This is a Class Justification and Approval (CJ&A) document for a sole source contract award by the Department of the Navy.
The document authorizes the award of multiple contract actions on a sole source basis to National Steel and Shipbuilding Company (NASSCO) for Detail Design and Construction (DD&C) of two AS(X) Class Submarine Tender Replacement ships. The anticipated contract award is in Fiscal Year 2027, with the first ship delivery expected in a redacted timeframe and the second ship delivery in another redacted timeframe. The authority to act under this class justification expires on May 31, 2035, upon final acceptance, or when the second ship reaches its Shipbuilding and Conversion, Navy (SCN) Obligation Work Limiting Date (OWLD), whichever is latest. The total estimated dollar value for procurement of the two ships is redacted, with outfitting and post-delivery efforts valued at a redacted amount. Design maturation and Vendor Furnished Information (VFI) procurement efforts totaling a redacted amount will be funded with FY 2027 Research, Development, Testing, and Evaluation, Navy (RDT&E,N) funds.
The justification cites 10 U.S.C. § 3204(a)(1) as statutory authority, establishing that only one responsible source (NASSCO) can satisfy agency requirements. NASSCO is determined the sole capable shipbuilder because it performed both the AS(X) Concept Refinement and Preliminary Design effort and the subsequent design studies and design maturation efforts. Award to another source would result in unacceptable delays of a minimum one year and substantial cost duplication estimated at a redacted amount in engineering and government costs, plus a minimum redacted amount in escalation costs. The Navy conducted multiple competitive solicitations (2018 CHAMP Industry Studies, 2021 AS(X) Preliminary Design, and 2023 AS(X) DD&C), but only NASSCO submitted an offer in the 2023 full and open competition. Subsequent market research and a Notice of Intent to Sole Source posted on July 16, 2026, generated no additional interest. As a mitigation measure, NASSCO will be required to compete subcontractor efforts to the maximum extent possible, with subcontracting goals established and approved by the Government through NASSCO's subcontracting plan.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF THE NAVY
OFFICE OF THE ASSISTANT SECRETARY OF THE NAVY
(RESEARCH, DEVELOPMENT, AND ACQUISITION)
1000 NAVY PENTAGON
WASHINGTON, DC 20350-1000
In reply refer to:
CJ&A 22,621
CLASS JUSTIFICATION AND APPROVAL (CJ&A)
FOR USE OF OTHER THAN FULL AND OPEN COMPETITION
1. Contracting Activity
The Portfolio Acquisition Executive (PAE) Maritime, Acquisition and Contracts (Maritime 02).
2. Description of the Action Being Approved
This Class Justification and Approval authorizes and approves the award of multiple contract actions on a sole source basis to National Steel and Shipbuilding Company (NASSCO) for the Detail Design and Construction (DD&C) of two AS(X) Class Submarine Tender Replacement ships. The AS(X) DD&C contract is anticipated to be awarded in Fiscal Year (FY) 2027. The first ship delivery is anticipated in , and the second ship delivery is anticipated in
Authority to act under this class justification expires on May 31, 2035, upon final acceptance, or the month in which the second ship reaches its Shipbuilding, and Conversion, Navy, (SCN) Obligation Work Limiting Date (OWLD), whichever is latest.
3. Description of Supplies/Services
The planned contract will provide for the procurement of two AS(X) Class Submarine Tender Replacement ships, including: the completion of design maturation, procurement and integration of Vendor Furnished Information (VFI), detail design, construction, data, provisions for the procurement of onboard spares and repair parts, outfitting, major shore based spares, engineering and industrial support, special studies, emergent material and support, technical manuals, and other direct costs.
The AS(X) Class Submarine Tender Replacement ships provide a number of critical upgrades over the existing submarine tenders with regard to providing services to submarines alongside.
The AS(X) Class will be purpose-built to support both COLUMBIA-class and VIRGINIA-class submarines
Upgrades specific to the AS(X) Class and the tending of future submarine classes include
. The first hulls of both the COLUMBIA and VIRGINIA Block V Classes are estimated to be delivered
CJ&A No: 22,621
The total estimated dollar value for the procurement of two AS(X) Class Submarine Tender Replacement ships is $ million (M). The total estimated dollar value for outfitting and post-delivery for both ships is $ . The DD&C efforts will be funded with FY 2027 SCN, with outfitting and post-delivery efforts planned outside of the Future Years Defense Program (FYDP). Additionally, the total estimated value to complete design maturation and VFI procurement and integration is $ . These efforts will be funded with FY 2027 Research, Development, Testing, and Evaluation, Navy (RDT&E,N).
