This solicitation requests proposals for the Technology Insertion (TI)-22, TI-24, and TI-26 Common Acoustic Cabinet (CAC) systems. The Naval Sea Systems Command seeks engineering and technical services including design, development, integration, testing, logistics support, and program management of upgrade and replacement products for existing CAC systems and equipment. Services will support modifications, retrofit kits, prototypes, and full rate production systems to develop common systems and components offering maximum cost and technical benefits across various platforms. The period of performance is from date of award through September 2029, including eight one-year option periods. Pricing includes cost-plus-incentive-fee, cost-plus-fixed-fee, firm-fixed-price, and cost reimbursement line items. Offerors must submit proposals by March 23, 2020.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N0002420R6119
CODE
(Hour)
PAGE(S)
until local time X A X B X C X D E X X G F 132 - 137 138 - 176 X H 177 - 191
RATING
PAGE
OF
PAGES
7. ISSUED BY
(Date) IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
Previous Edition is Unusable 33-134
STANDARD FORM 33 (REV. 9-97)
Prescribed by GSA FAR (48 CFR) 53.214(c) (If other than Item 7)
15A. NAME
16. NAME AND TITLE OF PERSON AUTHORIZED TO
AND
ADDRESS
SIGN OFFER (Type or print)
OF
OFFEROR
AMENDMENT NO.
DATE
15B. TELEPHONE NO
(Include area code)
17. SIGNATURE
15C. CHECK IF REMITTANCE ADDRESS
IS DIFFERENT FROM ABOVE - ENTER
SUCH ADDRESS IN SCHEDULE.
18. OFFER DATE
1. THIS CONTRACT IS A RATED ORDER
UNDER DPAS (15 CFR 700)
2. CONTRACT NO.
N00024
8. ADDRESS OFFER TO
See Item 7
9. Sealed offers in original and copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in CAUTION - LATE Submissions, Modifications, and Withdrawals:See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.
10. FOR INFORMATION
CALL:
A. NAME
(NO COLLECT CALLS)
11. TABLE OF CONTENTS
SOLICITATION/ CONTRACT FORM
SUPPLIES OR SERVICES AND PRICES/ COSTS
2 - 49 X I
CONTRACT CLAUSES
DESCRIPTION/ SPECS./ WORK STATEMENT
X
PACKAGING AND MARKING
50 - 68 69 - 72 J
LIST OF ATTACHMENTS
INSPECTION AND ACCEPTANCE
DELIVERIES OR PERFORMANCE
73 - 77 78 - 84 X K
REPRESENTATIONS, CERTIFICATIONS AND
OTHER STATEMENTS OF OFFERORS
CONTRACT ADMINISTRATION DATA
85 - 98 X
SPECIAL CONTRACT REQUIREMENTS
OFFER (Must be fully completed by offeror) 99 - 102 X M L
INSTRS., CONDS., AND NOTICES TO OFFERORS
EVALUATION FACTORS FOR AWARD
NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. DISCOUNT FOR PROMPT PAYMENT
(See Section I, Clause No. 52.232-8)
14. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments
AMENDMENT NO.
DATE
to the SOLICITATION for offerors and related documents numbered and dated):
FACILITY
12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period
SOLICITATION, OFFER AND AWARD
X (X)
SEC.
DESCRIPTION
(X)
SEC.
DESCRIPTION
PAGE(S)
PART I - THE SCHEDULE
26. NAME OF CONTRACTING OFFICER (Type or print)
27. UNITED STATES OF AMERICA
28. AWARD DATE
EMAIL:
TEL:
(Signature of Contracting Officer)
CODE
CODE
B. TELEPHONE (Include area code)
C. E-MAIL ADDRESS
AWARD (To be completed by Government)
19. ACCEPTED AS TO ITEMS NUMBERED
20. AMOUNT
21. ACCOUNTING AND APPROPRIATION
22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)
23. SUBMIT INVOICES TO ADDRESS SHOWN IN
ITEM
24. ADMINISTERED BY (If other than Item 7)
CODE
25. PAYMENT WILL BE MADE BY
CODE
PART IV - REPRESENTATIONS AND INSTRUCTIONS
PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
103 - 129
PART II - CONTRACT CLAUSES
NAVAL SEA SYSTEMS COMMAND (HQ)
1333 ISAAC HULL AVE SE
WASHINGTON NAVY YARD, DC 20376-2030
FAX:
TEL:
FAX:
TEL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SOLICITATION
130 - 131
6. REQUISITION/PURCHASE NO.
5. DATE ISSUED
21 Jan 2020
4. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
[ X ]
3. SOLICITATION NO.
N0002420R6119
23 Mar 2020
2:00PM
See Section L
Section B - Supplies or Services and Prices
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 0001
| 50,000 |
| Hours |
Engineering and Technical Services
CPIF
Base Year (FY21) See Notes A and F
FOB: Origin (Shipping Point)
TARGET COST
TARGET FEE
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
SHARE RATIO ABOVE TARGET
SHARE RATIO BELOW TARGET
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 0002
Lot
Incidental Material for CLIN 0001
COST
Base Year (FY21) Estimated Cost including all overheads: $400,000 See Notes B and F
ESTIMATED COST
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 0003
Lot
Travel for CLIN 0001
COST
Base Year (FY21) Estimated Cost including all overheads: $60,000 See Notes B and F
ESTIMATED COST
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 0004
Each
Major Material for CLIN 0001
CPFF
Base Year (FY21) Estimated Cost and Fee: $750,000 See Note F
ESTIMATED COST
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 0005
| OPTION |
| Orders |
CPIF
Estimated Cost and Fee: $3,000,000 The Ordering period for this CLIN is for the duration of the contract.
This CLIN is for informational purposes only, and all prices should be at the priced SLINs.
See Notes C, F and G
TARGET COST
TARGET FEE
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
SHARE RATIO ABOVE TARGET
SHARE RATIO BELOW TARGET
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 0006
| OPTION |
| Orders |
FFP
Estimated Cost and Fee: $3,000,000 The Ordering period for this CLIN is for the duration of the contract.
This CLIN is for informational purposes only, and all prices should be at the priced SLINs.
