Amendment 1 FINAL.pdf

PDF 173 KB Posted

Attached to
Aircraft Carrier Tow and Dismantlement
Solicitation number
N00024-20-R-4204
Issued by

View the file

Other files

File Type Posted
Carrier Dismantle RFP Q and A Master List 3.0.xlsx XLSX spreadsheet
Dismantlement RFP Amendment 3 FINAL.pdf PDF
Carrier Dismantle RFP Q and A Master List 2.0.xlsx XLSX spreadsheet
Amendment 2 FINAL.pdf PDF
Carrier Dismantle RFP Q and A Master List.xlsx XLSX spreadsheet
CV60 Gallery Deck.JPG JPG image
CV-67 2267304-Sheet-11-A.png PNG image
CV-67 2267304-Sheet-03-A.png PNG image
ATTACHMENT L-4_Pre-Proposal Information Form.docx DOCX document
Plate 8B AFT Color Public.JPG JPG image
CV60 Data Sheet.JPG JPG image
CV60 Double Bottom.JPG JPG image
CV60 second deck.JPG JPG image
CV60 Main Deck.JPG JPG image
CV-67 2267304-Sheet-09-A.png PNG image
CV-67 2267304-Sheet-08-A.png PNG image
CV60 1st plat.JPG JPG image
CV60 third deck.JPG JPG image
CV60 Inboard.JPG JPG image
CV60 01 level.JPG JPG image
CV-67 2267304-Sheet-07-A.png PNG image
Plate 4 AFT color public.JPG JPG image
CV-67 2267304-Sheet-06-A.png PNG image
CV60 02 level.JPG JPG image
ATTACHMENT L-1_ Resume_ Format.docx DOCX document
Plate 2 FWD color public.JPG JPG image
CV60 Outboard Port.JPG JPG image
CV-67 2267304-Sheet-10-A.png PNG image
ATTACHMENT J-8 DD254 for N00024-20-R-4204.pdf PDF
Plate 8B FWD Color Public.JPG JPG image
Plate 2 AFT color public.JPG JPG image
CV-67 2267304-Sheet-05-A.png PNG image
FINAL RFP N00024-20-R-4204.pdf PDF
CV-67 2267304-Sheet-01-A.png PNG image
CV60 2nd platform.JPG JPG image
CV60 Outboard star.JPG JPG image
ATTACHMENT J-6 Environmental-Safety Information Instructions Terms-Conds.pdf PDF
ATTACHMENT J-10 List of Key Personnel.docx DOCX document
ATTACHMENT J-9 Quality Assurance Surveillance Plan.docx DOCX document
CV-67 2267304-Sheet-04-A.png PNG image
CV60 Flight Deck.JPG JPG image
Plate 4 FWD color public.JPG JPG image
Plate 3 FWD color public.JPG JPG image
CV-67 2267304-Sheet-02-A.png PNG image
ATTACHMENT J-1 Carrier_Disposal CDRLs.pdf PDF
ATTACHMENT L-3_Past_Performance_Questionaire.docx DOCX document
CV60 4th Deck.JPG JPG image
ATTACHMENT L-2_Ref_Inf_Sheet.docx DOCX document
Plate 3 AFT color public.JPG JPG image
CV60 Island Levels.JPG JPG image
Show 40 more

Latest 50 of 51 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N0002420NR67000

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

See Page 2.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 4

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 07-Aug-2020

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N0002420R4204

X 9B. DATED (SEE ITEM 11)

23-Jul-2020

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

06-Aug-2020

CODE

NAVAL SEA SYSTEMS COMMAND

1333 ISAAC HULL AVE SE - MAIL STOP 2030

WASHINGTON NAVY YARD DC 20376-2030

N00024 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N0002420R4204

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

The following items are applicable to this modification:

The following items are applicable to this modification:

SUMMARY OF CHANGES

SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS

The following have been modified (changes are highlighted):

1. Under Section III. GENERAL INFORMATION, B. Specifications and associated reference documentation is modified as follows:

B. Specifications and associated reference documentation:

1. The following documents are posted with this solicitation:

a. Ex-SARATOGA (CV 60) Aircraft Carrier Booklet of General Plans (BOGP) which is representative of ex-KITTY HAWK (CV 63)

b. De-classified ex-JOHN F KENNEDY (CV 67) BOGP

2. A security clearance at the CONFIDENTIAL level is required to review any classified information pertaining to ex-JOHN F KENNEDY (CV 67).

3. Upon request, the following documents are available for distribution through DoD SAFE.

Offerors may request these documents by sending an email to the Contracting Officer and Contracts Specialist noted as points of contact on this solicitation. The Offeror shall provide their name, e-mail and requested documents so the Government can generate a pick-up request from the DoD SAFE application to be sent to the Offeror, which is valid for 14 calendar days.

