N772.08. Paper copies will not be provided. Competitive Full and Open Drawings are available. Item is explosive. A Safety Survey will be required. Explosive Class: 1.4S. The solicitation contains FAT, LAT, CDRLs, FOB Origin.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 18RK047_Amend_0004.pdf | ||
| 18RK047_Amend_0003.pdf | ||
| 18RK047_Amend_0002.pdf | ||
| 18RK047_Amend_0001.pdf | ||
| CDRLS_N5006318NA015_3W41.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CODE
(Hour)
PAGE(S)
until local time
X
A
X B
X C X D
EX
X
G
F 48 - 54
55 - 61
X H 62 - 63 aaron.heit@navy .mil
RATING PAGE OF PAGES
7. ISSUED BY
(Date)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)
Prescribed by GSA
FAR (48 CFR) 53.214(c)
DO-A6 1 63
(If other than Item 7)
15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO
AND
ADDRESS
SIGN OFFER (Type or print)
OF
OFFEROR
AMENDMENT NO. DATE
15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS
IS DIFFERENT FROM ABOVE - ENTER
SUCH ADDRESS IN SCHEDULE.
18. OFFER DATE
1. THIS CONTRACT IS A RATED ORDER
UNDER DPAS (15 CFR 700)
2. CONTRACT NO.
N00104 8. ADDRESS OFFER TO
See Item 7
9. Sealed offers in original and copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in
CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.
10. FOR INFORMATION
CALL:
A. NAME (NO COLLECT CALLS)
AARON R. HEIT 717-605-2430
11. TABLE OF CONTENTS
SOLICITATION/ CONTRACT FORM
SUPPLIES OR SERVICES AND PRICES/ COSTS
2 - 7
X I CONTRACT CLAUSES
DESCRIPTION/ SPECS./ WORK STATEMENT X
PACKAGING AND MARKING
8 - 10
11 - 12
J LIST OF ATTACHMENTS
INSPECTION AND ACCEPTANCE
DELIVERIES OR PERFORMANCE
13 - 18
19 - 22 X K
REPRESENTATIONS, CERTIFICATIONS AND
OTHER STATEMENTS OF OFFERORS
CONTRACT ADMINISTRATION DATA 23 - 24 X
SPECIAL CONTRACT REQUIREMENTS
OFFER (Must be fully completed by offeror) 25 - 26 X M
L INSTRS., CONDS., AND NOTICES TO OFFERORS
EVALUATION FACTORS FOR AWARD
NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. DISCOUNT FOR PROMPT PAYMENT
(See Section I, Clause No. 52.232-8)
14. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments
AMENDMENT NO. DATE
to the SOLICITATION for offerors and related documents numbered and dated):
FACILITY
12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period
SOLICITATION, OFFER AND AWARD
X
(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)
PART I - THE SCHEDULE
26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE
EMAIL:TEL: (Signature of Contracting Officer)
CODE CODE
B. TELEPHONE (Include area code) C. E-MAIL ADDRESS
AWARD (To be completed by Government)
19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION
22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)
23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE
PART IV - REPRESENTATIO NS AND INSTRUCTIO NS
PART III - LIST O F DO CUMENTS, EXHIBITS AND O THER ATTACHMENTS
27 - 46
PART II - CO NTRACT CLAUSES
NAVSUP WEAPON SYSTEMS SUPPORT
AARON HEIT, CODE N772.08
5450 CARLISLE PIKE
P.O. BOX 2020
MECHANICSBURG PA 17055
717-605-2430
717-605-2807FAX:
TEL:
FAX:
TEL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SOLICITATION
6. REQUISITION/PURCHASE NO.
N5006318NA015
5. DATE ISSUED
17 Sep 2018
4. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
[ X ]
3. SOLICITATION NO.
N0010418RK047
aaron.heit Typewritten Text aaron.heit Typewritten Text electronically aaron.heit Typewritten Text aaron.heit Typewritten Text aaron.heit Typewritten Text aaron.heit Typewritten Text aaron.heit Typewritten Text
19OCT18
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
DODIC: 3W41
FFP
Nomenclature:
Valve Assembly, Fuel Shutoff
IAW DWG: 2526651 and all other Associated Drawings & Specifications
NSN: 4T-1356-01-274-1543
PURCHASE REQUEST NUMBER: N5006318NA015
NET AMT
0001AA 1 Set Contract Data Requirements List
FFP
Technical Data, See DD Form 1423
Data items A001 through A005
FOB: Destination aaron.heit Typewritten Text
NSP
aaron.heit Typewritten Text aaron.heit
NSP
0001AB 12 Each First Article (Preproduction) Test
FFP
Samples (See FAR 52.209-3) IAW MIL-V-82443 4.3.1. Retain as production standard or perform failure analysis if discrepant. IAW MIL-V-82443 NOTICE 1;
Plus 25 sample squibs shall be subjected to the tests as detailed in 4.5.7 through
4.5.7.5. See amplification in notes. Testing is destructive.
0001AC 24 Each Production Lot (Periodic) Test Samples.
FFP
Consists of one lot of 402 each, plus additional respective quantities for Test
Samples. Periodic Production Sample will be IAW MIL-V-82443 4.3.3, See
Section E.
STEP 1: Upon initiation of production randomly select 3 units from each group of
30 units. Upon satisfactory compliance of samples selected from 3 consecutive groups, shift to Step 2: Randomly select 3 units from each group of 70 units.
Continue with Step 2: for the balance of the contract or until a defective unit is found. Testing is destructive. See amplification in notes.
***Quantity of 24 is based on successful completion of STEP 1 and STEP 2 with no failures. Additional test samples will be added if there are any failures.*** aaron.heit Typewritten Text
NSP
aaron.heit Typewritten Text
NSP
aaron.heit Typewritten Text
NSP
aaron.heit
NSP
0001AD 402 Each
DODIC: 3W41
FFP
Nomenclature: Valve Assembly, Fuel Shutoff
TAC: NSTS
FOB: Origin
May purchase up to 125% of original PMS 404 requirement.
FOB: Origin (Shipping Point)
OPTION DODIC: 3W41
FFP
Nomenclature: Valve Assembly, Fuel Shutoff
OPTION FY19 Requirement; up to 125% of basic procurement.
