Drawing_OD_16188.pdf

PDF 2 MB Posted

Attached to
NSN: 4T-1355-00-433-3214-TA68 Air Stabilizer MK-28 Mod 3
Solicitation number
N0010415RK079
Issued by

About this file

Requested Drawing

View the file

Other files

File Type Posted
RFP_15RK079_Amendment_10.pdf PDF
RFP_15RK079_Amendment_9.pdf PDF
RFP_15RK079_Amendment_8.pdf PDF
RFP_15RK079_Amendment_7.pdf PDF
Drawing_OD_42880.pdf PDF
Drawing_541260_10001_LD_003_J_1.pdf PDF
Exemption_Letter_2012081801.pdf PDF
Drawing_OD7690_REV_1.pdf PDF
Drawing_541260_10001_LD_002_H_1.pdf PDF
Drawing_541260_10001_LD_001_J_1.pdf PDF
RFP_15RK079_Amendment_5.pdf PDF
RFP_15RK079_Amendment_4.pdf PDF
RFP_15RK079_Amendment_3.pdf PDF
RFP_15RK079_Amendment_2.pdf PDF
RFP_15RK079_Amendment_1.doc DOC document
N0010415RK079_CDRLs.pdf PDF
N0010415RK079.pdf PDF
Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NAVSEA OD 16188

0627-LP-356-9700 SECOND REVISION

TECHNICAL MANUAL

FOR

SPECIAL MANUFACTURING PROCESS

FOR PACKING

TORPEDO STABILIZER MARK 28 MOD 3

TORPEDO MARK 46 MODS 0 AND 1

UNCONTROllE~

DISTRIBUTION STATEMENT D: DISTRIBUTION AUTHORIZED TO DOD AND DOD CONTRACTORS ONLY; CRITICAL TECHNOLOGY: DATE OF PUBLICATION. OTHER U.S. REQUESTS SHALL BE REFERRED TO NAVAL UNDERSEA WARFARE

CENTER DIVISION (CODE 32), KEYPORT, WA 98345-7610.

WARNING: THIS DOCUMENT CONTAINS TECHNICAL DATA WHOSE EXPORT IS RESTRICTED BY THE ARMS EXPORT CONTROL ACT {TITLE 22, U.S.C. SEC. 2751 ET SEQ.) OR THE EXPORT ADMINISTRATION ACT OF 1979, AS AMENDED, TITLE 50, U.S.C., APP 2401, ET SEQ. VIOLATIONS OF THESE EXPORT LAWS ARE SUBJECT TO SEVERE CRIMINAL PENALTIES.

DISSEMINATE IN ACCORDANCE WITH PROVISIONS OF OPNAVINST 5510.161, REfERENCE OJ).

HANDLING AND DESTRUCTION NOTICE: COMPLY WITH DISTRIBUTION STATEMENT AND DESTROY BY ANY METHOD THAT WILL PREVENT DISCLOSURE OF CONTENTS OR RECONSTRUCTION OF THE DOCUMENT.

PUBUSHED BY DIRECTION OF COMMANDER, NAVAL SEA SYSTEMS COMMAND

DEPARTMENT OF THE NAVY

NAVAl SEA SYSTEMS COMMAND

WASHINGTON, D. C. 20062

SPECIAL MANUFACTURING PROCESS

FOR PACKING TORPEDO STABILIZER

MARK 28 MOO 3, TORPEDO MARK 46

MODSOAND 1

NAVSEA 00 16188

SECOND REVISION CHANGE 6

0627-LP-356-9706

1 SEPTEMBER 1993

PAGE 1 OF 1 PAGE

PUBLISHED BY DIRECTION OF

COMMANDER, NAVAL SEA SYSTEMS COMMAND

After the attached enclosures have been Inserted. record this change on the change record sheet and msert this change guide between the front cover and title page.

The attached enclosures incorporate changes resu~ing from NOR 46-5/NUWC-K/5253/04.

Holders of this manual should incorporate this change in numerical sequence.

