N00024-21-R-5211 A004 Conformed.pdf
PDF 2 MB Posted
- Attached to
- Small Surface Combatant Combat System Ship Integration and Test Federal contract opportunity
- Solicitation number
- N00024-21-R-5211
About this file
This is a Request for Proposal from the Naval Sea Systems Command for Small Surface Combatant Combat System Ship Integration and Test services from Fiscal Year 2021 through 2031. The RFP seeks to procure efforts including developing and updating test documents; modifying and updating CS space arrangements, installation documents, and interface documents; providing engineering support; performing integration and test planning; conducting waterfront integration and testing; and supporting post-delivery test teams. Questions are due within 20 calendar days of receipt, with unclassified questions to be submitted electronically to the listed contracting officers.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| N00024-21-R-5211 A0006 Conformed.pdf | ||
| N00024-21-R-5211 A0006.pdf | ||
| N00024-21-R-5211 A005.pdf | ||
| 20-R-5211 SSC CS SIT QA5.pdf | ||
| N00024-21-R-5211 A005 conformed.pdf | ||
| 20-R-5211 SSC CS SIT QA4.pdf | ||
| N00024-21-R-5211 A004.pdf | ||
| N00024-21-R-5211 A003 conformed.pdf | ||
| N00024-21-R-5211 A003.pdf | ||
| 20-R-5211 SSC CS SIT QA3.pdf | ||
| N00024-21-R-5211 A002.pdf | ||
| N00024-21-R-5211 A002 Conformed.pdf | ||
| N00024-21-R-5211 SSC CS SIT QA2.pdf | ||
| N00024-21-R-5211 A001-Conformed.pdf | ||
| J-31 Unclassified TOUA SSC CS SIT 20200522.docx | DOCX document | |
| N00024-21-R-5211 A001.pdf | ||
| N00024-21-R-5211 SSC CS SIT QA1.pdf | ||
| J-32 Solicitation Q Submittal Form SSC CS SIT 20200522.xlsx | XLSX spreadsheet | |
| N00024-21-R-5211 RFP 20200522.pdf |
Show all 19
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CODE
(Hour)
PAGE(S)
until 03:00 PM local t ime 05 Aug 2020
X
A X B X C X D
EX
X
G F 176 - 185
186 - 218 X H 219 - 228 kevin.richter@navy .mil
RATING PAGE OF PAGES
7. ISSUED BY
(Date)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)
Prescribed by GSA FAR (48 CFR) 53.214(c)
DO 1 228
(If other than Item 7)
15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO
AND
ADDRESS SIGN OFFER (Type or print)
OF
OFFEROR
AMENDMENT NO. DATE
15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS
IS DIFFERENT FROM ABOVE - ENTER
SUCH ADDRESS IN SCHEDULE.
18. OFFER DATE
1. THIS CONTRACT IS A RATED ORDER
UNDER DPAS (15 CFR 700)
2. CONTRACT NO.
N00024 8. ADDRESS OFFER TO
See Item 7
9. Sealed offers in original and 1 copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in
CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and
Section L conditions contained in this solicitation.
10. FOR INFORMATION
CALL:
A. NAME (NO COLLECT CALLS)
KEVIN A RICHTER 202-781-4211
11. TABLE OF CONTENTS
SOLICITATION/ CONTRACT FORM
SUPPLIES OR SERVICES AND PRICES/ COSTS
2 - 94
X I CONTRACT CLAUSES
DESCRIPTION/ SPECS./ WORK STATEMENT X
PACKAGING AND MARKING
95 - 142
J LIST OF ATTACHMENTS
INSPECTION AND ACCEPTANCE
DELIVERIES OR PERFORMANCE
144 - 150
151 - 152 X K REPRESENTATIONS, CERTIFICATIONS AND
OTHER STATEMENTS OF OFFERORS
CONTRACT ADMINISTRATION DATA 153 - 161 X
SPECIAL CONTRACT REQUIREMENTS
OFFER (Must be fully completed by offeror) 162 - 166 X M
L INSTRS., CONDS., AND NOTICES TO OFFERORS
EVALUATION FACTORS FOR AWARD
NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. DISCOUNT FOR PROMPT PAYMENT
(See Section I, Clause No. 52.232-8)
14. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments
AMENDMENT NO. DATE
to the SOLICITATION for offerors and related documents numbered and dated):
FACILITY
12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period
SOLICITATION, OFFER AND AWARD
X
(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)
PART I - THE SCHEDULE
26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE
EMAIL:TEL: (Signature of Contracting Officer)
CODE CODE
B. TELEPHONE (Include area code) C. E-MAIL ADDRESS
AWARD (To be completed by Government)
19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION
22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)
23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE
PART IV - REPRESENTATIO NS AND INSTRUCTIO NS
PART III - LIST O F DO CUMENTS, EXHIBITS AND O THER ATTACHMENTS
167 - 174
PART II - CO NTRACT CLAUSES
NAVAL SEA SYSTEMS COMMAND
1333 ISAAC HULL AVE SE
WASHINGTON NAVY YARD DC 20376
(202) 781-4102
FAX:
TEL:
FAX:
TEL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SOLICITATION
6. REQUISITION/PURCHASE NO.
N0002420NR4900201
5. DATE ISSUED
22 May 2020
4. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
[ X ]
