CVN_74_FAF_Lease_RFI_Q&A_March_6_2019.pdf
PDF 427 KB Posted
- Attached to
- Carrier Floating Accommodation Facility RFI
- Solicitation number
- N00024-20-R-2101
About this file
This document contains questions and answers regarding a request for information for a Carrier Floating Accommodation Facility lease. The Navy seeks to lease a floating facility capable of berthing over 300 personnel by June 2020. Desired capabilities include over 5,000 square feet for messing, 6,600 square feet for berthing, 3,200 square feet of offices, 3,500 square feet of classrooms, and 1,500 square feet for medical facilities. Respondents are asked to provide details on available assets, lead times for outfitting, and experience leasing and transporting floating accommodation facilities. Responses were due by September 13, 2018 to the Naval Sea Systems Command.
CVN 74 FAF Lease RFI Q&A
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 74_RCOH_Industry_Day_Distro_A.pdf | ||
| CVN_74_FAF_Lease_RFI_QA.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1) What is the number of male and female officers?
A: There will be an approximate split between male and female: 25% female; 75% male for the crew.
This would result in approximately the following split:
24 Officers: 18 Male; 6 Female
40 Senior Enlisted (Chiefs): 30 Male; 10 Female
236 Enlisted: 177 Male; 59 Female
2) In regards to the medical facility, will these rooms require deck coating and stainless surfaces?
A: There is no specified surface material. However, the floors and counters will need to be cleaned and sanitized.
3) Is ABS Barge classification suitable?
A: Yes. Other local and national OSHE requirements must be met at place of performance.
4) Are there needs for the following:
a. Boarding ramp and brows
A: Yes, a brow and boarding ramp is required. These do not have to be separate access points.
b. Laundry
A: Yes
c. Wired for satellite communications, LAN - NIPR / SIPR?
A: The Navy will provide its own network connection. We will need to run lines to support Navy network.
d. Potable water storage.
e. Black/Gray water storage.
5) Will the barge have an option to be powered? Generators, duration – fuel storage, total electrical power load TBA 6
A: Barge may be self-powered. Shore services will be made available; contractor is responsible for providing any adapters that may be necessary to accommodate U.S. standards.
6) Is there safety equipment requirements?
a. Fire detection:
b. Flooding
c. Gas detection
A: Yes
d. Cameras.
A: No.
e. Security and access.
A: No. Navy will provide security. Facility must be securable.
7) What is the QTY of people that will need work stations with computer WIFI service?
A: Office spaces shall be outfitted with desks. Approximate 32 desks are desired. No less than 20 desks. No computer WIFI services are required.
8) Will the entire barge be heat and air conditioned?
A: Yes, for inhabited spaces.
9) Will the men and women bathrooms require "Heads" facility to serve?
A. “Heads”, or toilets, will be required on board.
10) Will common areas have picnic tables, refrigerators, microwaves?
A: tables, refrigerators, microwaves are desired in the common areas but are not required.