LAW_Industry_Day_Brief_posted_SAM.GOV.pdf
PDF 750 KB Posted
- Attached to
- RFI: US Navy Light Amphibious Warship (LAW)
- Solicitation number
- N0002420SN018
View the file
Other files
| File | Type | Posted |
|---|---|---|
| LAW Industry_Day 2 Q and A.pdf | ||
| LAW Industry_Day 2 Brief.pptx | PPTX presentation | |
| LAW Industry Day 04 MAR Q and A.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Light Amphibious Warship
(LAW)
Industry Day
DISTRIBUTION STATEMENT A. Approved for public release. Distribution is unlimited. 1
4 March 2020
Agenda
DISTRIBUTION STATEMENT A. Approved for public release. Distribution is unlimited. 2
Housekeeping:
• Emergency Exits and Restrooms
0900-0915:
• Ground Rules: PMS 317C (Mr. Dan Maher)
• Introduction/Greeting: N95B (Dr. DiGiovanni), PMS 317 (CAPT Searles)
0915-1015:
• LAW Program Brief: Mr. Dan Maher, PMS317C
• Questions/Answers
1015-1030: Break
1030-1300: Individual Breakout Discussions
Ground Rules
DISTRIBUTION STATEMENT A. Approved for public release. Distribution is unlimited. 3
• This brief and discussion is preliminary only – not binding
– Does not constitute a Request for Proposal nor a commitment on behalf of the
Government
– Information provided is subject to modification and is no way binding onthe
Government
• Please hold questions until the end of the briefing
– No detailed information beyond the brief or the RFI will be provided at this time
• The list of attendees, the brief/slides and questions will be posted to FBO
– Additional questions not answered after the brief or during the breakout discussions can be submitted via email
• One-on-one breakout discussions
– No additional time will be provided over the allotted meeting time
– Walk-on meeting requests will be accepted on a first come, first serve basis
• All cell phone devices must be turned off or on silent
– Cameras and recording devices are not allowed
Introduction
DISTRIBUTION STATEMENT A. Approved for public release. Distribution is unlimited. 4
OPNAV N95 Dr. DiGiovanni
PMS317 PM Captain Scot Searles
Why LAW?
Evolving threats in the global maritime environment causing the Naval Forces to re-evaluate/adjust their
Concept of Operations (CONOPs) to meet new challenges associated with maintaining persistent Naval forward presence to enable sea control and denial operations.
LAW
Intended to provide Naval Forces the maneuver and sustainment vessels to confront the changing character of warfare.
DISTRIBUTION STATEMENT A. Approved for public release. Distribution is unlimited. 5
What will LAW be?
DISTRIBUTION STATEMENT A. Approved for public release. Distribution is unlimited. 6
LAW Primary Function: Force maneuver and force closure, including operating into small, undeveloped ports and beaches.
LAW Secondary Function: May include force sustainment, logistics and reconnaissance.
Intended to be capable of:
- Beaching on sand, gravel, shale, small stone, and man-made marine ramps.
- Supporting on/offload of all existing USMC Rolling Stock invintory to beach areas with fording depths of less than 42”
- Operating at 14 knots for a minimum of 3500 nm
- Transiting open ocean up to Sea State 5 while fully loaded
- Enduring up to several weeks-long deployments and trans-oceanic transits
- Operating within fleet groups, or deploy independently
A cq ui si tio n
C on tr ac tin g
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2Q1 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
FY19 FY20 FY21 FY22 FY23 FY24 FY25
M id dl e
T ie r A cq ui si ti on T ra di ti on al A cq ui si ti on
Milestone
Milestone Complete
Phase Start/End
Phase Started/Complete
LAW Notional Program Schedule
Key Program Assumptions
DISTRIBUTION STATEMENT A. Approved for public release. Distribution is unlimited. 8
The Navy…
• Expects notional procurement profile to be 3/6/10/9 starting in FY23
• Expects to leverage Industry’s commercial design with few tailored Navy requirements to meet mission
– Adapted Commercial Design
– Alter Commercial Design
– Build to Print with Historic Design
• Desires to drive down life cycle costs:
– The crew manning requirement identified is the maximum acceptable manning value
– Further reductions through technology are encouraged
Objectives of the RFI
DISTRIBUTION STATEMENT A. Approved for public release. Distribution is unlimited. 9
The Navy desires to:
• Understand Industry’s parent designs and their ability to meet the minimum attributes provided in this brief
• Understand the sensitivities/drivers to the parent design when modified to meet minimum attributes
• Understand Industry’s existing production capacity/ capability, and/or ability to partner to meet desired quantities in the required timeframe
• Understand any additional drivers to non-recurring engineering, production, and operating/support costs
• Evaluate information obtained from RFI for possible follow on Preliminary Design effort in late FY20/early
FY21
Information Requested
The Navy requests that interested parties:
• Identify specific attributes for which the minimum attributes can be exceeded for minimal cost increases
• Identify any specific attribute that is either a significant cost driver, and/or drives a significant design change
– With a description of the issue and preferred alteration, including the NRE ROM cost
• Identify any tradeoffs necessary to meet or exceed attributes
– Including production and cost impacts
– If tradeoffs are required, vendors are encouraged to prioritize based on cost and production schedule impact
The Navy request White Paper Information of ship designs w/attributes be submitted no later than 20 March
DISTRIBUTION STATEMENT A. Approved for public release. Distribution is unlimited. 10
Key LAW Attributes
DISTRIBUTION STATEMENT A. Approved for public release. Distribution is unlimited. 11
The Navy considers the following attributes to be the minimum acceptable level :
Attributes Minimum Cargo Area 8000 sqft
Cargo Weight 850 short tons
Deck Loading 500 lb/sqft
Service Life 10years
Transit Speed 14 kts
Manning Accommodations 30 Navy crew max 43 Marine Surge min
Range (Minimum operating range at most efficient speed w/ 10% fuel reserve)
3500 NM
Crane (boat and cargo) 10 tons
Cargo Fuel 90,000 gal
Overall length 200-400 ft
Breakout Discussions
DISTRIBUTION STATEMENT A. Approved for public release. Distribution is unlimited. 12
• Breakout Discussions will be held from 1030-1300
– Schedules handed out at registration and also posted in the kitchen area
– Any material provided should be appropriately marked (i.e.
Proprietary, company sensitive, etc.…)
– Once the Breakout session is concluded, the vendor is done for the day
Questions?