N00024-19-R-5393_Conformed_07.02.2019.pdf
PDF 1 MB Posted
- Attached to
- MK 41 Vertical Launching System (VLS) Design Agent Engineering Services Federal contract opportunity
- Solicitation number
- N00024-19-R-5393
About this file
This is a solicitation for MK 41 Vertical Launching System (VLS) Design Agent Engineering Services. The solicitation will result in award of two separate contracts, one for mechanical requirements and one for electronic requirements. Offerors may submit proposals for the mechanical requirements, electronic requirements, or separate proposals for both. The services required include production support, system product improvement, new missile integration, studies to improve reliability, integration into new ships, producibility enhancements, launcher/canister upgrades/remanufacture, material orders/spares support, and depot support. Offerors must be a U.S. company or independent U.S. subsidiary, and all contractor personnel must be U.S. citizens with SECRET clearances. The export of defense articles is subject to Arms Export Control Act regulations.
Conformed copy including original solicitation and updated amendment.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| N00024-19-R-5393_Conformed_A00003_07.11.2019.pdf | ||
| N00024-19-R-5393_modification_A00003_07.11.2019.pdf | ||
| N00024-19-R-5393BiddersQ&ADate07.11.2019.xlsx | XLSX spreadsheet | |
| 5239.2___Information_Systems_Security___29_Jul_1998.pdf | ||
| N00024-19-R-5393_Modification_07.02.2019.pdf | ||
| N00024-19-R-5393_Bidders_Q&A_Date_07.02.2019.xlsx | XLSX spreadsheet | |
| N00024-19-R-5393_Conformed.pdf | ||
| N00024-19-R-5393_Bidders_Q&A_6.26.19.xlsx | XLSX spreadsheet | |
| N00024-19-R-5393_Modification.pdf | ||
| N00024-19-R-5393_Solicitation_Attachments.zip | ZIP file | |
| N00024-19-R-5393_Attachments.zip | ZIP file | |
| N00024-19-R-5393.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CODE
(Hour)
PAGE(S)
until 02:00 PM local time 16 Jul 2019
X
A X B X C X D
EX
X
G F 204 - 211
212 - 258 X H 259 - 274 claire.morton@navy.mil
RATING PAGE OF PAGES
7. ISSUED BY
(Date)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)
Prescribed by GSA FAR (48 CFR) 53.214(c)
DO-A3 1 274
(If other than Item 7)
15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO
AND
ADDRESS
SIGN OFFER (Type or print)
OF
OFFEROR
AMENDMENT NO. DATE
15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS
IS DIFFERENT FROM ABOVE - ENTER
SUCH ADDRESS IN SCHEDULE.
18. OFFER DATE
1. THIS CONTRACT IS A RATED ORDER
UNDER DPAS (15 CFR 700)
2. CONTRACT NO.
N00024 8. ADDRESS OFFER TO
See Item 7
9. Sealed offers in original and 1 copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in
CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and
See Section L conditions contained in this solicitation.
10. FOR INFORMATION
CALL:
A. NAME (NO COLLECT CALLS)
CLAIRE MORTON 202-781-1343
11. TABLE OF CONTENTS
SOLICITATION/ CONTRACT FORM
SUPPLIES OR SERVICES AND PRICES/ COSTS
2 - 72
X I CONTRACT CLAUSES
DESCRIPTION/ SPECS./ WORK STATEMENT X
PACKAGING AND MARKING
73 - 146 147 - 150
J LIST OF ATTACHMENTS
INSPECTION AND ACCEPTANCE
DELIVERIES OR PERFORMANCE
151 - 155 156 - 161
X K
REPRESENTATIONS, CERTIFICATIONS AND
OTHER STATEMENTS OF OFFERORS
CONTRACT ADMINISTRATION DATA 162 - 172 X
SPECIAL CONTRACT REQUIREMENTS
OFFER (Must be fully completed by offeror) 173 - 178 X M
L INSTRS., CONDS., AND NOTICES TO OFFERORS
EVALUATION FACTORS FOR AWARD
NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. DISCOUNT FOR PROMPT PAYMENT
(See Section I, Clause No. 52.232-8)
14. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments
AMENDMENT NO. DATE
to the SOLICITATION for offerors and related documents numbered and dated):
FACILITY
12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period
SOLICITATION, OFFER AND AWARD
X
(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)
PART I - THE SCHEDULE
26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE
EMAIL:TEL: (Signature of Contracting Officer)
CODE CODE
B. TELEPHONE (Include area code) C. E-MAIL ADDRESS
AWARD (To be completed by Government)
19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION
22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)
23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE
PART IV - REPRESENTATIONS AND INSTRUCTIONS
PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
179 - 201
PART II - CONTRACT CLAUSES
NAVAL SEA SYSTEMS COMMAND (HQ)
1333 ISAAC HULL AVE SE
WASHINGTON NAVY YARD DC 20376-2030
FAX:
TEL:
FAX:
TEL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SOLICITATION
202 - 203
6. REQUISITION/PURCHASE NO.
N0002417NR43064
5. DATE ISSUED
30 Apr 2019
4. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
[ X ]
3. SOLICITATION NO.
N0002419R5393
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
CLIN
Number
19,250 Hours
Engineering, Design, and Technical
CPFF
Base Period Engineering, Design, and Technical Services in support of MK 41 VLS. See Note C.
FOB: Destination
PURCHASE REQUEST NUMBER: N0002417NR43064
ESTIMATED COST
FIXED FEE
TOTAL EST COST + FEE
1 Lot
Material to support Item 0001
CPFF
Material in support of MK 41 VLS Engineering, Design, and Technical Services.
See Note C.
Travel Cost to Support Item 0001
COST
Travel in support of MK 41 VLS Engineering, Design, and Technical Services.
See Note C.
68,750 Hours
OPTION Integration Engineering & Tech Serv
CPFF
Integration Engineering and Technical Services in support of MK 41 VLS. See Notes B and C.
OPTION Material to Support Item 0004
CPFF
Material in support of MK 41 VLS Integration Engineering and Technical Services. See Notes B and C.
OPTION Travel Cost to Support Item 0004
COST
Travel in support of MK 41 VLS Integration Engineering and Technical Services.
See Notes B and C.
OPTION RESERVED
CPFF
RESERVED
22,902 Hours
OPTION Depot Operations Services
CPFF
Depot Operations Services in support of MK 41 VLS. See Notes B and C.
OPTION Material to Support Item 0011
CPFF
Material in support of MK 41 VLS Depot Operations Services. See Notes B and C.
OPTION Travel Cost to Support Item 0011
COST
Travel in support of MK 41 VLS Depot Operations Services. See Notes B and C.
Data Items
FFP
Not Separately Priced (NSP). Applicable to CLINs 0001-0003, and (if options are exercised) Items 0004-0006, 0011-0013, 0101-0106, 0111-0113, 0201-0206, 0211- 0213, 0301-0306, 0311-0313, 0401-0406 and 0411-0413.
See Notes A and C. See Exhibit A, DD Form 1423
NET AMT
OPTION Engineering, Design, and Technical
CPFF
Option Period 1 Engineering, Design, and Technical Services in support of MK 41 VLS. See Notes B and C.
OPTION Material to support Item 0101
CPFF
Material in support of MK 41 VLS Engineering, Design, and Technical Services.
See Notes B and C.
OPTION Travel Cost to Support Item 0101
COST
Travel in support of MK 41 VLS Engineering, Design, and Technical Services.
See Notes B and C.
CPFF
Option Period 1 Integration Engineering and Technical Services in support of MK 41 VLS. See Notes B and C.
OPTION Material to Support Item 0104
CPFF
Material in support of MK 41 VLS Integration Engineering and Technical Services. See Notes B and C.
OPTION Travel Cost to Support Item 0104
COST
Travel in support of MK 41 VLS Integration Engineering and Technical Services.
See Notes B and C.
17,302 Hours
CPFF
Option Period 1 Depot Operations Services in support of MK 41 VLS. See Notes B and C.
OPTION Material to Support Item 0111
CPFF
Material in support of MK 41 VLS Depot Operations Services. See Notes B and C.
OPTION Travel Cost to Support Item 0111
COST
Travel in support of MK 41 VLS Depot Operations Services. See Notes B and C.
CPFF
Option Period 2 Engineering, Design, and Technical Services in support of MK 41 VLS. See Notes B and C.
OPTION Material to support Item 0201
CPFF
Material in support of MK 41 VLS Engineering, Design, and Technical Services.
See Notes B and C.
OPTION Travel Cost to Support Item 0201
COST
Travel in support of MK 41 VLS Engineering, Design, and Technical Services.
