This is a questions and answers document containing 218 technical questions and government responses related to solicitation N00024-25-R-4421 for the USS THE SULLIVANS (DDG 68) FY25 Docking Selected Restricted Availability (DSRA).
The Q&A addresses various technical specifications, work items, drawings, references, and requirements including clarifications on tank repairs, structural work, equipment installations, preservation requirements, temporary services, and government furnished material. Key clarifications include: the cancellation of work item 992-11-010 for heavy weather preparations, updates to government furnished material listings in Attachment J-8, changes to out-of-homeport work items, corrections to technical manual references, and modifications to required report submissions. The government declined requests for additional proposal extensions beyond the previously granted 7-day extension. Multiple questions sought clarification on reference revisions, material specifications, and work item requirements which were addressed through upcoming errata changes.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 25-C-4421 A0004.pdf | ||
| 25-C-4421 A0003.pdf | ||
| 25-C-4421 Conformed A0003.pdf | ||
| 25-C-4421 Conformed A0004.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation # N00024-25-R-4421
NAVSEA POC Brian Romano, brian.c.romano.civ@us.navy.mil
Zachary Sullivan, zachary.s.sullivan13.civ@us.navy.mil
Question
Area
1 992-11-007 Attachment J-1 3.1.3 Please provide Attachment A referred to in para. 3.1.3, not attached to the work item. Attachment A provided. See Errata 1.
2 123-15-001 Attachment J-1 3.1.2 and 3.1.3 Are the repairs listed in 3.1.2 and 3.1.3 for each tank or a combined amount for all tanks? Repairs in para 3.1.2 and 3.1.3 are for all tanks listed in 1.2. See Errata 1.
3 Missing References The contractor has received notification that references will not be available for disemination until December 11th. Contractor requests that the proposal due date be extended for 2 weeks as the references will be provided 2 weeks after the RFP release.
An extension of 7 days is hereby granted.
4 Section L
Section L only identified 3 dates for submission of questions. With the delay in receiving the references, contractor requests that additional submission dates be provided. This will allow time for all vendors to review and provided questions once the references are received and distributed.
Do not concur. The bidders' question period will remain unchanged for now.
5 997-11-001 Attachment J-1 3.7
Recent NAVSEA solicitations such as the Porter EDSRA, Laboon DSRA, and Ramage DSRA have changed the requirement to dry dock the ship within the first 10% of the contract period to instead focus on when the ship undocks. This provides the Government with the time needed for post-undocking testing, etc. but also allows contractors to be creative in the way work is scheduled to meet the requirement and provides greater flexibility and opportunity for docking resources in the port. We ask the Government to remove the docking in the first 10% of the availability requirement and instead apply an undocking deadline.
Concur. Docking constraint language removed. See Errata 1.
6 Attachment J-3 The J3 has a undock date NLT 5/27/26. Is there work that requires the ship to be pierside after this date and prior to Habitability
Complete or CSSE Light Off Milstone dates.
The J1 Attachment contains all work package information necessary to determine pier and dock requirements.
7 077-00-001 Attachment J-1 3.1 The work item requires a fire drill every 120 days. In the soliciation Section C para 4.5 requires fire drills every 180 days. What is the Governments requirements for how many day between Fire drills?
Per 8010 Rev 1, the requirement is every 120 days. Section C to be updated.
8 123-00-001 Attachment J-1 3.1 How many gallons of product will each type of tank have at the start of the availabiity?
Assume all tanks and voids contain liquids that are at low suction to calculate disposal quantities as required by relevant work items.
Assume all compensating tanks are at low suction of fuel and fully compensated with seawater.
9 Attachment J-2 Attachement J-2 Work Item Plans, Drawings and Other References was request the day the soliciation was sent out to the contractors and has not been received. Request the J-2.
J2 is available at SERMC. Please contact Mr. Dwight Beeman, at dwight.l.beeman.civ@us.navy.mil; (904) 270-5126 ext 3145 to arrange pickup.
10 Extension Request Request a 30 day extension until 2/24/25 to the proposl due date to support the bidding process due the late arrival of the references and the ability to obtaining pricing from subcontractos over the holidays.
An extension of 7 days is hereby granted.
11 Section L I. C. Request additional Question due dates of 1/3/25 & 1/10/25 to support Subcontrators bid question Do not concur. The bidders' question period will remain unchanged for now.
12 857-11-002 Attachment J-1 Is the contract to bid this item as if there is not a Berthing Barge avilable for the entier availablilty? If so will this tempoary berthing be required when the ship is being worked at the Navy Base?
Offerors are to price all option items based upon their local requirements. Option items may or may not be exercised based upon the location of the awardee.
13 863-11-001 Attachment J-1 In Jacksonsville this work is normally accomplished by the Regional Maintenance Center and Ship Force through a separate contracting source. The contractor does not have any interface in the process. Please delete the work item.
Offerors are to price all option items based upon their local requirements. Option items may or may not be exercised based upon the location of the awardee.
14 992-11-011 Attachment J-1 Work Item directs Contractor to tow 2 fuel barges from Craney Island Naval Fuel Deopt Portsmouth, VA. Is this work item only for
Contractor's proposing docking outside of Ship's homeport?
Offerors are to price all option items based upon their local requirements. Option items may or may not be exercised based upon the location of the awardee.
15 167-11-001 Attachment J-1 3.3
Paragraph 3.3.1 instructs Contractor to Accomplish the requirements of 009-32 of 2.1, including Table 4, Line 13 (SP-10), for each lower surface scuttle cover and coaming assembly.
Given the small square footage to perform SP- 10 on the ships coaming will the Government accept the requirements of 009-32 SP-11 in place of SP-10?
Do not concur. The work item is correct as written.
16 982-31-001 Dock Trial, Fast Cruise, and Sea Trial; accomplish 3.2
Paragraphs 3.2.1 & 3.2.2 requires contractor to provide rigging and crane for additional mooring lines. Also, licensed marine pilot and tug.
The ship is expected to be in Mayport at this time of the availability.
Will the government require additional mooring lines for dock trials while in Mayport Naval Station?
Will the government allow access 2 times to a commercial Tug and pilot for ships movement during sea trials or utilized base services?
1. No the Government will not require additional lines for dock trials while at NS MYPT.
2. Yes, tug access will be permitted.
17 992-11-022 Internet Support Service;
provide (OPTION ITEM) 3.1
In Jacksonsville this work is normally accomplished by the Regional Maintenance Center and Ship Force through a separate contracting source. The contractor does not have any interface in the process. Please delete the work item.