See Notes C, F and G
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 0007
| 1 |
| Each |
| OPTION |
| TI22 CAC Engineering Development Model |
CPIF
TI22 CAC Engineering Development Model for SSGN and LOS ANGELES Base Year (FY21) See Notes F and G
TARGET COST
TARGET FEE
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
SHARE RATIO ABOVE TARGET
SHARE RATIO BELOW TARGET
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 0008
Each
| OPTION |
| TI22 CAC Kit LLM for CLIN 0105 |
CPIF
TI22 CAC Kit Long Lead Material for CLIN 0105 Base Year (FY21) Stepladder cost for each quantity is provided in Attachment 7.
See Notes E, F and G
TARGET COST
TARGET FEE
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
SHARE RATIO ABOVE TARGET
SHARE RATIO BELOW TARGET
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 0009
Each
| OPTION |
| TI22 CAC Spares LLM for CLIN 0106 |
CPIF
TI22 CAC Spares Long Lead Material for CLIN 0106 Base Year (FY21) Stepladder cost for each quantity is provided in Attachment 7.
TARGET COST
TARGET FEE
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
SHARE RATIO ABOVE TARGET
SHARE RATIO BELOW TARGET
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 0010
| 1 |
| Lot |
Data Data for Items 0001 through 0009, and (if options are exercised) Items 0101 through 0804 See Note H
NOT SEPARATELY PRICED (NSP)
The delivery dates are in accordance with applicable CDRL.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 0011
| 1 |
| Each |
| OPTION |
| Data Rights Buy-Out |
FFP
Data Rights/ Licenses See Notes F, G and I FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 0012
| 1 |
| Each |
TI22 CAC First Article Testing
CPIF
First Article Test for SSGN and LOS ANGELES Base Year (FY21) See Notes D, F and G
TARGET COST
TARGET FEE
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
SHARE RATIO ABOVE TARGET
SHARE RATIO BELOW TARGET
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 0101
| 50,000 |
| Hours |
| OPTION |
| Engineering and Technical Services |
CPIF
Option Year 1 (FY22) See Notes A, F and G
TARGET COST
TARGET FEE
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
SHARE RATIO ABOVE TARGET
SHARE RATIO BELOW TARGET
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 0102
Lot
| OPTION |
| Incidental Material for CLIN 0101 |
COST
Option Year 1 (FY22) Estimated Cost including all overheads: $400,000 See Notes B, F and G
ESTIMATED COST
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 0103
Lot
| OPTION |
| Travel for CLIN 0101 |
COST
Option Year 1 (FY22) Estimated Cost including all overheads: $60,000
ESTIMATED COST
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 0104
Each
| OPTION |
| Major Material for CLIN 0101 |
CPFF
Option Year 1 (FY22) Estimated Cost and Fee: $750,000
ESTIMATED COST
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 0105
Each
| OPTION |
| TI22 CAC Kit |
CPIF
TI22 CAC Kit for SSGN and LOS ANGELES Option Year 1 (FY22) Stepladder cost for each quantity is provided in Attachment 7.
TARGET COST
TARGET FEE
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
SHARE RATIO ABOVE TARGET
SHARE RATIO BELOW TARGET
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 0106
Each
| OPTION |
| TI22 CAC Spares |
CPIF
TI22 CAC Spares for SSGN and LOS ANGELES Option Year 1 (FY22) Stepladder cost for each quantity is provided in Attachment 7.
TARGET COST
TARGET FEE
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
SHARE RATIO ABOVE TARGET
SHARE RATIO BELOW TARGET
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 0107
Each
| OPTION |
| TI22 CAC Kit LLM for CLIN 0205 |
CPIF
TI22 CAC Kit Long Lead Material for CLIN 0205 Option Year 1 (FY22) Stepladder cost for each quantity is provided in Attachment 7.
TARGET COST
TARGET FEE
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
SHARE RATIO ABOVE TARGET
SHARE RATIO BELOW TARGET
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 0108
Each
| OPTION |
| TI22 CAC Spares LLM for CLIN 0206 |
CPIF
TI22 CAC Spares Long Lead Material for CLIN 0206 Option Year 1 (FY22) Stepladder cost for each quantity is provided in Attachment 7.
TARGET COST
TARGET FEE
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
SHARE RATIO ABOVE TARGET
SHARE RATIO BELOW TARGET
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 0201
| 50,000 |
| Hours |
| OPTION |
| Engineering and Technical Services |
CPIF
Option Year 2 (FY23)
TARGET COST
TARGET FEE
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
SHARE RATIO ABOVE TARGET
SHARE RATIO BELOW TARGET
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 0202
Lot
| OPTION |
| Incidental Material for CLIN 0201 |
COST
Option Year 2 (FY23) Estimated Cost: $400,000
ESTIMATED COST
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 0203
Lot
| OPTION |
| Travel for CLIN 0201 |
COST
Option Year 2 (FY23) Estimated Cost including all overheads: $60,000
ESTIMATED COST
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 0204
Each
| OPTION |
| Major Material for CLIN 0201 |
CPFF
Option Year 2 (FY23) Estimated Cost and Fee: $750,000
ESTIMATED COST
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 0205
Each
| OPTION |
| TI22 CAC Kit |
CPIF
TI22 CAC Kit for SSGN and LOS ANGELES Option Year 2 (FY23) Stepladder cost for each quantity is provided in Attachment 7.
TARGET COST
TARGET FEE
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
SHARE RATIO ABOVE TARGET
SHARE RATIO BELOW TARGET
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 0206
Each
| OPTION |
| TI22 CAC Spares |
CPIF
TI22 CAC Spares for SSGN and LOS ANGELES Option Year 2 (FY23) Stepladder cost for each quantity is provided in Attachment 7.
TARGET COST
TARGET FEE
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
SHARE RATIO ABOVE TARGET
SHARE RATIO BELOW TARGET
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 0207
Each
| OPTION |
| TI22 CAC Kit LLM for CLIN 0305 |
FFP
TI22 CAC Kit Long Lead Material for CLIN 0305 Option Year 2 (FY23) Stepladder cost for each quantity is provided in Attachment 7.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 0208
Each
| OPTION |
| TI22 CAC Spares LLM for CLIN 0306 |
CPIF
TI22 CAC Spares Long Lead Material for CLIN 0306 Option Year 2 (FY23) Stepladder cost for each quantity is provided in Attachment 7.