FOB: ORIGIN
PURCHASE REQUEST NUMBER: TBD
Stepladder:
100 – 200
201 – 350
351 - 503
SECTION B NOTES
SOLICITATION NOTES:
1. Faxed offers will NOT be accepted.
2. Since the Government intends to award without discussion, any exceptions to the requirements of this solicitation should be raised prior to submission of an offer.
3. This item is not a CSI – Critical Safety Item.
4. This is an explosive item.
5. All contractual documents (i.e. contracts, purchase orders, task orders, delivery orders and modifications) related to the instant procurement are considered to be "issued" by the
Government when copies are either deposited in the mail, transmitted by facsimile, or sent by other electronic commerce methods, such as email. The Government's acceptance of the contractor's proposal constitutes bilateral agreement to "issue" contractual documents as detailed herein.
6. Electronic submission of an offer may be accomplished by attaching your offer to an email directed to aaron.heit@navy.mil. The size limitation of an email through the NAVSUP WSS mail server is 10 MB. All files designated as .zip files will be stripped from any email sent. Files larger than the server limitation may be segregated and sent via several emails as long as they are clearly identified as such. It is highly recommended that the Offeror request email delivery confirmation or other form of acknowledgement to verify that the proposal submission was received.
7. Testing (FAT, LAT)
With the addition of RFC-RFV-54_NUWC-K_V17026 to the 3W41 TDP, the following FAT and LAT requirement modification will be necessary:
Full FAT:
• For 4.4.1, replace the 12 valve requirement in 4.4.1 with 24 valves, in addition to the 25 squib requirement.
• For Table IV, 4 valves will be required to be tested in accordance with each of the 6 test sequences, A through F. For Table IV, 4.4.4.13, Firing Current, test IAW with RFC-RFV-54_NUWC-K_V17026 - 8 units fired at low temp (4 at 5,000psi, 4 at 0psi), 8 units fired at ambient (4 at 5,000psi, 4 at 0psi), and 8 units fired at high temp (4 at 5,000psi, 4 at 0psi). Test Sequences B,C, and D will each require the 4 respective valves to be subjected to the tests of 4.4.4.13.
• All remaining FAT requirements remain unchanged.
Modified FAT:
• Replace the 12 valves & 25 squib requirement in 4.4.1 with 24 valves. Those valves are to be subjected to the following tests for the modified FAT:
• 4.5.7.1: Bridge wire resistance prior to firing
• 4.5.7.2: Insulation resistance prior to firing
• 4.5.7.3: Auto Ignition Low Temp
• 4.5.7.4: No-Fire Current mailto:x.x@navy.mil
• 4.4.4.13: Firing Current, IAW with RFC-RFV-54_NUWC-K_V17026 - 8 units fired at low temp (4 at 5,000psi, 4 at 0psi), 8 units fired at ambient (4 at 5,000psi, 4 at 0psi), and 8 units fired at high temp (4 at 5,000psi, 4 at 0psi)
• 4.4.4.14: Visual Inspection, After Firing
• 4.4.4.15: Ram Operation
• 4.4.4.16: Leakage at Operating Pressure, Normally Closed Outlet Port, After Firing
• 4.4.4.17: Leakage at Operating Pressure, Inlet and Outlet Ports, After Firing
Full LAT (Required All vendors):
4.5.1 Tests and examinations
4.5.1.1 -Valve
a. Leakage at proof pressure
b. Bridge wire resistance
c. Insulation resistance
d. Configuration
e. Operational test, IAW RFC-RFV-54_NUWC-K_V17026. Divide acceptance valve units evenly amongst the 6 test conditions (low, ambient, high temperatures at 0psig & 5000psig)
4.5.1.2 Sample squibs.
a. Bridge wire resistance, prior to firing
b. Insulation resistance, prior to firing
c. Auto-ignition, low temperature
d. No-fire current
e. Firing current
Continue with requirements through 4.5.9
8. Pricing- Please list unit prices for all option listed below.
BASE YEAR FAT QUANTITY UNIT PRICE
FULL FAT 402
MODIFIED FAT 402
NO FAT 402
OPTION YEAR
FULL FAT 100-200
MODIFIED FAT 100-200
NO FAT 100-200
FULL FAT 201-350
MODIFIED FAT 201-350
NO FAT 201-350
FULL FAT 351-503
MODIFIED FAT 351-503
NO FAT 351-503
Section C - Descriptions and Specifications
SECTION C
PROCUREMENT SPECIFICATION
I. NSN: 4T-1356-01-274-1543-3W41
NOMENCLATURE: VALVE ASSEMBLY, FUEL SHUTOFF
Assembly Level Baseline – Sequential
Drawing Revision Nomenclature
1330495 C CUSHION
1330496 C CUSHION
1330497 B
CONTAINER, SHIPPING AND STORAGE (FOR SIZ VALVE ASSEMBLIES,
FUEL SHUTOFF)
1330497 D CONT, FUEL SOV
1330498 G
SHIPPING (PACKING) CONDITION (FOR SIX VALVE ASSEMBLIES, FUEL
SHUTOFF)
1330498 E S/P FUEL SOV
2526651 L VALVE ASSEMBLY, FUEL SHUTOFF +46-5/NUWC-K/6546R2 NOR: 07R2
MIL-V-82443 SPEC VALVE, FUEL SHUT-OFF +54/NUWC-K/V17026
Reference Documents for Assembly (References with Approved Replacements in Parentheses)
DOCUMENT NUMBER
A-A-208 (00208)
A-A-1558
A-A-59303
ASME Y14.5
ASME Y14.24
ASME Y14.34
ASME Y14.35
ASME Y14.100
CFR SECTION 4.2.2
CRF 49 172.407
DOD-STD-2101
DI-PACK-81059
FED-STD-595 (SAE AMS-STD-595)
FF-S-2738
MIL-D-3464
MIL-E-16663
MIL-PRF-3150
MIL-PRF-23377
MIL-PRF-26514
MIL-STD-105 (MIL-STD-1916, ASQ Z1.4)
MIL-STD-129
MIL-STD-130
MIL-STD-331
MIL-STD-889
DESCRIPTION AND SPECIFICATIONS
NOTE 1: NON-ANTICIPATION OF INITIAL DEVIATIONS ON AWARDS
Offerors are reminded that any resultant contract will require performance in strict compliance with the specifications set forth therein, and that prices offered should not be predicated upon contractor anticipation of government authorization of deviations, even though such deviations may have been granted previously under other contracts for the same item.