WI changed to Out of Homeport Only, Option Item. See errata 5.
18 863-11-001
Local Area Network
(LAN) Support Service;
provide (OPTION
ITEM)
In Jacksonsville this work is normally accomplished by the Regional Maintenance Center and Ship Force through a separate contracting source. The contractor does not have any interface in the process. Please delete the work item.
WI changed to Out of Homeport Only, Option Item. See errata 5.
19 120-11-002
Engine Room Number
(No.) One Structural;
repair and preserve
3.1
Paragraph 3.1.3 states to remove existing and install new for a total of 50 square feet of deteriorated and damaged deck and bulkhead plating listed 1.3.2 through 1.3.4. The total of 1.3.2 through 1.3.4 only equals 40 sqaure feet, Will the Government confirm to the
Contractor if they are to remove and replace 40 square feet or 50 square feet?
40 sq. ft. is the correct amount. See Errata 2
Contractor Question
USS THE SULLIVANS (DDG 68) FY25 Docking Selected Restricted Availability
Government Response
PPI Responses
23-Jan-25
PPI # Work Item Section / Para #
20 980-11-001
Government Sponsored
Representative Office
Space; provide
3.1
Para 3.1 states to Provide and make operational One EA office trailer or office space for use by Government Sponsored
Representative using Attachment A for guidance, from 14 days prior to availability start date to 14 days after availability completion.
The ERL indicates a the work item is to be compleete at the Undocking milestone date.
Will the government confirm if the Office trailer is needed for the date provided in the ERL or for the entire availability as it is written in the work spec?
Confirmed. The trailer is required for the entire availability. J3 Attachment ERL will be updated.
21 980-90-002
ShipAlt DDG51-96345K and 86222K, AN/SQQ-
89A(V)15 with TI-20
HW and AN/UQN-10
NGF (Fathometer), Alteration Installation
Team (AIT)
Support Service; provide
(OPTION ITEM)
3.1.3
Para 3.1.3 indicates that the AIT will be accomplishing 6 Access Cuts on the vessel. Will these access cuts support the removal and installation of the equipment in paragraph 3.1.9 and 3.1.10? Please provide the location and size of each access cut. Will any of these access cut be made on the hull or near or below the waterline?
Reference 2.4 added that includes information requested. See Errata 2.
22 123-00-002
Auxiliary Machinery
Room Number (No.) One
Tank Top; repair and preserve
1.3.2 and 1.3.3
Work Item 123-00-002 identifies three areas for tank top repairs in Auxiliary Room Number One in Paragraph 1.2. Paragraph 1.3.2 calls for 85 SF of tank top replacement, yet when the location is measured out, it equates to 414 SF. Also, Paragraph 1.3.3 calls for
100 SF of tank top replacement, yet when that location is measured out, it equates to only 60 SF. Will the Government confirm the locations for Paragraphs 1.3.2 and 1.3.3, or confirm that 474 SF of tank top plating will be replaced when combining the two locations?
Do not concur. The Squarefoot designations will be made in the locations listed in 1.3 for the quantities listed of 85 SqFT and 100
SqFt.
23 441-11-001
OA-9242A(V)4/SR and
OA-9243A (V)3/SR
Antenna Tilting Group
Replacement; accomplish
3.2 and 3.2.3
Work Item paragraph 3.2 states to disconnect mechanically and remove equipment in 1.3.1 and 1.3.2 and 3.2.3 calls for shipping the material in 1.3.1 and 1.3.2.
Will the Antennas and Tilting Mechanisim be electrically disconnected and the antennas mounted on the tilting mechanisim be removed prior to contractor removing the Tilting Mechanisim or will contractor be required to electrically disconnect and remove? If contractor is responible, what is the directive for the Antennas?
Listed work item (441-11-001) for question number 23 is incorrect. The correct work item number is 441-11-004.
Equipment to be electronically and mechanically disconnected. See Errata 2.
24 441-11-001
OA-9242A(V)4/SR and
OA-9243A (V)3/SR
Antenna Tilting Group
Replacement; accomplish
3.4 Can the government confirm that the replacement Tilt Mechanisims will have PCMS Affixed or will the contractor be responsible for
Installing? If Contractor is to install will the government be providing the PCMS material GFM?
Listed work item (441-11-001) for question number 24 is incorrect. The correct work item number is 441-11-004. Contractor is responsible for installing PCMS tiles. Equipment added as GFM. Requested information provided in Errata 2.
25 110-11-001 Underwater Hull; inspect and repair
3.7 Paragraph 3.7 of this work item states for the Contractor to accomplish a 009-25 completion air test of each bilge keel, stern flap, skeg, and rudder stool, yet is not noted as requiring a (V) (G) "AIR TEST." Will the Government require these tests to be (V) (G)?
No, a report is required in paragraph 3.7.1 for results of 009-25.
26 110-11-001 Underwater Hull; inspect and repair 3.8
Paragraph 3.8 of this work item states for the Contractor to preserve each bilge keel listed in 1.2 with rust preventative compound, conforming to MIL-PRF-16173, Grade One, by completely filling and draining. The stern flap, skeg, and rudder stool are not stated for preservation. Is it the intent of the
Government to have the Contractor only preserve the bilge keels? Also, will the Government allow the Contractor to accomplish preservation IAW NSTM 631 (S9086-VD-ARM-10/CH-631 REV-3, Preservation of Ships in Service), Table 631-8-7?
Yes, it is the intent of the Government to have the Contractor only preserve the bilge keels in this work item. Yes, MIL-PRF-16173 as specified is the requirement within NSTM 631.
27 123-00-001 Tank and Void Cleaning and Pumping; accomplish
1.2 In 1.2, Location of Work, 1.2.5 Fuel Oil Service Tank (5-300-2-F) and 1.2.27 Compensated Fuel Oil Tank, Gp-4 (5-300-2-F) appear to be the same tank. Is it the intent of the Government to have this tank listed twice?
Duplicate Para 1.2.5 location removed. See Errata 2.
28 123-22-001 Chain Locker; repair and preserve 3.1
This work item does not state to accomplish a preservative steam out the Inaccessible Voids on each side of the Chain Locker. Will the Government confirm if the Contractor is to accomplish the preservative steam out, then conduct a 009-25 air test after Pargraph
3.1 of this work item is completed. Also, will Contractor be required to conduct 009-25 completion air test after chain locker preservation and reinstall preservative in Inaccessible Voids?
Preservative steam out is only required as needed in accordance with 009-23. 009-25 is required as stated in 3.4.
