N0010418RF026.U002.pdf
PDF 207 KB Posted
- Solicitation number
- N0010418RF026
About this file
N0010418RF026.U002.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N0010418RF026.U001.pdf | ||
| N0010418F0N45_N0010418RF026_(ASP-2380)_Final_JA_Redacted.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICAITON NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicble)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICIATION NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a)By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPIRATION DATA (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc. ) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION ( Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
J 1 1
U0002 May 7, 2018 See Schedule
N00104
NAVSP Weapon Systems Support 5450 Carlisle Pike Attn: Code N743.32 Mechanicsburg, PA 17055-0788 Phone/E-mail: 717-605-4048 royce.hoffman@navy.mil
See Block 6
N0010418RF026
Apr 23, 2018
1) Section C, 501-K34 STATEMENT OF WORK for ASP-2380, paragraph (1).c is removed in its entirety.
2) Section C, 501-K34 STATEMENT OF WORK for ASP-2380, paragraph (2).a is revised to indicate NRFI compressor ASP-452C
3) All other terms and conditions remain unchanged.
N0010418RF007.U0002
Section C - Description/Specifications/Statement of Work
SECTION C
SECTION C - 501-K34 STATEMENT OF WORK for ASP-2380
The Contractor shall induct the engine, upload engine location to WEBLOG, verify GGTB 11 inventory sheet, disassemble, inspect, photograph any discrepancies or abnormalities, and analyze the engine assembly, container/canister, accessories, assemblies, subassemblies, and components. (CDRLs A001, A002, A006 and A007)
(1) The following applies to the depot repair of the following 501-K34 gas turbine engine, serial number ASP-2380:
a. The depot engine Repair Turn-Around-Time (RTAT) will not exceed 180 days for the engine repaired.
i. RTAT, for purposes of this contract is defined as the time from engine induction until the time the engine successfully completes post repair test cell evaluation and the performance data provided is reviewed and considered acceptable by NSWC-PD.
ii. Induction of an engine is defined as the point at which a non-Ready-
For-Issue (NRFI) engine is removed from the shipping container.
(DCMA QAR is required to be on-sight at the Contractor’s facility to inspect the received engine with the vendor).
iii. The Contractor will be required to induct the engine within 7 days of receiving the asset.
b. The Contractor is required to provide written documentation showing serviceable, repairable and new parts held in stock are of sufficient quantities to support all engine repairs, or produce order boards showing estimated delivery dates of long lead items that will be delivered to support the 180 days
RTAT per engine under the stated repair schedule.
i. Where insufficient serviceable, repairable, or new material is held by the vendor, and it is apparent that long lead material delivery dates prevent completing a repair within 180 days of an engines induction, the vendor is required to notify the Contracting Officer immediately, indicating what the expected impact may be to planned RTAT.
ii. The Contracting Officer may request consideration in such cases when
RTAT will not be met. This consideration may include, but not limited to negotiation for provision of Government Furnished Material and associated pricing offsets as he/she deems appropriate and in the best interest of the Government.
(2) For the engine, the Contractor shall repair, replace, modify, assemble, test, preserve, package, mark and prepare for shipment each gas turbine engine/module assembly, container/canister accessories, assemblies, subassemblies, and components
a. The following defines a limited depot inspection and repair requirement for the 501-K34 engine, serial number ASP-2380. This engine has suffered a low time engine failure (Time Since Repair = 2,038.5 hours). The cause of this removal was contributed to a number 2 bearing failure. As a result of this failure, the compressor suffered extensive damage and is considered Beyond
Economic Repair (BER). The US Navy will provide a Non Ready for Issue
(NRFI) Compressor Assembly (S/N ASP-452C) to the Contractor as
Government Furnished Material (GFM) to replace the damaged Compressor
Assembly (ASP-2380C). This NRFI Compressor assembly shall be inducted for repair with the remainder of the engine. In addition, the Turbine Inlet
Casing (TIC) has been removed and replaced with an asset that requires extensive repairs.
b. The Contractor shall develop the balance of the work scope for the engine from the complete work control document package based on analysis of the problem(s) identified and the requirement for the engine to operate 15,000 hours before the need for subsequent depot repair.
c. The Contractor is to be informed of any suspected latent defects discovered after engine acceptance that were not readily identifiable per inspection or test cell performance evaluation, as soon as they occur and will have a technician ready to travel to the ship, wherever it may be in the world within 48 hours.