MS3113 (INACTIVE FOR NEW DESIGN, USE MS3443)
MS20003
MS24347 (INACT FOR NEW DESIGN, USED FOR REPLACEMENT ONLY)
NAS816 (INACT FOR NEW DESIGN
SAE AS6055
CONFIGURATION CONTROL – ANSI/EIA–649
1. Any Engineering Change Proposal (ECP) or Request for Variation (RFV) affecting an item being procured under this contract shall be in accordance with ANSI/EIA-649. Final approval of any ECP and/or RFV shall be in writing, by the Contracting Officer, NAVSUP Weapon Systems Support. If any such approval affects the cost of
Performance of this contract, an equitable adjustment shall be made in the contract price in accordance with the provisions of the "Changes" clause of this contract.
2. RFVs shall be issued using information outlined in ANSI/EIA-649 section 5.3.4.1. The use of DD Form 1694 is a required form for RFV submissions. MIL-HDBK-61 provides additional guidance for preparation of RFVs.
3. ECPs shall be issued using information outlined in ANSI/EIA-649 section 5.3.1.4. The use of DD Form 1692 is a required form for ECP submissions. MIL-HDBK-61 provides additional guidance for preparation of ECPs.
4. The contractor's assigned RFV number shall use the following numbering format:
a. The last four alpha-numeric characters of the contract number followed by a dash (-).
b. The letter "V", followed by consecutively assigned numeric characters beginning with 001.
5. The contractor's assigned ECP number shall use the following numbering format:
a. The last four alpha-numeric characters of the contract number followed by a dash (-).
b. The letters "ECP", followed by consecutively assigned numeric characters beginning with 001.
6. The contractor shall submit an electronic copy of any ECP or RFV to the Contracting Officer, Administrating
Contracting Officer, and the activity below:
A. Contract Administration Office (CAO), (for review and comment to PCO)
B. NAVSUP WSS Contracting Officer N742.13, Email: aaron.heit@navy.mil
C. NAVSUP GLS, Code 4511, Email: margaret.bowerman@navy.mil
7. Technical approval authority for RFVs and ECPs is NUWC Keyport (nicole.lerner@navy.mil).
8. Authorization to accept non-conforming supplies is specifically retained by the Contracting Officer.
CLAUSES INCORPORATED BY REFERENCE
252.211-7005 Substitutions for Military or Federal Specifications and
Standards
NOV 2005
mailto:kirsten.barnes@navy.mil mailto:margaret.bowerman@navy.mil mailto:nicole.lerner@navy.mil
Section D - Packaging and Marking
SECTION D
Packaging, Packing, Preservation and Transportation
PR: N5006318NA015
1. Preservation, Packaging, and Packing shall be in accordance with all associated drawings and specification listed herein.
2. Transportation Data:
a. NSN/NALC: 4T-1356-01-274-1543-3W41
b. Nomenclature: VALVE ASSEMBLY, FUEL SHUTOFF
c. GBL Freight Description: ELECTRIC SQUIBS, AMMUNITION EXPLOSIVES, CLASS C
MOTOR: EXPLOSIVES, NOI RAIL: SAFETY SQUIBS
d. NMFC Number: 064300
e. UFCC Number: 35720
f. Hazard Classification (Class, Division and Storage Compatibility): 1.4, S
g. UN Number: 0454
Competent Authority Approval (CAA):
Exemption number: EX1987100479
h. Container Markings: IAW all associated drawings and specifications as listed herein.
i. Performance Oriented Packaging Certification Marking:
j. Label: IAW all associated drawings and specifications as listed herein. EXPLOSIVE 1.4 S
k. CIIC (Controlled Inventory Item Code): 7
l. Hazardous materials shall be offered for transportation in full compliance with Title 49 Code of Federal
Regulations (49 CFR).
m. GFM (is) (is not) hazardous: Hazardous GFM is identified if any: No GFM PROVIDED
Remarks: For hazardous and explosive material the above transportation data must be updated within 30 days prior to marking and labeling because of the lead-time between the initiation of the procurement and the actual shipping timeframe. Please contact the contracting officer (aaron.heit@navy.mil) at the NAVSUP Weapon Systems Support, Mechanicsburg, PA for updated data.
MIL-STD-1168C – AMMUNITION LOT NUMBERING & AMMUNITION DATA CARD
mailto:aaron.heit@navy.mil
Ammunition lot numbers shall be formatted in accordance with the current version of MIL-STD 1168 and include all lot number elements as reflected in the standard. The lot number shall be documented on the Ammunition Data
Card and include associated data in accordance with the current version of MIL-STD 1168:
(1) Manufacturer’s Identification symbol: Only the approved Manufacturer’s Identification symbol for the contractor or manufacturer is to be used in the lot number. Requests for approval of a Manufacturer’s
Identification symbol are to be submitted via the Government Inspector. Refer to MIL-HDBK-1461 for guidance, which is available on the WARP Website (https://mhpwarp.redstone.army.mil).
(2)
SERIAL/REGISTER NUMBER REQUEST
Serial Numbers Required. Contractor to complete this request form as provided. Submit to NUWC Keyport or
NUWC Newport as per this request form instructions.