TARGET COST
TARGET FEE
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
SHARE RATIO ABOVE TARGET
SHARE RATIO BELOW TARGET
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 0209
Each
| OPTION |
| TI24 CAC Kit LLM for CLIN 0307 |
CPIF
TI24 CAC Kit Long Lead Material for CLIN 0307 Option Year 2 (FY23) Stepladder cost for each quantity is provided in Attachment 7.
TARGET COST
TARGET FEE
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
SHARE RATIO ABOVE TARGET
SHARE RATIO BELOW TARGET
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 0210
Each
| OPTION |
| TI24 CAC Spares LLM for CLIN 0308 |
CPIF
TI24 CAC Spares Long Lead Material for CLIN 0308 Option Year 2 (FY23) Stepladder cost for each quantity is provided in Attachment 7.
TARGET COST
TARGET FEE
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
SHARE RATIO ABOVE TARGET
SHARE RATIO BELOW TARGET
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 0301
| 50,000 |
| Hours |
| OPTION |
| Engineering and Technical Services |
CPIF
Option Year 3 (FY24)
TARGET COST
TARGET FEE
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
SHARE RATIO ABOVE TARGET
SHARE RATIO BELOW TARGET
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 0302
Lot
| OPTION |
| Incidental Material for CLIN 0301 |
COST
Option Year 3 (FY24) Estimated Cost including all overheads: $410,000
ESTIMATED COST
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 0303
Lot
| OPTION |
| Travel for CLIN 0301 |
COST
Option Year 3 (FY24) Estimated Cost including all overheads: $60,000
ESTIMATED COST
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 0304
Each
| OPTION |
| Major Material for CLIN 0301 |
CPFF
Option Year 3 (FY24) Estimated Cost and Fee: $750,000 See Note F and G
ESTIMATED COST
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 0305
Each
| OPTION |
| TI22 CAC Kit |
CPIF
TI22 CAC Kit for SSGN and LOS ANGELES Option Year 3 (FY24) Stepladder cost for each quantity is provided in Attachment 7.
TARGET COST
TARGET FEE
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
SHARE RATIO ABOVE TARGET
SHARE RATIO BELOW TARGET
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 0306
Each
| OPTION |
| TI22 CAC Spares |
CPIF
TI22 CAC Spares for SSGN and LOS ANGELES Option Year 3 (FY24) Stepladder cost for each quantity is provided in Attachment 7.
TARGET COST
TARGET FEE
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
SHARE RATIO ABOVE TARGET
SHARE RATIO BELOW TARGET
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 0307
Each
| OPTION |
| TI24 CAC Kit |
CPIF
TI24 CAC Kit for SSGN and LOS ANGELES Option Year 3 (FY24) Stepladder cost for each quantity is provided in Attachment 7.
TARGET COST
TARGET FEE
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
SHARE RATIO ABOVE TARGET
SHARE RATIO BELOW TARGET
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 0308
Each
| OPTION |
| TI24 CAC Spares |
CPIF
TI24 CAC Spares for SSGN and LOS ANGELES Option Year 3 (FY24) Stepladder cost for each quantity is provided in Attachment 7.
TARGET COST
TARGET FEE
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
SHARE RATIO ABOVE TARGET
SHARE RATIO BELOW TARGET
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 0309
Each
| OPTION |
| TI24 CAC Kit LLM for CLIN 0405 |
CPIF
TI24 CAC Kit Long Lead Material for CLIN 0405 Option Year 3 (FY24) Stepladder cost for each quantity is provided in Attachment 7.
TARGET COST
TARGET FEE
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
SHARE RATIO ABOVE TARGET
SHARE RATIO BELOW TARGET
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 0310
Each
| OPTION |
| TI24 CAC Spares LLM for CLIN 0406 |
CPIF
TI24 CAC Spares Long Lead Material for CLIN 0406 Option Year 3 (FY24) Stepladder cost for each quantity is provided in Attachment 7.
TARGET COST
TARGET FEE
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
SHARE RATIO ABOVE TARGET
SHARE RATIO BELOW TARGET
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 0401
| 50,000 |
| Hours |
| OPTION |
| Engineering and Technical Services |
CPIF
Option Year 4 (FY25)
TARGET COST
TARGET FEE
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
SHARE RATIO ABOVE TARGET
SHARE RATIO BELOW TARGET
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 0402
Lot
| OPTION |
| Incidental Material for CLIN 0401 |
COST
Option Year 4 (FY25) Estimated Cost including all overheads: $450,000
ESTIMATED COST
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 0403
Lot
| OPTION |
| Travel for CLIN 0401 |
COST
Option Year 4 (FY25) Estimated Cost: $65,000
ESTIMATED COST
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 0404
Each
| OPTION |
| Major Material for CLIN 0401 |
CPFF
Option Year 4 (FY25) Estimated Cost and Fee: $750,000
ESTIMATED COST
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 0405
Each
| OPTION |
| TI24 CAC Kit |
CPIF
TI24 CAC Kit for SSGN and LOS ANGELES Option Year 4 (FY25) Stepladder cost for each quantity is provided in Attachment 7.
TARGET COST
TARGET FEE
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
SHARE RATIO ABOVE TARGET
SHARE RATIO BELOW TARGET
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 0406
Each
| OPTION |
| TI24 CAC Spares |
CPIF
TI24 CAC Spares for SSGN and LOS ANGELES Option Year 4 (FY25) Stepladder cost for each quantity is provided in Attachment 7.
TARGET COST
TARGET FEE
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
SHARE RATIO ABOVE TARGET
SHARE RATIO BELOW TARGET
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 0407
Each
| OPTION |
| TI26 CAC Kit LLM for CLIN 0505 |
CPIF
TI26 CAC Kit Long Lead Material for CLIN 0505 Option Year 4 (FY25) Stepladder cost for each quantity is provided in Attachment 7.
TARGET COST
TARGET FEE
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
SHARE RATIO ABOVE TARGET
SHARE RATIO BELOW TARGET
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 0408
Each
| OPTION |
| TI26 CAC Spares LLM for CLIN 0506 |
CPIF
TI26 CAC Spares Long Lead Material for CLIN 0506 Option Year 4 (FY25) Stepladder cost for each quantity is provided in Attachment 7.