Incorporate the attached enclosure as follows:

Remove

Cover

Letter of Promulgation A

Insert

Cover Tille page A Foreword TMDER (3 copies)

NAVAL UNDERWATER SYSTEMS CENTER

Newport, Rhode Island 02840

To all holders of NAVSEA OD 16188

SECOND REVISION, CHANGE 4

insert change;

Approved by the Commanding Officer

Cb-b~~

J.E. SIRHALIS

By direction

NAVSEA 00 16188 SECOND REVISION

CHANGE 4

is changed as follows:

NAVSEA 00 16188

SECOND REVISION

CHANCE 5

CODE IOENT 53711

4 January 1979

Page 1 of 1 Page

SPECIAL MANUFACTURING PROCESS

FOR PACKING TORPEDO STABILIZER

MARK 28 MOD 3 TORPEDO MARK 46

MODS 0 AND 1

After the attached. encl osure has been inserted, insert this CHANGE guide behind the front cover and enter change on CHANCE RECORD page .

The purpose of this change is to correct static line extension and a general update of the document.

NOTE: The portion of the text affected by the latest change is indicated by a vertical line in the outer margin of the page.

Remove and insert the following page except where indicated:

l. A (Insert) 3. 1 thru 3

2. Change Record ( I nsert) 4. 8

Requests for additional copies of 01ANGE 5 to 00 16188 Second Revision, should be submitted to the Commanding Officer, Naval Ship Weapon Systems Engineering Station, Code 5740, Port Hueneme, CA 93043.

To all holders of NAVSEA OD 16188

SECOND REVISION, CHANGE 3

insart change;

Approved by the Commanding Officer

(~5.-~~~

J. E. SIRMALIS .

By direction

NAVSEA OD 16188 SECOND REVISION

CHANGE 3

is changed as follows:

NAVSEA OD 16188

SECOND REVISION

CHANGE 4

CODE !DENT 53711

2 November 1977

Page 1 of 1 Page

SPECIAL ~WFACTURING PROCESS

FOR PACKING TORPEDO STABILIZER

MARK 28 MOD 3

TORPEDO HARK 46 MODS 0 AND 1

After the attached enclosure has been inserted, i nsert t his OlANGE guide behind the front cover and mark on front cover "CHANGE 4 INSERTED" .

The purpose of this change is to substitute a cau tion flag for the caution tag .

NOTE; The portion of the text affected by the latest change is indicated by a vertical line in the outer margin of the page.

Remove and insert the following page.

1. Cover 3. 1 5. 8

2. Letter of Promulgation 4. 2

Requests for additional copies of CHANGE 4 to OD 16188 Second Revision, should be submitted to the Commanding Officer, Naval Shi p Weapon Systems Engineering Station, Code 5740, Port Hueneme, CA 93043 .

Newport, Rhode lslond 02840

To all holders of NAVSEA OD 16188

SECOND REVISION, CHANGE 2

insert change;

Approved by the Commanding Officer

~£. _.fl._..' o:;o;; E. SIRMALIS

B direction

NAVSEA OD 16188 SECOND REVISION

CHANGE 2

is changed as follows:

NAVSEA OD 16188

SECOND REVISION

CHANGE 3

CODE I DENT 53711

15 August 1977

Page 1 of 1 Page

SPECIAL MANUFACTURING PROCESS

FOR PACKING TORPEDO STABILIZER

MARK 28 MOD 3

TORPEDO MARK 46 l!ODS 0 AND 1

After the attached enclosure has been inserted, insert this CHANGE guide behind the front cover and mark on front cover "CHANGE 3 INSERTED" .

The purpose of this change is to update instructions for tightening parachute can clamp spring.

NOTE: The portion of the text affected by the latest change is indicated by a vertical line in the outer margin of the page.

Remove and insert the following page.

1. 8

Requests for additional copies of CHANGE 3 to OD 16188 Second Revision, should be submitted to the Commanding Officer, Naval Ship Weapon Systems Engineering Stat ion, Code 5740, Port Hueneme_. CA 93043.