ITEM: 4T-1356-01-274-1543-3W41; VALVE ASSEMBLY, FUEL SHUTOFF
DWG: 2526651
ACTIVITY CONTRACTOR:
CAGE: ____________
NAME: ________________________________
ADDRESS: _____________________________ PHONE: ______________________
_____________________________ FAX: _________________________
VENDOR POC: ___________________
CONTRACT: _______________________
QUANTITY OF PARTS TO BE PRODUCED THIS CONTRACT/MODIFICATION: _______
REQUESTOR SIGNATURE: ______________________________DATE: ___________
FAX or EMAIL REQUEST TO:
COMMANDER
NAVAL UNDERSEA WARFARE CENTER DIVISION KEYPORT
610 DOWELL ST.
KEYPORT, WA 98345-7610
FAX: (360) 396-1018
ATTN: Matt Duckworth matt.duckworth.ctr@navy.mil
ENSURE COPY OF REQUEST IS FORWARDED TO NAVSUP WSS CONTRACTING OFFICER,
aaron.heit@navy.mil, margaret.bowerman@navy.mil, warren.eslinger@navy.mil and
MECH_NOLSC_PRP@navy.mil.
https://mhpwarp.redstone.army.mil/ mailto:matt.duckworth.ctr@navy.mil mailto:kirsten.barnes@navy.mil mailto:margaret.bowerman@navy.mil mailto:warren.eslinger@navy.mil mailto:MECH_NOLSC_PRP@navy.mil
Section E - Inspection and Acceptance
SECTION E
PRODUCTION LOT TEST SAMPLES (CONTRACTOR TESTING)
1. Test samples are required from each production lot and are to be tested in accordance with the approved test plan.
A production lot shall consist of net deliverable quantity, LOT test sample units, and any retained sample units for investigative purposes as may be required by Section B.
2. The production lot(s) must be manufactured and presented to the Government Quality Assurance Representative
(QAR) with all documentation required by section B. The documentation (WAWF-RRs and Ammunition Data Card printed from WARP) accompanying the production lot test samples shall contain the contract number, item, lot number identification, DODIC, NSN, and serial numbers. The presentation of the lot shall be made to the QAR 180 calendar days after date of contract to select the production test samples. If FAT is required then presentation of lot samples shall be made IAW timetable in Section F. The samples shall be selected, at random, from each production lot, by the QAR within 48 hours for resident QARs, or 7 calendar days for non-resident QARs after presentation of the lot.
PURPOSE (Reference is MIL-V-82443 QUANTITY
Preproduction Inspection Test, per paragraph 4.3.2 and MIL-STD-105 12
Periodic Production Test, per paragraph 4.3.3 24
Delivery quantity 402
Total valve production lot size 438
Total squib production lot size 463
3. Sample units removed for testing from different lots shall not be commingled.
4. Production lot testing shall be performed by the Contractor within 30 calendar days of production lot sample selection. Production lot testing shall be witnessed by a representative of the engineering activity and/or the cognizant QAR. The Contractor shall provide written notification to the Contracting Officer, with concurrent notification to the engineering activity, and the QAR, at least 20 calendar days prior to the planned testing date.
NOTE: If a failure occurs during testing and an engineering activity representative is not present, all testing shall be halted and the engineering activity and contracting officer shall be notified within 24 hours. A government representative shall be allowed to participate in the failure investigation in accordance with applicable CDRLs. Contractor testing shall resume upon notification by the Contracting Officer.
5. Disposition of Production Lot Test Samples – Production Lot Testing Samples are subject to destructive testing.
These units cannot be used to meet the total contract quantity.
6. Retained samples, if applicable, shall be sent to the address shown in Section F after lot release.
7. A production lot test report is required and shall be forwarded in accordance with the DD 1423 sequence number
A002 requirements to the address shown in Block 14. The test report shall include all results of testing conducted in accordance with the approved test plan.
8. Acceptance, shipment, and payment shall not be accomplished until the production lot test samples have been tested, the required report approved, and the lot has been released for service use. The retained samples, if applicable, shall be shipped to the address provided in Section F of the contract after the lot has been released for service use.
9. The only valid and contractually binding notification of production lot approval, conditional approval, or disapproval shall be in writing and issued by the Contracting Officer. This notification may be made to the
Contractor within 30 calendar days after the Contracting Officer receives the production lot test report(s) and all applicable CDRL requirements. Upon receipt of the written approval accepting a production lot(s), the Contractor shall ship the production lot(s) as soon as possible and no later than 15 calendar days after receipt of such notice.
Final acceptance of the production lot(s) shall be the responsibility of the cognizant DCMA QAR, but shall not occur unless and until the production lot approval has been issued in writing by the Contracting Officer.
a) Any notice of approval or conditional approval shall not relieve the Contractor from complying with all requirements of the specifications and all other terms and conditions of this contract.
b) A notice of conditional approval shall state any further action required of the Contractor. In the event the test sample fails to meet the requirements of the specification or drawing, the Contractor shall submit a Failure
Analysis and Corrective Action Report (DD Form 1423, sequence number, A003) with all associated costs and expenses to be borne solely by the Contractor.
c) A notice of disapproval may cite reasons for such. If the production lot test report(s) is disapproved by the Contracting Officer, the QAR may be required to select an additional production lot test sample(s) for testing.
This direction may be given by the Contracting Officer in the notice of disapproval. The Contractor shall furnish such additional test sample(s) under the terms and conditions and within the time specified in the notification. The cost of each additional approval test, and all costs related to such test(s), shall be borne by the Contractor. Upon approval of the production lot test sample(s) and report(s), the Contracting Officer may equitably adjust the delivery schedule of the contract for only the lot represented by such sample(s). The Government reserves the right to require an equitable decrease of the contract price for any extension of the delivery schedule necessitated by additional test(s) or for any additional costs incurred by the Government due to the need for additional approval test(s).
10. If the Contractor fails to deliver any production lot test sample(s) within the time or times specified, or if the
Contracting Officer disapproves any production lot test report(s), the contract may be deemed to have failed to make delivery within the meaning of the "Default" clause of this contract, and this contract may be subject to termination for default. In such an event, failure of the Government to terminate this contract for default shall not relieve the
Contractor of the responsibility to meet the delivery schedule for production quantities.
1. Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001AA Technical Data See DD1423 See DD1423 See DD1423 See DD1423
0001AB First Article Testing Contractor Government Contractor Government
0001AC Lot Acceptance Testing Contractor Government Contractor Government
0001AD – 0001XX Production Units Contractor Government Contractor Government
If supplies will be packaged at a location different from the offeror address indicated on the solicitation, the offeror shall provide the name and street address of the packaging location:
Packaging House - N/A
Address - N/A
INSPECTION AND ACCEPTANCE OF TEST PLANS / PROCEDURES
1. The Contractor shall submit a test plan/procedure for Government approval/disapproval as specified in the
Contract Data Requirements List (DD Form 1423, sequence number, A001). The test plan shall be submitted within
60 calendar days after contract award date. The Acceptance Test Plan shall identify that test fixtures are available for use at the Contractor’s Facility.