29 562-11-001 Port and Starboard
Rudder; inspect and repair 3.11
Paragraph 3.11 of this work item states to float coat each internal surface of each rudder with corrosion preventative compound conforming to each requirement of MIL-PRF-16173, coat each internal surface of each rudder with corrosion preventative compound conforming to each requirement of MIL-PRF-16173, Grade One, by using 2.4 for guidance. Will the Government allow the
Contractor float each rudder IAW NSTM 631 (S9086-VD-ARM-10/CH-631 REV-3, Preservation of Ships in Service), Table 631-8-
7?
Do not concur. Follow the requirements of Ref 2.4.
30 992-11-011
Fuel Assistance and
Towboat Service for Fuel
Barge out of Home Port;
provide (OPTION ITEM)
3.2
Will the Government confirm that if this availability is not accomplished in Norfolk that this work item will not be invoked?
Confirmed. The work item is for Out of Homeport (Mayport) Only.
31 992-21-001 Defuel Ship; accomplish 3.1 Will the Government advise the Contractor if the fuel removed for this availability will be required to be transferred to a Navy Depot?
Para 3.1.2 advises to transfer to nearest Navy Fuel Depot, as designated by the SUPERVISOR.
32 992-21-001 Defuel Ship; accomplish 3.1 Will the Government advise the Contractor if they will be permitted to mix distillate fuels during the defueling of the ship?
Para 3.2.4 states that mixing of each dissimilar petroleum product is prohibited, except when directed by the Navy petroleum inspector.
33 992-21-001 Defuel Ship; accomplish 3.2 Paragraph 3.2.5 states for the Contractor to accomplish the requirements of 009-63. Will the Government advise the Contractor if this will actually be done by Ship's Force, or that is will be a requirement of the Contractor?
Work item is correct as written. 009-63 is the responsibility of the contractor.
34 992-21-001 Defuel Ship; accomplish 3.1 Will the Government confirm if the ship's Fuel Oil Transfer System (FOTS) will be operational at the start of this availability? If so, will Ship's Force be transferring fuel to the fuel barge via their refueling station?
Confirmed.
35 992-31-001 Bilge Cleaning and
Pumping; accomplish 3.2
Paragraph 3.2.3 of this work item states to remove and dispose of an additional 60,000 gallons of nonhazardous liquid generated by the Navy. Will the Government require a (V) (G) source determination for nonhazardous liquids removed?
No, a report is required in 3.2.3.1 for amount of liquid removed.
36 042-00-005
General Requirements for
Work Within Naval
Station Norfolk;
accomplish
1.1
This item is for work performed at Naval Station Norfolk. Is it the Government's intent to have any work performed at NS Norfolk? If not, will the government cancel work item? If so, should there be a Pier Differential for Naval Station Norfolk added to Solicitation
Evaluation?
WI changed to Out of Homeport Only, Option Item. See errata 5.
37 468-90-001
ShipAlt DDG51-96840K, Harpoon Weapon System
Removal;
accomplish (OPTION
ITEM)
3.7 Paragraph 3.7 states to accomplish 009-78, which is PCMS. There is No square footage provided and No PCMS Material provided as
GFM.
Wiil the government consider providing a square footage of how much PCMS is to be worked and Provide the PCMS Material as
GFM?
Requested information added to WI. See Errata 3.
38 468-90-001
ShipAlt DDG51-96840K, Harpoon Weapon System
Removal;
accomplish (OPTION
ITEM)
3.1 Previous Harpoon Removals have called out the requierment of Test Note T2 of reference 2.2 for Tempest Configuration Control
Inspection.
Will the government consider including this in the work item to ensure that this is accomplished?
Test Note T2 is already referenced in 2.2
39 N/A N/A II. B. 6.
Offerors are responsible for generating a drop-off time prior to the proposal submission date/time. Can the Government confirm if there is a minimum or maximum amount of days prior to the due date to generate this drop off time?
Offerors may submit their proposals via the PIEE Solicitation module any time prior to the submission deadline established in the
RFP.
40 980-90-002
ShipAlt DDG51-96345K and 86222K, AN/SQQ-
89A(V)15 with TI-20
HW and AN/UQN-10
NGF (Fathometer), Alteration Installation
Team (AIT)
Support Service; provide
(OPTION ITEM)
3.1.3
Para 3.1.3 indicates that the AIT will be accomplishing 6 Access Cuts on the vessel and Contractor to provide rigging support. Will
AIT be responsible for 009-23 interferences in way of the rigging route, 009-05 for the access cuts, 009-23s to support access cuts, and 009-32s to support access cut restoration?
Yes, these are AIT responsibilities.
41 980-90-002
ShipAlt DDG51-96345K and 86222K, AN/SQQ-
89A(V)15 with TI-20
HW and AN/UQN-10
NGF (Fathometer), Alteration Installation
Team (AIT)
Support Service; provide
(OPTION ITEM)
3.1.3
Para 3.1.3 indicates that the AIT will be accomplishing 6 Access Cuts on the vessel in support of SQQ-89 shipalt. Attachment J-3 lists
Contractual Milestone/Key Event for SQQ-89 Access Cuts to be complete. Request the Government remove the 21 November SQQ-
89 access cut Milestone from the J-3 as it is in the AIT's work scope and not that of the LMA.
Concur. J3 updated.
42 993-11-003
Government Furnished
Material and Equipment
Warehouse Storage Space;
provide (OPTION ITEM)
3.1.1 40,000 square feet warehousing space may be hard to secure. Availability and costs are volatile. Is 40,000 sq feet actually required, or can the requirement be reduced to a size that is more manageable and cost effective? Is there an alternate plan available to the
Government that will ensure warehouse space is available to support the repair availability?
This WI has been canceled. See errata 1.
43 993-11-003
Government Furnished
Material and Equipment
Warehouse Storage Space;
provide (OPTION ITEM)
3.1 Procuring warehouse of this size takes around 6 months and is subject to availability. Will this Option be invoked in a timeframe that will support obtaining warehouse space. Does the Government have a plan for GFM if warehouse is unable to be acquired in the allotted time?
This WI has been canceled. See errata 1.
44 165-11-002 Attachment J-1 3.1 Contractor has noted that 009-90 has not been called out in the item where normally it is. Will the Government be adding this to the item?
No. 009-90 requirements have been revised and is no longer required to be referenced in this circumstance.
45 980-90-002 Attachment J-1 3.1.7 Paragraph 3.1.7 requires the contractor to prove and "Office Style Conex Box" with 160 square foot of floor space. The 160 Sq. Ft.
requirements is consistent with a 20' Conex Office. Will existing office space be a suitable substitute?