The inability to satisfy this requirement will result in the U.S. Navy being authorized to attempt a repair with no impact on the warranty.
d. NAVSEA technical directives shall be incorporated as directed by the General
Gas Turbine Bulletin No. 0, latest revision. U.S. Navy approved OEM engineering change proposals shall be incorporated.
e. The Contractor is required to provide an induction and build schedule Plan of
Action and Milestones reflecting all work in process, and ongoing in the repair facility and demonstrate graphically as part of their proposal where the planned induction fit into the Contractor’s Work In-Process (WIP) to validate ability to achieve requested repair turn time.
f. The Contractor shall be guided by the S9311-CW-TRS-010, the S9234-BD-
MMD-010 and the Rolls Royce Allison 501-K34 Industrial Engine Overhaul
Manual, Publication No. CSP12017. Also authorized are OEM and U.S.
Navy technical guidance related to the components being repaired and tested.
The Contractor can use prior approved Contractor developed procedures but new procedures must be individually approved by NSWC-PD. A list of all such procedures must be maintained by the Contractor and made available for
NSWC-PD inspection. The list must include the approval date and the name and organization of the individual who granted the approval.
g. Authorized replacement material shall be OEM, DLA, or US Navy owned serviceable parts. Prior to the use of serviceable parts, the Contractor shall disclose the origination of such parts and request official approval from
NSWC-PD, Code 423 and the NAVSUP-WSS Contracting Officer to use them in the engine repair, prior to embodying such parts into the engine. All exchange and/or serviceable material shall be in overhauled condition.
h. Material removed from Navy Decommissioned Assets is the property of the
US Navy and shall be placed in Government property storage. With U.S.
Navy approval, this material may be used on any engine/module inducted for repair under this contract, and may reduce the cost of any fixed price proposal submission.
i. The on-site Government representative and/or NSWC-PD, Code 423 shall have the authority to require further disassembly, or more extensive failure analysis of all, or part of any parts/assemblies. In addition, the Contractor shall advise the Contracting Officer, the Contracting Officer’s designated representative (DCMA, DCMA QAR), NAVSUP-WSS End Item Manager and NSWC-PD, Code 423 via e-mail if an extensive engineering analysis is required and the reason for it. If NSWC-PD, Code 423 agrees to authorize the
Contractor to conduct an engineering analysis, such authorization shall be confirmed in writing to the Contracting Officer, who will direct revision to the pre-inspection proposal by the Contractor and request resubmittal by the
Contractor for further consideration.
j. The vendor is required to submit an Engine Repair Completion Report within
30 days after the engine acceptance test data is accepted by NSWC-PD. This report shall be emailed to NSWC-PD Codes 423 and 424, as well as uploaded to Marine Gas Turbine Information System (MGTIS)/WEBLOG.
k. Information on engine install service life and removal cause is available with
MGTIS/WEBLOG. If required, access to MGTIS/WEGLOG will be granted on an as needed basis.
501-K34 ENGINE MINIMUM INSPECTION/REPAIR REQUIREMENTS
GENERAL REQUIREMENTS (CDRLs A003 and A004 as required)
NOTE
Any deviations from the following work scope must be approved by the Contracting
Officer and NSWC-PD, Code 423.
NOTE
All requests for special consideration related to a component or engine assessment and repair are to be directed to the contracting officer and NSWC-PD, Code 423.
The engine build must comply with the latest configuration as described in U.S. Navy technical documentation.
All work will be accomplished in accordance with applicable OEM and U.S. Navy technical documentation. Vender developed component repair procedures must be approved by the
Navy.
All components, including self-locking fasteners are to be inspected and must be in serviceable or overhauled condition in order to be included in the build, regardless of if they are specifically called out in this document.
501-K34 ENGINE REQUIREMENTS
(3) Minimum work scope:
a. Induct engine.
b. All row one hot section turbine blades and vanes are to be replaced with new.
c. All ball and rolling element bearings in the entire engine and accessory gearbox are to be replaced with new.
d. All fuel nozzles are to be replaced with serviceable or repaired, or with new if serviceable or repaired are not available. No fretting, carbon buildup or deterioration of any type is permitted.
e. All six (6) check valves in the air manifold to the fuel nozzles are to be replaced with new.
f. All combustion liners are to be replaced with serviceable or repaired, or with new if serviceable or repaired are not available. The combustor is to be assembled using a modified outer combustor case as an alignment fixture.