2. Notification of test plan approval, conditional approval, or disapproval shall be be provided via IRAPT. This notification may be made within 30 calendar days after receipt of the Production plan/procedure.
3. The notice of approval or conditional approval shall not relieve the Contractor from complying with all requirements of the specifications and all other terms and conditions of this contract.
4. A notice of conditional approval shall state any further action required of the Contractor.
5. A notice of disapproval shall cite the reasons for such. If the plan or procedure is disapproved by the
Government, the Contractor may be required, at the option of the Government, to submit a revised plan or procedure for evaluation. After each notification by the Government to submit a revised plan or procedure, the Contractor shall, at no additional cost to the Government, make any necessary revisions or modifications to the plan or procedure. Such revisions shall be furnished in accordance with terms and conditions and within the time specified in the notification. The Government may take action on the resubmitted plan or procedure within the time specified above. The Government reserves the right to require an equitable adjustment of the contract price for any extension of the delivery schedule necessitated by resubmission of the plan or procedure.
6. If the Contractor fails to deliver the plan or procedure within the time specified, or if the Contracting Officer disapproves any plan or procedure, the Contractor shall be deemed to have failed to make delivery within the meaning of the "Default" clause of this contract, and this contract shall be subject to termination for default.
However, failure of the Government in such an event to terminate the contract shall not relieve the Contractor of the responsibility to meet all requirements of the contract including delivery of any first article sample(s), data requirements, and/or production quantities.
7. There is hereby created an option for the Government to waive the requirement for submission of a plan or procedure. If the offeror has had its plan previously approved by the Government, the following information shall be furnished:
Approved by__________________________ Date of approval___________________
Contract number and contractor under which plan/procedure was approved__________________.
Test Plan number, revision date and NSN for which the item was previously approved_____________.
8. If the submission of the plan or procedure is waived, the previously approved plan or procedure shall apply to the contract.
INSPECTION AND ACCEPTANCE
Production Quality Assurance of all items to be furnished hereunder shall be made by the cognizant Government
Inspector at the contractor's or sub-contractor's plant. Quality Assurance Inspection System to be in accordance with
ISO-9001, ANSI/ASQC or
MIL-I- 45208.
NOTE:
Acceptance or rejection shall be accomplished by the cognizant GQAR based upon his own inspection(s) and the results of the First Articles or Periodic Production and/or Acceptance Samples from the testing activity to the GQAR via
Procurement Contracting Officer (PCO).
QUALITY ASSURANCE REQUIREMENTS
An inspection lot shall consist of items manufactured under essentially the same conditions and at essentially the same time. Prior to submittal of each inspection lot to the Government Representative, the contractor shall provide inspection/or test records that assure the units presented have passed all inspections and tests required by the applicable drawings, specifications and quality assurance documentation. Unless specified otherwise, as a minimum this inspection and testing shall be in accordance with MIL-STD-105 (MIL-STD-1916), latest revision at issue date of solicitation, inspection Level II, with 100% inspection for critical characteristics, 1.0 AQL (Acceptance Quality Level), for major characteristics and 2.5 AQL for all other characteristics. All defects of the same class will be considered collectively when determined compliance with applicable AQL.
AMMUNITION DATA CARDS AND MATERIAL INSPECTION AND RECEIVING
REPORT
1. Under the direction of MIL-STD-1168C, the Contractor shall furnish Ammunition Data Cards (ADC) for each shipment (test and production) as generated using the Worldwide Ammunition-data Repository Program (WARP).
Preparation instructions are found in DI-MISC-80043B and on the WARP website in the WARP User's Manual.
All components and subassemblies shall be listed on the ADC per DI-MISC-80043B, paragraph 3, in accordance with DD 1423 sequence number A004. A printed copy of the ADC from WARP shall be included with each
Shipment.
NOTE: The WARP system for Ammo Data Cards requires contractors to hold a certificate to access the system and communicate with the secure DoD server.
The site to obtain ECA Access Certificate is: http://www.identrust.com/warp/index.html
The WARP login website is: https://mhpwarp.redstone.army.mil
2. Lot numbers for all explosive components and explosive subassemblies shall be in accordance with MIL-STD-
1168 (Ammunition Lot Numbering and Ammunition Data Card), and shall be included in the components section of the Ammunition Data Card.
http://www.identrust.com/warp/index.html https://mhpwarp.redstone.army.mil/
3. In accordance with the DFAR clause at 252.246-7000, Material Inspection and Receiving Report, the Contractor shall prepare and furnish to the Government a WAWF Receiving Report (WAWF-RR) at the time of each delivery
(test and production). Preparation instructions are found in the DFAR Supplement Appendix F.
If the date cited in WAWF-RR is an estimated "ship date", the Contractor shall make distribution of a corrected
WAWF-RR indicating the "actual ship date" within 24 hours after actual shipment. The following additional data shall be furnished on the WAWF-RR:
a. Complete lot number
b. Total lot size (consists of net, test, and investigative).
c. Serial numbers of units shipped to consignee.
d. Net quantity shipped to destination.
1) Item quantity shipped to consignee
2) Total item quantity shipped to consignee
3) Item quantity due consignee
4. The contractor shall make distribution of the ADC and WAWF-RR in accordance with the information provided in Section H no later than 24 hours after shipment. When Item 0001, 0002, etc. is indicated under the designator, the Contractor shall furnish all shipping documents for all SUBCLINs under that line item.
52.246-2 Inspection Of Supplies--Fixed Price AUG 1996
52.246-16 Responsibility For Supplies APR 1984
CLAUSES INCORPORATED BY FULL TEXT
52.246-11 HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (DEC 2014)
(a) The Contractor shall comply with the higher-level quality standard(s) listed below.
ISO-9001:2015
(b) The Contractor shall include applicable requirements of the higher-level quality standard(s) listed in paragraph
(a) of this clause and the requirement to flow down such standards, as applicable, to lower-tier subcontracts, in--
(1) Any subcontract for critical and complex items (see 46.203(b) and (c)); or
(2) When the technical requirements of a subcontract require--
(i) Control of such things as design, work operations, in-process control, testing, and inspection; or
(ii) Attention to such factors as organization, planning, work instructions, documentation control, and advanced metrology.