3. SOLICITATION NO.
N0002421R5211
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
CLIN
Number
1 Each
Develop Program Management Documents
CPIF
Development of Program Management, Process, Standards, and Performance and Reporting Requirements FOB: Destination
PURCHASE REQUEST NUMBER: N0002420NR4900201
PSC CD: N012
TARGET COST
TARGET FEE
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
SHARE RATIO ABOVE TARGET
SHARE RATIO BELOW TARGET
LCS Freedom
CPIF
Develop CS Test Procedures, CS Test Sequence Network (TSN), & CS Master Test Plan (MTP) FOB: Destination
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
LCS Independence
CPIF
Develop CS Test Procedures, CS Test Sequence Network (TSN), & CS Master Test Plan (MTP) FOB: Destination
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
2,980 Hours
OPTION LUSV
CPIF
Develop CS Test Procedures, CS Test Sequence Network (TSN), & CS Master Test Plan (MTP) See Note B FOB: Destination
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
9,905 Hours
OPTION LCS Freedom
CPIF
Develop CS Space Arrangement Drawings, CS Installation and Interface Control Drawings See Note B FOB: Destination
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
9,905 Hours
OPTION LCS Independence
CPIF
Develop CS Space Arrangement Drawings, CS Installation and Interface Control Drawings See Note B FOB: Destination
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
6,792 Hours
CPIF
Develop CS Space Arrangement Drawings, CS Installation and Interface Control Drawings See Note B FOB: Destination
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
30,829 Hours
CPIF
CS Ship Integration Engineering and Test Planning See Note B FOB: Destination
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
CPIF
CS Ship Integration Engineering and Test Planning See Note B FOB: Destination
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
21,140 Hours
CPIF
CS Ship Integration Engineering and Test Planning See Note B FOB: Destination
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
40,798 Hours
CPIF
CS Waterfront Integration and Test See Note B and D FOB: Destination
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
CPIF
CS Waterfront Integration and Test See Note B and D FOB: Destination
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
46,627 Hours
CPIF
CS Waterfront Integration and Test See Note B and D FOB: Destination
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
38,071 Hours
OPTION Engineering Services
CPFF
See Note B FOB: Destination
ESTIMATED COST
FIXED FEE
TOTAL EST COST + FEE
OPTION ODC/Incidental Materials
COST
In support of CLINs 0004 through 0013, and 0017 Not to Exceed (NTE) Value- $2,554,000 See Note B FOB: Destination
OPTION PIO
FFP
Provisioned Item Order Not to Exceed (NTE) Value- $1,096,000 See Note B and C FOB: Destination
NET AMT
Data CLIN
Data in support of CLINs 0001, 0002, 0003, and if Options are exercised, 0004, 0005, 0006, 0008, 0009, 0010, 0011, 0012, 0013, 0017, 1004-6004, 1005-9005, 1006-9006, 1007-9007, 1008-9008, 1009-9009, 1010-9010, 1011-9011, 1012- 9012, 1013-9013, 1017-9017, 2014-9014, 2015-9015, and 2016-9016 in accordance with Contract Data Requirements List (CDRL), DD Form 1423 Exhibits A and B.
Not Separately Priced (NSP) See Note A FOB: Destination
OPTION Data Rights License Upgrade Option
FFP
See Note B, E and F FOB: Destination
OPTION Performance Incentive Fee CLIN
COST
Associated with CLIN 0011 See Note B and D FOB: Destination
COST
Associated with CLIN 0012 See Note B and D
COST
Associated with CLIN 0013 See Note B and D
2,384 Hours
CPIF
Develop CS Test Procedures, CS Test Sequence Network (TSN), & CS Master Test Plan (MTP) See Note B
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
7,924 Hours
CPIF
Develop CS Space Arrangement Drawings, CS Installation and Interface Control Drawings See Note B FOB: Destination
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
CPIF
Develop CS Space Arrangement Drawings, CS Installation and Interface Control Drawings See Note B FOB: Destination
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
5,434 Hours
CPIF
Develop CS Space Arrangement Drawings, CS Installation and Interface Control Drawings See Note B FOB: Destination
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
CPIF
CS Ship Integration Engineering and Test Planning See Note B FOB: Destination
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
CPIF
CS Ship Integration Engineering and Test Planning See Note B FOB: Destination
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
CPIF
CS Ship Integration Engineering and Test Planning See Note B FOB: Destination
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
CPIF
CS Waterfront Integration and Test See Note B and D FOB: Destination
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
CPIF
CS Waterfront Integration and Test See Note B and D FOB: Destination
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
CPIF
CS Waterfront Integration and Test See Note B and D FOB: Destination
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
36,788 Hours
CPFF
See Note B FOB: Destination
COST
In support of CLINs 1004 through 1013, and 1017 Not to Exceed (NTE) Value- $2,512,000 See Note B FOB: Destination
COST
Associated with CLIN 1011 See Note B and D
COST
Associated with CLIN 1012 See Note B and D
COST
Associated with CLIN 1013 See Note B and D
CPIF
Develop CS Test Procedures, CS Test Sequence Network (TSN), & CS Master Test Plan (MTP) See Note B
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
CPIF
Develop CS Space Arrangement Drawings, CS Installation and Interface Control Drawings See Note B FOB: Destination
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
CPIF
Develop CS Space Arrangement Drawings, CS Installation and Interface Control Drawings See Note B FOB: Destination
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
CPIF
Develop CS Space Arrangement Drawings, CS Installation and Interface Control Drawings See Note B FOB: Destination
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
CPIF
CS Ship Integration Engineering and Test Planning See Note B FOB: Destination
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
CPIF
CS Ship Integration Engineering and Test Planning See Note B FOB: Destination
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
CPIF
CS Ship Integration Engineering and Test Planning See Note B FOB: Destination
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
CPIF
CS Waterfront Integration and Test See Note B and D FOB: Destination
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
CPIF
CS Waterfront Integration and Test See Note B and D FOB: Destination
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
CPIF
CS Waterfront Integration and Test See Note B and D FOB: Destination