Yes, existing office space is acceptable.
46 980-90-002 Attachment J-1
3.1.7.13 through
3.1.7.19
Paragraphs 3.1.7.13 through 3.1.7.19 detail the requirements for 2 each lavatory/sanitary facilities required within the Office Conex called out in 3.1.7. This is not an option for such a small office. Will this item be revised, removing these requirements or providing the use of existing office space as an option?
Do not concur. The Government will not revise the work item to remove any of the Alteration Installation Team’s (AIT) requested requirements listed in paragraph(s) 3.1.7.13 through 3.1.7.19.
47 980-90-002 Attachment J-1 3.1.3, 3.1.9, 3.1.10
Paragraph 3.1.3 requires contractor to provide crane/rigging services to support the AIT in cutting six each Temp. Access Openings.
While paragraphs 3.1.9 and 3.1.10 require contractor to move equipment to and from the ship. Are the TAO's being accomplished by the AIT to support the removal of the equipment being moved in paragraphs 3.1.9 and 3.1.10?
Yes, these are AIT responsibilities.
48 980-90-003 Attachment J-1 3.1.10, 3.1.11
Paragraphs 3.1.10 and 3.1.11 require the contractor to move equipment to and from the ship using a "government furnished certified weight tested lifting fixture." Will this item be revised to provide a government furnished certified weight tested lifting fixture as
GFM paragraph 5.1?
Concur. See Eratta 2
49 980-90-003 Attachment J-1 3.1.10, 3.1.11 The dimensions for the equipment to be moved in paragraphs 3.1.10 and 3.1.11 are all hatchable (no TAO needed). Will the equipment dimensions still be hatchable after the government furnished certified weight tested lifting fixture is attached?
No, any interferences in space will require access cut.
50 980-90-003 Attachment J-1 3.1.10, 3.1.11 Paragraphs 3.1.10 and 3.1.11 require the use of a government furnished certified weight tested lifting fixture. Will this lifting fixture be attached/disconnect to the equipment by AIT or contractor?
This is a Contractor responsibility.
51 980-90-019 Attachment J-1 3.1.3
Paragraph 3.1.1 requires contractor to provide rigger services for "20 EA lifts for removing and installing AIT material, supplies and equipment." For estimating purposes, can a max weight of 135 lbs. per lift be used to determine labor required to accomplish this paragraph? Note: 135 lbs. is the heaviest piece of equipment call out in this item.
Yes, max. weight of 135 lbs can be used for estimates.
52 980-90-020 Attachment J-1 3.1.4 Paragraph 3.1.4 requires the contractor to provide an "Office Style Conex Box." Will existing office space be a suitable substitute?
No, an existing office space will not be a suitable substitute; the requirement requested provides the office in close proximity to the ship’s work site.
53 980-90-020 Attachment J-1
3.1.4.17 through
3.1.4.23
Paragraphs 3.1.4.17 through 3.1.4.23 detail the requirements for 2 each lavatory/sanitary facilities required within the Office Conex called out in 3.1.4. This is not an option for a Conex Style Office. Will this item be revised, removing these requirements or providing the use of existing office space as an option?
No, the Government will not revise the work item to remove any of the Alteration Installation Team’s (AIT) requested requirements listed in paragraph(s) 3.1.4.17 through 3.1.4.23.
54 980-90-020 Attachment J-1
3.1.4.10 through
3.1.4.15
Paragraphs 3.1.4.10 through 3.1.4.15 detail the requirements for a "kitchen area" required within the Office Conex called out in
3.1.4. This is not an option for a Conex Style Office. Will this item be revised, removing these requirements or providing the use of existing office space as an option?
No this will not be revised. Existing office space is an option.
55 980-90-023 Attachment J-1 3.1.4, 3.1.5 Paragraphs 3.1.4 and 3.1.5 require contractor to move CIWS mounts and cabinets. Will the AIT provide a weight tested certified
Lifting Fixture for the CIWS Mount and ELX Cabinet?
Yes, AIT will provide this.
56 980-90-023 Attachment J-1 3.1.4, 3.1.5 Will the AIT be responsible for connecting and disconnecting the lifting fixture? Yes, these are AIT responsibilities.
57 980-90-023 Attachment J-1 3.1.4, 3.1.5, Will the mount and ELX cabinet be removed and installed as one unit or separately? Separate units as defined in 3.1.4 and 3.1.5.
58 980-90-023 Attachment J-1 3.1.4, 3.1.5 Will the Shipping Skids be provided by the AIT? Yes, these are AIT responsibilities.
59 980-90-023 Attachment J-1 3.1.4, 3.1.5 Will the AIT be responsible for bolting and unbolting the CIWS Mount/ELX Cabinet to and from the Shipping Skid? Yes, these are AIT responsibilities.
60 980-90-023 Attachment J-1 3.1.4, 3.1.5 Once CIWS Mount is removed will AIT be responsible for containment of gun mount foundation and securing the deck? No. containment provided in 3.1.9.
61 992-11-016 Attachment J-1 3.1 This item is identified as "Homeport Only" and paragraph 3.1 requires the contractor to pick-up and deliver the barge from Naval
Station Norfolk. Homport for the The Sullivans is Naval Station Mayport. Will this item be revised as Out of Homeport Only?
WI changed to Out of Homeport Only, Option Item. See errata 5.
62 992-11-016 Attachment J-1 3.1
Paragraph 3.1 requires the contractor to tow the Messing Barge to and from government facility. This is not possible due to Naval
Station Norfolk not allowing contractors to tow to or from their facility. Norfolk Naval Shipyard, South Gate Annex, delivers and picks up messing barges, to and from the home port contractors. Will this item be changed to non-homeport bidders only or will the requirements be removed?
WI changed to Out of Homeport Only, Option Item. See errata 5.
63 992-11-016 Attachment J-1 3.3 through 3.7
Paragraphs 3.3 through 3.7 require contractor to maintain the barge in a seaworthy condition, install lights, install pumps, lashdown furniture, secure hatches/doors, add floatation marks, install flooding alarms, install navigational lights, for a 90 minute tow. None of this is possible due to the contractor not taking responsibility for Messing and Berthing Barge until it is pierside at contractors facility.
Will item be revised removing these requirements from the homeport only item?
WI changed to Out of Homeport Only, Option Item. See errata 5.
64 992-11-017 Attachment J-1 3.1 This item is identified as "Out of Homeport" and paragraph 3.1 requires the contractor to pick-up and deliver the barge from Naval
Station Mayport. Homport for the The Sullivans is Naval Station Mayport. Will this item be revised to Homeport Only?