This case will be provided by the Navy if required. Ensure the liner supports and igniters can be installed without significant resistance upon completion of the build.
g. The ignition exciter is to be replaced with serviceable or repaired, or with new if serviceable or repaired are not available.
h. Both igniters are to be replaced with new.
i. All turbine outlet temperature thermocouples are to be replaced with new.
j. The fuel pump is to be replaced with serviceable or repaired, or with new if serviceable or repaired are not available. If serviceable or repaired, the work scope is to include the installation of new mechanical seals.
k. All engine mounted hoses, tubes and electrical components are to be free of any damage or deterioration.
l. The engine must undergo operational testing and demonstrate new engine specification performance in accordance with Model 501-K34 Industrial gas turbine engine specification 922A as modified to reflect the latest build configuration, for the areas of shaft horsepower, specific fuel consumption and vibration.
i. No fuel or lube oil leakage is acceptable.
ii. No fluid leakage is acceptable from the fuel pump telltale drain.
m. The completed Ready-For-Issue (RFI) engine must have its lube oil system preserved to prevent bearing corrosion during storage. Operation during test with MIl-PRF-23699F C/I (corrosion inhibiting) oil satisfies this requirement.
n. The RFI engine must be clean and presentable in terms of appearance, exterior paint / coating cable and tube clamping, etc.
o. The RFI engine is to be returned in a Navy provided storage container with caps and covers on all open fittings, ports, inlet and exhaust.
p. The engine storage container must be:
i. Free of damage.
ii. Configured in accordance with Navy technical documentation.
iii. All prior markings must be removed or permanently covered.
iv. Properly marked with:
a. The engine serial numbers (GTA and HOT).
b. The engine Navy Stock Number.
q. Update MGTIS/WEBLOG custody and transfer log.
r. Upload to MGTIS/WEBLOG a completed engine condition report documenting all aspects of the depot visit, including:
i. Reason for induction.
ii. As received condition.
iii. Repairs performed.
iv. Parts installed.
v. Final performance test logs.
vi. Photographs of the completed engine.
(4) General Repair Guidance:
a. Within seven (7) business days of receipt the contractor shall:
b. Induct the engine.
i. Upload engine location to WEBLOG.
ii. Photo document engine storage container external condition (proper identification markings, damage, internal pressure, humidity indicator status, etc.)
iii. Report all discrepancies or abnormalities to NSWC-PD, Code 423.
c. Open the engine storage container, remove engine for inspection:
i. Photo document contents.
ii. Validate GGTB 11 inventory list provided with engine.
iii. Document any contents that are not associated with the engine configuration that will be tested at the conclusion of the engine repair.
All such contents will be returned to NSWC-PD, Code 423.
iv. Photo document any missing or damaged components.
v. Report all discrepancies or abnormalities to NSWC-PD, Code 423.
d. Specific Guidance:
i. Accessory Gear Box (AGB) Assembly:
1. Disassemble AGB and inspect all components for compliance with service limits. Replace unserviceable parts with new or repaired.
2. Ensure internal surfaces and components are clean, free of corrosion and debris.
3. Replace all bearing.
4. Ensure exterior paint is clean and free of nicks, chips and damage. Refinish as necessary.
ii. Compressor:
1. The compressor assembly for ASP-2380 is considered BER and will not be overhauled.
2. The US Navy will provide a NRFI Compressor Assembly to the Contractor (S/N ASP-1366C) as GFM to be inducted and repair with the remainder of the engine.
3. Disassemble as required to clean and inspect all components.
Ensure all are within serviceable limits. Repair, recoat or replace as required.
4. Inspect compressor blades for cracks, corrosion, or pitting. No cracks, corrosion or pitting is acceptable.
5. Inspect compressor blades for coating loss and impact damage that exceed service limits. Repair, recoat 1st thru 5th stage compressor blades with Sermetel Coating or equivalent, or replace as required.
6. Inspect compressor vanes for damage or deterioration that exceed serviceable limits. Repair or replace as required.
7. Inspect compressor wheels for damage and coating loss.
Repair and recoat 1st thru 5th stage compressor wheels with
Sermetel Coating or equivalent, as required. Custom 450 compressor wheels will remain uncoated.
8. Reestablish rotor grind diameter, ensure new grind diameter falls within the acceptable range. Document grind diameter it in the Engine Condition Report.
9. Restore abradable coating on compressor blade tracks and all seals as required.
10. Inspect compressor diffuser for deterioration and cracking of internal surfaces. No deterioration or cracking of internal surfaces is acceptable. Repair or replace as required.
11. Inspect bearing bores for damage and dimensional compliance.
Restore as required.