(End of clause)
ICP EA04 EDITABLE
INSPECTION, ACCEPTANCE, AND PLACE OF PACKAGING
Supplies furnished hereunder Shall be: Inspected at (X) Contractor's and/or Subcontractor's plant or ( )
Destination.
Acceptance Shall be: at (X) Contractor's and/or Subcontractor's plant or ( ) Destination.
If supplies will be packaged at a location different from the offeror address indicated on the solicitation, the offeror shall provide the name and street address of the packaging location:
Packaging House
Address
Section F - Deliveries or Performance
SECTION F
SECTION F
DELIVERIES OR PERFORMANCE
Unless otherwise indicated in this contract, accelerated deliveries are desirable and acceptable at no additional cost to the Government. The addresses for the activities designated to receive supplies are listed below:
LINE / SUBLINE ITEM and QTY SHIP TO:
0001AB 12 EA (FAT) Contractor Testing Site (Contractor Facility)
0001AC 24 EA (LAT) Contractor Testing Site (Contractor Facility)
0001AD 402 EA
NUWC Keyport
UIC: N00253
ATTN: Receiving Office Bldg 893/144
610 Dowell Street
Keyport, WA 98345-7610
NOTES:
Please contact NAVSUP WSS Contracting Officer (Code N772.08) 60 days prior to shipment to confirm delivery destination. QAR is not authorized to approve items for shipment; approval for shipment is only authorized after the test validation reports have been reviewed and approved by the NAVSUP WSS PCO.
Shipment/Performance Notice Distribution - The cognizant DCMA office shall provide automated
Shipment/Performance Notice (PJJ card) to the Commanding Officer, Attn: Code 4511, NAVSUP
GLS, Mechanicsburg, PA 17055-0735 DOD Address Code N49935 (Routing ID Code NCB), (Communications ID RUSAACM), in support of the Ordnance Information System-Wholesale (OIS-
W, formerly CAIMS).
SECTION H – ADMINISTRATIVE POINTS OF CONTACT (MARCH 2016)
1) Inquiries and correspondence directed to the Administrative Point of Contact at NAVSUP should be addressed as follows:
Name: Aaron Heit Code: N742.08
Phone: 717-605-2430 Email: aron.heit@navy.mil
2) Inquiries and correspondence directed to the Acquisition Management Specialist (AMS) should be addressed as follows:
Name: Margaret Bowerman Code: N4113
Phone: 717-605-5377 Email: margaret.bowerman@navy.mil
3) If the inquiry involves technical questions, (drawing, specifications, etc.) inquiry should be submitted in accordance with the procurement specification. All telephone inquiries pertaining to technical questions must be confirmed in writing with the above AMS and PCO within 48 hours.
mailto:aron.heit@navy.mil
[IH > Delete following section if GFP does not apply, plus this Red sentence.]
52.242-15 Stop-Work Order AUG 1989
52.242-17 Government Delay Of Work APR 1984
52.247-29 F.O.B. Origin FEB 2006
52.247-30 F.O.B. Origin, Contractor's Facility FEB 2006
52.247-34 F.O.B. Destination NOV 1991
52.247-58 Loading, Blocking, And Bracing Of Freight Car Shipment APR 1984
52.247-59 F.O.B Origin--Carload and Truckload Shipments APR 1984
52.247-61 F.O.B. Origin--Minimum Size Of Shipments APR 1984
52.247-65 F.O.B. Origin, Prepaid Freight--Small Package Shipments JAN 1991
252.247-7023 Transportation of Supplies by Sea APR 2014
252.247-7028 Application for U.S. Government Shipping
Documentation/Instructions
JUN 2012
FAR 52.211-8 TIME OF DELIVERY
(a) The Government requires delivery to be made according to the following schedule:
FIRST ARTICLE REQUIRED DELIVERY SCHEDULE
Item Quantity Days Item Quantity Days
0001AB 12 EA (FAT) 180 DADC A001 (Test Procedure) 1 Set 60 DADC
0001AC 24 EA (LOT 1) 210 DAFATA A002 (Test Report) 1 Set 15 DANLATA
0001AD 402 EA 240 DAFATA A003 (Failure Analysis) 1 Set A/R
0002 (OPTION) 300 EA A004 (ADC) 1 Set A/R
A005 (Production Progress Report)
Monthly
KEY: DADC = Days After Date of Contract DAFATA = Days After First Article Test Approval
FIRST ARTICLE WAIVED DELIVERY SCHEDULE
0001AC 24 EA (LAT LOT 1) 180 DADC A001 (Test Procedure) 1 Set 60 DADC
0001AD 402 EA 210 DADC A002 (Test Report) 3 Sets 15 DANLATA
0002 (OPTION) 300 EA A003 (Failure Analysis) 1 Set A/R
A004 (ADC) A/R
A005 (Production
Progress Report)
Monthly
KEY: DADC = Days After Date of Contract DAFATA = Days After First Article Test Approval DANLATA = Days After Notification of
LAT Approval
The Government will evaluate equally, as regards time of delivery, offers that propose delivery of each quantity within the applicable delivery period specified above. Offers that propose delivery that will not clearly fall within the applicable required delivery period specified above will be considered non-responsive and rejected. The Government reserves the right to award under either the required delivery schedule or the proposed delivery schedule, when an offeror offers an earlier delivery schedule than required above. If the offeror proposes no other delivery schedule, the required delivery schedule above will apply.
OFFERORS PROPOSED DELIVERY SCHEDULE – First Article Required Delivery Schedule
KEY: DADC = Days After Date of Contract DAFATA = Days After First Article Test Approval
OFFERORS PROPOSED DELIVERY SCHEDULE – First Article Waived Delivery Schedule
KEY: DADC = Days After Date of Contract DAFATA = Days After First Article Test Approval DANLATA = Days After Notification of
LAT Approval
(b) Attention is directed to the Contract Award provision of the solicitation that provides that a written award or acceptance of offer mailed, or otherwise furnished to the successful offeror, results in a binding contract. The Government will mail or otherwise furnish to the offeror an award or notice of award not later than the day award is dated. Therefore, the offeror should compute the time available for performance beginning with the actual date of award, rather than the date the written notice of award is received from the Contracting Officer through the ordinary mails. However, the
Government will evaluate an offer that proposes delivery based on the Contractor's date of receipt of the contract or notice of award by adding (1) five calendar days for delivery of the award through the ordinary mails, or (2) one working day if the solicitation states that the contract or notice of award will be transmitted electronically. (The term "working day" excludes weekends and U.S. Federal holidays.) If, as so computed, the offered delivery date is later than the required delivery date, the offer will be considered non-responsive and rejected.