TARGET COST
TARGET FEE
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
SHARE RATIO ABOVE TARGET
SHARE RATIO BELOW TARGET
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 0501
| 50,000 |
| Hours |
| OPTION |
| Engineering and Technical Services |
CPIF
Option Year 5 (FY26)
TARGET COST
TARGET FEE
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
SHARE RATIO ABOVE TARGET
SHARE RATIO BELOW TARGET
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 0502
Lot
| OPTION |
| Incidental Material for CLIN 0501 |
COST
Option Year 5 (FY26) Estimated Cost including all overhead: $450,000
ESTIMATED COST
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 0503
Lot
| OPTION |
| Travel for CLIN 0501 |
COST
Option Year 5 (FY26) Estimated Cost including all overhead: $65,000
ESTIMATED COST
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 0504
Each
| OPTION |
| Major Material for CLIN 0501 |
CPFF
Option Year 5 (FY26) Estimated Cost and Fee: $750,000
ESTIMATED COST
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 0505
Each
| OPTION |
| TI26 CAC Kit |
CPIF
TI26 CAC Kit for SSGN and LOS ANGELES Option Year 5 (FY26) Stepladder cost for each quantity is provided in Attachment 7.
TARGET COST
TARGET FEE
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
SHARE RATIO ABOVE TARGET
SHARE RATIO BELOW TARGET
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 0506
Each
| OPTION |
| TI26 CAC Spares |
CPIF
TI26 CAC Spares for SSGN and LOS ANGELES Option Year 5 (FY26) Stepladder cost for each quantity is provided in Attachment 7.
TARGET COST
TARGET FEE
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
SHARE RATIO ABOVE TARGET
SHARE RATIO BELOW TARGET
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 0507
Each
| OPTION |
| TI26 CAC Kit LLM for CLIN 0605 |
CPIF
TI26 CAC Kit Long Lead Material for CLIN 0605 Option Year 5 (FY26) Stepladder cost for each quantity is provided in Attachment 7.
TARGET COST
TARGET FEE
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
SHARE RATIO ABOVE TARGET
SHARE RATIO BELOW TARGET
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 0508
Each
| OPTION |
| TI26 CAC Spares LLM for CLIN 0606 |
CPIF
TI26 CAC Spares Long Lead Material for CLIN 0606 Option Year 5 (FY26) Stepladder cost for each quantity is provided in Attachment 7.
TARGET COST
TARGET FEE
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
SHARE RATIO ABOVE TARGET
SHARE RATIO BELOW TARGET
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 0601
| 50,000 |
| Hours |
| OPTION |
| Engineering and Technical Services |
CPIF
Option Year 6 (FY27)
TARGET COST
TARGET FEE
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
SHARE RATIO ABOVE TARGET
SHARE RATIO BELOW TARGET
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 0602
Lot
| OPTION |
| Incidental Material for CLIN 0601 |
COST
Option Year 6 (FY27) Estimated Cost including all overheads: $450,000
ESTIMATED COST
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 0603
Lot
| OPTION |
| Travel for CLIN 0601 |
COST
Option Year 6 (FY27) Estimated Cost including all overheads: $65,000
ESTIMATED COST
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 0604
Each
| OPTION |
| Major Material for CLIN 0601 |
CPFF
Option Year 6 (FY27) Estimated Cost and Fee: $750,000
ESTIMATED COST
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 0605
Each
| OPTION |
| TI26 CAC Kit |
CPIF
TI26 CAC Kit for SSGN and LOS ANGELES Option Year 6 (FY27) Stepladder cost for each quantity is provided in Attachment 7.
TARGET COST
TARGET FEE
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
SHARE RATIO ABOVE TARGET
SHARE RATIO BELOW TARGET
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 0606
Each
| OPTION |
| TI26 CAC Spares |
CPIF
TI26 CAC Spares for SSGN and LOS ANGELES Option Year 6 (FY27) Stepladder cost for each quantity is provided in Attachment 7.
TARGET COST
TARGET FEE
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
SHARE RATIO ABOVE TARGET
SHARE RATIO BELOW TARGET
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 0607
Each
| OPTION |
| TI26 CAC Kit LLM for CLIN 0705 |
CPIF
TI26 CAC Kit Long Lead Material for CLIN 0705 Option Year 6 (FY27) Stepladder cost for each quantity is provided in Attachment 7.
TARGET COST
TARGET FEE
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
SHARE RATIO ABOVE TARGET
SHARE RATIO BELOW TARGET
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 0608
Each
| OPTION |
| TI26 CAC Spares LLM for CLIN 0706 |
CPIF
TI26 CAC Spares Long Lead Material for CLIN 0706 Option Year 6 (FY27) Stepladder cost for each quantity is provided in Attachment 7.
TARGET COST
TARGET FEE
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
SHARE RATIO ABOVE TARGET
SHARE RATIO BELOW TARGET
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 0701
| 50,000 |
| Hours |
| OPTION |
| Engineering and Technical Services |
CPIF
Option Year 7 (FY28)
TARGET COST
TARGET FEE
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
SHARE RATIO ABOVE TARGET
SHARE RATIO BELOW TARGET
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 0702
Lot
| OPTION |
| Incidental Material for CLIN 0701 |
COST
Option Year 7 (FY28) Estimated Cost including all overheads: $470,000
ESTIMATED COST
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 0703
Lot
| OPTION |
| Travel for CLIN 0701 |
COST
Option Year 7 (FY28) Estimated Cost including all overhead: $70,000
ESTIMATED COST
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 0704
Each
| OPTION |
| Major Material for CLIN 0701 |
CPFF
Option Year 7 (FY28) Estimated Cost and Fee: $750,000
ESTIMATED COST
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 0705
Each
| OPTION |
| TI26 CAC Kit |
CPIF
TI26 CAC Kit for SSGN and LOS ANGELES Option Year 7 (FY28) Stepladder cost for each quantity is provided in Attachment 7.
TARGET COST
TARGET FEE
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
SHARE RATIO ABOVE TARGET
SHARE RATIO BELOW TARGET
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 0706
Each
| OPTION |
| TI26 CAC Spares |
CPIF
TI26 CAC Spares for SSGN and LOS ANGELES Option Year 7 (FY28) Stepladder cost for each quantity is provided in Attachment 7.