Do not concur. This WI is for Out of Homeport offerors as specified.
65 123-00-001 Attachment J-1 3.2 For estimating purposes, will the Govt. provide the quantities of petroleum products that will require removal and disposal? See BQ 8
66 123-00-001 Attachment J-1 3.1 For estimating purposes, will the Govt. provide any tanks and spaces, including adjacent tanks or spaces that require pumping, opening, cleaning for certification and maintenance that are not listed in Paragraph 1.2 for the location of work?
No. This information is obtainable from the specifications in the work package.
67 123-00-001 Attachment J-1 3.2 For estimating purposes, will the Govt. provide the quantities of comp water that will require removal and disposal? See BQ 8
68 863-51-001 Attachment J-1 3.1 Will the ships permanently installed fire/smoke detection system remain online during this availability, with the exception being sensors taken offline due to the DSRA?
Yes.
69 992-11-013 Attachment J-1 3.1, 3.1.1
Paragraph 3.1 requires contractor to provide a 3000 KW Temporary Emergency Generator, but with no duration. Paragraph 3.1.1 states "Generator will remain for duration after undocking." Is it the intent of this item for the contractor to provide a 3000 KW
Temporary Emergency Generator for the entire availability or just the duration after docking?
WI updated to change requirement to 1500 KW generator. Duration is for the entire availability. See errata 3.
70 992-11-021 Attachment J-1 3.1 Will the ships 1MC general announcing system remain online during this availability, with the exception being sensors taken offline due to the DSRA?
Yes.
71 583-80-001 Attachment J-1 3.5 - 3.5.3, 2.10 Paragraphs direct to accomplish new SLAD lubrication, install, and reeve new wire rope and adjust cam limit switch referencing 2.10
(Potable Water System Diagram). This drawing is not applicable to the steps called out. Will the government provide clarification?
Reference and WI requirements updated via Errata 3.
72 245-11-003 Material 3.9.1, 3.12, and 3.15 Paragraphs 3.9.1, 3.12, and 3.15 all have material from Rolls Royce Naval Marine, the OEM, with a 24 week lead time. None are available in the stock system. Will the Gov't provide this material as GFM?
Concur. GFM material updated. See Errata 2.
245-11-003
245-12-003 Attachment J-1 3.15
Each item specifies to install new 80 each blade bolts for a total of 160. Historically a ship's set requires only 40 per side for a total of
80. Will the Government clarify how many should be installed: 80 or 160?
Each work item identifies 40 blade bolts in accordance with paragraph 3.6 and all its sub paragraphs.
245-11-003
245-12-003 Attachment J-1 3.6.7
Paragraph 3.6.7 provides direction to Copper Flash 40 each blade bolts. Paragraph 3.15 directs to install new blade bolts. Bidder has verified with the OEM (Rolls Royce) that the new bolts will already have the Copper Flashing applied. Will paragraph 3.6.7 still apply?
Yes, Para 3.6.7 applies. Para 3.6 states to retain blade bolts; 3.6.7 states to copper flash each bolt retained. 3.15 does not direct to install new blade bolts.
75 245-12-003 Material 3.9.1, 3.12, and 3.15 Paragraphs 3.9.1, 3.12, and 3.15 all have material from Rolls Royce Naval Marine, the OEM, with a 24 week lead time. None are available in the stock system. Will the Gov't provide this material as GFM?
Concur. GFM material updated. See Errata 2.
76 631-13-001 Attachment J-1 3.5
Specification directs contractor to accomplish several repairs for which amount was provided but not a designation. Specification is silent about repairs been "as designated by the SUPERVISOR".
Would the government please designate the specific areas for repairs or assign them "as designated by the SUPERVISOR" in paragraph 3.5?
Concur. See Errata 3.
77 168-11-002 Attachment J-1 2.10
2.10 600-6219243 Rev AC, DDG-51 Class Unit Strl Arr Dwg Assy Unit 4110. The description of the reference appears to be missing verbiage as the Title Block of the Drawing notes 01 lvl FR 110-126. Will the Government please clarify if the reference number is correct as written in the work specification?
Reference description corrected in Errata 3.
78 432-11-001 Attachment J-1 2.2
2.2 SE105-AQ-MMO-041, Integrated Voice Communication System AN/STC-2(V) No revision noted. Will the Government plesae confirm the correct revision to be utilized in Para 2.2? Per 009-01 paragraph 3.7, use the most recent Technical Manual issued at the date of solicitation.
79 432-11-001 Attachment J-1 2.3
2.3 SE105-AQ-MMO-060, Integrated Voice Communication System AN/STC-2(V No revision noted. Will the Government plesae confirm the correct revision to be utilized in Para 2.3?
Per 009-01 paragraph 3.7, use the most recent Technical Manual issued at the date of solicitation.
80 438-90-001 Attachment J-1 2.6
2.6 8100-3535-0059 Rev W. SERMC Technical Library provided both Rev W and Rev Y. KTR notes that Rev Y is called out in work specification 472-90-001. Will the Government please confirm the revision of the reference to be utilized in Para. 2.10?
Rev Y. Reference corrected in Errata 3.
81 441-11-004 Attachment J-1 2.5
2.5 320-6567851 Rev M, One Line Diagram Power Supplies to Electronic
Equipment SRD. SERMC Technical Library provided Rev P as Hi Rev of the reference in Para. 2.5. Will the Government please confirn the revision of the reference to be utilized in Para. 2.5?
Rev P. Reference corrected in Errata 3.
82 441-11-004 Attachment J-1 2.9
2.9 180-6219050 Rev R, Foundation Arrangement Drawing Design Design Zone
3350 Booklet No. One. SERMC Technical Library provided Rev AG of the reference. KTR notes that the Title Block reads …Zone
4610 vice 3350. Will the Government please confirm correct reference with revision to be utilized in Para. 2.9
Reference corrected in Errata 3
83 468-11-001 Attachment J-1 2.3
2.3 PM 390-505, SERMC, Measure Electrical Condition of DT-513 Hydrophones and Check NMH/CRH Function on Sonar System.
Reference is sam as called in Para. 2.4. SERMC Technical Library provided PM 390-506-RevA.
Will the Government pleas clarifiy the reference to be utilized in Para. 2.3?
Reference corrected in Errata 3.
84 468-11-001 Attachment J-1 2.4
2.4 390-505, SERMC, Critical Item Performance Specification for DT-513D/F Hydrophone. SERMC Technical Library provided PM
390-505 RevA. Will the Government please confirm the correct reference to be utilized in Para. 2.4?
Reference corrected in Errata 3.
85 468-11-001 Attachment J-1 2.5
2.5 465-6220405 Bathythermograph Hydrophone and Acoustic Test System Cable Block Diagram. SERMC Technical Library provided Rev G. Will the Government please confirm the revision of the reference to be utilized in Para. 2.5?
Reference corrected in Errata 3.
86 468-11-001 Attachment J-1 2.8
2.8 53711-5808784 Rev C, Critical Item Performance Specification for DT-513D/F Hydrophone. SERMC Technical Library provided RevC and LTR notes RevN dated 29 Jan 2019 is available in NMD.
Will the Government please confirm the revision of the reference to be utilized in Para. 2.8?
Rev C per the specification.
87 474-11-001 Attachment J-1 2.7
2.7 320-6567851 Rev N, One Line Diagram Power Supplies to Electronic Equipment SRD. SERMC Technical Library provided Rev
P as Hi Rev of the reference in Para. 2.7. Will the
Government please confirn the revision of the reference to be utilized in Para. 2.7?
Rev P. Reference corrected in Errata 3.
88 120-11-002 Attachment J-1 2.5
Reference 2.5 of this work item appears to be incorrect, as it is does not show the structural plans for 5N1-8-A - No. 1 LPAC
Foundation, 5K1-8-A - No. 1A LPAD Foundation, or 5L1-8-A - No. 1B LPAD Foundation. Will the Government please clarifiy the reference to be utilized in Paragraph 2.5?
Paragraph 2.5 is the correct drawing. Please access the drawing through NSEDR or Tech Library as this provides the complete 150 sheets including structural plans (Pg 123-125).
89 122-20-002 Attachment J-1 3.1
Is it the intent of the Government to have the Contractor accomplish SSPC-SP11 for the entire tank top from Frame 370 to 410? If so, will the Government advise the Contractor which Table and Line from Standard Item 009-32 to follow to accomplish proper preservation of the tank top?
Reference updated in Errata 3.
90 475-11-001 Attachment J-1 2.3
2.3 475-62-8700 Rev K, DDG-51 Class, Electrical One Line Diagram. The reference number appears incomplete.
Will the Government please Clarify the reference number to be utilized in Para. 2.3?
Reference corrected in Errata 3.
91 520-11-001 Attachment J-1 2.2
2.2 PM 390-591, SERMC, DDG-51 Class Sea Valve List, DDG-68. SERMC Technical Library provided PM 310-591.
Will the Government please confirm the reference to be utilized in Para. 2.2?
Reference corrected in Errata 1.
92 561-11-001 Attachment J-1 2.4 2.4 4C561C101 Orig Rev 3, Steering Gear System Dockside Test. SERMC Technical Library provided RevM of the reference.
Will the government please clarify the revision to be utilized in Para. 2.4?
Reference corrected in Errata 3.
93 561-11-002 Attachment J-1 2.7
2.7 803-0921865 Rev T, Cathodic Protection Hull Zinc Anodes. The Title Block of the drawing reads Cathodic Protection Sacrificial
Anodes. Will the Govermnet please confirm that this is the correct reference to be utilized in Para. 2.7?
KTR means 562-11-002.
Title of Ref 2.7 corrected in Errata 3.
94 562-11-003 Attachment J-1 2.4
2.4 S9561-BV-MMA-010 Rev 8, Steering Machinery Subsystem Model 03956-1808422. KTR notes that Rev 9 is called out in 561-
11-001 and 561-80-001. Will the Government please confirm the revision of the reference to be utilized in Para. 2.4?
Per 009-01 paragraph 3.7, use the most recent Technical Manual issued at the date of solicitation.
95 583-80-001 Attachment J-1 2.6 2.6 LAR 92392/DDG68/1213320, SupShip Bath Drawing Review Comments. The LAR Title on the document notes LAR
AER92392/DDG68/1213320. Wi;; the Government please confirm this is the correct reference to be utilized in Para. 2.6?
Confirmed. That is the correct reference.
96 583-80-001 Attachment J-1 2.7
2.7 RLAR 92392/DDG71/1215433, Add Conduit and Fittings to Provide EMI/EMP Protection for Pedestal Limit SwitchRLAR
AER92392/DDG71/1215433. Will the Government plesae confirm that this is the correct reference to be utilized in Para. 2.7?
Confirmed. That is the correct reference.
97 583-80-001 Attachment J-1 2.11
2.11 2C583C100 Rev PYA, SLAD Installation Operational and Weight Test. SERMC Technical Library provided Rev PY-A1 of this reference. Will the Government please confirm the correct revision of the reference to be utilized in Para. 2.11?
Reference corrected in Errata 3.
98 631-12-001 Attachment J-1 2.3 2.3 631-9391 Rev T, Paint Schedule. Reference nummber is incomplete. KTR believes the correct number to be 631-6219391 Rev T.
Will the government please confirm the reference number to be utilizeed in Para. 2.3?
Reference corrected in Errata 3.
99 631-13-003 Attachment J-1 2.6 2.6 631-9391 Rev T, Paint Schedule. Reference nummber is incomplete. KTR believes the correct number to be 631-6219391 Rev T.
Will the government please confirm the reference number to be utilizeed in Para. 2.6?
Reference corrected in Errata 3.
100 631-10-004 Attachment J-1 2.2 2.2 631-9391 Rev T, Paint Schedule. Reference nummber is incomplete. KTR believes the correct number to be 631-6219391 Rev T.
Will the government please confirm the reference number to be utilizeed in Para. 2.2?
Reference corrected in Errata 3.
101 631-10-005 Attachment J-1 2.2 2.2 631-9391 Rev T, Paint Schedule. Reference nummber is incomplete. KTR believes the correct number to be 631-6219391 Rev T.
Will the government please confirm the reference number to be utilizeed in Para. 2.2?
Reference corrected in Errata 3.
102 631-13-001 Attachment J-1 2.2
2.2 101-66218624 Rev AA DDG51 Class Compt & Acs & DK SPRT 01 Lvl. SERMC Technical Library provided the drawing and the Title Block notes additional verbiage; specifically "& 41' --0" FLAT".
Will the Government please confirm this is the correct reference to be utilized in Para.2.2?
Reference corrected in Errata 3.
103 640-80-001 Attachment J-1 2.4 and 2.5 2.4 640-8181104 RevD and 2.5 640-8181104 RevE. The references and verbiage are repetitive. SERMC Technical Library provided
Revisions D, E and G. Will the Governmnt please clarify the references with revisions for Para. 2.4 and 2.5?
Reference corrected in Errata 3.
104 643-80-002 Attachment J-1 2.5
2.5 331-8741254 Rev C, Habitability Improvement (DDG-68) Piping Officer Living Spaces Modifications. 2.5 verbiage repeats the verbiage in 2.4. Reference 331-8741254 RevC Title Block reads Habitability Improvement ( DDG-68 ) Electrical Piping Officer
Living Spaces Modifications. Will the Government please clarify the correct for Para. 2.5 ?
Reference corrected in Errata 3.
105 644-80-002 Attachment J-1 2.6
2.6 512-8741259 RevC Ventilation Manufacturing Details Officer Living & Sanitary Spaces. SERMC Technical Library provided
Rev A. Will the Government plesae confirm the revision to be utilized in Para. 2.6?
Reference corrected in Errata 3.
106 651-11-005 Attachment J-1 2.6
2.6 320-6567853 Rev M, DDG-51 Class, One Line Diagram Power System - 60Hz. Rev N is called out in multiple work specifications and SERMC Technical Library provided both RevN and RevM. Will the government plesae confirm the revision of the reference to be utilized in Para. 2.6?
Reference corrected in Errata 3.
107 264-31-001 Attachment J-1 2.4
2.4 320-6567853 Rev M, DDG-51 Class, One Line Diagram Power System - 60Hz. Rev N is called out in multiple work specifications and SERMC Technical Library provided both RevN and RevM. Will the government plesae confirm the revision of the reference to be utilized in Para. 2.4?
Reference corrected in Errata 3.
108 710-11-001 Attachment J-1 2.2
2.2 600-621 Rev W, DDG51 Class Hull Outfit Instl Design Zone 4420 Fwd Stack and 02 Lvl (WEATHER). Reference number appears incomplete. Will the Govenrment please confirm the reference number to be utilised in Para. 2.2?
Reference corrected in Errata 3.
109 712-10-001 Attachment J-1 2.5
2.5 712-6567457 Rev K, Ammo Hoist Inst & Arr. SERMC Technical Library provided the reference & KTR notes Title Block of drawing reads 5" Ammo Hoist Inst & Arr. Will the government please confirm this is the correct reference to be utilized in Para. 2.5
Reference corrected in Errata 3.
110 992-11-015 Attachment J-1 2.3
2.3 CG NRHB 20180126, Navigation Rules and Regulation Handbook. SERMC Technical Library provided a copy dated 20180217 -
KTR has a copy dated 20190628. Will the Government please confirm the correct version/revision of the reference to be utilized in Para. 2.3?
Reference corrected in Errata 3.
111 992-11-016 Attachment J-1 2.3
2.3 Navigation Rules and Regulation Handbook, CG NRHB 20180126. SERMC Technical Library provided a copy dated 20180217 -
KTR has a copy dated 20190628. Will the Government please confirm the correct version/revision of the reference to be utilized in Para. 2.3?
Reference corrected in Errata 3.
112 992-11-017 Attachment J-1 2.3
2.3 Navigation Rules and Regulation Handbook, CG NRHB 20180126. SERMC Technical Library provided a copy dated 20180217 -
KTR has a copy dated 20190628. Will the Government please confirm the correct version/revision of the reference to be utilized in Para. 2.3?
Reference corrected in Errata 3.
113 120-11-002 Attachment J-1 2.2
2.2 100-6218917 Rev AB, Unit Structural Arr Dwg-Assy Unit 2220. SERMC Technical Library provided Rev AA of this reference and RevAA is called out in multiple work specifications. Will the
Government please confirm the correct revision to be utilized in Para. 2.2?
Reference corrected in Errata 3.
114 123-00-004 Attachment J-1 2.3
2.3 DM 220-018, SURFMEPP, Fuel Oil Tank Coating Condition Conversion to P10 After Partial Coating Removal. SERMC
Technical Library provided DM 220-018A SURF Rev1. Will the Government please confirm the revision of the reference to be utilized in Para. 2.3?
Reference corrected in Errata 3.
115 123-11-006 Attachment J-1 2.2
2.2 DM 220-018, SURFMEPP, Fuel Oil Tank Coating Condition Conversion to P10 After Partial Coating Removal. SERMC
Technical Library provided DM 220-018A SURF Rev1. Will the
Government please confirm the revision of the reference to be utilized in Para. 2.2?
Reference corrected in Errata 3.
116 123-19-003 Attachment J-1 2.4 2.4 633-6567062 Rev AD, Installation of Cathodic Protection & Zinc Anode. SERMC provided Rev AM of this reference.
Will the Government please confirm the revision of the reference to be utilized in Para. 2.4?
Reference corrected in Errata 3.
117 163-11-001 Attachment J-1 2.3 2.3 633-6567062 Rev AD, Installation of Cathodic Protection & Zinc Anode. SERMC provided Rev AM of this reference.
Will the Government please confirm the revision of the reference to be utilized in Para. 2.3?
Reference corrected in Errata 3.
118 633-11-001 Attachment J-1 2.6
2.6 633-6567062 Rev AL, Installation of Cathodic Protection and Zinc. SERMC provided Rev AM of this reference.
Will the Government please confirm the revision of the reference to be utilized in Para. 2.6?
Reference corrected in Errata 3.
119 150-11-003 Attachment J-1 2.4 and 2.5
2.4 472-6765051 Rev E, DDG 51 Class Installation Details Special Coating
Materials
2.5 472-6765050 Rev E, DDG 51 Arr of Special Treatment Materials
SERMC Technical Library did not provide. Will the
Government please confirm the reference numbers to be utilized in Para. 2.4 and 2.5?
Reference corrected in Errata 1.
120 165-11-001 Attachment J-1 2.4
2.4 DMT 529-001 Rev A, SERMC, SDPS Operational Test Procedure. SERMD Technical Library provided Rev B.
Will the Governmnet please confirm the revision of the reference to be utilized in Para. 2.4?
Reference corrected in Errata 3.
121 167-11-002 Attachment J-1 2.4 2.4 100-6218944 Rev T, DDG-51 Class Unit Structural Arr Dwg Assy Unit3350. SERMC Technical Library provided RevW .
Will the Government please confirm the revision of the reference to be uilized in Para. 2.4?
Reference corrected in Errata 3.
122 167-80-001 Attachment J-1 2.12
2.12
150-6218963 Rev AA, DDG 51 Class Unit Structural Arr Dwg Assy Unit 4410. The reference number is duplicated from Para. 2.10.
SERMC Technical Library provided 150-6218964 RevW. Will the Government please confirm the reference number with revision to be utilized in Para 2.12?
Reference corrected in Errata 3.
123 243-11-003 Attachment J-1 2.10
2.10 243-6218425 Rev 1, DDG51 Class Arrangement of Attach to Suit Prop Shaft Shipping and Unshippings. SERMC Technical
Library provided Rev L. Will the Government please confirm the revision of the reference to be utilized in Para. 2.10?
Reference corrected in Errata 3.
124 244-10-002 Attachment J-1 2.4
2.4 DM 230-001 Rev 5, SURFMEPP, Stern Tube/Strut Bearing Banding Repair. SERMC Technical Library provided DM 230-001
Rev5 which is titled INSTALLATION OF SHIM STRAP ON WATERBORNE BEARING.
Will the Government please confirm the DM and Title of reference to be utilized in Para. 2.4?
Reference corrected in Errata 3.
125 442-11-001 Attachment J-1 1.3, 3.3, 5.1
Paragraph 1.3 identifies 2 Transducer (TR-232B/WQC-2A and TR-233B/WQC-2A), Paragraph 3.3 requiers replacement of each
Transducer cable, connector and associated o-ring, Paragraph 5.1 lists 2 Transducers as GFM. There is No call out in the Work Spec.
to replace the Transducers themselves.
Can the government clarify if it is the intent to replace the Cable AND Transducers or just the Cable?
Para 3.3 updated for clarity. See Errata 3.
126 992-11-006 Attachment J-1 3.7
Paragraph 3.7 requires Winterizing the Barge IAW Attachment B.
Attachment B is not provided with the work item.
Will the government provide Attachment B for pricing purposes?
Attachment B provided. See Errata 3.
127 244-11-001 Attachment J-1
Paragraph 3.2.3.2 of this work item requires measurements to be provided to the government within 30 days after docking. This is not possible due to sequential timelines associated with things such as :
• Pumping aft group comp tanks
• Gas freeing tanks
• Getting hot work approved
• Performing work necessary to be able to remove shafts, such as MX-9 seal removals and Stern Tube extension removals
• Performing work necessary to be able to take requested data, such as blasting the stern tubes and strut bearings first
Will the government adjust paragraph 3.2.3.2 to allow 45 days after docking for these measurements to be taken and submitted?
Do not concur. Accomplish work item as written.
128 472-90-001 Attachment J-1 2.33
2.33 8100-1301-0269, Heating, Ventilation and Air Conditioning (HVAC)
Ventilation Flanges 'C', 'D', and 'E'. SERMC Technical Library provided RevG. Will the government please confirm the revision of the reference to be utilized in Para. 2.33?
Reference corrected in Errata 3.
129 472-90-001 Attachment J-1 2.39
2.39 51221-3-086 Rev C38 DDG-51 Class, HVAC/AN/SLQ-32(V)6/SEWIP Block 2 Upgrade Volumetric Balancing Test. SERMC
Technical Library provided Rev C39. Will the government please confirm the revision of the reference to be utilized in Para. 2.39?
Reference corrected in Errata 3.
130 512-11-003 Attachment J-1 2.5
2.5 512-6218400 Rev T, DDG-51 Class Htg Vent Air Cond Heater & Convector List. SERMC Technical Library provided
511.6218400 RevT . Will the government please confirm the
revision of the reference to be utilized in Para. 2.5 ?
Reference corrected in Errata 3.
131 520-11-001 Attachment J-1 2.14
2.14 S9505-AG-MMA-01A Rigid Rod Valve Remote Control System (ForSurface Ships Only).
Will the Government please review the Technical Manual number & confirm that the number provided is correct vice S9505-AG-
MMA-010 ChangeA ?
Reference corrected in Errata 3.
132 571-11-001 Attachment J-1 2.8
2.8 DMT 571-045 Rev E, SERMC, Sliding Padeye Weight Test Procedure. SERMC Technical Library provided Rev F.
Will the government please confirm the revision of the reference to be utilized in Para. 2.8 ?
Reference corrected in Errata 3.
133 612-80-001 Attachment J-1 2.4
2.4 RLAR 92461/DDG59/1225460, Replacement Of Shackle. The verbiage in work specification appears incomplete. SERMC provided this reference and the title reads REPLACEMENT OF SHACKLE IN LOWER CORNER OF FILLER NET.
Will the government please confirm that the reference number provided is the correct reference to be utilized in Para. 2.4?
Reference corrected in Errata 3.
134 CLIN 0041 Section B
Section B lists Work Item 167-11-002 as the only Option Item associated with CLIN 0041. J-4 Pricing Sheet lists Work Items: 259-10-
001, 259-10-002, 992-11-010, 992-11-020, 993-11-003, and 993-31-002 as Option Items associated with CLIN 0041. Is it the
Governments intent to have all the Work Items listed associated with CLIN 0041? If so, will the Government please correct Section B so all Option Items are listed/accounted for on Section B?
For CLINs that include multiple work items, typically only the first WI of the group is listed in Section B. The J4 is correct.
135 CLIN 0042 Section B
Section B lists Work Item 857-11-002 as the only Option Item associated with CLIN 0042. J-4 Pricing Sheet lists Work Items: 863-11-
001, 992-11-005, 992-11-009, 992-11-011, 992-11-014, 992-11-015, 992-11-022 as Option Items associated with CLIN 0042. Is it the Governments intent to have all the Work Items listed associated with CLIN 0042? If so, will the Government please correct
Section B so all Option Items are listed/accounted for on Section B?
For CLINs that include multiple work items, typically only the first WI of the group is listed in Section B. The J4 is correct.
136 120-00-001 Attachment J-10 3.5
IAW J-10 for work item 120-00-001 Paragraph 3.5 does not exist nor is there any paragraph that requires a 20% report to be submitted. All Repairs are identified in paragraph 1.2 of the work item to include location. Request that this requirement of a 20% report be deleted from the J-10.
J-10 Corrected
137 120-00-002 Attachment J-10 3.2
IAW J-10 for work item 120-00-002 Paragraph 3.2 is not related to a report to be submitted nor is there any paragraph that requires a
20% report to be submitted. All Repairs are identified in paragraph 1.2 of the work item to include location. Request that this requirement of a 20% report be deleted from the J-10.
J-10 Corrected
138 123-15-001 Attachment J-10 3.2
IAW J-10 for work item 123-15-001 Paragraph 3.2 is not related to a 20% or any report to be submitted nor is there any paragraph in the item that requires a 20% report.