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
9,785 Hours
CPIF
Post Delivery and Post-Industrial CS Test and Trials Support See Note B FOB: Destination
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
CPIF
Post Delivery and Post-Industrial CS Test and Trials Support See Note B FOB: Destination
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
6,709 Hours
CPIF
Post Delivery and Post-Industrial CS Test and Trials Support See Note B FOB: Destination
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
40,188 Hours
CPFF
See Note B FOB: Destination
COST
In support of CLINs 2004 through 2017 Not to Exceed (NTE) Value- $2,782,000 See Note B FOB: Destination
COST
Associated with CLIN 2011 See Note B and D
COST
Associated with CLIN 2012 See Note B and D
COST
Associated with CLIN 2013 See Note B and D
CPIF
Develop CS Test Procedures, CS Test Sequence Network (TSN), & CS Master Test Plan (MTP) See Note B
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
CPIF
Develop CS Space Arrangement Drawings, CS Installation and Interface Control Drawings See Note B FOB: Destination
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
CPIF
Develop CS Space Arrangement Drawings, CS Installation and Interface Control Drawings See Note B FOB: Destination
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
CPIF
Develop CS Space Arrangement Drawings, CS Installation and Interface Control Drawings See Note B FOB: Destination
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
CPIF
CS Ship Integration Engineering and Test Planning See Note B FOB: Destination
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
CPIF
CS Ship Integration Engineering and Test Planning See Note B FOB: Destination
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
CPIF
CS Ship Integration Engineering and Test Planning See Note B FOB: Destination
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
CPIF
CS Waterfront Integration and Test See Note B and D FOB: Destination
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
CPIF
CS Waterfront Integration and Test See Note B and D FOB: Destination
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
CPIF
CS Waterfront Integration and Test See Note B and D FOB: Destination
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
CPIF
Post Delivery and Post-Industrial CS Test and Trials Support See Note B FOB: Destination
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
CPIF
Post Delivery and Post-Industrial CS Test and Trials Support See Note B FOB: Destination
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
6,709 Hours
CPIF
Post Delivery and Post-Industrial CS Test and Trials Support See Note B FOB: Destination
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
40,188 Hours
CPFF
See Note B FOB: Destination
COST
In support of CLINs 3004 through 3017 Not to Exceed (NTE) Value- $2,838,000 See Note B FOB: Destination
COST
Associated with CLIN 3011 See Note B and D
COST
Associated with CLIN 3012 See Note B and D
COST
Associated with CLIN 3013 See Note B and D
2,781 Hours
CPIF
Develop CS Test Procedures, CS Test Sequence Network (TSN), & CS Master Test Plan (MTP) See Note B
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
CPIF
Develop CS Space Arrangement Drawings, CS Installation and Interface Control Drawings See Note B FOB: Destination
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
CPIF
Develop CS Space Arrangement Drawings, CS Installation and Interface Control Drawings See Note B FOB: Destination
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
6,339 Hours
CPIF
Develop CS Space Arrangement Drawings, CS Installation and Interface Control Drawings See Note B FOB: Destination
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
CPIF
CS Ship Integration Engineering and Test Planning See Note B FOB: Destination
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
CPIF
CS Ship Integration Engineering and Test Planning See Note B FOB: Destination
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
24,663 Hours
CPIF
CS Ship Integration Engineering and Test Planning See Note B FOB: Destination
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
CPIF
CS Waterfront Integration and Test See Note B and D FOB: Destination
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
CPIF
CS Waterfront Integration and Test See Note B and D FOB: Destination
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
CPIF
CS Waterfront Integration and Test See Note B and D FOB: Destination
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
CPIF
Post Delivery and Post-Industrial CS Test and Trials Support See Note B FOB: Destination
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
CPIF
Post Delivery and Post-Industrial CS Test and Trials Support See Note B FOB: Destination
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
7,828 Hours
CPIF
Post Delivery and Post-Industrial CS Test and Trials Support See Note B FOB: Destination
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
41,080 Hours
CPFF
See Note B FOB: Destination
COST
In support of CLINs 4004 through 4017 Not to Exceed (NTE) Value- $2,959,000 See Note B FOB: Destination
COST
Associated with CLIN 4011 See Note B and D
COST
Associated with CLIN 4012 See Note B and D
COST
Associated with CLIN 4013 See Note B and D
CPIF
Develop CS Test Procedures, CS Test Sequence Network (TSN), & CS Master Test Plan (MTP) See Note B
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
CPIF
Develop CS Space Arrangement Drawings, CS Installation and Interface Control Drawings See Note B FOB: Destination
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
CPIF
Develop CS Space Arrangement Drawings, CS Installation and Interface Control Drawings See Note B FOB: Destination
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
CPIF
Develop CS Space Arrangement Drawings, CS Installation and Interface Control Drawings See Note B FOB: Destination
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
CPIF
CS Ship Integration Engineering and Test Planning See Note B FOB: Destination
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
CPIF
CS Ship Integration Engineering and Test Planning See Note B FOB: Destination
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
CPIF
CS Ship Integration Engineering and Test Planning See Note B FOB: Destination
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
CPIF
CS Waterfront Integration and Test See Note B and D FOB: Destination
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
CPIF
CS Waterfront Integration and Test See Note B and D FOB: Destination
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
CPIF
CS Waterfront Integration and Test See Note B and D FOB: Destination
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