To all holders of NAVORD OD 16188

SECOND REVISION, CHANGE 1

inser t change;

Approved by ~he Commanding Officer

~f· _;2__.c- :JOHNi. SIRMALIS By direc~ion

NAVSEA OD 16188

SECOND REVISION

CHANGE 2

CODE !DENT 10001

25 May 1977

Page 1 of 1 Page

NAVORD OD 16188 SECOND REVISION

CHANGE 1

is changed as follows:

SPECIAL MANUFACTURING PROCESS

FOR PACKI NG TORPEDO STABILIZER

MARK 28 MOD 3 .

TORPEDO MARK 46 MODS 0 AND 1

Af~er ~he a~tached enclosures have been inserted, insert this CHANGE guide behind the front cover and mark on front cover "CHANGE 2 inserted".

The purpose of this change is to provide a loop in the i nsulated nylon cord to pre vent restricting the opening of the hinged valve of the parachute can by a nylon cord t hat has been installed too tight.

NOTE: The portion of the tex t affected by the latest change is indicated by a vertical line in the outer margin of the page.

Remove and insert the following pages unless indicated otherwise:

L Cover

2. Signature page ( remove)

3. Letter of Promulgation (insert)

4. 8

Requests for additional copies of CHANGE 2 to OD 16188 SECOND REVISION should be submitted to the Commanding Officer, Naval Ship Weapon Systems Engineering Station, Code 5740, Port Hueneme, CA 93043 .

!lAVAL UNDERIIA':ER SYS'l:E2'18 CEN7ER Newport , R. I. 02840

To all holders of NAVORD OD 16188 (SEX:OND REV::SI ON} insert change;

.A,pproved by the Camnanding Officer

; L. WINNICK

By direct i on

NAVORD OD 16188

S~Oiii) REVISIOK

CHANGE 1

CODE IDEN'l' 10001

6 September 1972

Page 1 of 1 Page

MAVOrtD OD 16188 SECOND m;v-_sroN is changed as follO'..rs:

SPEX:IAL MANUFAC'ruRDIG PROCESS

FOR PACIC1:G TORPEDO

STABILIZER MARK 28 MOD 3,

TORPEDO MK 46 MOD 0 AND 1

After l;he attached enclosures have been inserted, inser:;; this Cl!AliGE guide behind the front cover and mark on front cover "CHANGE 1 INSERTED" .

The purpose of t his change i s to del e t e torque r equiremenc and updat e document .

NOTE: On a changed page, the portion of the text a ffected by the latest c hange is indicated by a vertical line in the outer margin o!' the page.

Remove and insert the following pages •

1 . Pages 2 and 8.

Requests for additionAl. copies of CHANGE 1 to OD 16188 SECOND REVISION should b~ submitted to the Commanding Officer, Naval Ordnance Station1 Louisville, Kentucky 40214 .

NAVSEA OD 16188

0627-LP-356-9700 SECOND REVISION

TECHNICAL MANUAL

FOR

SPECIAL MANUFACTURING PROCESS

FOR PACKING

TORPEDO STABILIZER MARK 28 MOD 3

TORPEDO MARK 46 MODS 0 AND 1

DISTRIBUTION STATEMENT D: DISTRIBUTION AUTHORIZED TO OOD AND DOD CONTRACTORS ONLY; CRITICAL TEC"*lOLOGY: DATE OF PUBUCA110N. OTHER U.S. REQUESlS SHALl SE REFERRED TO NAVAL UNDERSEA WARFARE

CENTER DIVISION (CODE 32), KEYPORT, WA 983AS..7610.

WARNING: THIS DOCUMENT CONTAINS TECHNICAL DATA WHOSE EXPORT IS RESTRICTED BY THE ARMS EXPORT CONTROLACT(TlTLE22, U.S.C. SEC.2751 ETSEO.)ORTHE EXPORT ADMINISTRATION ACT OF 1979, AS AMENDED, mLE 50, U.S.C., APP 2401, ET SEQ. VIOLATIONS OF THESE EXPORT LAWS ARE SUBJECT TO SEVERE CRIMINAL PENALTIES.

