This enclosure outlines maintenance and repair requirements for the USS Lake Erie. The Navy seeks contractors to accomplish various tasks including repairing the anchor hawse and lube oil storage tank, inspecting and cleaning the controllable pitch propeller oil sump tank heater and gas turbine exhaust duct collector, cleaning and inspecting the main reduction gear lube oil cooler, accomplishing ventilation duct cleaning, conducting bilge drain well repairs, inspecting and weight testing helo safety nets and frames, replacing the Nomex deck panel and flight deck nonskid, preserving the forward and aft mast, repairing large 5XXX superstructure cracks, overhauling the helo hangar door assembly, aft steering HPUs, NR 1 & 2 HPACs and LPACs, preserving the MER 1 & 2 and AUX 1 & 2 bilges, preserving the forward and aft pump rooms, repairing the P&S sliding pad eye, overhauling the P&S boat davits, and inspecting and repairing the P&S rudder, stock, upper and lower bearings. The solicitation number is N00024-20-R-4401 for the USS Lake Erie selected restricted availability.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Enclosure (1) | Page iv

Anchor hawse; repair Lube Oil Storage Tank; repair Bolted Equipment Removal Plate (BERP) Repair Controllable Pitch Propeller (CPP) Oil Sump Tank Heater; inspect and clean Gas Turbine (GTRB) Exhaust Duct Collector; repair Main Reduction Gear (MRG) Lube Oil Cooler; clean and inspect Ventilation Duct Cleaning; accomplish Bilge Drain Well repairs Helo safety nets and frames; inspect and weight test Nomex Deck Panel; replace Flight Deck Nonskid; replace Fwd and aft mast; preserve Large 5XXX Superstructure cracks; repair Helo hangar door assembly; replace Aft steering HPU’s; overhaul NR 1 & 2 HPAC; overhaul NR 1 & 2 LPAC; overhaul MER 1 & 2 bilge; preserve AUX 1 & 2 bilge; preserve Forward and aft pump room; preserve P&S sliding Pad eye; repair P&S boat davits; overhaul HENL/BENL 33 Crew Berthing’s/Heads P&S rudder, stock, upper and lower bearing inspection and repairs