TARGET COST
TARGET FEE
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
SHARE RATIO ABOVE TARGET
SHARE RATIO BELOW TARGET
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 0801
| 20,000 |
| Hours |
| OPTION |
| Engineering and Technical Services |
CPIF
Option Year 8 (FY29)
TARGET COST
TARGET FEE
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
SHARE RATIO ABOVE TARGET
SHARE RATIO BELOW TARGET
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 0802
Lot
| OPTION |
| Incidental Material for CLIN 0801 |
COST
Option Year 8 (FY29) Estimated Cost including all overheads: $200,000
ESTIMATED COST
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 0803
Lot
| OPTION |
| Travel for CLIN 0801 |
COST
Option Year 8 (FY29) Estimated Cost including all overheads: $30,000
ESTIMATED COST
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 0804
Each
| OPTION |
| Major Material for CLIN 0801 |
CPFF
Option Year 8 (FY29) Estimated Cost and Fee: $750,000
ESTIMATED COST
FIXED FEE
TOTAL EST COST + FEE
NOTE A
Hours shown in these line items are ceiling values. The Government will fund these items as needed during contract performance. The Government will issue Technical Instructions in accordance with the Section C clause of this contract entitled “C-242-H003 TECHNICAL INSTRUCTIONS (NAVSEA) (OCT 2018)”. The Contractor shall not perform any efforts under these items until and unless tasked by the Government.
The Offeror shall divide the proposed estimated cost and the proposed fixed fee amount by the associated number of hours and insert the results rounded to the nearest penny in the appropriate columns in the table below. Estimated hourly rate (composite rate) is determined by including all allowable costs (including COM, if applicable). Fee/hour is calculated on cost less COM (if applicable). If COM is proposed necessary columns may be added. For purposes of the “Payment of Fee(s) (Level of Effort – Alternate I)” clause the hourly fee rate is as follows:
FEE SCHEDULE FOR CPIF ENGINEERING SERVICES ITEMS**
| ITEM |
| HOURS |
| TARGET COST (TC)* |
| TC HOURLY RATE |
| TARGET FEE (TF) |
| TF HOURLY RATE |
| TOTAL TARGET AMOUNT |
| 0001 |
| 50,000 |
| 0101 |
| 50,000 |
| 0201 |
| 50,000 |
| 0301 |
| 50,000 |
| 0401 |
| 50,000 |
| 0501 |
| 50,000 |
| 0601 |
| 50,000 |
| 0701 |
| 50,000 |
| 0801 |
| 20,000 |
* The Target Cost amount shown above includes Cost of Money; however, the Target Fee potential calculation excluded Cost of Money.
** Offeror shall insert the applicable rates in accordance with their offer
NOTE B
Incidental material and travel costs incurred by the Contractor during the performance of this contract will be reimbursed to the Contractor at cost only (no fee will be paid on this line item). Dollars shown in these line items are ceiling values. The Government will fund this item as needed during contract performance via Technical Instructions (TIs) in accordance with the Section C clause of this contract entitled “C-242-H003 TECHNICAL INSTRUCTIONS (NAVSEA) (OCT 2018)”. The Contractor shall not perform any efforts under these items until and unless tasked by the Government.
Incidental material shall include all hardware, software and other material needed to maintain or upgrade the Contractor’s development, integration and test facilities to enable the Contractor to perform under the Engineering Services efforts for the duration of the contract.
NOTE C
The Contractor shall furnish the supplies and services when ordered by the Contracting Officer in accordance with the terms and conditions set forth in the Order.
NOTE D
Item to which the clause entitled “WAIVER OF FIRST ARTICLE REQUIREMENTS (NAVSEA) (OCT 2018) in Section B is applicable. If First Article is waived, then CLIN 0012 will become an option. In the event First Article is required, CLINs 0001, 0002, and 0003 will become options and CLIN 0012 will be the only CLIN funded at the time of award.
NOTE E
Offeror shall propose pricing for each stepladder quantity identified in Attachment 7. Long Lead Material refers to material that has more than 9 months long lead time for procurement.
The Government may unilaterally exercise this option within the established stepladder pricing in accordance with FAR 52.217-7, incorporated in Section I. Furthermore, the Government has the right to unilaterally increase the quantity of these CLINs multiple times after it has been initially exercised as long as it occurs before the close of option exercise window stated under FAR 52.217-7. The quantity can be increased by any increment as long as the total quantity does not exceed the maximum quantity stated in the stepladder pricing for that CLIN. If this increase occurs within a 90 day period of other quantities exercised under the CLIN, then pricing for all hardware under that CLIN procured within this 90 day period shall be adjusted to the unit price from the stepladder pricing appropriate for the total quantity being procured. For quantity increases not occurring within a 90-day period of when other quantities are exercised under the CLIN, the Government shall use unit pricing from the stepladder pricing applicable to the quantity of hardware being added and the pricing of previous quantities under said CLIN shall not change.
The Government will fluctuate the production procurement quantity from year to year based upon Government needs in accordance with the established price for the quantity procured on Attachment 7.
NOTE F
The overall ceiling for this contract is $TBD as follows:
| Description |
| CLINs |
| Ceiling Value |
| Engineering and Technical Services |
| 0001 - 0004, 0010, and if options are exercised; 0101 - 0104, 0201 - 0204, 0301 - 0304, 0401 - 0404, 0501 - 0504, 0601 - 0604, 0701 - 0704, and 0801 - 0804 |
| $TBD |
| Orders |
| 0005 and 0006 |
| $TBD |
| Production |
| 0007 - 0009, and if options are exercised; 0105 - 0108; 0205 - 0210; 0305 - 0310; 0405 - 0408; 0505 - 0508; 0605 - 0608; and 0705 - 0706 |
| $TBD |
| Data Rights |
| 0011 |
| $TBD |
| First Article Testing |
| 0012 |
| $TBD |
Overall Ceiling
$TBD
NOTE G
Option Item to which the option clause in Section I entitled “OPTION TO EXTEND THE TERM OF THE CONTRACT” applies and which is to be supplied only if and to the extent said Option is exercised.
NOTE H
Offeror shall complete the "Price Group" and "Estimated Total Price" blocks of each data item on the Contract Data Requirements List(s), attached hereto.