DISSEMINATE IN ACCORDANCE WITH PROVISIONS OF OPNAVINST 5510.161, REFERENCE (j).

HANDLING AND DESTRUCTION NOTICE: COMPLY WITH DISTRIBUTION STATEMENT AND DESTROY BY ANY METHOD THAT WILL PREVENT DISCLOSURE OF CONTENTS OR RECONSTRUCTION OF THE DOCUMENT.

PUBUSHED BY DIRECTION OF COMMANDER, NAVAL SEA SYSTEMS COMMAND

CHANGE 6

1 MARCH 1970

15 SEPTEMBER 1993

LIST OF EFFECTIVE PAGES

NAVSEAOD 16188

SECOND REVISION

Dates of original and changed pages are:

Original ...... 0 . . . . . . . . . . . . . . . 1 Mar70 Change ... .. 4 Change 1 ............... 6 Sep 72 Change ...... 5 Change ..... 2 . .............. 25 May77 Change ..... 6 Change ..... 3 . .............. 15 Aug 77

Total number of pages In this publication Is 34 consisting of the following single sided pages:

Page No.

'Change No.

Title A Change Record Foreword 3 through 9 10 ............ •

·zero In this column indicates an original page.

2 Nov 77 4 Jan 79

15Sep93

CHANGES A

NAVSEA TECHNICAL MANUAL CERTIFICATION SHEET _j_ol_l

Certification Apploes to: NewManuaiO RevisionO Cha/1980

Applicable TMINS/Pub. No. NAVSEA OD 16188 SECOND REVISION CHANGE 6

Publication Date (Mo. Da. Yr) SEPTEMBER 15. 1993

Reacng Grade Level (RGL): NINTH GRADE litle:

SPECIAL MANUFACTURING PROCESS FOR PACKING TORPEDO STABILIZER MARK 28 MOD 3,

TORPEDO MARK 46 MODS 0 AND 1

TMCR/TMSR/SpecifiC8tion No .. TMCR 880046-000

CHANGES AND REVISIONS:

Purpose: To incorporate NOR 46-5/NUWC-K/5253104 changes.

Equl\l<l>8f1( Afteralion Numbers Incorporated: NIA

TMDER/ACN Numbers Incorporated: N/ A

Continue on revtNSII SJdB or add pages as needed.

CERTIFICATION STATEMENT

This is to certify that responsible NAVSEA activities have reviewed the above identifi ed document for acquisition compliance, technical coverage, and printing quality. This form is for internal NAVSEA management use only, and does not imply contractual approval or acceptance of the technical manual by the Government, nor relieve the contractor of any responsibility for delivering the technical manual in accordance with the contract requirement.

Authority Name Signature Organization Code Date

Acquisition A. BJORGEN /hqq_ ' NUWC 3224 ~79, Teclncal V. JONES (), (/ , For .tJJ_ \ L oo. NUWC 3221 IL/16/q~

'~;. Printing Releu. C. BROUSSARD ~.~Ofld_ NUWC 3224

NAVSEA 4160/8 (2-91) "

CHANGE RECORD

CHANGE NO. DATE

CHANGE 5

NAVSEA OD 16188

(2ND REV)

DATE INSER':'ED

Change Record

FOREWORD

SECOND REVISION

NAVSEA 00 16188 provides instructions for packing Torpedo Stabilizer Mk 28 Mod 3. The instrue1ions con tained herein ar intended for use by manufacturing activlbes engaged in the packing of a~rcraft tOJpedo stabi lizers.

The information contained in this manual is presented In four sections:

Section 1.

Section 2.

Section 3.

