The Navy is seeking information from potential lessors of a Carrier Floating Accommodation Facility (CFAF) through this Request for Information. Respondents are to describe means of providing a CFAF capable of berthing 300 personnel, including messing facilities for 300 people and office, classroom, and medical spaces. The Navy desires occupation by June 2020 to support the USS John C. Stennis crew. Responses should include details on asset capabilities and certifications, lead times for outfitting, and the respondent's experience leasing and maintaining FAFs. Responses are due by September 13, 2018 to Naval Sea Systems Command. The Navy may request additional information, presentations, or site visits and anticipates releasing a solicitation by April 2019 for a lease with occupancy from August 2020 through January 2021.
CVN 74 RCOH Industry Day Distro A
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CVN_74_FAF_Lease_RFI_Q&A_March_6_2019.pdf | ||
| CVN_74_FAF_Lease_RFI_QA.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Distro A – Approved for Public Release 1
Carrier Floating Accommodation Facility
(CFAF)
Roy Yim
Contracting Officer
202-781-4180
Mark Braza
Program Office Rep
202-781-5283
Distro A – Approved for Public Release
Announcement of Ground Rules
Leasing Overview and Desires
Closing Remarks
Break-out sessions
Agenda
All attendees must sign in
Turn off cell phone
Presentation will be posted on FedBizOps
Admin Announcement
Objective of today’s industry day is to have open discussion on the Navy’s desire to lease a Carrier Floating
Accommodation Facility (CFAF)
Dialogue is encouraged in both plenary and one-on-one sessions. None of today’s dialogue is binding on any party
All technical requirements in this presentation are considered notional and pre-decisional in nature
If there are any differences between this brief and the solicitation, the final solicitation will govern
Submit all questions in writing to the contracting officer at roy.yim@navy.mil and the contracting specialist at benjamin.smallenbroe@navy.mil
Ground Rules mailto:roy.yim@navy.mil
Timing. Leasing minimum time requirements from Aug 2020 through Jan 2021 with potential to begin as early as Feb 2020 or end as late as Apr 2021. Most likely: Jun
2020 through Feb 2021. Lease will be no longer than 1 year.
Desired Notional Capability/Capacity.*
– Messing for 250 people at lunch, 75 breakfast and dinner (approx. 5000 square feet)
– 300 total person berthing
» 24 Officers (approx. 600 square feet)
» 40 senior enlisted (approx. 1000 square feet)
» 236 enlisted personnel (approx. 5000 square feet)
– Offices (approx. 3200 square feet or 32 offices of ~ 10'x10')
– Training classrooms for 200 personnel (approx. 3500 square feet and 4 classrooms)
– Offices for Classified (Confidential) document and computer security (approx. 1500 square feet)
– Space capable of being outfitted for medical and dental facilities (Navy will outfit) (approx. 1500 square feet)
*The Navy recognizes that all of these conditions may not be met. The contract the Navy awards will weigh the ability to closely meet the above criteria at a competitive cost
Statement of Work
Location
– Naval Station Norfolk (Prior to Jan 15 2021)
– Newport News Shipbuilding (After Jan 15 2021)
Other Notes
– Multiple smaller assets that meet the requirements will be considered
– Respondents will be responsible to obtain USCG approval for transit to and from the
Hampton Roads Virginia area. Delivery and return of CFAF will occur at either Naval
Station Norfolk or Newport Final outfitting may occur in either Naval Station Norfolk.
– Certification to standards required for occupancy / berthing personnel in the above capacity. This includes USCG certification exemption as largely land based facility.
– Contractor personnel on site will be required to pass background check and receive access to Naval Station Norfolk and Newport News Shipbuilding.
Statement of Work (con’t)
Layout at Naval Station Norfolk
P
IE
R
C V
N
FAF
P
IE
R
100 ft
300 ft http://www.google.com/url?sa=i&rct=j&q=&esrc=s&frm=1&source=images&cd=&cad=rja&uact=8&ved=0CAcQjRxqFQoTCLzex-z6_cYCFQPJPgodnGMLkA&url=http://www.clipartsheep.com/simple-compass-rose-clipart/dT1hSFIwY0RvdkwyRnlkR052Ykd4bFoyVnNhV1psTG1acGJHVnpMbmR2Y21Sd2NtVnpjeTVqYjIwdk1qQXhNeTh3Tnk5amIyMXdZWE56TFhKdmMyVXRibk5sZHkxaWR5MW1hVzVoYkM1cWNHY3x3PTI1NTB8aD0yNTA0fHQ9anBlZ3w/&ei=Yoe3VbylK4OS-wGcx62ACQ&bvm=bv.98717601,d.cWw&psig=AFQjCNGw34N-IlqULgedsGge2Bcq9w99IA&ust=1438177485783242
Layout at Naval Station Norfolk
Note: shore services will be available
1) Will cooking be done onsite? If so, will we need to provide a commercial kitchen for them to use. Do we need to provide cooking equipment (beyond the standard equipment that comes in all kitchens?
A: Cooking will be done onsite. The kitchen will need to meet commercial kitchen standards. Desired facility will allow for reasonable cooking to support Messing for 250 people at lunch, 75 breakfast and dinner. Other non-standard kitchen equipment is not required. Cooks not required
2) Will contractor need to supply basic equipment for meeting space - tables and chairs? Any other specific equipment?
A: It is desired that the meeting space include basic equipment, including tables, chairs, and white-board. The Navy will be able to supply this if cost prohibitive.
3) Are there any technology requirements in the sleeping quarters ( phone, sound, video/TV/ internet)?
Technology requirements for the classroom/meeting facilities?
A: Phone connection will be required to support meeting and office spaces. Some AV equipment to support classroom/meeting rooms is desired. No additional technology is required beyond those USCG or other necessary to meet the requirements laid out in the RFI. The Navy will require allowance to install temporary wires, cables, mounts, stands, and connections to support Navy technology requirements.
4) For the rooms for dental/medical, will we need to supply any basic technology/AV equipment? What are the minimum power requirements?
A: Equipment will be provided by the Navy. Power requirements will be standard US 3-prong 120V and 60Hz outlet. A 220V plug would also be desired but not required. Pot water and waste water services desired.
Q&As Received to Date
5) Will the vessel be anchored at sea or will a dock facility be provided - if dock, can you please include name and specifications about the facility
A: While the site is not yet defined, the most likely location will be to dock the vessel at Pier 11 or other designed to port can accommodate larger vessels. The desired size will be less than 100 ft wide and 300 ft long.
6) How will the rooming or lodging be handled, in terms of single, double or triple per room?
A: Lodging room arrangements are flexible as long as it can support the requirements outlined in this brief; this can be a mix of state rooms and larger bunk rooms. Large bunk rooms is what is typically used for enlisted personnel; state rooms for officers
7) Does the Barge need to be US Flag?
A: The barge does not need to be US Flagged.
8) Does it need to be Built in the US?
A: The barge does not need to be built in the US. However, transport vessels required to move of the barge (tug, heavy lift) will be subject the Jones Act.
9) Will there be enough time to do any modifications?
A: It is anticipated that approximately 6 months will be provided to perform modifications.
Q&As Received to Date (con’t)
NAVSEA is considering awarding a Firm Fixed Price contract based on best value (mix of capability and cost)
Contract will likely have a base contract for a period of performance with an option to extend the period of performance.
Price is the firm fixed price for the specifications of the lease
A technically compliant proposal will demonstrate the ability of a lease barge to meet regulatory requirements while closely matching the Navy’s desired requirement
Potential Contract Structure
The below list of items would be helpful to understand prior to releasing the RFP:
Asset capability:
– What would be the most economical and/or most expedient method for providing an asset which can be occupied and functioning by June 2020?
– How do potential assets match the desired notional criteria?
– Are the potential assets available for inspection?
– How many assets are available? Multiple smaller FAFs will be considered.
– How are potential assets currently certified?
Timing:
– What portion of the desired time window could an asset be provided?
– What lead time is required for outfitting for occupancy after arrival in the Hampton Roads Virginia area?
Respondent Experience:
– Respondent's experience in leasing of FAFs?
– Respondent's experience in maintaining FAFs during the lease period or period of owners use?
– Respondent's experience in transporting FAFs for delivery?
Helpful Information from Industry
Release RFP: Apr 2019
Receive Proposals: Jun 2019
Evaluate Proposals: July 2019
Discussions and Proposal Updates (if needed): July 2019
Notice of selection: Sept 2019
Contract Award: Dec 2019 (no later than)
Notional Contracting Timeline
A copy of today’s presentation will be made available on www.fbo.gov (FEDBIZOPS)
Submit all questions in writing to the contracting officer at roy.yim@navy.mil and the contracting specialist at benjamin.smallenbroe@navy.mil
Closing Remarks
Thank you for your interest http://www.fbo.gov/ mailto:roy.yim@navy.mil
Distro A – Approved for Public Release 15
The following slides depict:
1. Docking at Newport News Shipbuilding. A similar docking arrangement may be required after Jan
2021.
2. Dxiting Floating Accommodation Facility. This is provided to illustrate the type of accommodations currently used.
Supplemental Pictures
FAF in
Drydock
FAF in
Drydock
OFFICE SPACES
SLEEPING
SPACES
OFFICE SUITE
416-B
OFFICE SUITE
416-B
OFFICE SPACE
OFFICE SPACE
BERTHING
OFFICER’S
OFFICER’S
OFFICE SPACES
FEMALE
BERTHING
GYM
COMAND MASTER
CHIEF OFFICE
MALE BERTHING
CONFERENCE ROOM
CREW BERTHING
CONFERENCE ROOM
OFFICE
323 GYM
247249251253255257
246256 250252254 248
OFFICE SPACES
BARBER SHOP
CLASSROOMS OFFICE SPACES
Distro A – Approved for Public Release 33
247 OFFICE SPACE
02 CLASSROOMS
245 BARBER SHOP
OFFICER & CHIEF
MESS
ENLISTED MESS
CLASSROOMS
CLASSROOM
CLASSROOMS
LAUNDRY
CREW MESS
CHIEF & OFFICER
MESS
GALLEY EQUIPMENT