NOTE I
Applicable to CLIN 0011 – Data Rights Buy-Out - The Offeror shall fill this in with their proposed cumulative price for those rights which the Offeror is willing to sell in accordance with Section M 3.1 which states - the Government desires at least Government Purpose Rights (GPR) license, as defined at DFARS 252.227-7013 and - 7014, in all non-commercial technical data and computer software. The cumulative buy out price is a summation of the Section J series of Attachments 8B, 9B, 10B and 11B.
CLAUSES INCORPORATED BY FULL TEXT
B-215-H002 REFUNDS (SPARES AND SUPPORT EQUIPMENT) (NAVSEA) (OCT 2018)
(a) In the event that the price of a spare part or item of support equipment delivered under this contract significantly exceeds its intrinsic value, the Contractor agrees to refund the difference. Refunds will not be made to recoup the amount of cost decreases that occur over time due to productivity gains (excluding economic purchase quantity considerations) or changes in market conditions.
(b) For purposes of this requirement, the intrinsic value of an item is defined as follows:
(1) If the item is one which is sold or is substantially similar or functionally equivalent to one that is sold in substantial quantities to the general public, intrinsic value is the established catalog or market price, plus the value of any unique requirements, including delivery terms, inspection, packaging, or labeling.
(2) If there is no comparable item sold in substantial quantities to the general public, intrinsic value is defined as the price an individual would expect to pay for the item based upon an economic purchase quantity as defined in FAR 52.207-4, plus the value of any unique requirements, including delivery terms, inspection, packaging or labeling.
(c) At any time up to two years after delivery of a spare part or item of support equipment, the Contracting Officer may notify the Contractor that based on all information available at the time of the notice, the price of the part or item apparently exceeds its intrinsic value.
(d) If notified in accordance with paragraph (c) above, the Contractor agrees to enter into good faith negotiations with the Government to determine if, and in what amount, the Government is entitled to a refund.
(e) If agreement pursuant to paragraph (d) above cannot be reached, and the Navy's return of the new or unused item to the Contractor is practical, the Navy, subject to the Contractor's agreement, may elect to return the item to the Contractor. Upon return of the item to its original point of Government acceptance, the Contractor shall refund in full the price paid. If no agreement pursuant to paragraph (d) above is reached, and return of the item by the Navy is impractical, the Contracting Officer may, with the approval of the Head of the Contracting Activity, issue a Contracting Officer's final decision on the matter, subject to Contractor appeal as provided in the "Disputes" clause (FAR 52.233-1).
(f) The Contractor shall make refunds, as required under this requirement, in accordance with instructions from the Contracting Officer.
(g) The Contractor shall not be liable for a refund if the Contractor advised the Contracting Officer in a timely manner that the price it would propose for a spare part or item of support equipment exceeded its intrinsic value, and with such advice, specified the estimated proposed price, the estimated intrinsic value and known alternative sources or item, if any, that can meet the requirement.
(h) This requirement does not apply to any spare parts or items of support equipment whose price is determined through adequate price competition. This requirement also does not apply to any spare part or item of support equipment if the Contractor submitted, and certified the currency, accuracy and completeness of, cost or pricing data applicable to the item.
(End of text)
Applicable CLINs: 0009, 0106, 0108, 0206, 0208, 0306, 0308, 0406, 0408, 0506, 0508, 0606, 0608, 0706
B-227-H001 PROVISIONING TECHNICAL DOCUMENTATION – WITHHOLDING OF PAYMENT (NAVSEA) (OCT 2018)
(a) For the purpose of paragraph (c) of the "Progress Payments" clause of this contract, if included, the requirement that the Contractor develop and deliver Provisioning Technical Documentation (PTD) is considered to be a "material requirement of this contract," and Contractor failure to make adequate progress in the development of PTD, or to deliver acceptable PTD on a timely basis, may result in reduction or suspension of Progress Payments as provided in said paragraph.
(b) The PTD is considered to be a part of the "Technical Data" specified to be delivered under this contract for the purposes of the "Technical Data--Withholding of Payment" (DFARS 252.227-7030) clause. The terms and conditions of the clause entitled "Limitation On Withholding of Payments (FAR 52.232-9), if included in this contract, shall not apply to withholding of payment for failure to make timely delivery of the PTD or delivery of deficient PTD.
B-231-H001 TRAVEL COSTS (NAVSEA) (OCT 2018)
(a) Except as otherwise provided herein, the Contractor shall be reimbursed for its actual travel costs in accordance with FAR 31.205-46. The travel costs to be reimbursed shall be those costs for which the Contractor has maintained appropriate documentation and which have been determined to be allowable, allocable, and reasonable by the Procuring Contracting Officer, Administrative Contracting Officer, or their duly authorized representative.
(b) Reimbursable travel costs include only that travel performed from the Contractor's facility to the worksite, in and around the worksite, and from the worksite to the Contractor's facility.
(c) Relocation costs and travel costs incidental to relocation are allowable to the extent provided in FAR 31.205-35; however, Procuring Contracting Officer approval shall be required prior to incurring relocation expenses and travel costs incidental to relocation.
(d) The Contractor shall not be reimbursed for the following daily local travel costs:
(i) travel at U.S. Military Installations where Government transportation is available,
(ii) travel performed for personal convenience/errands, including commuting to and from work, and
(iii) travel costs incurred in the replacement of personnel when such replacement is accomplished for the Contractor's or employee's convenience.
Applicable CLINs: 0003, 0103, 0203, 0303, 0403, 0503, 0603, 0703, 0803
B-232-H004 PAYMENTS OF FEE(S) (LEVEL OF EFFORT)--BASIC (NAVSEA) (OCT 2018)
(a) For purposes of this contract, "fee" means "target fee" in cost-plus-incentive-fee type contracts, "base fee" in cost-plus-award-fee type contracts, or "fixed fee" in cost-plus-fixed-fee type contracts.