See1ion 4.

lntroductlon Documentation Parts, Equipment. and Consumable Supplies Packing Procedures

Ships, training activities, supply points, depots, Naval Shipyards, and Supervisors of Shipbuilding are re quested to arrange for the maximum practical use and evaluation of NAVSEA technical manuals. All errors, omission, discrepancies, and suggestions lor improvement to NAVSEA technical manuals shaH be forwarded to:

COMMANDER

CODE5B60

NAVSURFWARCENDIV

4363 MISSILE WAY

PORT HUENEME, CA 93043-4307

on NAVSEA Technical Manual Deficiency/Evaluation Repon form NAVSEA 4160/1. All feedback comments shall be thoroughly investigated and originators will be advised of action resulting therefrom. Three copies of form NAVSEA4160/1 are onduded at the end of each separately bound technical manual &-112 x 11 inches or larger. Copies of form NAVSEA 416011 may be requisitioned from Standardization Documents Order Desk, Building 40, 700 Robbins Avenue, Philadelphia, PA 19111-5094.

CHANGE 6 Foreword

1 . INTROOOC'!'ION

SECOND REVISION

1.1 This publication contains information concerning packing Torpedo Stabilizer Mk 28 Mod 3 DL1330711. Adherence to these instructions will assure proper packing and assembly of the torpedo s tabilizer.

2 . APPLICABLE DOCUMENTS

2.: The !ollowino documen~s are referenced within this publication:

SPEC!FICATIOtiS

MILITI\.RY

MIL-I-631

MIL-c-5040

M:L-c-7515

MS35275

MS122030

FEDERAL

Insulation, Electrical, Synthetic Resin Composition, Non Rigid

Cord, Nylon

Co::-d, Nylon

Sc::-a..•, Mach1ne Drilled Filliscer Head, Slott.ed, corrosion Resisting Steel washer. Lock Spring

IND-STI> ASTM A580

(A:.T: ASTM A313 )

Wire. Steel. Corrosion Resisting

STANDARDS

FEDERAL

A-A-131

MS35206

(!\LT MS519571

MS3367

::JRAWINGS

Commercial Icem Description, Rubber Band

Screw, Machine

Strap, Tiedown, Electrical Components, Adjustable, Se:!-clinching, Plastic, Type 1, Class 1

NAVAL SEA SYSTEMS COMMAND

LD 541260 Parachute, Mk 32 Mod 0

LD 53749 Parachute Can, Clamp

CHANGES

I

NAVSEA OD 16188 (2ND REV)

011330712 Torpedo Parachute Release Mk 32 Mod 1

PL1330711 Torpedo Stabilizer Mk 28 liod 3

1330711 Torpedo Stabilizer Mk 28 Mod 3

011330714 Shipping (Packing) Condition Stabilizer Torpedo Mk 28 Mod 3

1330714 Shipping (Packing) Condition Stabilizer Torpedo Mk 28 Mod 3

1330750 Washer , Flat

2048395 Screws, Self Locking

3262057 Flag, caution

3. PAR':$, EQUIPMENT, AND CONSUMABLE SUPP:i:.IES

3.1 Parts. The parts required for packing t he torpedo stabilizer are lis•ed on PL13307ll.

3.2 Equipment . The equipment used to pack the torpedo stabilizer is listed in table 1 of this publication.

3. 3 Consumable Supplies . The consumable supplies used in packing the torpedo stabilizer are lis•ed on PL13307ll end in table 2 of this publ:.cation.

Table 1 . Special Tools and Equipment

EQUIPMENT PROCESS SOURCE OF SPECIFICATION

3-6 ton hydraulic Operate compressor Coml.

arbor press

Parachute Compressor Compress parachute SA7088192

Pedestal Assembly Remove parachute SA7087213 from canpressor

Band Clamp Secure parachute Coml.

can

Rub~r Mallet Secure parachute C=l..

