Att 2 DRAFT NAVFAC 30OP Skimmer Specification Response Matrix.xlsx

XLSX spreadsheet 19 KB Posted

Attached to
OSR OP Skimmer Federal contract opportunity
Solicitation number
N00024-22-R-2287
Issued by
Department of the Navy Naval Sea Systems Command

View the file

Other files for this federal contract opportunity

Other files attached to OSR OP Skimmer, newest first.
File Type Posted
Att 3 DRAFT 30OP Skimmer Initial Spares.xlsx XLSX spreadsheet
Att_7_- Technical Data Rights Assertion.doc DOC document
Solicitation.docx DOCX document
Att 1 NAVFAC Skimmer Specification 02FEB2022.pdf PDF
Att_5_-_DRAFT Delivery Schedule.XLS XLS spreadsheet
Att 8 FPSL Past Performance and Experience.doc DOC document
Att_4_-_Unique_Item_Identification_(UID).doc DOC document
Att_6_-_Warranty Terms.doc DOC document
Draft Solicitation 12-16-21.docx DOCX document
DRAFT_Att1_2020-006 NAVFAC Skimmer Specification_10DEC2021.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Att 1 Spec Response Matrix

ATTACHMENT 2
Naval Facilities (NAVFAC), Oil Spill Response (OSR)

Oil Pollution Skimmer

SPECIFICATION RESPONSE MATRIX

NOTES & INSTRUCTIONS:

Offerors to submit Attachment 2 with response for parameters identified in the Specification (See Section J).

1. Where specific parameters or other technical information are required in the Specification (indicated by red text in the Specification), Offerors shall fill in the specific parameters/information for their proposed design for each boat configuration (as applicable) in this attachment and include supporting data in Vol I as directed. At bottom Offerors shall respond with 'Comply' to indicate their design meets all Specification requirements; or 'Comply w/Exceptions' to indicate disagreement with any specific section of the Specification.

2. A response of 'Comply w/Exceptions' shall be accompanied by amplifying notes in the 'Offeror's Notes' section at bottom, providing rationale for any exceptions. Each exception shall list the Specification section, the specific rationale for non-compliance with the section, and a proposed alternative approach. Any proposed alternative approach must meet the minimum requirement of the Specification to the Government's satisfaction. Description of Offeror's alternative approach shall include the detailed approach to achieving the minimum Specification requirement; applicable material specifications, make and model numbers for all parts/components; compliance with any requisite commercial or military standard, or associated “best practice”; and shall include any supporting product performance, test data, or other empirical evidence for the proposed product or service capability where applicable. The Government reserves the right to reject (without discussion) any proposed alternative which is incomplete or fails to meet minimum requirements of the Specification.

3. A response is required for each Specification section identified herein. The Government reserves the right to evaluate incomplete responses as non-compliant with the Specification and unacceptable for Factor 1 (Technical Approach).

Specification ItemSpecification ParameterOfferor Response
070-1Enter Length Overall (LOA) including appendages: xx.xx ft
070-1Enter Hull Length (Lhull) : xx.xx ft
070-1Enter Beam Overall (BOA) [Shall be less than or equal to 120 inches per Section 084]: xx.x ft
070-1Enter Height, Keel to Fixed Structure: xx.x ft
070-1Enter Height, Keel to Moveable Structure: xx.x ft
070-1Enter Height on trailer when rigged for transport [Shall be less than or equal to 162 inches per Section 084]: xx.x ft
070-1Enter Width on trailer when rigged for transport [Shall be less than or equal to 120 inches per Section 084]: xx.x ft
070-1Enter Height from waterline to fixed structure: xx.x ft
070-1Enter Deadrise at midships: xx degrees
070-1Enter Deadrise at transom: xx degrees
070-1Enter Total Installed Fuel Capacity: xxx gallons
070-1Enter Total Installed HPU Fuel Capacity: xxx gallons
070-1Enter Total Installed Oil Recover Tanks Capacity: xxx gallons
070-1Enter Full Load Weight: (as defined in Section 070): xx,xxx lbs incl x% construction or build margin or both
070-1Enter LCG in Full Load: xx.x ft forward of the transom/keel intersect
070-1Enter Skimming Speed [Shall be 1.5+ knots] xx knots at Full Load in calm water
070-1Enter Sprint Speed [Shall be 15+ knots] xx knots at Minimum Operation in calm water
084-3Enter Highway Trailer Make and Model;
100-1General Requirements for Hull Structure - Provide a name and short description of structural methodology.
236-2Outboard Engines - Honda Model and horsepower
236-2Outboard Engines - Mercury Model and horsepower
236-2Outboard Engines - Yamaha Model and horsepower
556-1Hydraulic Power Unit - Make and Model
593-1Oil Skimmer Module - Provide Description of System

Offeror's Notes:

&12RFP N00024-16-R-22XX

Example Response

ATTACHMENT 2
SPECIFICATION RESPONSE MATRIX - EXAMPLE RESPONSE

See below for partial example responses.

Specification Item Specification Parameter Offeror Response (See Note 1)

070-1Enter Length Overall (LOA): xx.xx ft31.50 ft
070-1Enter Length with collar deflated: xx.xx ft30.75 ft
070-1Enter Hull Length (Lhull): xx.xx ft29.50 ft
070-1Enter Beam Overall (BOA): xx.x ft10.0 ft
070-1Enter Deadrise: xx degrees (state if constant or variable)19 degrees, constant
070-1Enter Total Installed Fuel Capacity: xxx gallons175 gallons
070-1Enter Full Load Weight: OCC Variant (as defined in Section 070-4): x,xxx lbs incl x% construction margin12,000 lbs with 3% construction margin
070-1Enter Cruise Speed (at xx,xxx engine RPM): xx knots at Full Load in calm water33 knots at 5,000 rpm
070-2Enter list of submitted drawings describing the proposed boat.100-123456 Gen'l Arr MERC OCC

100-123457 Transport MERC OCC (Continue per Sect L)

084-6Enter Trailer Make & Model; confirm trailer spec sheet submitted in Vol I.Boatmaster Model 32-RTT; Spec Sheet in Vol I
130-1Enter Aft Deck Interior Beam: xx inchesOJECTIVE MET

85 inches

236-1Enter Projected Static Bollard Pull: x,xxx lbs using Government's perferred engine model.4,400 lbs
310-1Enter Generator Make & ModelKohler 7.5 EKD
512-4CABEnter HVAC Make, Model, Quantity(2) Dometic VTD8K
512-4CABEnter HVAC cooling capacity: x,xxx BTU8,000 BTU (each)
Offeror's Notes:
313-3: Exception: Builder has no local distributor for Blue Seas voltmeters. Builder proposes a BrandX Model xxx123 voltmeter in lieu of a Blue Seas voltmeter specified. A catalog sheet for BrandX Model xxx123 is included in Vol I. Builder has used BrandX voltmeters in 300 boats in similar applications.

File details come from the government source that posted it. Updated .