The Government’s minimum needs have been verified by the certifying technical and requirements personnel.
4. Statutory Authority Permitting Other Than Full and Open Competition
10 U.S.C. § 3204(a)(1), Only one responsible source and no other supplies or services will satisfy agency requirements.
5. Rationale Justifying Use of Cited Statutory Authority
As one of the shipbuilders that performed the AS(X) Concept Refinement and Preliminary Design (PD) effort and the only shipbuilder that performed the follow-on design studies and design maturation effort, NASSCO is determined the only shipbuilder capable of performing this subsequent production effort for AS(X) DD&C in accordance with 10 U.S.C. § 3204(b)(B).
Awarding to another source would result in unacceptable delays in fulfilling the program’s requirements and substantial duplication of costs to the Government that are not expected to be recovered through competition.
The AS(X) Class Submarine Tender Replacement ships are specifically designed to support deployed VIRGINIA Class (VCS), COLUMBIA Class (CLB), and future generation submarines.
AS(X) is required to support all aspects of I-level maintenance and support to deliver expeditionary tending services to CLB and VCS Block V (and later) submarines and Unmanned Underwater Vehicles. This effort requires a specialized knowledge of the ship’s mission, design, systems, and commercial standards.
NASSCO has completed several efforts towards the AS(X) Class Submarine Tender Replacement ships design through various phases to include Industry Studies, Special Studies, PD and Design Maturation (DM)/Contract Design (CD). These efforts have either been completed or will be completed between FY 2019 and FY 2027. These design phase contracts were awarded on competitive and sole source bases. NASSCO has performed sole design yard efforts in support of AS(X) Class development for over two years. The sole design efforts performed by NASSCO will total three years by FY 2027. One year of the three-year design development timeframe was utilized to investigate capability reductions in the pursuit of program affordability. These capability reductions, already being accomplished, would not require a duplication of effort. However, while the Government retains the right to distribute non-proprietary design work completed to date, rework of the existing Technical Data Package (TDP) by another supplier to suit yard specific production processes would be required prior to furthering the design in support of Start of Construction (SOC). Award to another source would therefore result in an unacceptable delay of a minimum one year. If another supplier was selected, an estimated three months for shipyard review and familiarization with an additional nine months of rework to the TDP would be required. Schedule delay was estimated by PAE Maritime Ship Design Manager (SDM) based on subject matter expertise related to technical document packages. The combined 12-month period reflects the time needed not merely to transfer existing technical data, but to adapt, validate, and mature the package for a different industrial base and production environment. The receiving shipyard must first conduct a comprehensive assessment of the existing design package, including drawings, specifications, production sequencing, material requirements, testing requirements, and shipyard-specific construction assumptions. This review is necessary to identify differences between the original shipyard’s facilities, workforce capabilities, production methods, tooling, supplier base, and integration approach and those of the prospective shipyard. Attempting to shorten these activities would increase the likelihood of incomplete design integration, unanticipated production constraints, schedule disruption, cost growth, and post-award engineering changes. This delay applies to the projected design and construction schedules of the AS(X) Class during the DD&C contract and includes impacts due to loss of key subject matter experts and loss of the associated knowledge base, as well as delays in design maturity due to the aforementioned rework to the design if another supplier was selected.
Delays to the AS(X) Class award timeline would directly affect the production lead-time for the one-for-one replacement of the existing Emory S. Land Class (AS-39 and AS-40) submarine tenders. Both existing submarine tenders are already past their original service life by almost a decade at nearly 50 years old. Further extensions to service life would require additional maintenance and repair costs. If their service life is continually extended then the failure modes associated with operating a ship at sea become more frequent and severe, causing the operational availability of the existing submarine tenders to decrease. Furthermore, the operational capability to provide support to, and perform maintenance on, the Navy’s submarine fleet would be negatively impacted by delays to the design and construction of the AS(X) Class Submarine Tender Replacement ships. The Emory S. Land class submarine tenders are only capable of providing limited maintenance services to future submarine classes, and the AS(X) Class ships will not be operational until , based on the current acquisition schedule.
There would also be a substantial duplication of costs associated with past and current contracted design efforts if an alternative supplier were to develop or acquire the expertise needed to accomplish design work to meet the requirements of this effort. Additional costs associated with the TDP rework are estimated to be $ in engineering and Government costs. This estimate was based on historical labor burn rates from various comparable shipyards that execute Government shipbuilding contracts. The monthly labor burn rates were averaged and multiplied by the schedule delay of 12 months. Moreover, one year of delays in the DD&C contract schedule increases the overall cost to the program by a minimum of due to escalation over the entire delay period. Lack of competitive interest in the AS(X) program, as described below, makes recovery of these duplicated costs through competition very unlikely.