CPIF
Post Delivery and Post-Industrial CS Test and Trials Support See Note B FOB: Destination
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
CPIF
Post Delivery and Post-Industrial CS Test and Trials Support See Note B FOB: Destination
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
CPIF
Post Delivery and Post-Industrial CS Test and Trials Support See Note B FOB: Destination
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
CPFF
See Note B FOB: Destination
COST
In support of CLINs 5004 through 5017 Not to Exceed (NTE) Value- $3,018,000 See Note B FOB: Destination
COST
Associated with CLIN 5011 See Note B and D
COST
Associated with CLIN 5012 See Note B and D
COST
Associated with CLIN 5013 See Note B and D
CPIF
Develop CS Test Procedures, CS Test Sequence Network (TSN), & CS Master Test Plan (MTP) See Note B
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
CPIF
Develop CS Space Arrangement Drawings, CS Installation and Interface Control Drawings See Note B FOB: Destination
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
CPIF
Develop CS Space Arrangement Drawings, CS Installation and Interface Control Drawings See Note B FOB: Destination
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
CPIF
Develop CS Space Arrangement Drawings, CS Installation and Interface Control Drawings See Note B FOB: Destination
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
CPIF
CS Ship Integration Engineering and Test Planning See Note B FOB: Destination
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
CPIF
CS Ship Integration Engineering and Test Planning See Note B FOB: Destination
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
CPIF
CS Ship Integration Engineering and Test Planning See Note B FOB: Destination
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
CPIF
CS Waterfront Integration and Test See Note B and D FOB: Destination
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
CPIF
CS Waterfront Integration and Test See Note B and D FOB: Destination
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
CPIF
CS Waterfront Integration and Test See Note B and D FOB: Destination
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
CPIF
Post Delivery and Post-Industrial CS Test and Trials Support See Note B FOB: Destination
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
CPIF
Post Delivery and Post-Industrial CS Test and Trials Support See Note B FOB: Destination
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
CPIF
Post Delivery and Post-Industrial CS Test and Trials Support See Note B FOB: Destination
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
CPFF
See Note B FOB: Destination
COST
In support of CLINs 6004 through 6017 Not to Exceed (NTE) Value- $3,078,000 See Note B FOB: Destination
COST
Associated with CLIN 6011 See Note B and D
COST
Associated with CLIN 6012 See Note B and D
COST
Associated with CLIN 6013 See Note B and D
CPIF
Develop CS Space Arrangement Drawings, CS Installation and Interface Control Drawings See Note B FOB: Destination
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
CPIF
Develop CS Space Arrangement Drawings, CS Installation and Interface Control Drawings See Note B FOB: Destination
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
CPIF
Develop CS Space Arrangement Drawings, CS Installation and Interface Control Drawings See Note B FOB: Destination
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
CPIF
CS Ship Integration Engineering and Test Planning See Note B FOB: Destination
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
CPIF
CS Ship Integration Engineering and Test Planning See Note B FOB: Destination
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
CPIF
CS Ship Integration Engineering and Test Planning See Note B FOB: Destination
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
CPIF
CS Waterfront Integration and Test See Note B and D FOB: Destination
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
CPIF
CS Waterfront Integration and Test See Note B and D FOB: Destination
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
CPIF
CS Waterfront Integration and Test See Note B and D FOB: Destination
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
CPIF
Post Delivery and Post-Industrial CS Test and Trials Support See Note B FOB: Destination
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
CPIF
Post Delivery and Post-Industrial CS Test and Trials Support See Note B FOB: Destination
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
CPIF
Post Delivery and Post-Industrial CS Test and Trials Support See Note B FOB: Destination
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
39,620 Hours
CPFF
See Note B FOB: Destination
COST
In support of CLINs 7005 through 7017 Not to Exceed (NTE) Value- $3,010,000 See Note B FOB: Destination
COST
Associated with CLIN 7011 See Note B and D
COST
Associated with CLIN 7012 See Note B and D
COST
Associated with CLIN 7013 See Note B and D
CPIF
Develop CS Space Arrangement Drawings, CS Installation and Interface Control Drawings See Note B FOB: Destination
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
CPIF
Develop CS Space Arrangement Drawings, CS Installation and Interface Control Drawings See Note B FOB: Destination
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
CPIF
Develop CS Space Arrangement Drawings, CS Installation and Interface Control Drawings See Note B FOB: Destination
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
CPIF
CS Ship Integration Engineering and Test Planning See Note B FOB: Destination
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
CPIF
CS Ship Integration Engineering and Test Planning See Note B FOB: Destination
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
CPIF
CS Ship Integration Engineering and Test Planning See Note B FOB: Destination
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
CPIF
CS Waterfront Integration and Test See Note B and D FOB: Destination
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
CPIF
CS Waterfront Integration and Test See Note B and D FOB: Destination
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
CPIF
CS Waterfront Integration and Test See Note B and D FOB: Destination
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
CPIF
Post Delivery and Post-Industrial CS Test and Trials Support See Note B FOB: Destination
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
CPIF
Post Delivery and Post-Industrial CS Test and Trials Support See Note B FOB: Destination
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
CPIF
Post Delivery and Post-Industrial CS Test and Trials Support See Note B
FOB: Destination
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
CPFF
See Note B FOB: Destination
