Industry Day Questions_07_13_2023.xlsx

XLSX spreadsheet 29 KB Posted

Attached to
40' Patrol Boats Industry Day
Solicitation number
N00024-23-R-2275
Issued by

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Industry Day Questions

40' Patrol Boat_N00024-23-R-2275_Industry Day Questions
#Date - mm/dd/yyyySource Document - [Identify the document to which the question or comment refers (e.g., RFP, Attachment XX, CDRL A0XX, etc.)]Reference - [Identify the page number (e.g., 254), paragraph number, clause name, etc.]Question - [Ask a clarifying question or offer a comment on the cited language/data. Provide a suggestion or recommendation relating to the question/comment for consideration by the Government.]Government Response
16/12/23N/AN/AAs a Set Aside for Small Business, will Teaming be considered and/or allowed? For example; Small Business Teaming with an other than Small Business Boat Builder?The Government is anticipating a Multiple Award for this effort. Small Business teaming is acceptable in accordance with FAR 52.219-14(e)(2).
26/12/23N/AN/AWould the Government consider allowing this solicitation to be a full and open acquisition?This is a Total Small Business Set-Aside requirement.
36/12/23Draft RFP N0002423R2275Att J-6 Critical Equipment List“Attachment 2 Brand Name Callouts” was provided during the November 2022 Sources Sought. This list is much more extensive than the “J-6 Critical Equipment List” provided with the Draft RFP. Should we expect the most recent J-6 will not be expanded to include the additional items in the November 2022 document?Attachment J-6 Critical Equipment List defines equipment that is critical to the configuration of the 40PB. The RFP will be revised to clarify.
46/12/23Draft RFP N0002423R2275N/AA hull scan at the completion of fabrication was mentioned during the virtual industry day presentation and is referenced in the CLIN list. Will more detail be provided on the expectations of this hull scan? For example, is this a true 3D hull scan and what are the acceptance criteria (ie. tolerances)?The "hull verification of critical dimensions (i.e. hull scan)" part of the "Initial Hull verification" outlined in Section C-3.042-3 of the RFP shall be completed by the Government. This will be clarified in the final RFP.
56/12/23Draft RFP N0002423R2275N/ACan it be assumed that all information and details provided in the reference material will be contract compliant?Yes.
66/14/23Draft RFP N0002423R2275Pages 14 through 18 B-216-H003 ECONOMIC PRICE ADJUSTMENTS—ALTERNATE III (NAVSEA) (JUN 2023)Is "Plastic Materials and Resins (1980:12=100), PPI325211" referenced in B-216-H003 ECONOMIC PRICE ADJUSTMENTS—ALTERNATE III (NAVSEA) (JUN 2023) the correct index?The Final RFP will include an updated EPA clause which will only include the Boat Building and Repair index.
76/14/23Draft RFP N0002423R2275Page 68 of 119 Section F - Deliveries or PerformanceIs the delivery schedule listed on page 68 of 119 of the Draft RFP the standard delivery schedule for this effort?This is the notional schedule that the Navy will require builders to comply with during execution of this contract.
86/14/23Draft RFP N0002423R2275Page 42 of 119 C-211-H007Does this clause apply to the 40' PB requirement?Clause will be removed from Final RFP.
96/14/23Draft RFP N0002423R2275N/AWould the government provide example photos of the current armor attachment points?Photos may be provided once requested from an interested offeror.
106/14/23Draft RFP N0002423R2275N/AWill a weld schedule be provided?There is no contractually required weld schedule. The weld schedule from the original contract will be provided in the informational data package. Builders may use this schedule or develop their own. Ultimately the final weld schedule must comply with the ISO requirements called out in the Specification.
116/14/23Draft RFP N0002423R2275N/AWhat GFE system will be updated or changed between the Draft and Final RFP?The following GFE systems will be updated due to obsolescence:

Tactical Computers

Current System: CF-31

New System: FZ-40

FLIR System

Current System: CCFLIR 640

New System: FLIR 240-EP

Vehicle Intercom System

Current System: VIC-5

New System: TOCNET G4

126/14/23Draft RFP N0002423R2275N/AWill the government be open to hull changes that can increase performance?The government desires craft that are operationally identical to the initial 40PB hulls. The government does not desire any changes that will alter the operational performance of the boat.
136/14/23Draft RFP N0002423R2275N/AWhat level of physical security will be required for storing GFE?The Contractor shall be responsible for receipt and safe storage of Government Furnished Equipment (GFE), and then installation, testing and proper operation onboard the boat. The Contractor shall ensure that adequate secure warehouse facilities, handling equipment and personnel shall be provided to handle and store all GFE as it is received at the Contractor’s facility. The Contractor shall make the warehouse facilities accessible to U. S. Government personnel for verification and validation of material upon request.
146/14/23Draft RFP N0002423R2275N/AWill there be any radiographic testing requirements on the hull structure?Currently the government has no intention of requiring radiographic testing of the hull structure.
156/14/23Draft RFP N0002423R2275N/ACan Deutsch connectors be used for roof electrical connections?Yes.
166/14/23Draft RFP N0002423R2275Pages 14 through 18 B-216-H003 ECONOMIC PRICE ADJUSTMENTS—ALTERNATE III (NAVSEA) (JUN 2023)Is the transparent armor (TA) a plastic or resin?The Final RFP will include an updated EPA clause which will only include the Boat Building and Repair index.
176/14/23Draft RFP N0002423R2275Pages 14 through 18 B-216-H003 ECONOMIC PRICE ADJUSTMENTS—ALTERNATE III (NAVSEA) (JUN 2023)Is labor included on the Economic Price Adjustment (EPA)?The Final RFP will include an updated EPA clause which will only include the Boat Building and Repair index. This index accounts for material and labor.
186/14/23Draft RFP N0002423R2275Pages 14 through 18 B-216-H003 ECONOMIC PRICE ADJUSTMENTS—ALTERNATE III (NAVSEA) (JUN 2023)Is there way to reflect labor on the EPA?The Final RFP will include an updated EPA clause which will only include the Boat Building and Repair index. This index accounts for material and labor.
196/14/23Draft RFP N0002423R2275N/AIs the delivery schedule specific to the complexity of the boats?The delivery schedule defined in Section F of the RFP is specific to the Navy's requirements.
206/14/23Draft RFP N0002423R2275N/AWhat are the trailer dimensions? Part of the equation to determine compliance is not provided.The trailer is not specified in the contract. The government does not intend for the builder to provide the trailer. The trailer information that is provided is for reference only.
216/14/23Draft RFP N0002423R2275N/AWhat are the office space requirements?The population of the office will be transient and will likely be full for the first months. The space will need to be able to accommodate design work and later use for inspections.
226/14/23Draft RFP N0002423R2275N/AWill the government put production pauses into effect?The only “pause” will be a 3D scan and scale weighing of the first hull.
236/14/23Draft RFP N0002423R2275N/AThe INS key events table has “initial” and “follow on” production events. If there are no production pauses in effect, what is the difference between the two?The initial production events refers to the events related to the initial or first boat only. The events associated with the initial boat are unique as it entails a "production pause" to allow for a "Initial Hull Verification" event as described in Section C-3.042-3 of the RFP. Follow-on boat production events shall not include an "Initial Hull Verification".
246/14/23Draft RFP N0002423R2275N/AIs there an FTE estimate for the 40PB test requirements and oversight?The government is not providing insight on that information.
256/14/23Draft RFP N0002423R2275N/AAre jigs provided?No.
266/14/23Draft RFP N0002423R2275N/AWhat are the changes on the Flight 2 40PBs compared to the current 40PBs?These changes are listed in the technical risk area of the Monday June 12 Industry Day presentation.
276/14/23Draft RFP N0002423R2275N/AWhat is the engineering scope of work for the builder?The engineering scope of work for the builder(s) may include some structural elements and build methodology that can be changed to fit builder processes. The builder(s) needs to provide production drawings.
286/14/23Draft RFP N0002423R2275N/AWould the government award a single award, and could it be to a joint venture?The Government is anticipating a Multiple Award for this effort. Small Business teaming is acceptable in accordance with FAR 52.219-14(e)(2).
296/14/23Draft RFP N0002423R2275N/ADo all the boats have to be built in the same location?The boats do not all have to be built in the same location.
306/14/23Draft RFP N0002423R2275N/AWhat is the minimum order of boats?The Government is anticipating a 1 boat minimum for the first delivery order for each successful offeror.
316/14/23Draft RFP N0002423R2275N/AWill GFI be provided in native formats?Yes. The 19 contract drawings will be provided in AutoCAD, the 3D model in SolidWorks.
326/14/23Draft RFP N0002423R2275N/ATo what scope does the Commonality and Standardization section apply?The section applies only to the boats in this contract, it does not require that the newly built boats match the current 40PBs.
336/23/23Draft RFP N0002423R2275N/AWill the RFP include stepladder pricing?The Government is anticipating the use of Stepladder pricing.
346/23/23Draft RFP N0002423R2275N/AGiven that Attachment 12 has yet to be provided, nor an updated buy plan since the Sources Sought, the following is based on some acknowledged assumptions. Assuming the intended ordering of 78 is broken down into 58 for NECC, 10 for "other Navy" and 10 for "FMS" pending funding. It is assumed that the budget is established for 58 to allow NECC to reach their TOA and the other 20 are contract placeholders for potential future customers. The desired delivery spacing once production begins is one boat every 30 days, or 12 boats per year. At some point in the future if the Navy doesn't order 12 boats from a builder each ordering period, there will be a break in production. If the order quantity is split across both builders and the delivery spacing remains at 30 days then both builders will experience a break in production. The break in production will decrease production efficiency and drive up cost. Without stepladder pricing, asking the builder to provide a single price for a boat in an option period whether they may build none or 1 or 6 or 12 boats places risk on small business. This risk may result in higher unit prices, where if the Navy orders higher quantities savings could be passed on via stepladder pricing.Attachment J-12 will be included with the final RFP which will include step ladder pricing for each Ordering Period.
356/23/23Draft RFP N0002423R2275N/AThe Navy has specified a single ballistics supplier without regional distributors and little commercial demand to set market pricing and availability.

a. how will the Navy ensure non-preferential treatment of the specified ballistic supplier to both of the two builders? i.e. if the ballistic supplier has supply chain issues they could favorably choose to supply to one builder over another and cause the second builder to miss contractual due dates.

b. Similar risk relates pricing equitableness.

c. Would the Navy be open to funding some of the required testing/design to identify an “Alternate Item” qualification for this sole source item. (similar to how ground vehicles have multiple suppliers for their A/B armor kits)It is incumbent upon the Successful Offeror(s) to manage relationships with their subcontractors and suppliers.
366/23/23Draft RFP N0002423R2275N/AWill there be a DPAS rating for this contract?DO-A3 is listed on top of RFP cover page
376/23/23Draft RFP N0002423R2275Page 6-10 CLINs 0006-0014a. Can we assume if ordered from a vendor all training Fam, Engine and Waterjet will be ordered?
b. There are some planning costs to coordinate setting up a training event , but if the Navy orders a la carte from either vendor, the CLIN with the planning costs may not be included. If we price as if the Navy may order a la carte, each individual CLIN will be priced higher resulting in higher cost to the Navy,The Navy has discretion to place orders on training FAM, Engine and Waterjet CLINs as needed.
386/23/23Draft RFP N0002423R2275Pages 14 through 18 B-216-H003 ECONOMIC PRICE ADJUSTMENTS—ALTERNATE III (NAVSEA) (JUN 2023)a. Where does Transparent Armor fit into these indices?

b. What about production labor?

c. Aluminum looks good. Recommend second item be specific to engines w/gears and waterjets for easy invoice determination. Third item be specific to opaque armor

d. The commercial market will set value for aluminum, engines and jets, however the opaque armor is such a niche item the Navy could be in danger of the specified vendor taking advantage of the EPA CLIN.

e. The RFP states after an economic price adjustment is made for a given CLIN, no further adjustment for that CLIN will be made under this clause. However that assumes that the CLINs will only be awarded each year. We've have many instances of orders being received for future years (PB being an example) which means we could get an award on Boat 30 (CLIN 001) and be in an inflationary environment whereby we attempt to collect after the 3% threshold has passed but since we only get one shot at it, could be expending additional costs if we have deposits that are being made in YR 0 and costs spread end of YR 1 and beginning of YR 2. The government requires the request for adjustment to be made 3 months prior to start date. One way to ensure equity would be to demonstrate at the end of the build inflationary pressure (or deflationary pressure) and provide additional compensation to/from the government. There are other simpler solutions that could also be pursued.

f. The EPA clause allows for the federal government two years to demonstrate deflationary pressures with the contractor required to payback anything evidenced by deflationary pressure but only allows a onetime adjustment three months prior to a build starting. Is there a reason there is such a disparity between the government's ability to claw back funds and the contractor’s ability to pass on inflationary costs?The EPA clause will be updated in the final RFP which will utilize the Boat Building Index (PPI 336612)
396/23/23Draft RFP N0002423R2275Page 19 references Government design drawingsAre these the same as the "Contract Drawings" in SOW C-3.040 on p.24 or are there another set of drawings?Yes. There are contract drawings provided as part of the Spec and informational data package and drawings provided as Attachment J-4, Item #15.
406/23/23Draft RFP N0002423R2275Page 25 Paragraph 042-3Makes reference to Contractors Ballistic design agent attending PDR/CDR but Contract drawings dictate design and agent. Does the Government want the specified design agent present?In accordance with C-3.042-3 "The Contractor shall hold DRs at the Contractor’s facility. The Contractor’s ballistics integration agent and design agent (if used) shall attend both design reviews."
416/23/23Draft RFP N0002423R2275Page 29 Table C-3 IMS key eventsa. Throughout this section multiple references to Initial and Follow-on Production exists but those are not defined in the SOW?
b. Should GFM In Yard need date be included as event for each hull in the IMS?a. In accordance with C-3.042-4 "The Contractor shall develop and adhere to this schedule commensurate with their program approach."

b. Yes.

426/23/23Draft RFP N0002423R2275Page 29-30 Classified Information SystemDoes Attachment J-11 reflect the Security Classification Guide associated with the DD254?Attachment J-11 has been provided in accordance with the latest security requirements.
436/23/23Draft RFP N0002423R2275Page 30 Paragraph 3.042-10In the table what does "OUTF/SI" stand for?Outfitting and System and Integration
446/23/23Draft RFP N0002423R2275Page 31What does "MELO" stand for?Main Engine Light-Off
456/23/23Draft RFP N0002423R2275Page 31 042-11Is FAX machine access still a requirement?Yes.
466/23/23Draft RFP N0002423R2275Page 32 SOW Paragraph 3.080-2IUID para references instructions in J-6 which is the Critical Equipment Attachment.The Critical Equipment shall have IUID markings.
476/23/23Draft RFP N0002423R2275Page 33 C-3.085-1 Technical Design Analysisa. Sub-para (c) Transportability Report (DI-012-03) requires trailer dimensions in order to complete the DI, but those are not included in the GFI listing.

b. Please note, all trailer height dimensions provided need to be reflective of a loaded trailer to ascertain suspension compression. Measuring an unloaded trailer will not provided accurate height data when loaded.

c. Comment applies to Att. J-2 DI-012-03 as well…Addressed in Final RFP.
486/23/23Draft RFP N0002423R2275Page 36 Paragraph 3.092-1(b)There is no DI for the Hull Verification ScanAddressed in Final RFP.
496/23/23Draft RFP N0002423R2275Page 36 Paragraph 3.092-3Paragraph requires test for each "year" in production.

a. Is this calendar year, fiscal year, 12 month period from ordering?

b. Example: If production of a 4 boat order starts in February and the last boat delivers in January of the following year do these tests have to be conducted twice for this order of

four boats because they delivered in different calendar years?Tests will be conducted within 12 months after award of each Delivery Order.
506/23/23Draft RFP N0002423R2275Page 37 Paragraph C-3.094-1First paragraph calls out Item 13 of Attachment J-4 but J-4 does not list an item 13.Addressed in Final RFP.
516/23/23Draft RFP N0002423R2275Page 42 C-211-H010 TUG AND PILOT SERVIESUnclear why this clause has been included unless to notify contractors they need a yard trailer since provision of trailers is outside the scope of this contract.The Government anticipates removal of this clause from the final RFP.
526/23/23Draft RFP N0002423R2275Page 43 C-211-H019 COMMONALITY AND STANDARDIZATIONSince USN has already stated 200+ brand name items is a C&SP still required?Yes.
536/23/23Draft RFP N0002423R2275Page 44 C-215-H001 PRICE ADJUSTMENT FOR CHANGES IN FEDERAL LAWThe clause states "No adjustment shall be made unless… an increase or decrease in the Contractor's cost of performance of this contract in excess of $250,000 per ship." It is noted this dollar value is relative to a ship and seems like that dollar value should be tailored for end item cost and may not be representative of boat costs.This is a standard NAVSEA Clause.
546/23/23Draft RFP N0002423R2275Page 54 C-242-H002 POST AWARD MEETINGClause seems redundant to specific language already in the SOWThis is a standard NAVSEA Clause.
556/23/23Draft RFP N0002423R2275Page 57 EXHIBIT A to C-243-H002, NOTIFICATION OF CHANGESMakes reference to an Attachment A not providedExhibit A provides example language that shall be submitted by the Contractor for Clause C-243-H002 NOTIFICATION OF CHANGES
566/23/23Draft RFP N0002423R2275Page 67 E-246-W007 NOTIFICATION OF INSPECTION OR TESTThe clause is blank and seems duplicative to specific SOW requirements in SOW para C-3.042-10This is a standard NAVSEA Clause.
576/23/23Draft RFP N0002423R2275Page 68 Section Fa. States "first 40PB of each delivery order is 360 days after successful completion of Production Readiness Review".

b. Per SOW C-3.042-3 (p.27) the Production Readiness Review is a one time first year event and not a "per delivery order" event. c. per SOW section C (p.22) conduct and data for PRR is paid on CLIN 0015,

d. P.23 Section C states CLIN 0015 will only be "included in the first Delivery Order issued to the Contractor."

e. Do not recommend delivery schedule for subsequent delivery orders be tied to PRR event.Addressed in Final RFP.
586/23/23Draft RFP N0002423R2275Page 70 F-247-H003 F.O.B. Originstates all supplies shall be delivered "F.O.B. Origin" seems contradictory to statement on page 68 stating all items shall be delivered FOB Destination and Section B which lists FOB destination for all CLINs.The Navy anticipates updates to F.O.B. in Final RFP.
596/23/23Draft RFP N0002423R2275Page 88 CLIN 0015States "Payable upon delivery and acceptance by the Government of the TDP".

a. the TDP is defined as the data package delivered on the boat per SOW 3.085.

b. P.23 Section be states CLIN 0015 will only be "included in the first Delivery Order issued to the Contractor."

c. Should payment of this CLIN be tied to successful completion of the CDR or PRR instead

of TDP delivery?No.
606/23/23Draft RFP N0002423R2275Attachment J-4 Item 15a. Item 15 is listed as the "Informational Data Package" b. The first list of data under the Informational Data Package on page 2 are the Contract drawings. c. on the first page, Item 15 is footnoted "* The 40PB Flight 1 Informational Package is for informational only. If used by the Contractor, it’s at their own risk. " d. This footnote applies to the Contract Drawings and seems contradictory to the SOW description of the Contract Drawings.Addressed in Final RFP.
616/23/23Draft RFP N0002423R2275Attachment J-1 Specification084 - trailer dimensions are needed to ensure design compliance with these requirements.Addressed in Final RFP.
626/23/23Draft RFP N0002423R2275Attachment J-1 Specification084-4 Boat Tiedowns makes provisions for the trailer winch cable to be considered in tiedown calculations. Will the Navy provide the strength rating of the trailer winch cable?Specification section 084-4 references NSWCCD-23-TM-2009/64 which provides guidance on acceptable methods of estimating winch cable strength.
636/23/23Draft RFP N0002423R2275Attachment J-1 Specification092-2.k will the builder be required to test the tiedowns on the trailer as stated in the Specification "Boat and Trailer Tiedown Fittings Hoisting Loads".Addressed in Final RFP.

File details come from the government source that posted it. Updated .