See Notes B and C.
CPFF
Option Period 2 Integration Engineering and Technical Services in support of MK 41 VLS. See Notes B and C.
OPTION Material to Support Item 0204
CPFF
Material in support of MK 41 VLS Integration Engineering and Technical Services. See Notes B and C.
OPTION Travel Cost to Support Item 0204
COST
Travel in support of MK 41 VLS Integration Engineering and Technical Services.
See Notes B and C.
CPFF
Option Period 2 Depot Operations Services in support of MK 41 VLS. See Notes B and C.
OPTION Material to Support Item 0211
CPFF
Material in support of MK 41 VLS Depot Operations Services. See Notes B and C.
OPTION Travel Cost to Support Item 0211
COST
Travel in support of MK 41 VLS Depot Operations Services. See Notes B and C.
CPFF
Option Period 3 Engineering, Design, and Technical Services in support of MK 41 VLS. See Notes B and C.
OPTION Material to support Item 0301
CPFF
Material in support of MK 41 VLS Engineering, Design, and Technical Services.
See Notes B and C.
OPTION Travel Cost to Support Item 0301
COST
Travel in support of MK 41 VLS Engineering, Design, and Technical Services.
See Notes B and C.
CPFF
Option Period 3 Integration Engineering and Technical Services in support of MK 41 VLS. See Notes B and C.
OPTION Material to Support Item 0304
CPFF
Material in support of MK 41 VLS Integration Engineering and Technical Services. See Notes B and C.
OPTION Travel Cost to Support Item 0304
COST
Travel in support of MK 41 VLS Integration Engineering and Technical. See Notes B and C.
CPFF
Option Period 3 Depot Operations Services in support of MK 41 VLS. See Notes B and C.
OPTION Material to Support Item 0311
CPFF
Material in support of MK 41 VLS Depot Operations Services. See Notes B and C.
OPTION Travel Cost to Support Item 0311
COST
Travel in support of MK 41 VLS Depot Operations Services. See Notes B and C.
CPFF
Option Period 4 Engineering, Design, and Technical Services in support of MK 41 VLS. See Notes B and C.
OPTION Material to support Item 0401
CPFF
Material in support of MK 41 VLS Engineering, Design, and Technical Services.
See Notes B and C.
OPTION Travel Cost to Support Item 0401
COST
Travel in support of MK 41 VLS Engineering, Design, and Technical Services.
See Notes B and C.
CPFF
Option Period 4 Integration Engineering and Technical Services in support of MK 41 VLS. See Notes B and C.
OPTION Material to Support Item 0404
CPFF
Material in support of MK 41 VLS Integration Engineering and Technical Services. See Notes B and C.
OPTION Travel Cost to Support Item 0404
COST
Travel in support of MK 41 VLS Integration Engineering and Technical Services.
See Notes B and C.
CPFF
Option Period 4 Depot Operations Services in support of MK 41 VLS. See Notes B and C.
OPTION Material to Support Item 0411
CPFF
Material in support of MK 41 VLS Depot Operations Services. See Notes B and B.
OPTION Travel Cost to Support Item 0411
COST
Travel in support of MK 41 VLS Depot Operations Services. See Notes B and C.
15,750 Hours
Engineering, Design, and Technical Svcs
CPFF
Base Period Engineering, Design, and Technical Services in support of MK 41 VLS. See Note D.
Material to support Item 1001
CPFF
Material in support of MK 41 VLS Engineering, Design, and Technical Services.
See Note D.
Travel Cost to Support Item 1001
COST
Travel in support of MK 41 VLS Engineering, Design, and Technical Services.
See Note D.
56,250 Hours
OPTION Integration Engineering & Tech Svcs
CPFF
Integration Engineering and Technical Services in support of MK 41 VLS. See Notes B and D.
OPTION Material to Support Item 1004
CPFF
Material in support of MK 41 VLS Integration Engineering and Technical Services. See Notes B and D.
OPTION Travel Cost to Support Item 1004
COST
Travel in support of MK 41 VLS Integration Engineering and Technical Services.
See Notes B and D.
14,502 Hours
CPFF
Depot Operations Services in support of MK 41 VLS. See Notes B and D.
OPTION Material to Support Item 1011
CPFF
Material in support of MK 41 VLS Depot Operations Services. See Notes B and D.
OPTION Travel Cost to Support Item 1011
COST
Travel in support of MK 41 VLS Depot Operations Services. See Notes B and D.