COST
In support of CLINs 8005 through 8017 Not to Exceed (NTE) Value- $3,069,000 See Note B FOB: Destination
COST
Associated with CLIN 8011 See Note B and D
COST
Associated with CLIN 8012 See Note B and D
COST
Associated with CLIN 8013 See Note B and D
CPIF
Develop CS Space Arrangement Drawings, CS Installation and Interface Control Drawings See Note B FOB: Destination
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
CPIF
Develop CS Space Arrangement Drawings, CS Installation and Interface Control Drawings See Note B FOB: Destination
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
CPIF
Develop CS Space Arrangement Drawings, CS Installation and Interface Control Drawings See Note B FOB: Destination
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
CPIF
CS Ship Integration Engineering and Test Planning See Note B FOB: Destination
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
CPIF
CS Ship Integration Engineering and Test Planning See Note B FOB: Destination
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
CPIF
CS Ship Integration Engineering and Test Planning See Note B FOB: Destination
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
CPIF
CS Waterfront Integration and Test See Note B and D FOB: Destination
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
CPIF
CS Waterfront Integration and Test See Note B and D FOB: Destination
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
CPIF
CS Waterfront Integration and Test See Note B and D FOB: Destination
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
CPIF
Post Delivery and Post-Industrial CS Test and Trials Support See Note B FOB: Destination
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
CPIF
Post Delivery and Post-Industrial CS Test and Trials Support See Note B FOB: Destination
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
CPIF
Post Delivery and Post-Industrial CS Test and Trials Support See Note B FOB: Destination
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
CPFF
See Note B FOB: Destination
COST
In support of CLINs 9005 through 9017 Not to Exceed (NTE) Value- $3,131,000 See Note B FOB: Destination
COST
Associated with CLIN 9011 See Note B and D
COST
Associated with CLIN 9012 See Note B and D
COST
Associated with CLIN 9013 See Note B and D
NOTES
NOTE A - Offeror shall complete the "Price Group" and "Estimated Total Price" blocks of each data item on the Contract Data Requirements List(s), attached hereto.
NOTE B - Option item to which the option clause in SECTION I, 52.217-7 OPTION FOR INCREASED QUANTITY--SEPARATELY PRICED LINE ITEM (MAR 1989) (NAVSEA VARIATION I) (SEP 2009), applies and which is to be supplied only if and to the extent said option is exercised.
NOTE C - Provisioned Item Orders (PIO) may be placed against this line item and the pricing thereof shall be established by the parties to the contract on a firm fixed price basis prior to the award of each order. See C-217-
H001- PROVISIONED ITEMS ORDERS (NAVSEA).
NOTE D- Performance Incentive Fee –Calculation and payment of Performance Incentive Fee for CLINs 0011, 0012, 0013, and Option CLINs 1011, 1012, 1013; 2011, 2012, 2013;, 3011, 3012, 3013; 4011, 4012, 4013; 5011, 5012, 5013; 6011, 6012, 6013; 7011, 7012, 7013; 8011, 8012, 8013; 9011, 9012, and 9013 shall be in accordance with B-232-H005 PAYMENTS OF FEE(S) (LEVEL OF EFFORT)--ALTERNATE I (NAVSEA) (OCT 2018). The processes and criteria of Performance Incentives are described in the Performance Incentive Fee Plan (Attachment J- 29). As an example, the Performance Incentive Fee associated with Base CLIN 0011 will be accumulated and earned under CLIN 0022. The fee is separated for administrative purposes only. The Contractor shall report all costs under Base CLIN 0011, or the respective primary CLIN. The Performance Incentive Fee Plan is provided under Section J – Attachment 29 – Performance Incentive Fee Plan.
Integration & Test
CLIN
Performance Incentive Fee
CLIN
Integration & Test CLIN Description
Potential Performance Incentive Pool (4%)
Performance Incentive Pool Earned
0011 0022 Freedom - Waterfront Integration & Test 0011 (Target Cost * 4%) N/A
0012 0023 Independence - Waterfront Integration & Test 0012 (Target Cost * 4%) N/A
0013 0024 LUSV - Waterfront Integration & Test 0013 (Target Cost * 4%) N/A
1011 1022 Freedom - Waterfront Integration & Test 1011 (Target Cost * 4%) N/A
1012 1023 Independence - Waterfront Integration & Test 1012 (Target Cost * 4%) N/A
1013 1024 LUSV - Waterfront Integration & Test 1013 (Target Cost * 4%) N/A
2011 2022 Freedom - Waterfront Integration & Test 2011 (Target Cost * 4%) N/A
2012 2023 Independence - Waterfront Integration & Test 2012 (Target Cost * 4%) N/A
2013 2024 LUSV - Waterfront Integration & Test 2013 (Target Cost * 4%) N/A
3011 3022 Freedom - Waterfront Integration & Test 3011 (Target Cost * 4%) N/A
3012 3023 Independence - Waterfront Integration & Test 3012 (Target Cost * 4%) N/A
3013 3024 LUSV - Waterfront Integration & Test 3013 (Target Cost * 4%) N/A
4011 4022 Freedom - Waterfront Integration & Test 4011 (Target Cost * 4%) N/A
4012 4023 Independence - Waterfront Integration & Test 4012 (Target Cost * 4%) N/A
4013 4024 LUSV - Waterfront Integration & Test 4013 (Target Cost * 4%) N/A
5011 5022 Freedom - Waterfront Integration & Test 5011 (Target Cost * 4%) N/A
5012 5023 Independence - Waterfront Integration & Test 5012 (Target Cost * 4%) N/A
5013 5024 LUSV - Waterfront Integration & Test 5013 (Target Cost * 4%) N/A
6011 6022 Freedom - Waterfront Integration & Test 6011 (Target Cost * 4%) N/A
6012 6023 Independence - Waterfront Integration & Test 6012 (Target Cost * 4%) N/A
6013 6024 LUSV - Waterfront Integration & Test 6013 (Target Cost * 4%) N/A
7011 7022 Freedom - Waterfront Integration & Test 7011 (Target Cost * 4%) N/A
7012 7023 Independence - Waterfront Integration & Test 7012 (Target Cost * 4%) N/A
7013 7024 LUSV - Waterfront Integration & Test 7013 (Target Cost * 4%) N/A
8011 8022 Freedom - Waterfront Integration & Test 8011 (Target Cost * 4%) N/A
8012 8023 Independence - Waterfront Integration & Test 8012 (Target Cost * 4%) N/A
8013 8024 LUSV - Waterfront Integration & Test 8013 (Target Cost * 4%) N/A
9011 9022 Freedom - Waterfront Integration & Test 9011 (Target Cost * 4%) N/A
9012 9023 Independence - Waterfront Integration & Test 9012 (Target Cost * 4%) N/A
9013 9024 LUSV - Waterfront Integration & Test 9013 (Target Cost * 4%) N/A
Note E - CLIN 0021 – Data Rights License Upgrade Option – If the Offeror so chooses, the Offeror shall fill this in with their proposed cumulative price for those license rights which the Offeror is willing to license in accordance with Section L. The cumulative Data Rights License Upgrade Option price is a summation of the Section J Attachment 25B.