6. Description of Efforts Made to Solicit Offers from as Many Offerors as Practicable
Between June and September of 2018, an Industry Day and Pre-Solicitation notice were released via SAM.gov for the Common Hull Auxiliary Multi-Mission Platform (CHAMP) Industry Studies. In February 2019, the competitive solicitation for the CHAMP Industry Studies was posted via SAM.gov. The solicitation package included design efforts specific to a future Submarine Tender. A total of four responses were received from Bollinger Shipyards Lockport, L.L.C., NASSCO, Philly Shipyard, Inc., and VT Halter Marine. All four Shipyards that responded were awarded contracts.
In August of 2021, the Navy posted a pre-solicitation notice for an AS(X) PD effort via SAM.gov. In October 2021, a competitive solicitation was posted via SAM.gov for the AS(X) PD effort. A total of six responses were received from Bollinger Shipyards Lockport, L.L.C., Huntington Ingalls Incorporated – Ingalls Shipbuilding (HII), L3 Harris Technologies (L3), NASSCO, Serco Incorporated, and VT Halter Marine. Through a source selection process, three awards were made to HII, L3, and NASSCO.
In March of 2023, a Pre-Solicitation and Industry Day notice was posted via SAM.gov for a full and open competition for the DD&C of two AS(X) Class Submarine Tender Replacement ships.
Prior to Industry Day, interested entities were provided with the draft AS(X) DD&C solicitation and associated attachments for review and questions. On 18 April 2023, an Industry Day for AS(X) was held in support of the forthcoming AS(X) DD&C efforts. Major shipyards in attendance at that time included Austal USA, HII, and NASSCO.
However, on 31 July 2023, the Navy released a solicitation for a full and open competition for DD&C of two AS(X) Class Submarine Tender Replacement Ships, and only received one offer, from NASSCO, on 18 December 2023. The 2023 DD&C competition provided further insight into the level of interest within the industrial base. Two out of three original PD participants did not respond to the 2023 DD&C Solicitation. Ship quantity, design complexity, and concurrently competed ship programs were factors in the low interest from shipbuilders. Shortly after the DD&C offer was received, the AS(X) SCN budget was marked to zero with a plus-up of
RDT&E.
NASSCO, the singular offeror, has been engaged with the Navy in various efforts between FY24 and present to mature the design and improve affordability and cost certainty. Multiple efforts were awarded under the existing Preliminary Design and Concept Refinement contract between 2024 and 2025.
On 08 May 2024, a synopsis and a redacted sole source J&A was posted on SAM.gov, which encompassed multiple planned efforts. No additional companies expressed an interest in this requirement at the prime level. One Service-Disabled Veteran-Owned Small Business vendor responded to the synopsis. The program provided a capability analysis and determined that this company did not possess the required resources or facilities to perform this effort at the prime level and referred the vendor to the NASSCO Contracts point of contact for subcontracting opportunities. The first effort, a 100-day study, was therefore tasked to NASSCO on 08 July 2024. This effort evaluated a tiered capability reduction approach to reduce overall program cost.
A follow-on, single-participant PD effort was then tasked to NASSCO on 15 January 2025 to incorporate design changes associated with the results of the 100-day study. On 30 June 2025, a Design Maturation/Contract Design effort was tasked to NASSCO. This is a continuation of efforts to improve affordability and mature the existing AS(X) design. Work under this award is ongoing and the expected period of performance completion date is 31 January 2027.
On 16 July 2026, the Navy released a ‘Notice of Intent to Sole Source’ via SAM.gov detailing the Government’s intention to award a sole source DD&C contract for the procurement of two AS(X) Class Submarine Tender Replacement Ships to NASSCO. The notice was open for responses through 31 July 2026. No responses were received as a result of the SAM.gov post.
7. Determination of Fair and Reasonable Costs
The Contracting Officer has determined the anticipated cost to the Government of the supplies/services covered by this CJ&A will be fair and reasonable.
8. Actions to Remove Barriers to Competition
As this is a subsequent effort to previously awarded design efforts addressed in J&A 21,967, the Navy evaluated the feasibility of conducting a new DD&C competition and conducted additional market research as described above. NASSCO remains the only interested source capable of performing the AS(X) DD&C effort. However, NASSCO will be required to compete subcontractor efforts to the maximum extent possible to encourage cost savings to the Government. The NASSCO subcontracting goals will be established and approved by the Government via the NASSCO subcontracting plan.