ASBESTOS Surveys for JFK – seven (7) documents:

1) Disposal_Reporting_Letter_Encl1G_ICO_JOHN J KENNEDY CV 67

2) Disposal_Reporting_Letter_Encl1A_ICO_JOHN J KENNEDY CV 67

3) Disposal_Reporting_Letter_Encl1B_ICO_JOHN J KENNEDY CV 67

4) Disposal_Reporting_Letter_Encl1C_ICO_JOHN J KENNEDY CV 67

5) Disposal_Reporting_Letter_Encl1D_ICO_JOHN J KENNEDY CV 67

6) Disposal_Reporting_Letter_Encl1E_ICO_JOHN J KENNEDY CV 67

7) Disposal_Reporting_Letter_Encl1F_ICO_JOHN J KENNEDY CV 67

PCB Surveys for JFK (PHASE 1) – nine (9) documents:

1) Disposal_Reporting_Letter_Encl4I_ICO_JOHN F KENNEDY CV 67_Phase 1

2) Disposal_Reporting_Letter_Encl4A_ICO_JOHN F KENNEDY CV 67_Phase 1

3) Disposal_Reporting_Letter_Encl4B_ICO_JOHN F KENNEDY CV 67_Phase 1

4) Disposal_Reporting_Letter_Encl4C_ICO_JOHN F KENNEDY CV 67_Phase 1

5) Disposal_Reporting_Letter_Encl4D_ICO_JOHN F KENNEDY CV 67_Phase 1

6) Disposal_Reporting_Letter_Encl4E_ICO_JOHN F KENNEDY CV 67_Phase 1

7) Disposal_Reporting_Letter_Encl4F_ICO_JOHN F KENNEDY CV 67_Phase 1

8) Disposal_Reporting_Letter_Encl4G_ICO_JOHN F KENNEDY CV 67_Phase 1

9) Disposal_Reporting_Letter_Encl4H_ICO_JOHN F KENNEDY CV 67_Phase 1

PCB Surveys for JFK (PHASE 2) – seven (7) documents:

1) Disposal_Reporting_Letter_Encl4G_ICO_JOHN J KENNEDY CV 67_Phase 2

2) Disposal_Reporting_Letter_Encl4A_ICO_JOHN J KENNEDY CV 67_Phase 2

3) Disposal_Reporting_Letter_Encl4B_ICO_JOHN J KENNEDY CV 67_Phase 2

4) Disposal_Reporting_Letter_Encl4C_ICO_JOHN J KENNEDY CV 67_Phase 2

5) Disposal_Reporting_Letter_Encl4D_ICO_JOHN J KENNEDY CV 67_Phase 2

6) Disposal_Reporting_Letter_Encl4E_ICO_JOHN J KENNEDY CV 67_Phase 2

7) Disposal_Reporting_Letter_Encl4F_ICO_JOHN J KENNEDY CV 67_Phase 2

Pictures of JFK Focsle and Draft Marking – one (1) document containing nine (9) pitcures.

4. Following contract award, the winning Offeror will be given all vessel specific documents.

2. Under Section V. PROPOSAL CONTENT, Element 1.2 MANAGEMENT CAPABILITY AND APPROACH is modified as follows:

Element 1.2 MANAGEMENT CAPABILITY AND APPROACH

The Offeror shall provide a description of its management approach and organization. The management approach should demonstrate how the Offeror’s organizational resources support the requirements of the PWS, ensuring dismantling procedures are executed in compliance with Environmental Protection Agency and Occupational Safety Health Administration standards. The management approach shall:

a. Provide a description of the major health, safety, environmental, and schedule risks which are involved in successfully completing this contract.

b. Provide a description of Offeror’s methods for mitigating health, safety, environmental, and schedule risks listed in subsection “a” above.

c. Provide a complete list of all proposed major subcontractors that are planned for use under this contract if performing more than ten (10) percent of the total labor man-hours or if proposed to prepare and or execute tow of vessel(s). This list should include:

1. Name of contractor.

2. Address of contractor.

3. Telephone number and point of contact.

4. Legal relationship between Offeror and major subcontractor.

5 Copies of signed agreements for teaming, subcontracting, or other arrangements that will have a direct impact on this effort.

6 Copies of permits or licenses, as applicable.

d. For Ex-JOHN F KENNEDY (CV 67) - Include the Offeror’s confirmation that all employees, prime and subcontractors, assigned to this contract will have U.S. citizenship.

e. For Ex-JOHN F KENNEDY (CV 67) – include Offeror’s eligibility to obtain the requisite security clearance requirements, in accordance with PWS Section C-3 and Attachment J-7.

f. Include a description of how the Offeror proposes to manage and monitor the work of all subcontractors.

g. Provide name and resumes of the following key personnel: Project Manager; Environmental, Safety and Health Manager(s), and Facility Security Officer. Use Attachment L-1 Resume Format for preparing key personnel resumes. Resumes shall:

1. Demonstrate that key personnel have the education and years of experience required by Section C of this solicitation, subsection 3.2.

2. Affirm U.S. citizenship.

3. For Ex-JFK only, the resume for the Facility Security Officer must include a Center for Development of Security Excellence (CDSE) certificate, or in the absence of a CDSE certificate, a plan to obtain one prior to contract award.

4. Include signed letters of intent to accept employment from individuals who are not currently employed by the Offeror.

h. Small Business Participation:

This section is not applicable to Small Businesses proposing as a Prime. Large Business concerns shall describe the extent to which your company has identified and committed to provide for participation of Small Business concerns, Small Disadvantaged Business concerns, Women- Owned Small Business concerns, HUBZone Small Business concerns and Service-Disabled Veteran-owned Small Business concerns as subcontractors in the performance of the requirements addressed within this solicitation. The Offeror shall provide sufficient information to demonstrate that the tasks assigned to the aforementioned businesses and institutions are meaningful, technical, and/or sustainable. In other words, they will be performing functions important to the overall success of the program and also broaden the subcontractors' capabilities. The Offeror shall describe its management approach for enhancing the technical capabilities of the above entities. Of special interest is the amount and type of work to be performed by the subcontractors. The Offeror shall include a list of the effort(s) to be provided by these subcontractors. The Offeror shall explain the reasons for and advantages of selecting particular subcontractors. The Small Business Subcontracting Plan shall be submitted as part of proposal Volume II.

(End of Summary of Changes)