(b) The Government shall make payments to the Contractor, subject to and per the clause in this contract entitled "Fixed Fee" (FAR 52.216-8) or "Incentive Fee", (FAR 52.216-10), as applicable. Such payments shall be no more than ten percent (10%) of the allowable cost of each invoice submitted by and payable to the Contractor pursuant to the clause of this contract entitled "Allowable Cost And Payment" (FAR 52.216-7), subject to the withholding terms and conditions of the "Fixed Fee" or "Incentive Fee" clause, as applicable (percentage of fee is based on fee dollars divided by estimated cost dollars, including facilities capital cost of money). Fee shall not be applied on Facilities Capital Cost of Money per FAR 15.404-4(c)(3) and DFARS 215-404-71-4. Total fee(s) paid to the Contractor shall not exceed the fee amount(s) set forth in this contract.
(c) The fee(s) specified in SECTION B, and payment thereof, is subject to adjustment pursuant to paragraph (g) of the text entitled Level of Effort. If the fee(s) is reduced and the reduced fee(s) is less than the sum of all fee payments made to the Contractor under this contract, the Contractor shall repay the excess amount to the Government. If the final adjusted fee exceeds all fee payments made to the contractor under this contract, the Contractor shall be paid the additional amount, subject to the availability of funds. In no event shall the Government be required to pay the Contractor any amount in excess of the funds obligated under this contract at the time of the discontinuance of work.
(d) Fee(s) withheld pursuant to the terms and conditions of this contract shall not be paid until the contract has been modified to reduce the fee(s) per the text entitled Level of Effort", or until the Procuring Contracting Officer has advised the paying office in writing that no fee adjustment is required.
Applicable CLINs: 0001, 0005, 0101, 0201, 0301, 0401, 0501, 0601, 0701, 0801
B-232-H003 PAYMENTS OF FEE (S) (COMPLETION) (NAVSEA) (OCT 2018)
(a) For purposes of this contract, "fee" means "target fee" in cost-plus-incentive-fee type contracts, "base fee" in cost-plus-award-fee type contracts, or "fixed fee" in cost-plus-fixed-fee type contracts.
(b) The Government shall make payments to the Contractor, subject to and per the clause in this contract entitled "Fixed Fee" (FAR 52.216-8) or "Incentive Fee", (FAR 52.216-10), as applicable. Such payments shall be equal to percent ( ) of the allowable cost of each invoice submitted by and payable to the Contractor pursuant to the clause of this contract entitled "Allowable Cost And Payment" (FAR 52.216-7), subject to the withholding terms and conditions of the "Fixed Fee" or "Incentive Fee" clause, as applicable (percentage of fee payable is based on fee dollars divided by estimated cost dollars including facilities capital cost of money). Fee shall not be applied on Facilities Capital Cost of Money per FAR 15.404-4(c)(3) and DFARS 215-404-71-4. Total fee(s) paid to the Contractor shall not exceed the fee amount(s) set forth in this contract.
(c) In the event of discontinuance of the work under this contract, or any specified phase of the contract, per the clause of this contract entitled "Limitation of Funds" (FAR 52.232-22) or "Limitation of Cost" (FAR 52.232-20), as applicable, the fee shall be equitably adjusted by mutual agreement to reflect the diminution of work. If the adjusted fee is less than the sum of all fee payments made to the Contractor under this contract, the Contractor shall repay the excess amount to the Government. If the adjusted fee exceeds all payments made to the Contractor under this contract, the Contractor shall be paid the additional amount, subject to the availability of funds. In no event shall the Government be required to pay the Contractor any amount in excess of the funds obligated under this contract at the time of the discontinuance of work.
(d) Fee(s) withheld pursuant to the terms and conditions of this contract shall not be paid until the contract has been modified to reduce the fee(s) per paragraph (c) above, or until the Procuring Contracting Officer has advised the paying office in writing that no fee adjustment is required.
Applicable CLINs: 0004, 0005, 0104, 0204, 0304, 0404, 0504, 0604, 0704, 0804
B-232-H006 LIMITATION OF COST OR LIMITATION OF FUNDS CLARIFICATION (NAVSEA) (OCT 2018)
The clause entitled "Limitation of Cost" (FAR 52.232-20) or "Limitation of Funds" (FAR 52.232-22), as appropriate, shall apply separately and independently to each separately identified estimated cost.
Section C - Descriptions and Specifications
National Institute of Standards and Technology Special Publication (NIST SP) 800-171 REVISION 1 For compliance with DFARS 252.204-7012, the Contractor is authorized to implement the security requirements of NIST SP 800-171 Revision 1, dated, December 2016.
ENGINEERING AND TECHNICAL SERVICES: ITEM 0001 AND (IF OPTIONS ARE EXERCISED) ITEMS 0101, 0201, 0301, 0401, 0501, 0601, 0701 AND 0801
The Contractor shall provide engineering services for the Program Executive Office (PEO) Submarines, PMS401 Program Office in accordance with Attachment 2. These services shall include but are not limited to the design, development, integration, delivery, testing, logistics support, and associated program management of products for the upgrade and/or replacement of existing cabinets and Engineering Development Model (EDM). Included are manufacturing prototypes, engineering changes and retrofit kits, and Full Rate Production (FRP) systems; the repair and refurbishment of the Common Acoustic Cabinet (CAC) systems and related equipment and data. The general objectives of these efforts shall be the development of common systems and/or common elements or components which meet the performance requirements of the various platforms, where commonality offers the greatest cost and technical benefits. All work accomplished under these Contract Line Item Numbers (CLINs) shall be done in accordance with Technical Instructions (TIs) issued from the Procuring Contracting Officer (PCO) or the Contracting Officer's Representative (COR), identified in Section G.
(a) The Contractor shall provide qualified engineer(s) to:
a. Perform engineering services tasks related to CAC and/or post-acceptance EDM. These services shall include but are not limited to modification, integration and checkout, test and evaluation, training, repairs, installation, inspection, technical issues resolution, trade studies, engineering change development, documentation, and logistics analyses.
b. Identify and incorporate software and hardware enhancements using emerging technologies, when feasible.
(b) The Contractor is responsible for the adequacy and accuracy of the system design to ensure the design meets the requirements specified by the applicable Technical Instructions (TIs).
(c) Under these CLINs, the Contractor will accumulate costs incurred by the prime contractor for all direct and indirect (1) labor costs for engineering services; (2) Subcontracts; and (3) Consultants.
(d) For purposes of this requirement, the following definitions apply:
(1) "Domestic services" means services rendered within the United States (U.S.) and/or on Navy vessels in ports within the U.S. or at sea, provided the vessel does not enter port outside the U.S.