Note F - The option clause in SECTION I only applies to the extent said option is exercised.
CLAUSES INCORPORATED BY FULL TEXT
B-215-H002 REFUNDS (SPARES AND SUPPORT EQUIPMENT) (NAVSEA) (OCT 2018)
(a) In the event that the price of a spare part or item of support equipment delivered under this contract significantly exceeds its intrinsic value, the Contractor agrees to refund the difference. Refunds will not be made to recoup the amount of cost decreases that occur over time due to productivity gains (excluding economic purchase quantity considerations) or changes in market conditions.
(b) For purposes of this requirement, the intrinsic value of an item is defined as follows:
(1) If the item is one which is sold or is substantially similar or functionally equivalent to one that is sold in substantial quantities to the general public, intrinsic value is the established catalog or market price, plus the value of any unique requirements, including delivery terms, inspection, packaging, or labeling.
(2) If there is no comparable item sold in substantial quantities to the general public, intrinsic value is defined as the price an individual would expect to pay for the item based upon an economic purchase quantity as defined in FAR 52.207-4, plus the value of any unique requirements, including delivery terms, inspection, packaging or labeling.
(c) At any time up to two years after delivery of a spare part or item of support equipment, the Contracting Officer may notify the Contractor that based on all information available at the time of the notice, the price of the part or item apparently exceeds its intrinsic value.
(d) If notified in accordance with paragraph (c) above, the Contractor agrees to enter into good faith negotiations with the Government to determine if, and in what amount, the Government is entitled to a refund.
(e) If agreement pursuant to paragraph (d) above cannot be reached, and the Navy's return of the new or unused item to the Contractor is practical, the Navy, subject to the Contractor's agreement, may elect to return the item to the Contractor.
Upon return of the item to its original point of Government acceptance, the Contractor shall refund in full the price paid.
If no agreement pursuant to paragraph (d) above is reached, and return of the item by the Navy is impractical, the Contracting Officer may, with the approval of the Head of the Contracting Activity, issue a Contracting Officer's final decision on the matter, subject to Contractor appeal as provided in the "Disputes" clause (FAR 52.233-1).
(f) The Contractor shall make refunds, as required under this requirement, in accordance with instructions from the Contracting Officer.
(g) The Contractor shall not be liable for a refund if the Contractor advised the Contracting Officer in a timely manner that the price it would propose for a spare part or item of support equipment exceeded its intrinsic value, and with such advice, specified the estimated proposed price, the estimated intrinsic value and known alternative sources or item, if any, that can meet the requirement.
(h) This requirement does not apply to any spare parts or items of support equipment whose price is determined through adequate price competition. This requirement also does not apply to any spare part or item of support equipment if the Contractor submitted, and certified the currency, accuracy and completeness of, cost or pricing data applicable to the item.
(End of text)
B-231-H001 TRAVEL COSTS (NAVSEA) (OCT 2018)
(a) Except as otherwise provided herein, the Contractor shall be reimbursed for its actual travel costs in accordance with FAR 31.205-46. The travel costs to be reimbursed shall be those costs for which the Contractor has maintained appropriate documentation and which have been determined to be allowable, allocable, and reasonable by the Procuring Contracting Officer, Administrative Contracting Officer, or their duly authorized representative.
(b) Reimbursable travel costs include only that travel performed from the Contractor's facility to the worksite, in and around the worksite, and from the worksite to the Contractor's facility.
(c) Relocation costs and travel costs incidental to relocation are allowable to the extent provided in FAR 31.205-35;
however, Procuring Contracting Officer approval shall be required prior to incurring relocation expenses and travel costs incidental to relocation.
(d) The Contractor shall not be reimbursed for the following daily local travel costs:
(i) travel at U.S. Military Installations where Government transportation is available,
(ii) travel performed for personal convenience/errands, including commuting to and from work, and
(iii) travel costs incurred in the replacement of personnel when such replacement is accomplished for the Contractor's or employee's convenience.
