 Pages

Distribution of Contract Documents

(See key below)

A B C D

(X) (X) (X) (X) margaret.bowerman@navy.mil

(X) (X) (X) (X) nicole.lerner@navy.mil

(X) (X) (X) (X) christian.nazario@navy.mil

(X) (X) (X) (X) john.d.knecht@navy.mil

(X) (X) (X) (X) MECH_NOLSC_PRP@navy.mil

(X) (X) jdelrio@alionscience.com

(X) (X) DCMA

Key:

A‐ Solicitation/Amendments B‐ Preliminary Notice of Award Sheet C‐ Contract D‐ Contract Amendments

File details come from the government source that posted it.