can

CHANGE 5 2

SECOND REVISION

Table 2 . Consumable Supplies

Insul ation, electrical, Synthetic Resin Composition, Non Rigid

Cord Nyl on 550 lb Test

Rubber Band

Lockwire

Wire

Screws

Screws

Strap, Cabl e

Washers

Washers

4. PACKING PROCEDURES

PROCESS

Prepare parachute can

Prepare parachute can

Secure loops

Secure clamp

Secure gas generators

Securing closure and parachute release

Secure f orward closure p l ate

Secure t:ies

SOURCE OR APPLICABLE

SP!C!FICA'l'!ON

MIL-I- 631, Type F Form U, Grade A Class I, Category I

YJL-c-5040, Type III or MIL-C-7515, Type II

A-A- 131 size 64

MS20995F4l-4

IND-STD ASTH A580

(hL'l': A3 13)

MS35275

2048395- 6

MS3367-2

(ALT: MS3367-1)

Securing closure and MS122030 parachute rel ease

Securing ~orward closure 1330750 plate

4.1 Ge:>eral. Packing torpedo stabilizer consises of p::-eparing Parachuee Mk 32 Mod 0, preparing the parachute can, compressing ehe parachute, and packing the compressed parachute into the can.

4.2 Procure all parts and materials listed on PL13307l1 .

4.3 Preparaeion of Parachute. Prepare Parachute Mk 32 Mod 0 LD 541260 for packing as follows:

4.3.1 Lay parachute on clean work bench and extend to its full length.

CHANGE 6 3

I

NAVSEAOO 16188

4 . 3 . 2 Temporar i ly secure a working line co vent lines at cop of parachute canopy.

4.3.3 Secure free end of working line co fixed object attached co end of bench.

4. 3. 4 Extend parachute and suspension lines co ~ull length along work bench by pulling Parachute Ring 2158776.

4.3.5 Locate the gore between suspension lines 7 and 6 and place it outside do~~ on the work bench.

4. 3. 6 Deleted.

4 . 3.7 Fold the gore between suspension lines 6 and 5 so that line 5 lies on top of line 6 and ~e fold lies along the center line of the gore between lines 6 and 7. See figure 1.

4.3.8 Position line 5 so that the reefing ring or bracket faces down.

4.3.9 Fold the gore between suspension line 5 and 4 so that. line 4 lies on top of line 5 and the fold coincides with the :old in the gore prepared in paragraph 4.3.7.

4.3.10 Fold each gore in the above manner until line l ic reached. Verify that the reefing l ine attachment (either ring or cutter bracket) on lines 2, 4, 6 face up while those on lines l, 3, 5 face down.

4.3.11 Fold the gore between suspension lines 7 and 8 so ~~t line 8 lies on top of line 7 and the fold lies along the center line of the. gore between lines 6 and 7 .

4.3.12 Deleted.

4.3.13 Fold the gore between suspension lines 8 and 9 so ~~at line 9 lies on top of :ine 8 and ~old coincides with the fold in che gore prepared in paragraph 4.3.11.

4.3. 14 Fold each gore in the above manner until line 12 is reached. Verify that the reefing line attachment (either ring or cucter bracket) on lines 7, 9, 11 face up while those on lines 8, 10, 12 face down.

4.3.15 Arrange suspension lines around ring, ~n proper sequence.

CHANGE 6 4

NOTE

Verify chat two turns of 0.032 diamecer wire QQ-W-423 FS- 302 Condition A, has been installed through the eyes in the gas generator firing sears of the parachute release and secured as shown on dwg 1330711.

NAVSEAOD 16188

SECOND REVISION

4.3. 16 Install Parachute Release DL1330712 on parachute ring with two screws

MS35206-282 (ALT: MS51957-82). I

4.3.17 Pl ace parachute release on Pedestal ASsembly SA7087213 with the gas generator firing sears down.

4.3. 18 Secure Forward Closure 2132301 to parachute release with six Screws MS35275, and washers MS122030.

4.3.19 Remove parachute release from pedestal assembly.

4. 3 .20 Starting 16 inches from Ring 2158776, gather each pa~r o: sus~~sion lines into 4-inch long bundles up to the attachment po~nts o: the static line harness and secure with Rubber Band, A-A-131 size 64. Do not include harness lines or static line in loops.