B-232-H005 PAYMENTS OF FEE(S) (LEVEL OF EFFORT)--ALTERNATE I (NAVSEA) (OCT 2018)
(a) For purposes of this contract, "fee" means "target fee" in cost-plus-incentive-fee type contracts, "base fee" in cost-plus-award-fee type contracts, or "fixed fee" in cost-plus-fixed-fee type contracts.
(b) The Government shall make payments to the Contractor, subject to and per the clause in this contract entitled "Fixed Fee" (FAR 52.216-8) or "Incentive Fee", (FAR 52.216-10), as applicable. Such payments shall be submitted by and payable to the Contractor pursuant to the clause of this contract entitled "Allowable Cost and Payment" (FAR 52.216-7), subject to the withholding terms and conditions of the "Fixed Fee" or "Incentive Fee" clause, as applicable. Fee paid per hour shall be based on total fee dollars divided by total hours to be provided. Total fee(s) paid to the Contractor shall not exceed the fee amount(s) set forth in this contract. In no event shall the Government be required to pay the Contractor any amount in excess of the funds obligated under this contract.
Applicable CLINs: 0004, 0005, 0006, 0007, 0008, 0009, 0010, 0011, 0012, 0013, 0017, 1004, 1005, 1006, 1007, 1008, 1009, 1010, 1011, 1012, 1013, 1017, 2004, 2005, 2006, 2007, 2008, 2009, 2010, 2011, 2012, 2013, 2014, 2015, 2016, 2017, 3004, 3005, 3006, 3007, 3008, 3009, 3010, 3011, 3012, 3013, 3014, 3015, 3016, 3017, 4004, 4005, 4006, 4007, 4008, 4009, 4010, 4011, 4012, 4013, 4014, 4015, 4016, 4017, 5004, 5005, 5006, 5007, 5008, 5009, 5010, 5011, 5012, 5013, 5014, 5015, 5016, 5017, 6004, 6005, 6006, 6007, 6008, 6009, 6010, 6011, 6012, 6013, 6014, 6015, 6016, 6017, 7005, 7006, 7007, 7008, 7009, 7010, 7011, 7012, 7013, 7014, 7015, 7016, 7017, 8005, 8006, 8007, 8008, 8009, 8010, 8011, 8012, 8013, 8014, 8015, 8016, 8017, 9005, 9006, 9007, 9008, 9009, 9010, 9011, 9012, 9013, 9014, 9015, 9016, 9017
B-232-H006 LIMITATION OF COST OR LIMITATION OF FUNDS CLARIFICATION (NAVSEA) (OCT 2018)
The clause entitled "Limitation of Cost" (FAR 52.232-20) or "Limitation of Funds" (FAR 52.232-22), as appropriate, shall apply separately and independently to each separately identified estimated cost.
Section C - Descriptions and Specifications
1.0 INTRODUCTION
1.1 SCOPE
This Statement of Work (SOW) sets forth the efforts required for the Small Surface Combatant Combat System Ship Integration and Test (SSC CS SI&T), which includes Lethality and Survivability (L&S) upgrade of the Freedom and Independence Littoral Combat Ship (LCS) variants after Ship delivery and all CS integration on Large Unmanned Surface Vessel (LUSV) both before and after Ship delivery. The SSC CS SI&T effort includes (1) providing program management, planning, training, and other efforts required to effectively support the execution of CS SI&T efforts; (2) development, assessment, modification, and update of CS related Test Procedures, CS Master Test Plan (MTP), and CS Test Sequence Network (TSN); (3) review, development, assessment, modification, and update of CS Space Arrangement drawings, CS Installation Control Drawings and CS Interface Control Drawings to include end-to-end CS Interface Control Drawings; (4) performance of CS Ship Integration and Test Planning; (5) performance of Waterfront Integration and Test of the CS and Combat System Support Equipment (CSSE) at the system and subsystem levels; (6) providing support to Government Test Teams in conducting the CS Ship Test and Trials Program; and (7) engineering studies to include feasibility studies as tasked by the Government for CS improvements.
CLIN 0001 – Develop Program Management Documents, in accordance with Paragraph 3.1.13: The Contractor shall develop program management and performance documents.
CLIN 0002- LCS Freedom Develop CS Test Procedures, CS Test Sequence Network (TSN), & CS Master Test Plan (MTP), in accordance with Paragraph 3.2: The Contractor shall develop, modify, and update the CS Test Procedures, MTP, and TSN.
CLIN 0003 - LCS Independence Develop CS Test Procedures, CS Test Sequence Network, & CS Master Test Plan, in accordance with Paragraph 3.2: The Contractor shall develop, modify, and update the CS Test Procedures, MTP, and TSN.
CLIN 0004 (1004-6004) - LUSV Develop CS Test Procedures, CS Test Sequence Network (TSN), & CS Master Test Plan (MTP), in accordance with Paragraph 3.3: The Contractor shall develop, modify, and update the CS Test Procedures, MTP, and TSN.
CLIN 0005 (1005-9005) - Develop LCS Freedom CS Space Arrangement Drawings, CS Installation and Interface Control Drawings, in accordance with Paragraph 3.4: The Contractor shall review, develop, update, and modify the CS Space Arrangements, CS Installation Drawings, and CS Interface Controls Drawings, which includes CS Topside and below deck. The Contractor shall also develop, modify, and update complete end-to-end CS Interface Control Drawings.