252.223-7003 CHANGE IN PLACE OF PERFORMANCE - AMMUNITION AND EXPLOSIVES (DEC 1991)
(a) The Offeror shall identify, in the "Place of Performance" provision of this solicitation, the place of performance of all ammunition and explosives work covered by the Safety Precautions for Ammunition and Explosives clause of this solicitation. Failure to furnish this information with the offer may result in rejection of the offer.
(b) The Offeror agrees not to change the place of performance of any portion of the offer covered by the Safety
Precautions for Ammunition and Explosives clause contained in this solicitation after the date set for receipt of offers without the written approval of the Contracting Officer. The Contracting Officer shall grant approval only if there is enough time for the Government to perform the necessary safety reviews on the new proposed place of performance.
(c) If a contract results from this offer, the Contractor agrees not to change any place of performance previously cited without the advance written approval of the Contracting Officer.
Section G - Contract Administration Data
252.232-7003 Electronic Submission of Payment Requests and Receiving
Reports
JUN 2012
252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (MAY 2013)
(a) Definitions. As used in this clause—
Department of Defense Activity Address Code (DoDAAC) is a six position code that uniquely identifies a unit, activity, or organization.
Document type means the type of payment request or receiving report available for creation in Wide Area
WorkFlow (WAWF).
Local processing office (LPO) is the office responsible for payment certification when payment certification is done external to the entitlement system.
(b) Electronic invoicing. The WAWF system is the method to electronically process vendor payment requests and receiving reports, as authorized by DFARS 252.232-7003, Electronic Submission of Payment Requests and
Receiving Reports.
(c) WAWF access. To access WAWF, the Contractor shall—
(1) Have a designated electronic business point of contact in the System for Award Management at https://www.acquisition.gov; and
(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.
(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training
Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the “Web Based Training” link on the WAWF home page at https://wawf.eb.mil/.
(e) WAWF methods of document submission. Document submissions may be via Web entry, Electronic Data
Interchange, or File Transfer Protocol.
(f) WAWF payment instructions. The Contractor must use the following information when submitting payment requests and receiving reports in WAWF for this contract/order:
(1) Document type. The Contractor shall use the following document type(s).
Combo unless Contractor’s business systems do not allow. In that event an “Invoice” (stand-alone) and “Receiving
Report” (stand-alone) may be used.
http://www.acq.osd.mil/dpap/dars/dfars/html/current/252232.htm https://www.acquisition.gov/ https://wawf.eb.mil/ https://wawf.eb.mil/
(Contracting Officer: Insert applicable document type(s). Note: If a “Combo” document type is identified but not supportable by the Contractor’s business systems, an “Invoice” (stand-alone) and “Receiving Report” (stand-alone) document type may be used instead.)
(2) Inspection/acceptance location. The Contractor shall select the following inspection/acceptance location(s) in
WAWF, as specified by the contracting officer.
See Section E Inspection and Acceptance
(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.
Routing Data Table*
Field Name in iRAPT (WAWF) Data to be entered in iRAPT (WAWF)
Pay Official DoDAAC See Block 12 of Award
Issue By DoDAAC See Block 5 of Award
Admin DoDAAC See Block 6 of Award
Inspect By DoDAAC See Block 6 of Award
Ship To Code See Section F
Ship From Code See Section F
Mark For Code See Section F
Service Approver (DoDAAC) See Block 6 of Award
Service Acceptor (DoDAAC) See Block 6 of Award
Accept at Other DoDAAC See Block 6 of Award
LPO DoDAAC Data to be entered in iRAPT (WAWF)
DCAA Auditor DoDAAC See Block 12 of Award
Other DoDAAC(s) See Block 5 of Award
(*Contracting Officer: Insert applicable DoDAAC information or “See schedule” if multiple ship to/acceptance locations apply, or “Not applicable.”)
(4) Payment request and supporting documentation. The Contractor shall ensure a payment request includes appropriate contract line item and subline item descriptions of the work performed or supplies delivered, unit price/cost per unit, fee (if applicable), and all relevant back-up documentation, as defined in DFARS Appendix F, (e.g. timesheets) in support of each payment request.
(5) WAWF email notifications. The Contractor shall enter the e-mail address identified below in the “Send
Additional Email Notifications” field of WAWF once a document is submitted in the system.
See Section H – Special Distribution
(g) WAWF point of contact.
(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity’s
WAWF point of contact. navsupwawf.wss.fct@navy.mil
(2) For technical WAWF help, contact the WAWF helpdesk at 866-618-5988.
mailto:navsupwawf.wss.fct@navy.mil
Section H - Special Contract Requirements
SECTION H
SECTION H – ADMINISTRATIVE POINTS OF CONTACT (MARCH 2016)
1) Inquiries and correspondence directed to the Administrative Point of Contact at NAVSUP should be addressed as follows:
Name: Aaron Heit Code: N772.08
Phone: 717-605-2430 Email: aaron.heit@navy.mil
2) Inquiries and correspondence directed to the Acquisition Management Specialist (AMS) should be addressed as follows:
Name: Margaret Bowerman Code: N4113
Phone: 717-605-5377 Email: margaret.bowerman@navy.mil
3) If the inquiry involves technical questions, (drawing, specifications, etc.) inquiry should be submitted in accordance with the procurement specification. All telephone inquiries pertaining to technical questions must be confirmed in writing with the above AMS and PCO within 48 hours.
SECTION H
SPECIAL DISTRIBUTION
NOTE 1: Use of the Wide Area Work Flow Receipt and Acceptance (WAWF-RR) electronic form is required. See clause 252.246-7000 Material Inspection and Receiving Report (MAR 2008) and 252.232-7003 Electronics
Submission of Payment Requests and Receiving Reports (JUN 2012).