4.3.21 Starting 8 inches from the skirt of canopy, gather each pair of suspension lines (e.g., Lines 1&2, 3&4, 5&6, etc. ) into 4-inch long bundles gradually working down to ~~a harness attachment points and secure with Rubber Band, A-A-131 size 64.

4.3.22 Make a 2-1/2 inch loop in suspension line at parachute release firing lanyard and secure with Rubber Band, A-A-131 size 64 as shown on dwg 1330711.

4.4 Packing Compressor

4.4. 1 Position Base SA7088183 on press.

4.4.2 Place Housing SA7088191 with Holding Ring SA708818~ ~stalled on work bench near parachute release.

4.4. 3 Remove working l ine attached in 4.3.2 from the canopy vent lines.

4.4.4 Temporarily secure a working line to the parachute vent lines in such a way that ~~e canopy can be suspended by tile working line ··.ri~~ the skirt ribbon :s i:lches a.bove the bench and graduall y l owered.

4.4. 5 Secure the parachute release firing lanyard, as prepared in paragraph

4.3.22 to the wire ring to the parachute release gas generators using a bowline knot and two cable straps as shown on dwg 1330711. Make sure that ~he ~istance from the parachute re:ease firing ring to the s~spension li~e to which the lanyard is attached is less chan 2 inches.

CHANGE6 5

I I

4.4.6 Place Center Post SA7088188 over parachute release, making sure the parachute releaae f i ring lanyard passes through the slot in the post .

4.4. 7 Place two Rubber Bands, A-A- 131 s i ze 64 over center post.

4.4.8 Form an eight inch loop in each pair of suspension lines between the parachute ring and the four inch bundles prepared in 4.3.20 by tucking the lines under the rubber bands installed on the center post in 4.4.7.

4. 4. 9 Distribute the loops a.bout t.he circumference of the cencer post so Chat they are in line with their respective attachment points on che parachuce ring.

4.4.10 Stack the suspension line bundles on the forward closure place adjacent to their respective ring attachmenc points. Position bundles

I prepared in 4.3.20 on the bottom. Keep the static line and harness lines 1 outside of the stacked bundles.

4.4.11 Lif t the forward closure and parachute re lease assembly using both hands by placing the finger tips under the parachute ring .

4. 4 . 12 Gradually lower =he assembly into the housl.ng until it bottoms agains t the holding ring.

4 . 4 .13 With suspension lines 1 through 6 on the right hand s i de and 7 t hrough 12 on the left hand side, position the assembly so that the static line and harness lines free lengths come towards the operator. Gather the four harness lines together to the base o= the center post on the side teeing the operacor. Fold the gathered harness line in half, posicioning the vinyl loop of the stacic line along the edge of the forward closure next co che gathered harness lines. Lay the folded harness lines at the base of the center pose adjacent to che bundles. sec the free length of the stecic line oucside of the housing so Chat it hangs adjacent to che point of the vinyl loop location (i.e., static line should come up the inside and go down the outside o! the housing at the same location) .

4.4.14 LOwer the suspended canopy until che bottom horizontal ribbon can be positioned around the inside circumference of the housing.

4. 4 .15 Pack r emainder of parachute into c0111pressor, distributing it evenly around center post by gradually lowering the canopy inco the housing and forcing down repeatedly with finger tips.

4.4.16 Separate vent lines so that vent can be pushed down around center post without vent lines catching on the cencer post.

4.4.17 Lay f~ee length of scatic li~e on top of packed canopy.

4.4.18 Posi tion packed housing on Base SA7088183 in press. Make sure scr ews that hold forward closure to parachute release seat in clearance hol es in base.

4.4.19 Instal l guide ring pressure ring assembly in compressor.

CHANGE 6 6

4.4.20 Apply pressure uncil pressure ring boctoms againsc housing.

4.4.21 Switch Rods SA7088190-1 into slots on pressure ring and tighten hand knobs to hold parachute in compressed condition.

4.4.22 Release press pressure and remove housing fro~ base and leave parachute secured in housing a minimum of two hours.

NOTE

Less expansion will be encountered, when parachute is removed from housing, if allowed to stand for a longer period of time.