12. Verify all oil passages are clean, free of carbon and debris.
13. Inspect compressor case exterior for coating loss and/or corrosion attack. Repair and recoat as required.
iii. Combustor:
1. Disassemble split outer combustion casing, clean split line flange surfaces and re-seal.
2. Clean all internal and external surfaces as required to remove carbon and surface irregularities.
3. Ensure all mating surfaces, bores and tapped holes are free of damage, fretting and deterioration. Restore as required.
iv. Turbine:
1. Disassemble as required to clean and inspect all components.
Ensure all are within serviceable limits or compliant with the paragraphs below. Repair or replace as required.
2. Replace all 1st stage blades and vanes with new.
3. Inspect 2nd and 3rd stage blades for deterioration and for coating loss. No coating loss is acceptable, Repair and recoat as required.
4. Inspect 4th stage blades for deterioration that exceeds service limits. Repair as required.
5. Inspect 2nd through 4th stage turbine vanes for deterioration that exceeds service limits. Repair and recoat as required.
6. Inspect turbine inlet case for deterioration. No metal loss on struts is acceptable. Repair or replace as required.
7. Inspect all components, including all seal surfaces for damage and dimensional compliance. Restore or replace as required.
8. Verify all oil passages are clean, free of carbon and debris.
9. Perform Row 1 turbine blade tip grind. Ensure grind diameter falls within the acceptable range. Document grind diameter in the Engine Condition Report.
10. Perform Row 1 turbine blade track grind. Ensure grind diameter falls within the acceptable range. Record grind diameter and provide it in the Engine Condition Report.
11. Inspect rear bearing support for cracking and deterioration.
Repair or replace as required.
12. Inspect rear scavenge pump and associated components for carbon and deterioration. Clean, repair or replace as required.
13. Inspect Turbine Exhaust, Inner Body for cracking or deterioration; none is acceptable. Repair or replace as required.
v. Accessory Components:
1. Electrical System:
a. Inspect and test thermocouple harnesses. Repair or replace as required.
b. Inspect and test thermocouple T-block. Replace as required.
c. Inspect and test all engine mounted electrical harnesses and cables. Repair or replace as required.
d. Replace CIT sensor with serviceable or repaired, or with new if serviceable or repaired are not available.
vi. Lube System:
1. Clean, inspect and test lube system magnetic plugs.
2. Clean and inspect lube oil filter housing, renew element.
3. Replace external scavenge pump and main oil pump with serviceable or repaired, or with new if serviceable or repaired are not available.
vii. Fuel System:
1. Clean, inspect and test burner drain valves.
2. Clean and inspect high pressure filter.
3. Clean and inspect low pressure filter.
4. Replace fuel pump with serviceable or repaired, or with new if serviceable or repaired are not available. Serviceable or repaired fuel pumps are to have new carbon seals and diaphragm.
viii. Air Bleed System:
1. Clean and inspect compressor air bleed filter.
2. Clean, inspect and test bleed air (14th stage) control valve.
3. Replace seals and rings in the 5th and 10th stage bleed air valves.
e. Operational Test:
i. Perform a seal break in and performance run in accordance with Navy and OEM guidance.
ii. Correct data to standard Navy rated conditions. Performance must meet or exceed new engine standards in the areas of shaft horsepower, specific fuel consumption and vibration.
iii. No internal or external oil or fuel leakage is permitted. All anomalies must be corrected prior to the engine being made RFI.
A replacement shipping container will be provided by the Navy if the contractor repair cost exceeds 70% of the cost of a new container.
f. Engine Shipping Container:
i. Inspect interior and exterior for damage, corrosion and deterioration of any type. No damage, corrosion or deterioration is acceptable.
ii. Verify all surfaces are clean and properly configured.
iii. Verify the container is outfitted with “Engine Mounting Slotted
Bracket Part No. 3-13869”. Substitutes are not acceptable.
iv. Replace all gaskets and seals with new.
v. Ensure all desiccants to be used are new.
vi. Ensure the container is capable of holding pressure in accordance with
Navy technical documentation.
g. MGTIS/WEBLOG:
i. MGTIS/WEBLOG custody and transfer log of both the GTA and HOT are to be updated when the engine is inducted and when the engine is discharged from the depot.
ii. The completed Engine Condition Report is to be posted to
MGTIS/WEBLOG for both the GTA and HOT within 30 days of the engine being discharged from the depot.
iii. The Contractor is to inform NSWC-PD, Code 423 when
MGTIS/WEBLOG has been updated with the engine condition report.
NSWC-PD, Code 423 will review the finalized document and if all is well, report to the Contracting Officer that the depot repair is complete. The depot repair shall not be considered complete until the finalized Engine Condition Report is posted.