(2) "Foreign services" means services other than domestic.
(3) "United States" means the United States, its possessions, Puerto Rico, and any other place subject to its jurisdiction, but does not include leased bases or trust territories.
(4) "Man day" means the services of one engineer for one day of eight hours, Monday through Friday (excluding holidays).
(5) "Holidays" means all Federally recognized holidays.
(e) The engineering services shall be performed within the limits, if any, as to place(s) and period(s) specified therefor, as authorized by the Contracting Officer’s Representative (COR) in Section G.
(f) When authorized under paragraph (e) above, each engineer shall perform engineering services in accordance with supplemental instructions provided by the Contract Administration Office (CAO) cognizant of vessel construction/conversion contract, a representative of the authorizing activity or a representative of the activity where the engineering services are performed, as applicable. However, each engineer shall not be considered an employee of the Government.
(g) Travel time necessary for performance of such services shall be included in computing the man days of service. When services are performed at sea and the engineer(s) is unable to leave the vessel when work is completed, the remaining time aboard the vessel shall be considered travel time for purposes of computing the man days of services. However, the Contractor shall be paid for no more than one man day of service per calendar day for each engineer while in travel status.
(h) Passports, visas, inoculations and other medical requirements necessary for performance of engineering services shall be at the sole responsibility and expense of the Contractor.
(i) Each time services are performed, the engineer(s) shall obtain a certification of performance from a responsible U.S. Government official aboard the vessel or at the activity where the services were performed, citing tasks satisfactorily performed and hours worked each day.
(j) In the event the Government does not designate time(s) and place(s) sufficient for performance of the total quantity of engineering services set forth in the Schedule within the period(s) provided therefor, those services not furnished shall be deemed to be terminated for the convenience of the Government at no cost to the Government. Such termination shall be evidenced by a written document signed by the Contracting Officer and mailed or otherwise furnished to the contractor.
INCIDENTAL MATERIAL AND TRAVEL: ITEMS 0002 AND 0003 AND (IF OPTIONS ARE EXERCISED) ITEMS 0102, 0103, 0202, 0203, 0302, 0303, 0402, 0403, 0502, 0503, 0602, 0603, 0702, 0703, 0802 AND 0803
The Contractor shall provide incidental materials supplies and travel necessary for the completion of Technical Instructions (TIs) issued in accordance with the Special Contract Requirement entitled "Technical Instructions" within the Government’s estimated amount. The Contractor shall be reimbursed for actual, allowable and allocable costs less any discounts taken, plus applicable burdens, incurred in the performance of these items in support of the related engineering services item(s).
MAJOR MATERIAL: ITEM 0004 AND (IF OPTIONS ARE EXERCISED) ITEMS 0104, 0204, 0304, 0404, 0504, 0604, 0704 AND 0804
(a) The Contractor shall be reimbursed for its reasonable actual Lab hardware procurement costs with a Fixed Fee amount of no more than five percent (5%) when specifically tasked in individual Technical Instructions incurred in the performance of the related engineering services item(s) in accordance with FAR 31.205-46. The costs to be reimbursed shall be those costs accepted by the cognizant DCAA.
ORDERS (CPIF): ITEM 0005
The contractor shall furnish CPIF supplies under items specified in Section B of the Schedule in accordance with the detailed specifications or requirements set forth in orders issued by the Contracting Officer in accordance with the special contract requirement(s) of this contract entitled “ORDERS”.
ORDERS (FFP): ITEM 0006
The contractor shall furnish FFP supplies under items specified in Section B of the Schedule in accordance with the detailed specifications or requirements set forth in orders issued by the Contracting Officer in accordance with the special contract requirement(s) of this contract entitled “ORDERS”.
TI22 COMMON ACOUSTIC CABINET (CAC) ENGINEERING DEVELOPMENT MODEL (EDM): OPTION ITEM 0007
The Contractor shall use the Government-furnished enclosure to modify, develop, and build the CAC TI22 EDM in accordance with the requirements of Attachment 2, Exhibit A, and Attachment 3. The Contractor shall participate in the A-RCI Technology Insertion (TI) Integrated Product Team (IPT). The Contractor shall produce one EDM configuration capable of supporting Fat-Line Towed Bodies (TB-16/34) and Thin-Line Towed Bodies (TB-23/29/29A) on SSGN and LOS ANGELES Class Submarines.
The delivery and acceptance of the EDM shall be contingent on successful completion of qualification and acceptance testing. The Contractor shall notify the Government one week prior to start of any test event during First Article Testing. The First Article unit shall meet or exceed the performance and environmental requirements provided in Attachment 3. The data to be furnished hereunder shall be prepared by the Contractor in accordance with CDRL A00S (First Article Qualification Test Plan and Procedures) and CDRL A00U (Test/Inspection Report).
The accepted TI22 CAC EDM under this Item shall serve as the TI22 production design baseline for the SSGN and LOS ANGELES Class Submarines.
TI22, TI24 AND TI26 CAC KIT LONG LEAD MATERIAL FOR SSGN AND LOS ANGELES: ITEM 0008 AND (IF OPTIONS ARE EXERCISED) ITEMS 0107, 0207, 0209, 0309, 0407, 0507, AND 0607
The Contractor shall procure the Long Lead Material for the TI22, TI24 and TI26 CAC Kits the year prior to Kit production in order to meet installation schedule requirements. Long Lead Material refers to material that has more than 9 months long lead time for procurement.
TI22, TI24 AND TI26 CAC SPARES LONG LEAD MATERIAL FOR SSGN AND LOS ANGELES: ITEM 0009 AND (IF OPTIONS ARE EXERCISED) ITEMS 0108, 0208, 0210, 0310, 0408, 0508, AND 0608
The Contractor shall procure the Long Lead Material for the TI22, TI24 and TI26 CAC Spares the year prior to Spares production in order to meet installation schedule requirements. Long Lead Material refers to material that has more than 9 months long lead time for procurement.
DATA REQUIREMENTS: ITEM 0010
The data to be furnished hereunder shall be prepared by the Contractor in accordance with the Contract Data Requirements List, DD Form 1423, Exhibit A, attached hereto.
DATA RIGHTS: 0011
If exercised, the Contractor shall grant the corresponding Data Rights license (e.g.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .