N00024-24-R-4411 A0001 CONFORMED.pdf

PDF 2 MB Posted

Attached to
FY25 USS GREEN BAY (LPD 20) Docking Selected Restricted Availability (DSRA)
Solicitation number
N0002424R4411
Issued by

About this file

This document is a solicitation for the FY25 USS GREEN BAY (LPD 20) Docking Selected Restricted Availability (DSRA) issued by the Naval Sea Systems Command (NAVSEA). The solicitation is for a combination of maintenance, modernization, and repair work on the USS GREEN BAY (LPD 20) ship. The availability will begin in February 2025 and is expected to be completed in October 2025. This is a full and open competition, as the Government has determined there are not two or more small businesses capable of competing for this requirement. Interested offerors must be registered in the System for Award Management (SAM) and request access to relevant attachments from the Contract Specialist. The Government anticipates making a single award on or around November 2024. The solicitation includes fixed price contract line items, as well as options, for various repair, alteration, and support services. Key details are provided regarding the contractor's responsibilities, schedule, logistics, reporting, and availability of technical references. Pricing terms include a fixed fully burdened ship repair labor rate and material burden rate to be used for negotiating growth and new work.

View the file

Other files

File Type Posted
06-04-2024 USS GBY BQ Responses PIEE_ GOVT Responses.xlsx XLSX spreadsheet
N00024-24-R-4411 A0001.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CODE

(Hour)

PAGE(S)

until local t ime

X

A X B X C X D

EX

X

G F 170 - 183

184 - 204 X H 205 - 216 jonathan.p.pagnucco.mil@us.navy .mil

RATING PAGE OF PAGES

7. ISSUED BY

(Date)

IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.

Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)

Prescribed by GSA FAR (48 CFR) 53.214(c)

DO-A3 1 216

(If other than Item 7)

15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO

AND

ADDRESS SIGN OFFER (Type or print)

OF

OFFEROR

AMENDMENT NO. DATE

15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS

IS DIFFERENT FROM ABOVE - ENTER

SUCH ADDRESS IN SCHEDULE.

18. OFFER DATE

1. THIS CONTRACT IS A RATED ORDER

UNDER DPAS (15 CFR 700)

2. CONTRACT NO.

N00024 8. ADDRESS OFFER TO

See Item 7

9. Sealed offers in original and copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in

CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.

10. FOR INFORMATION

CALL:

A. NAME (NO COLLECT CALLS)

JON P PAGNUCCO 202-781-1024

11. TABLE OF CONTENTS

SOLICITATION/ CONTRACT FORM

SUPPLIES OR SERVICES AND PRICES/ COSTS

2 - 79

X I CONTRACT CLAUSES

DESCRIPTION/ SPECS./ WORK STATEMENT X

PACKAGING AND MARKING

80 - 119 120 - 121

J LIST OF ATTACHMENTS

INSPECTION AND ACCEPTANCE

DELIVERIES OR PERFORMANCE

122 - 126

127 - 133 X K REPRESENTATIONS, CERTIFICATIONS AND

OTHER STATEMENTS OF OFFERORS

CONTRACT ADMINISTRATION DATA 134 - 143 X

SPECIAL CONTRACT REQUIREMENTS

OFFER (Must be fully completed by offeror) 144 X M

L INSTRS., CONDS., AND NOTICES TO OFFERORS

EVALUATION FACTORS FOR AWARD

NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.

13. DISCOUNT FOR PROMPT PAYMENT

(See Section I, Clause No. 52.232-8)

14. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments

AMENDMENT NO. DATE

to the SOLICITATION for offerors and related documents numbered and dated):

FACILITY

12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period

SOLICITATION, OFFER AND AWARD

X

(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)

PART I - THE SCHEDULE

26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE

EMAIL:TEL: (Signature of Contracting Officer)

CODE CODE

B. TELEPHONE (Include area code) C. E-MAIL ADDRESS

AWARD (To be completed by Government)

19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION

22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:

10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)

23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE

PART IV - REPRESENTATIO NS AND INSTRUCTIO NS

PART III - LIST O F DO CUMENTS, EXHIBITS AND O THER ATTACHMENTS

145 - 168

PART II - CO NTRACT CLAUSES

NAVAL SEA SYSTEMS COMMAND (HQ)

1333 ISAAC HULL AVE SE

WASHINGTON NAVY YARD DC 20376-2030

FAX:

TEL:

FAX:

TEL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SOLICITATION

6. REQUISITION/PURCHASE NO.

N0002424R4411C

5. DATE ISSUED

09 May 2024

4. TYPE OF SOLICITATION

SEALED BID (IFB)

NEGOTIATED (RFP)

[ X ]

3. SOLICITATION NO.

N0002424R4411

Section B - Supplies or Services and Prices

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

CLIN

Number

1 Lot

Reserved - Availability Preparation

FFP

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS GREEN BAY (LPD 20) DURING FY25 DRY-DOCKING

SELECTED RESTRICTED AVAILABILITY (DSRA) (Non-prorated WIs – See attachment J-4 for list)

The Contractor shall prepare for and accomplish repair and alterations during the Dry-Docking Selected Restricted Availability (DSRA) onboard USS GREEN BAY (LPD 20) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A, B and D - G

FOB: Destination

PURCHASE REQUEST NUMBER: N0002424R4411C

NET AMT

Reserved - Advanced Material Procurement

FFP

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS GREEN BAY (LPD 20) DURING FY25 DRY-DOCKING

SELECTED RESTRICTED AVAILABILITY (DSRA) (Non-prorated WIs – See attachment J-4 for list)

The Contractor shall prepare for and accomplish repair and alterations during the Dry-Docking Selected Restricted Availability (DSRA) onboard USS GREEN BAY (LPD 20) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A, B and D - G

Reserved - CDRLs

FFP

Contracts Data Requirements Lists (CDRLs) - Not Separately Priced (NSP)

TYCOM (1B4B)

FFP

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS GREEN BAY (LPD 20) DURING FY25 DRY-DOCKING

SELECTED RESTRICTED AVAILABILITY (DSRA) (Non-prorated WIs – See attachment J-4 for list)

The Contractor shall prepare for and accomplish repair and alterations during the Dry-Docking Selected Restricted Availability (DSRA) onboard USS GREEN BAY (LPD 20) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A - G

TYCOM HAB

FFP

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS GREEN BAY (LPD 20) DURING FY25 DRY-DOCKING

SELECTED RESTRICTED AVAILABILITY (DSRA) (Non-prorated WIs – See attachment J-4 for list)

The Contractor shall prepare for and accomplish repair and alterations during the Dry-Docking Selected Restricted Availability (DSRA) onboard USS GREEN BAY (LPD 20) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A - G

Temporary Service; Provide

FFP

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS GREEN BAY (LPD 20) DURING FY25 DRY-DOCKING

SELECTED RESTRICTED AVAILABILITY (DSRA) (Non-prorated WIs – See attachment J-4 for list)

The Contractor shall prepare for and accomplish repair and alterations during the Dry-Docking Selected Restricted Availability (DSRA) onboard USS GREEN BAY (LPD 20) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A - G

OPTION PMS 321 OMN

FFP

Multiple (PMS 321 OMN) (OPTION ITEM)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS GREEN BAY (LPD 20) DURING FY25 DRY-DOCKING

SELECTED RESTRICTED AVAILABILITY (DSRA) (Non-prorated WIs – See attachment J-4 for list)

The Contractor shall prepare for and accomplish repair and alterations during the Dry-Docking Selected Restricted Availability (DSRA) onboard USS GREEN BAY (LPD 20) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A - G

OPTION PMS 321 OPN

FFP

Multiple (PMS 321 OPN) (OPTION ITEM)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS GREEN BAY (LPD 20) DURING FY25 DRY-DOCKING

SELECTED RESTRICTED AVAILABILITY (DSRA) (Non-prorated WIs – See attachment J-4 for list)

The Contractor shall prepare for and accomplish repair and alterations during the Dry-Docking Selected Restricted Availability (DSRA) onboard USS GREEN BAY (LPD 20) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A - G

OPTION Personnel Berthing Barge Support

FFP

Personnel Berthing Barge Support; Provide (OPTION ITEM)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS GREEN BAY (LPD 20) DURING FY25 DRY-DOCKING

SELECTED RESTRICTED AVAILABILITY (DSRA) (Non-prorated WIs – See attachment J-4 for list)

The Contractor shall prepare for and accomplish repair and alterations during the Dry-Docking Selected Restricted Availability (DSRA) onboard USS GREEN BAY (LPD 20) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A - G

OPTION ShipAlt LPD17-87849K

FFP

ShipAlt LPD17-87849K, Blue Force Tracker 2 (BFT-2), Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS GREEN BAY (LPD 20) DURING FY25 DRY-DOCKING

SELECTED RESTRICTED AVAILABILITY (DSRA) (Non-prorated WIs – See attachment J-4 for list)

The Contractor shall prepare for and accomplish repair and alterations during the Dry-Docking Selected Restricted Availability (DSRA) onboard USS GREEN BAY (LPD 20) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A - G

OPTION ShipAlt LPD17-84619K

FFP

ShipAlt LPD17-84619K, PEOC4I Navy Multiband Terminal (NMT) Advanced Time Division Multiple Access (TDMA) Interface Processor (ATIP); accomplish

(OPTION ITEM)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS GREEN BAY (LPD 20) DURING FY25 DRY-DOCKING

SELECTED RESTRICTED AVAILABILITY (DSRA) (Non-prorated WIs – See attachment J-4 for list)

The Contractor shall prepare for and accomplish repair and alterations during the Dry-Docking Selected Restricted Availability (DSRA) onboard USS GREEN BAY (LPD 20) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A - G

OPTION ShipAlt LPD17-85030K

FFP

ShipAlt LPD17-85030K, Global Broadcast Service (GBS) Receive Broadcast Manager Installation; accomplish (OPTION ITEM)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS GREEN BAY (LPD 20) DURING FY25 DRY-DOCKING

SELECTED RESTRICTED AVAILABILITY (DSRA) (Non-prorated WIs – See attachment J-4 for list)

The Contractor shall prepare for and accomplish repair and alterations during the Dry-Docking Selected Restricted Availability (DSRA) onboard USS GREEN BAY (LPD 20) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A - G

OPTION ShipAlt LPD17-92525K

FFP

ShipAlt LPD17-92525K, Multi Frequency-Time Division Multiple Access (MF- TDMA) Modem Support Installation; accomplish (OPTION ITEM)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS GREEN BAY (LPD 20) DURING FY25 DRY-DOCKING

SELECTED RESTRICTED AVAILABILITY (DSRA) (Non-prorated WIs – See attachment J-4 for list)

The Contractor shall prepare for and accomplish repair and alterations during the Dry-Docking Selected Restricted Availability (DSRA) onboard USS GREEN BAY (LPD 20) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A - G

OPTION ShipAlt LPD17-80897K

FFP

ShipAlt LPD17-80897K, Navy Multiband Terminal (NMT) AN/WSC- 9(V)XXQ/K/A/X/GBS Terminal; accomplish (OPTION ITEM)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS GREEN BAY (LPD 20) DURING FY25 DRY-DOCKING

SELECTED RESTRICTED AVAILABILITY (DSRA) (Non-prorated WIs – See attachment J-4 for list)

The Contractor shall prepare for and accomplish repair and alterations during the Dry-Docking Selected Restricted Availability (DSRA) onboard USS GREEN BAY (LPD 20) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A - G

OPTION ShipAlt LPD17-96034K

FFP

ShipAlt LPD17-96034K, Battle Force Tactical Network (BFTN) AN/USQ- 195A(V)1 Installation; accomplish (OPTION ITEM)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS GREEN BAY (LPD 20) DURING FY25 DRY-DOCKING

SELECTED RESTRICTED AVAILABILITY (DSRA) (Non-prorated WIs – See attachment J-4 for list)

The Contractor shall prepare for and accomplish repair and alterations during the Dry-Docking Selected Restricted Availability (DSRA) onboard USS GREEN BAY (LPD 20) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A - G

OPTION ShipAlt LPD17-90149K

FFP

ShipAlt LPD17-90149K, ADNS AN/USQ-144K Service Pack 4 Install;

accomplish (OPTION ITEM)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS GREEN BAY (LPD 20) DURING FY25 DRY-DOCKING

SELECTED RESTRICTED AVAILABILITY (DSRA) (Non-prorated WIs – See attachment J-4 for list)

The Contractor shall prepare for and accomplish repair and alterations during the Dry-Docking Selected Restricted Availability (DSRA) onboard USS GREEN BAY (LPD 20) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A - G

OPTION ShipAlt LPD17-91244K

FFP

ShipAlt LPD17-91244K, Advanced TDMA Interface Processor (ATIP) Enhanced Bandwidth Efficient Modem (EBEM) Local Control Terminal Hardware Modification; accomplish (OPTION ITEM)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS GREEN BAY (LPD 20) DURING FY25 DRY-DOCKING

SELECTED RESTRICTED AVAILABILITY (DSRA) (Non-prorated WIs – See attachment J-4 for list)

The Contractor shall prepare for and accomplish repair and alterations during the Dry-Docking Selected Restricted Availability (DSRA) onboard USS GREEN BAY (LPD 20) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A - G

OPTION ShipAlt LPD17-93584K

FFP

ShipAlt LPD17-93584K Automatic Identification System (AIS) V1 Cyber Hardening; accomplish (OPTION ITEM)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS GREEN BAY (LPD 20) DURING FY25 DRY-DOCKING

SELECTED RESTRICTED AVAILABILITY (DSRA) (Non-prorated WIs – See attachment J-4 for list)

The Contractor shall prepare for and accomplish repair and alterations during the Dry-Docking Selected Restricted Availability (DSRA) onboard USS GREEN BAY (LPD 20) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A - G

OPTION ShipAlt LPD17-70678K

FFP

ShipAlt LPD17-70678K, AN/SPS-48G(V) ROAR (L-Class), Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS GREEN BAY (LPD 20) DURING FY25 DRY-DOCKING

SELECTED RESTRICTED AVAILABILITY (DSRA) (Non-prorated WIs – See attachment J-4 for list)

The Contractor shall prepare for and accomplish repair and alterations during the Dry-Docking Selected Restricted Availability (DSRA) onboard USS GREEN BAY (LPD 20) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A - G

OPTION ShipAlt LPD17-97990K

FFP

ShipAlt LPD17-97990K, Real Time Spectrum Operations (RTSO) Own Force Monitoring (OFM); accomplish (OPTION ITEM)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS GREEN BAY (LPD 20) DURING FY25 DRY-DOCKING

SELECTED RESTRICTED AVAILABILITY (DSRA) (Non-prorated WIs – See attachment J-4 for list)

The Contractor shall prepare for and accomplish repair and alterations during the Dry-Docking Selected Restricted Availability (DSRA) onboard USS GREEN BAY (LPD 20) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A - G

OPTION ShipAlt LPD17-91020K

FFP

ShipAlt LPD17-91020K, Consolidated Afloat Networks and Enterprise Services (CANES) HW2; accomplish (OPTION ITEM)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS GREEN BAY (LPD 20) DURING FY25 DRY-DOCKING

SELECTED RESTRICTED AVAILABILITY (DSRA) (Non-prorated WIs – See attachment J-4 for list)

The Contractor shall prepare for and accomplish repair and alterations during the Dry-Docking Selected Restricted Availability (DSRA) onboard USS GREEN BAY (LPD 20) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A - G

OPTION ShipAlt LPD17-97187K

FFP

ShipAlt LPD17-97187K, Ship Signal Exploitation Equipment (SSEE) Increment F AN/SSQ-130(V)7 Installation; accomplish (OPTION ITEM)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS GREEN BAY (LPD 20) DURING FY25 DRY-DOCKING

SELECTED RESTRICTED AVAILABILITY (DSRA) (Non-prorated WIs – See attachment J-4 for list)

The Contractor shall prepare for and accomplish repair and alterations during the Dry-Docking Selected Restricted Availability (DSRA) onboard USS GREEN BAY (LPD 20) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A - G

OPTION ShipAlt LPD17-83326K

FFP

ShipAlt LPD17-83326K, Oil Pollution Abatement (OPA) System Improvement for LPD Class; accomplish (OPTION ITEM)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS GREEN BAY (LPD 20) DURING FY25 DRY-DOCKING

SELECTED RESTRICTED AVAILABILITY (DSRA) (Non-prorated WIs – See attachment J-4 for list)

The Contractor shall prepare for and accomplish repair and alterations during the Dry-Docking Selected Restricted Availability (DSRA) onboard USS GREEN BAY (LPD 20) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A - G

OPTION ShipAlt LPD17-93155K

FFP

ShipAlt LPD17-93155K, OE-4691(V)1/URN Antenna Group, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS GREEN BAY (LPD 20) DURING FY25 DRY-DOCKING

SELECTED RESTRICTED AVAILABILITY (DSRA) (Non-prorated WIs – See attachment J-4 for list)

The Contractor shall prepare for and accomplish repair and alterations during the Dry-Docking Selected Restricted Availability (DSRA) onboard USS GREEN BAY (LPD 20) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A - G

OPTION ShipAlt LPD17-78304K

FFP

ShipAlt LPD17-78304K Remove TSSS SPS-48E Unit Stimulator, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS GREEN BAY (LPD 20) DURING FY25 DRY-DOCKING

SELECTED RESTRICTED AVAILABILITY (DSRA) (Non-prorated WIs – See attachment J-4 for list)

The Contractor shall prepare for and accomplish repair and alterations during the Dry-Docking Selected Restricted Availability (DSRA) onboard USS GREEN BAY (LPD 20) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A - G

OPTION ShipAlt LPD17-98046K

FFP

ShipAlt LPD17-98046K, FDR D-EVO Suite FSX, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS GREEN BAY (LPD 20) DURING FY25 DRY-DOCKING

SELECTED RESTRICTED AVAILABILITY (DSRA) (Non-prorated WIs – See attachment J-4 for list)

The Contractor shall prepare for and accomplish repair and alterations during the Dry-Docking Selected Restricted Availability (DSRA) onboard USS GREEN BAY (LPD 20) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A - G

OPTION ShipAlt LPD17-92738K

FFP

ShipAlt LPD17-92738K, Navigation Data Distribution Systems (NDDS) Navigation Display Upgrade, Alteration Installation Team (AIT) Support Service;

provide (OPTION ITEM)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS GREEN BAY (LPD 20) DURING FY25 DRY-DOCKING

SELECTED RESTRICTED AVAILABILITY (DSRA) (Non-prorated WIs – See attachment J-4 for list)

The Contractor shall prepare for and accomplish repair and alterations during the Dry-Docking Selected Restricted Availability (DSRA) onboard USS GREEN BAY (LPD 20) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A - G

OPTION ShipAlt LPD17-96483K

FFP

ShipAlt LPD17-96483K, Common Aviation Command and Control System (CAC2S) Afloat Flight 0 Hardware, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS GREEN BAY (LPD 20) DURING FY25 DRY-DOCKING

SELECTED RESTRICTED AVAILABILITY (DSRA) (Non-prorated WIs – See attachment J-4 for list)

The Contractor shall prepare for and accomplish repair and alterations during the Dry-Docking Selected Restricted Availability (DSRA) onboard USS GREEN BAY (LPD 20) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A - G

OPTION ShipAlt LPD17-92737K

FFP

ShipAlt LPD17-92737K, Navigation Critical Distribution System (NCDS) LAN, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS GREEN BAY (LPD 20) DURING FY25 DRY-DOCKING

SELECTED RESTRICTED AVAILABILITY (DSRA) (Non-prorated WIs – See attachment J-4 for list)

The Contractor shall prepare for and accomplish repair and alterations during the Dry-Docking Selected Restricted Availability (DSRA) onboard USS GREEN BAY (LPD 20) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A - G

OPTION ShipAlt LPD17-92735K

FFP

ShipAlt LPD17-92735K, Navigation Data Distribution System (NDDS) Sustainment and Obsolescence Upgrade, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS GREEN BAY (LPD 20) DURING FY25 DRY-DOCKING

SELECTED RESTRICTED AVAILABILITY (DSRA) (Non-prorated WIs – See attachment J-4 for list)

The Contractor shall prepare for and accomplish repair and alterations during the Dry-Docking Selected Restricted Availability (DSRA) onboard USS GREEN BAY (LPD 20) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A - G

OPTION ShipAlt LPD17-87447K

FFP

ShipAlt LPD17-87447K, Installation of Moriah Wind System, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS GREEN BAY (LPD 20) DURING FY25 DRY-DOCKING

SELECTED RESTRICTED AVAILABILITY (DSRA) (Non-prorated WIs – See attachment J-4 for list)

The Contractor shall prepare for and accomplish repair and alterations during the Dry-Docking Selected Restricted Availability (DSRA) onboard USS GREEN BAY (LPD 20) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A - G

OPTION Engineering Change 98814

FFP

Engineering Change 98814, Navy Cash 2.0 Upgrade, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS GREEN BAY (LPD 20) DURING FY25 DRY-DOCKING

SELECTED RESTRICTED AVAILABILITY (DSRA) (Non-prorated WIs – See attachment J-4 for list)

The Contractor shall prepare for and accomplish repair and alterations during the Dry-Docking Selected Restricted Availability (DSRA) onboard USS GREEN BAY (LPD 20) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A - G

OPTION MPDE Turbocharger Replacement

FFP

Number 1A Main Propulsion Diesel Engine (MPDE) Turbocharger Replacement;

accomplish (OPTION ITEM)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS GREEN BAY (LPD 20) DURING FY25 DRY-DOCKING

SELECTED RESTRICTED AVAILABILITY (DSRA) (Non-prorated WIs – See attachment J-4 for list)

The Contractor shall prepare for and accomplish repair and alterations during the Dry-Docking Selected Restricted Availability (DSRA) onboard USS GREEN BAY (LPD 20) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A - G

OPTION Fuel Barge Service

FFP

Fuel Assistance and Towboat Service for Fuel Barge; provide (OPTION ITEM)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS GREEN BAY (LPD 20) DURING FY25 DRY-DOCKING

SELECTED RESTRICTED AVAILABILITY (DSRA) (Non-prorated WIs – See attachment J-4 for list)

The Contractor shall prepare for and accomplish repair and alterations during the Dry-Docking Selected Restricted Availability (DSRA) onboard USS GREEN BAY (LPD 20) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A - G

OPTION Pierside Small Boat Storage; provide

FFP

Pierside Small Boat Storage; provide (OPTION ITEM)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS GREEN BAY (LPD 20) DURING FY25 DRY-DOCKING

SELECTED RESTRICTED AVAILABILITY (DSRA) (Non-prorated WIs – See attachment J-4 for list)

The Contractor shall prepare for and accomplish repair and alterations during the Dry-Docking Selected Restricted Availability (DSRA) onboard USS GREEN BAY (LPD 20) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A - G

OPTION Defuel Ship; accomplish

FFP

Defuel Ship; accomplish (OPTION ITEM)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS GREEN BAY (LPD 20) DURING FY25 DRY-DOCKING

SELECTED RESTRICTED AVAILABILITY (DSRA) (Non-prorated WIs – See attachment J-4 for list)

The Contractor shall prepare for and accomplish repair and alterations during the Dry-Docking Selected Restricted Availability (DSRA) onboard USS GREEN BAY (LPD 20) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A - G

OPTION Growth Reservation for CLIN 0004

FFP

Growth Reservation Associated with CLIN 0004. See attachment J-4.

See Notes A - G

FFP

See Notes A – G

FFP

FFP

FFP

Growth Reservation for CLIN 0005

FFP

Growth Reservation Associated with CLIN 0005. See attachment J-4.

Growth Reservation for CLIN 0006

FFP

Growth Reservation Associated with CLIN 0006. See attachment J-4.

OPTION Growth Reservation for CLIN 0007

FFP

Growth Reservation Associated with CLIN 0007. See attachment J-4.

FFP

FFP

OPTION Growth Reservation for CLIN 0008

FFP

Growth Reservation Associated with CLIN 0008. See attachment J-4.

FFP

Growth Reservation Associated with CLIN 0008. See attachment J-4.

FFP

Growth Reservation for CLIN 0008. See attachment J-4.

OPTION Growth Reservation for CLIN 0009

FFP

Growth Reservation for CLIN 0009. See attachment J-4.

OPTION Growth Reservation for CLIN 0009

FFP

Growth Reservation for CLIN 0009. See attachment J-4.

OPTION Growth Reservation for CLIN 0010

FFP

Growth Reservation for CLIN 0010. See attachment J-4.

OPTION Growth Reservation for CLIN 0011

FFP

Growth Reservation for CLIN 0011. See attachment J-4.

OPTION Growth Reservation for CLIN 0012

FFP

Growth Reservation for CLIN 0012. See attachment J-4.

OPTION Growth Reservation for CLIN 0013

FFP

Growth Reservation for CLIN 0013. See attachment J-4.

OPTION Growth Reservation for CLIN 0014

FFP

Growht Reservation for CLIN 0014. See attachment J-4.

OPTION Growth Reservation for CLIN 0015

FFP

Growth Reservation for CLIN 0015. See attachment J-4.

OPTION Growth Reservation for CLIN 0016

FFP

Growth Rervation for CLIN 0016. See attachment J-4.

OPTION Growth Reservation for CLIN 0017

FFP

Growth Reservation for CLIN 0017. See attachment J-4.

OPTION Growth Reservation for CLIN 0018

FFP

Growth Reservation for CLIN 0018. See attachment J-4.

OPTION Growth Reservation for CLIN 0019

FFP

Growth Reservation for CLIN 0019. See attachment J-4.

OPTION Growth Reservation for CLIN 0020

FFP

Growth Reservation for CLIN 0020. See attachment J-4.

OPTION Growth Reservation for CLIN 0021

FFP

Growth Reservation for CLIN 0021. See attachment J-4.

OPTION Growth Reservation for CLIN 0022

FFP

Growth Reservation for CLIN 0022. See attachment J-4.

OPTION Growth Reservation for CLIN 0023

FFP

Growth Reservation for CLIN 0023. See attachment J-4.

OPTION Growth Reservation for CLIN 0024

FFP

Growth Reservation for CLIN 0024. See attachment J-4.

OPTION Growth Reservation for CLIN 0025

FFP

Growth Reservation for CLIN 0025. See attachment J-4.

OPTION Growth Reservation for CLIN 0026

FFP

Growth Reservation for CLIN 0026. See attachment J-4.

OPTION Growth Reservation for CLIN 0027

FFP

Growth Reservation for CLIN 0027. See attachment J-4.

OPTION Growth Reservation for CLIN 0028

FFP

Growth Reservation for CLIN 0028. See attachment J-4.

OPTION Growth Reservation for CLIN 0029

FFP

Growth Reservation for CLIN 0029. See attachment J-4.

OPTION Growth Reservation for CLIN 0030

FFP

Growth Reservation for CLIN 0030. See attachment J-4.

OPTION Growth Reservation for CLIN 0031

FFP

Growth Reservation for CLIN 0031. See attachment J-4.

OPTION Growth Reservation for CLIN 0032

FFP

Growth Reservation for CLIN 0032. See attachment J-4.

OPTION Growth Reservation for CLIN 0033

FFP

Growth Reservation for CLIN 0033. See attachment J-4.

OPTION Growth Reservation for CLIN 0034

FFP

Growth Reservation for CLIN 0034. See attachment J-4.

OPTION Growth Reservation for CLIN 0035

FFP

Growth Reservation for CLIN 0035. See attachment J-4.

OPTION Growth Reservation for CLIN 0036

FFP

Growth Reservation for CLIN 0036. See attachment J-4.

OPTION Incentive Reservation for CLIN 0037

FFP

Incentive Reservation for CLIN 0037. See attachment J-4.

OPTION Incentive Reservation for CLIN 0038

FFP

Incentive Reservation for CLIN 0038. See attachment J-4.

OPTION Incentive Reservation for CLIN 0039

FFP

Incentive Reservation for CLIN 0039. See attachment J-4.

OPTION Incentive Reservation for CLIN 0040

FFP

Incentive Reservation for CLIN 0040. See attachment J-4.

See Notes A - G.

OPTION Incentive Reservation for CLIN 0041

FFP

Incentive Reservation for CLIN 0041. See attachment J-4.

OPTION Incentive Reservation for CLIN 0044

FFP

Incentive Reservation for CLIN 0044. See attachment J-4.

OPTION Incentive Reservation for CLIN 0045

FFP

Incentive Reservation for CLIN 0045. See attachment J-4.

OPTION Incentive Reservation for CLIN 0046

FFP

Incentive Reservation for CLIN 0046. See attachment J-4.

OPTION Incentive Reservation for CLIN 0047

FFP

Incentive Reservation for CLIN 0047. See attachment J-4.

OPTION Incentive Reservation for CLIN 0048

FFP

Incentive Reservation for CLIN 0048. See attachment J-4.

OPTION Incentive Reservation for CLIN 0050

FFP

Incentive Reservation for CLIN 0050. See attachment J-4.

OPTION Incentive Reservation for CLIN 0051

FFP

Incentive Reservation for CLIN 0051. See attachment J-4.

NOTE A: LEVEL OF EFFORT TO COMPLETION – SHIP REPAIR

1. The Contractor agrees to provide the level of effort to completion (LOE to Completion) in the performance of growth CLINs in the execution of the USS GREEN BAY (LPD 20) DSRA:

a. 148,941 direct labor hours (labor hours) and $4,660,748 ($TBD fully burdened) materials to complete expected, within scope growth work on the USS GREEN BAY (LPD 20) DSRA work package under CLINs 0037 – 0090.

2. The total LOE to Completion for the performance of the above growth CLINs shall be comprised of labor hours and the associated material required to support the expected, within scope growth. The mix of labor hours and material may be adjusted. Adjustments to the labor hour and material mix will be documented via weekly Technical Direction Letter (TDL) and subsequently unilaterally adjusted via contract modification. The Government reserves the right to reconcile the weekly TDLs via unilateral modification at the Administrative Contracting Officer’s (ACO) discretion.

3. LOE to Completion obligations specified above shall only include effort performed in direct support of this contract and shall not include time and effort expended on such things as local travel to and from an employee's usual work location, uncompensated effort while on travel status, truncated lunch periods, work (actual or inferred) at an employee's residence or other non-work locations.

4. LOE to Completion labor hours and material are within the scope and pricing of this contract and are not subject to an equitable adjustment under FAR 52.243-1 ‘Changes – Fixed Price’. The utilization of LOE to Completion is at the discretion of the Contracting Officer and subject to the schedule phasing identified in Note F.

5. If, in the opinion of the Contractor, any effort directed in the Growth Management Request Form (GMR) calls for effort outside the scope of the contract, the Contractor shall notify the Administrative Contracting Officer (ACO) in writing within two (2) working days after the receipt of any such direction. In the event of a cost dispute, the ACO may unilaterally authorize hours and material against LOE work. The Contractor shall not proceed with the work directed by the GMR unless and until the Contractor is notified by the ACO to proceed with the directed work. The Contractor is required to proceed with the directed work as directed by the ACO.

Thereafter, any remaining disagreement shall be addressed in accordance with FAR 52.233-1(Alt. 1) ‘Disputes.’

Additionally, if the cost of performing the disputed direction exceeds $100,000, the Contractor is required to comply with FAR 52.243-6 ‘Change Order Accounting.’

6. The labor hours and material requirements listed in Section B, Note A, paragraph 1 above are part of this contract. Prime contractor efforts shall be deducted from the labor hours allocated. Subcontractor efforts and materials shall be deducted from the materials allocated. The balance of labor hours and materials remaining in the LOE to Completion CLINs will be recouped by the Government via final contract modification at the end of the availability.

7. Only authorized direct production labor hours shall be deducted from the LOE to Completion direct labor hour ceiling set forth in Section B, Note A, paragraph 1 above. Per Note B paragraph 2 below, all non-production labor shall be included in the Contractor’s fully burdened labor rate. Non-production hours shall not be included in pricing submitted in support of growth issued under the LOE to Completion CLINs. Additionally, Contractor LOE to Completion pricing shall not include any allowance for technical representatives or for any other Government directed source unless specifically directed by the Contracting Officer.

8. Only authorized material dollars shall be deducted from LOE to Completion material reservation set forth in

Section B, Note A, paragraph 1 above. This material reservation consists of the total cost of materials and subcontractor efforts proposed. All subcontractor quotes shall be included in the Change Order Price Analysis (COPA) as per Section C, paragraph 1.13. Material dollars may include freight or duties if specifically itemized on the invoice for the material. The Contractor shall not be allowed to add material handling charges, overhead (including G&A), or profit into the settled cost of materials deducted from the material reservation.

9. The information received in the consolidated final report required by Section C paragraph 6.6 will be used by the ACO in the issuance of one contract modification based on the information received in the final report identified in Section C below, which will be a final settlement for all LOE to Completion labor hours and material dollars. Once the number of labor hours and materials for directed work has been settled, neither party shall be entitled to an adjustment because the expended labor hours and materials differ from the settled price.

This shall not preclude an adjustment otherwise permitted by law and regulation; e.g. fraud, product substitution, defective workmanship or materials. Each directed work shall receive approval by the SUPERVISOR and the ACO. “SUPERVISOR” as defined in NAVSEA Standard Item (NSI) 009-01, paragraph 4.3, refers to the local Government activity responsible for the execution and contract administration of Navy maintenance and modernization work.

NOTE B: FIXED SHIP REPAIR LABOR AND MATERIAL BURDEN RATES FOR GROWTH AND

NEW WORK

SCHEDULE OF PRICES / RATES: SHIP REPAIR LABOR RATE (FULLY BURDENED)

1. The Contractor’s fully burdened ship repair labor rate will be used for negotiating growth; and new work to be performed under this contract. The contractor agrees that the number of hours included in its price proposal submitted in response to Requests for Contract Changes (RCCs), Growth Management Requests (GMRs) and Reservation Task Requests (RTRs) shall include only direct production hours. For these purposes, direct production hours are for skilled labor at the journeyman level expended in direct production including but not limited to the following functions:

Abrasive cleaning/blasting Fire Watch Welding Burning Brazing Carpentry Machinists (inside and outside) Electrical Work Electronic Work Engineering Design Support Lagging Ship-fitting Boiler-making Painting Sheet-metal Work Pipefitting Rigging

General Labor Staging/Scaffolding Diesel Mechanics

2. The fully burdened ship repair labor rate proposed by the contractor listed in paragraph 7 below shall include all costs associated with support functions (whether charged directly or indirectly by the offeror’s accounting systems) provided in support of the direct production functions listed in paragraph 1 above. Support functions shall be considered to be included in the offeror’s fully burdened ship repair labor rate for direct production hours. Labor hours for the below support functions shall not be separately proposed, including in support of subcontractors. Support functions include, and are not limited to, those types listed below:

Testing Quality Assurance Execution Planning Cleaning (except tank cleaning) Supervision (all types, including, but not limited to supervision of trades, support personnel and subcontractors) Security Surveying Administration Transportation Purchasing Staff Lofting Other indirect support Handling & Warehousing Safety/Environmental Program Management

3. The fully burdened ship repair labor rate is a fixed hourly rate that includes all wages, (i.e. straight time, overtime, shift differential, holiday time, etc.), overhead, all other indirect costs, general and administrative expenses, Facilities Capital Cost of Money (FCCOM) and profit. The fully burdened ship repair labor rate represents a blended rate including labor transferred between divisions, subsidiaries, or affiliates of the contractor under a common control.

4. Consumable materials are goods used in the ordinary course of work performance such as office supplies, paper, rags, vehicle or equipment fuel costs, cleaning chemicals, disposable tools, welding rods, paint buckets, paint brushes, protective clothing, etc., that are consumed/used in the process of repair and do not become an integral part of the repaired vessel. Consumable material shall be included in the contractor’s fully burdened ship repair labor rate and not separately priced.

5. Physical materials are goods that become incorporated into the repaired vessel in the course of the repair, such as replacement steel, pipes, paint, and fasteners. The material burden rate applies to physical materials but not to consumable materials. The material burden rate will be applied to the actual cost of the physical material. Actual cost does not include handling charges, general and administrative cost, overhead, profit, or any other indirect cost.

6. For growth and new work contract changes involving subcontractors, subcontractor quotes will be treated as

Other Direct Costs (ODCs) and will be subject to the contract material burden rate shown in paragraph (7) below. Subcontractor (competitive quotes if required by the ACO) quotes must be submitted with the contractor’s COPA in response to RCCs, GMRs and RTRs issued by the Contracting Officer. For new work only, these subcontractor quotes must be competitively acquired. At no time will the proposed total to be performed by the prime contractor combined with subcontractor quote, material quote, and applicable burdens be allowed to cost more than it would have, had the prime contractor directly provided all material and labor. The proposed total pricing restriction addressed in the preceding sentence does not apply in any case where the work is required to be performed by Original Equipment Manufacturers (OEMs), Government directed subcontractors, and/or Government authorized vendors. RCCs and RTRs that are subcontracted for material only (no associated labor required within the RCC) shall not be subject to the Material Burden Rate. Any material burden rate applied to new work shall be approved by the ACO, upon receipt of supporting documentation in accordance with FAR 15.404-3, Subcontract Pricing Considerations.

7. The contract fixed fully burdened ship repair labor rate and material burden rate are shown below. These fixed rates shall be used for negotiating growth, and new work during the availability and up to three (3) months after the Attachment J-3 ‘Contract Complete’ date:

USS GREEN BAY FY25 DSRA

Fully Burdened Ship Repair Labor Rate TBD Material Burden Rate TBD

8. In the event of a one-bid or directed availability, the Contracting Officer may negotiate the Fully Burdened

Ship Repair Labor Rate and Material Burden Rate (not to exceed the ceiling rate(s) identified above) with the offeror in accordance with FAR 15.4, Contract Pricing. The rates herein are not considered a Forward Pricing Rate Agreement (FPRA) and are identified solely for the purpose of establishing a ceiling.

9. In the event of an extension due to excusable delay to the delivery date for the USS GREEN BAY FY25 DSRA, the Contractor’s fully burdened ship repair labor rate shall be escalated by 0.XX % commencing 3 months after the Attachment J-3 “Contract Complete” date. Following the “Contract Complete” date identified in Attachment J-3 (Milestones), this rate shall be escalated quarterly through the 24th month, if necessary, and shall be used to negotiate all growth, and new work. Note, in the event of an excusable delay, this escalation rate shall be applied only to growth and new work not previously identified in Attachment J-4 (Pricing Worksheet). The material burden rate shall not increase.

NOTE C: OPTION ITEMS

Option item to which the option clause FAR 52.217-7 (NAVSEA Variation II) applies and which is to be supplied only if and to the extent said option is exercised.

NOTE D: SCHEDULE OF DAILY RATES FOR PIERSIDE AND DRY-DOCKING (FULLY BURDENED)

FOR PURPOSES OF A COMPENSABLE EXTENSION TO THE DRY-DOCKING OR DELIVERY DATE

1. In the event of a compensable extension to the dry-docking or delivery date, the Contractor’s fully burdened daily rates for additional dry-dock and/or pierside performance period at the Contractor’s facility will be evaluated by the ACO upon receipt of the Contractor’s certified or other than certified cost or pricing data (certification requirements are subject to FAR 15.403).

2. The Contractor agrees that the daily rates shall include all costs that run with time associated with additional performance days in accordance with the work package specification requirements of this availability. The daily rates shall include all costs associated with additional performance days (whether charged directly or indirectly by the offeror’s accounting systems) including but not limited to:

• Temporary Services, including but not limited to:

o Decking services o Pumping services o Electricity

• Internet Connectivity

• Air Conditioning

• Support Services for the Navy, its agents and Contractors

• Facilities, including but not limited to:

o Piers o Dry-docks o Office spaces o Trailers o Parking o Flammable Liquid Storage and Hazardous Material Storage o Material Warehousing and Lay-down space

• Project Management and other labor costs that run with time including but not limited to:

o Program Management o Supervision o Integration & Scheduling o Cleaning (except tank cleaning) o Quality Assurance o Execution Planning o Security o Administration o Contracts o Purchasing o Other indirect support o Safety/Environmental

• Transportation

3. The fully burdened daily rates are fixed rates that include all wages, overhead, other indirect costs, general and administrative expenses, Facilities Capital Cost of Money (FCCOM) and profit.

4. The proposed, fully burdened daily rates for pierside and dry-docking may be used during the availability’s extension period, up to 24 months after the “Contract Complete” date identified in Attachment J-3 (Milestones).

If the use of these extension rates is determined to be warranted by the ACO during execution, the Contractor shall submit certified or other than certified cost or pricing data to support the rates (certification requirements are subject to FAR 15.403).

USS GREEN BAY FY25

DSRA

Additional Day Requiring Availability Extension

Additional Day Does Not Require Availability Extension

Additional Dry-Docking Day TBD TBD Additional Pierside Day TBD

5. The Contractor bears the burden of proving the requested extension is compensable in accordance with this contract, and establish the duration of compensability through schedule analysis utilizing the Production Schedule establishing impact to critical path and/or controlling work items. The Contractor agrees that, in the event of such an extension, a bilateral modification will be executed with the price of the extension calculated as follows:

Total Price of Extension = D(e) * (P/D) D(e) = Agreed Extension Days to the Delivery Date (P/D) = Price/Day

6. The (P/D) will be utilized for any modifications to extend the contract in the event of compensable delay impacting the pierside and dry-docking period, regardless of the number of modifications or the number of days required to meet the Schedule Milestone ‘Contract Complete’ within 24 months of the ‘Contract Complete’ date. If the Contracting Officer determines a delay in meeting the Schedule Milestone is not compensable, no modification will be executed and the Contractor will be directed to continue work until certified ‘Contract Complete’ by the RMC.

7. In the event the Contracting Officer determines the delay is concurrent, but clearly apportioned, a bilateral modification will be executed with the price calculated as follows:

Total Price of Extension = (D(g) - (D(c)) * (P/D) D(g) = Government Responsible Delay (measured in days) D(c) = Contractor Responsible Delay (measured in days) (P/D) = Price/Day

The values for D(g) and D(c) will be determined by the Contracting Officer.

8. If the Contracting Officer determines the delay is excusable, a modification will be executed to extend the Delivery Date, however, the Contractor shall not be entitled to recover a Daily Extension Rates.

9. All terms and conditions under the contract apply to all modifications extending the delivery date. If the Contracting Officer and Contractor are unable to reach agreement regarding duration or compensability, the…