CLIN 0006 (1006-9006) - Develop LCS Independence CS Space Arrangement Drawings, CS Installation and Interface Control Drawings, in accordance with Paragraph 3.4: The Contractor shall review, develop, update, and modify the CS Space Arrangements, CS Installation Drawings, CS Interface Controls Drawings, and Ship Installation Drawings (SIDs), which includes CS Topside and below deck. The Contractor shall also develop, modify, and update complete end-to-end CS Interface Control Drawings.
CLIN 0007 (1007-9007) - Develop LUSV CS Space Arrangement Drawings, CS Installation and Interface Control Drawings, in accordance with Paragraph 3.4: The Contractor shall review, develop, and provide recommendations as necessary to the new CS Space Arrangements, CS Installation Drawings, CS Interface Controls Drawings, and Ship Installation Drawings (SIDs), which includes CS Topside and below deck. The Contractor shall also review, develop, and provide recommendations as necessary to the complete end-to-end LUSV CS Interface Control Drawings.
CLIN 0008 (1008-9008) - LCS Freedom CS Ship Integration Engineering and Test Planning, in accordance with Paragraph 3.5: The Contractor shall review and analyze CS designs and ensure that intra CS Enclave and inter enclaves are integrated. The Contractor shall also perform CS Test Planning for LCS and assist the Shipyard and Alteration Installation Team (AIT) during the CS Ship Installation and Integration.
CLIN 0009 (1009-9009) - LCS Independence CS Ship Integration Engineering and Test Planning, in accordance with Paragraph 3.5: The Contractor shall review and analyze CS designs and ensure that intra CS Enclave and inter enclaves are integrated. The Contractor shall also perform CS Test Planning for LCS and assist the Shipyard and AIT during the CS Ship Installation and Integration.
CLIN 0010 (1010-9010) - LUSV CS Ship Integration Engineering and Test Planning, in accordance with Paragraph
3.5 (The Contractor shall review and analyze CS designs and ensure that all CS are integrated. The Contractor shall also perform CS Test Planning and assist the Shipbuilder during the CS Ship Installation and Integration.
CLIN 0011 (1011-9011) - LCS Freedom CS Waterfront Integration and Test, in accordance with Paragraph 3.6: The Contractor shall integrate CS with the ship systems by providing required expertise to perform integration and test, CS Test Coordination, CS Alignment, and CS Engineering and Test Execution.
CLIN 0012 (1012-9012) - LCS Independence CS Waterfront Integration and Test, in accordance with Paragraph 3.6: The Contractor shall integrate CS with the ship systems by providing required expertise to perform integration and test, CS Test Coordination, CS Alignment, and CS Engineering and Test Execution.
CLIN 0013 (1013-9013) - LUSV CS Waterfront Integration and Test, in accordance with Paragraph 3.6: The Contractor shall integrate CS with the ship systems by providing required expertise to perform integration and test, CS Test Coordination, CS Alignment, and CS Engineering and Test Execution.
CLIN 2014 (3014-9014) - LCS Freedom Post Delivery and Post-Industrial CS Tests and Trials Support, in accordance with Paragraph 3.7: The Contractor shall monitor, coordinate, and provide on-site (ship and shore) support for Combat System Ship Qualification Trials (CSSQTs), Developmental Testing (DT), Operational Test (OT), and CS modifications or special testing.
CLIN 2015 (3015-9015) - LCS Independence Post Delivery and Post-Industrial CS Tests and Trials Support, in accordance with Paragraph 3.7: The Contractor shall monitor, coordinate, and provide on-site (ship and shore) support for Combat System Ship Qualification Trials (CSSQTs), Developmental Testing (DT), Operational Test (OT), and CS modifications or special testing.
CLIN 2016 (3016-9016) - LUSV Post Delivery and Post-Industrial CS Tests and Trials Support, in accordance with Paragraph 3.7: The Contractor shall monitor, coordinate, and provide on-site (ship and shore) support for Combat System Ship Qualification Trials (CSSQTs), Developmental Testing (DT), Operational Test (OT), and CS modifications or special testing.
CLIN 0017 (1017-9017) - Engineering Services, in accordance with Paragraph 3.8: The Contractor shall provide engineering services to include but not limited to, conducting and supporting feasibility studies, data analysis, test and evaluation, safety, Failure Review Boards (FRBs), project engineering, and revising, updating, and modifying documents. The Contractor shall also provide in-service support to LUSV ships as specified in the TI.
CLIN 0018 (1018-9018)- Other Direct Costs (ODCs) and Incidental Materials, in accordance with Paragraph 3.9:
This Contract Line Item Number (CLIN) includes ODCs and Incidental Materials for work performed under CLINs 0004, 0005, 0006, 0007, 0008, 0009, 0010, 0011, 0012, 0013, 0017, and Option CLINs if exercised, 1004-6004, 1005-9005, 1006-9006, 1007-9007, 1008-9008, 1009-9009, 1010-9010, 1011-9011, 1012-9012, 1013-9013, 1017- 9017, 2014-9014, 2015-9015, and 2016-9016.
CLIN 0019 - Provisioned Item Orders (PIO), in accordance with Paragraph 3.10: This CLIN includes PIO to support the efforts under CLINs 0004, 0005, 0006, 0007, 0008, 0009, 0010, 0011, 0012, 0013, and Option CLINs if exercised, 1005-9005, 1006-9006, 1007-9007, 1008-9008, 1009-9009, 1010-9010, 1011-9011, 1012-9012, 1013- 9013, 2014-9014, 2015-915, and 2016-9016.
CLIN 0020 - Data CLIN (Not Separately Priced), in accordance with Paragraph 3.11: The data to be furnished hereunder shall be prepared and delivered in ac