4. 5 Preparation of Parachute Can. Prepare pa:::achute can as follows.

4.5.1 Using existing holes in Clamp 2158783 as guides, and with Strap 2158780 straddling the groove in Can 2132250, match drill through, using

0.125 drill. Rivet clamp to can as shown on dwg 1330711.

4.5.2 Pull a 12-inch length of Electrical Insulation, Specification Y.IL-I-631 , ~e F, Form u, Grade A, Cl ass l, Category l, over a 48 inch length of 500-po~d test Nylon Cord, Spec:f1cat:on MI~-c-5040, Type III or MIL-C-75!5 , Type II.

4.5.3 Open parachute can and run nylon cord through the two holes in the hinged end of the can. Work insulation through holes until the holes are centered on the insulation.

4.5.4 Position nylon cord in the insulation as shown on dwg 1330711 and secure w~th a bowline knot and two cable straps.

~.6 Packing Pa:achute in Parachute Can. Pack parachute in parachute can as follows.

4.6.1 Loosen hand knob and swing rods free of pressure ring . Remove guide ring pressure ring assembly.

4. 6. 2 Re:•ove con;;>ressor center post by pulling straight up on the 0. SO inch cross bar.

4.6.3 Position exhaust valve. ex~ending from bottom of compressor housing, on pedescal assembly.

4.6.4 Lift free length of stati c line from top of compressed parachute and hang over the edge of the housing. Insure that the static line hangs over the edge of the housing on the same side of, and in line with, the vinyl loop.

4.6.5 Secure free end of nylon cord attached to parachute can in 4.4.4 to vent lines of parachute as shown on dwg 1330711 .

NOTE

Make sure that knot includes all of the vent lines and it allo~o'S the vent lines to center themselves when force is appl1ed to :i~es.

CHANGES 7

NAVSEAOO 16188

4.6.6 Place hands on circumference of housing and push down sliding the housing off of dle compressed parachute.

4.6.7 Place parachute can over compressed par achute and orient clamp latch relative to stat ic line as s hown on dwg 1330711.

4.6.8 Posit~on :orward closure in r ecess of parachute can, then clamp static line between forward closure and can.

4.6.9 Temporar i ly secure parachute can by placing a 10 1/2-inch f l at band clamp around center of can.

4.6.10 Tighten nut on band clamp to draw sides of can together. Be sure forward closure remains positioned in recess of can.

4.6.11 Connect Parachute c an Clamp LD 535749.

4.6.:2 Pull s"acic line so that a minimum of 35 inches o: line extends from can.

4.6.13 Safety wire Caution Flag 3262057, in position with Lockwire MS20995F41-4. Run wire from cam of parachute can clamp to hole in top ot rim of parachute can.

4 .6.14 Pull insulation cover ed nylon cord to form a loop lar ge enough to allow passage of a 1 l/2-inch diame t er rod between loop and can. Do not form an excessive size loop.

4.6 . 15 Tighten nut of parachute can clamp until Helical Spring 2132740 is compressed unti l the spri ng coils touch each other . Do not overcompress.

4.6.16 Remove olat band f r om parachute can.

4.6.17 I.nstall eight Washers, 1330750 and eight Self Locking Screws 2048395-6 in forward closure plate a s shown on 1330711.

4. 7 MArking and Packing. Mark and pack parachute can as follows.

4 .7.1 Apply Name Plate 1330720 to parachute can as indicated on dwg 1330711.

4 .7. 2 Pack Torpedo Stabilizer Mk 28 Mod 3 for shipmen t as shown on DLl3307l4 and dwg l3307l4.

CHANGE 6 B

GUIDE RING

PARACHUTE

RELEASe;

(REF)

HAND KNOB

PRESSURE RING

. l

'-··1 r· L, .·j

BASE

HAVORD Or :.6;. oc (:?Nt ID')

ROO

CENTER POST

HOUSING

HOLDING RING

Figure 2. Compressor Fixture.

File details come from the government source that posted it. Updated .