NOTE 2: When using WAWF-RR to submit Contract Data Requirements List (CDRL) data and “Not Separately
Priced” items, the following information shall be listed in the “Comments” field of the WAWF electronic form:
Shipping company, shipment tracking number, and date shipped.
WAWF-RR documents accompanying the shipment are to be attached as follows (Type of Shipment - Location):
1. Carload or truckload - Affix to the shipment where it will be readily visible and available upon request.
2. Less than carload or truckload - Affix to container number one or container bearing lowest number.
3. Mail, including parcel post - Attach to outside or include in the package. Include a copy in each additional package of multi-package shipments.
Activity Number of Copies
Commanding Officer 1
NAVSUP Weapon Systems Support
Attn: Code N772.08
P.O. Box 2020
Mechanicsburg, PA 17055-0788 aaron.heit@navy.mil
NAVSUP Global Logistics Support
Attn: Code 45113
Bldg. 407N mailto:aaron.heit@navy.mil mailto:kirsten.barnes@navy.mil
Mechanicsburg, Pa 17055-0735 margaret.bowerman@navy.mil
MECH_NOLSC_PRP@navy.mil
Administrative Contracting Officer (ACO) 1
(Indicated in block 6 of SF 26)
NUWC Keyport Division
Attn: Code N421
610 Dowell Street
Keyport, WA 98325 nicole.lerner@navy.mil mailto:MECH_NOLSC_PRP@navy.mil mailto:nicole.lerner@navy.mil
Section I - Contract Clauses
52.202-1 Definitions NOV 2013
52.203-3 Gratuities APR 1984
52.203-5 Covenant Against Contingent Fees MAY 2014
52.203-6 Restrictions On Subcontractor Sales To The Government SEP 2006
52.203-7 Anti-Kickback Procedures MAY 2014
52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or
Improper Activity
MAY 2014
52.203-10 Price Or Fee Adjustment For Illegal Or Improper Activity MAY 2014
52.203-12 Limitation On Payments To Influence Certain Federal
Transactions
OCT 2010
52.203-17 Contractor Employee Whistleblower Rights and Requirement
To Inform Employees of Whistleblower Rights
APR 2014
52.204-2 Security Requirements AUG 1996
52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber
Content Paper
MAY 2011
52.204-10 Reporting Executive Compensation and First-Tier
Subcontract Awards
OCT 2016
52.204-13 System for Award Management Maintenance OCT 2016
52.204-18 Commercial and Government Entity Code Maintenance JUL 2016
52.204-19 Incorporation by Reference of Representations and
Certifications.
DEC 2014
52.204-22 Alternative Line Item Proposal JAN 2017
52.204-23 Prohibition on Contracting for Hardware, Software, and
Services Developed or Provided by Kaspersky Lab and Other
Covered Entities.
JUL 2018
52.209-6 Protecting the Government's Interest When Subcontracting
With Contractors Debarred, Suspended, or Proposed for
Debarment
OCT 2015
52.209-9 Updates of Publicly Available Information Regarding
Responsibility Matters
JUL 2013
52.209-10 Prohibition on Contracting With Inverted Domestic
Corporations
NOV 2015
52.211-5 Material Requirements AUG 2000
52.211-15 Defense Priority And Allocation Requirements APR 2008
52.215-2 Audit and Records--Negotiation OCT 2010
52.215-8 Order of Precedence--Uniform Contract Format OCT 1997
52.215-14 Integrity of Unit Prices OCT 2010
52.219-8 Utilization of Small Business Concerns NOV 2016
52.219-9 (Dev) Small Business Subcontracting Plan (Deviation 2016-O0009) JAN 2017
52.219-16 Liquidated Damages-Subcontracting Plan JAN 1999
52.219-28 Post-Award Small Business Program Rerepresentation JUL 2013
52.222-1 Notice To The Government Of Labor Disputes FEB 1997
52.222-3 Convict Labor JUN 2003
52.222-4 Contract Work Hours and Safety Standards- Overtime
Compensation
MAY 2014
52.222-19 Child Labor -- Cooperation with Authorities and Remedies OCT 2016
52.222-20 Contracts for Materials, Supplies, Articles, and Equipment
Exceeding $15,000
MAY 2014
52.222-21 Prohibition Of Segregated Facilities APR 2015
52.222-26 Equal Opportunity SEP 2016
52.222-37 Employment Reports on Veterans FEB 2016
52.222-40 Notification of Employee Rights Under the National Labor
Relations Act
DEC 2010
52.222-50 Combating Trafficking in Persons MAR 2015
52.222-54 Employment Eligibility Verification OCT 2015
52.223-6 Drug-Free Workplace MAY 2001
52.223-18 Encouraging Contractor Policies To Ban Text Messaging
While Driving
AUG 2011
52.225-13 Restrictions on Certain Foreign Purchases JUN 2008
52.227-1 Authorization and Consent DEC 2007
52.227-2 Notice And Assistance Regarding Patent And Copyright
Infringement
DEC 2007
52.229-3 Federal, State And Local Taxes FEB 2013
52.232-1 Payments APR 1984
52.232-8 Discounts For Prompt Payment FEB 2002
52.232-11 Extras APR 1984
52.232-17 Interest MAY 2014
52.232-18 Availability Of Funds APR 1984
52.232-23 Assignment Of Claims MAY 2014
52.232-25 Prompt Payment JAN 2017
52.232-33 Payment by Electronic Funds Transfer--System for Award
Management
JUL 2013
52.232-39 Unenforceability of Unauthorized Obligations JUN 2013
52.232-40 Providing Accelerated Payments to Small Business
Subcontractors
DEC 2013
52.233-1 Disputes MAY 2014
52.233-3 Protest After Award AUG 1996
52.233-4 Applicable Law for Breach of Contract Claim OCT 2004
52.242-5 Payments to Small Business Subcontractors JAN 2017
52.242-13 Bankruptcy JUL 1995
52.243-1 Changes--Fixed Price AUG 1987
52.244-5 Competition In Subcontracting DEC 1996
52.244-6 Subcontracts for Commercial Items JAN 2017
52.246-23 Limitation Of Liability FEB 1997
52.247-1 Commercial Bill Of Lading Notations FEB 2006
52.247-68 Report of Shipment (REPSHIP) FEB 2006
52.248-1 Value Engineering OCT 2010
52.249-2…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.