17,902 Hours
OPTION Launcher Installation and Test Support
CPFF
Launcher Installation and Test in support of MK 41 VLS. See Notes B and D.
OPTION Material to Support Item 1020
CPFF
Material in support of MK 41 VLS Launcher Installation and Test Support. See Notes B and D.
OPTION Travel to support Item 1020
COST
Travel in support of MK 41 VLS Launcher Installation and Test Support. See Notes B and D.
72,000 Hours
OPTION Aegis Modernization Installation & Test
CPFF
Aegis Modernization Installation and Test in support of MK 41 VLS. See Notes B and D.
OPTION Material to Support Item 1030
CPFF
Material in support of MK 41 VLS Aegis Modernization Installation and Test Support. See Notes B and D.
OPTION Travel to support Item 1030
COST
Travel in support of MK 41 VLS Aegis Modernization Installation and Test Support. See Notes B and D.
3,400 Hours
OPTION On-Site Support
CPFF
On-Site Support of MK 41 VLS. See Notes B and D.
OPTION Material to Support Item 1040
CPFF
Material in support of MK 41 VLS On-Site Support. See Notes B and D.
OPTION Travel to support Item 1040
COST
Travel in support of MK 41 VLS On-Site Support. See Notes B and D.
Data Items
FFP
Not Separately Priced (NSP). Applicable to CLINs 1001-1003, and (if options are exercised) Items 1004-1006, 1011-1013, 1020-1022, 1030-1032, 1040-1042, 1101- 1106, 1111-1113, 1120-1122, 1130-1132, 1140-1142, 1201-1206, 1211-1213, 1220-1222, 1230-1232, 1240-1242, 1301-1306, 1311-1313, 1320-1322, 1330- 1332, 1340-1342, 1401-1406, 1411-1413, 1420-1422, 1430-1432 and 1440-1442.
See Notes A and C. See Exhibit A, DD Form 1423
NET AMT
OPTION Engineering, Design, and Technical Svcs
CPFF
Option Period 1 Engineering, Design, and Technical Services in support of MK 41 VLS. See Notes B and D.
OPTION Material to support Item 1101
CPFF
Material in support of MK 41 VLS Engineering, Design, and Technical Services.
See Notes B and D.
OPTION Travel Cost to Support Item 1101
COST
Travel in support of MK 41 VLS Engineering, Design, and Technical Services.
See Notes B and D.
CPFF
Option Period 1 Integration Engineering and Technical Services in support of MK 41 VLS. See Notes B and D.
OPTION Material to Support Item 1104
CPFF
Material in support of MK 41 VLS Integration Engineering and Technical Services. See Notes B and D.
OPTION Travel Cost to Support Item 1104
COST
Travel in support of MK 41 VLS Integration Engineering and Technical Services.
See Notes B and D.
8,902 Hours
CPFF
Option Period 1 Depot Operations Services in support of MK 41 VLS. See Notes B and D.
OPTION Material to Support Item 1111
CPFF
Material in support of MK 41 VLS Depot Operations Services. See Notes B and D.
OPTION Travel Cost to Support Item 1111
COST
Travel in support of MK 41 VLS Depot Operations Services. See Notes B and D.
CPFF
Option Period 1 Launcher Installation and Test in support of MK 41 VLS. See Notes B and D.
OPTION Material to Support Item 1120
CPFF
Material in support of MK 41 VLS Launcher Installation and Test Support. See Notes B and D.
OPTION Travel to support Item 1120
COST
Travel in support of MK 41 VLS Launcher Installation and Test Support. See Notes B and D.
48,000 Hours
CPFF
Option Period 1 Aegis Modernization Installation and Test in support of MK 41 VLS. See Notes B and D.
OPTION Material to Support Item 1130
CPFF
Material in support of MK 41 VLS Aegis Modernization Installation and Test Support. See Notes B and D.
OPTION Travel to support Item 1130
COST
Travel in support of MK 41 VLS Aegis Modernization Installation and Test Support. See Notes B and D.
CPFF
Option Period 1 On-Site Support of MK 41 VLS. See Notes B and D.
OPTION Material to Support Item 1140
CPFF
Material in support of MK 41 VLS On-Site Support. See Notes B and D.
OPTION Travel to support Item 1140
COST
Travel in support of MK 41 VLS On-Site Support. See Notes B and D.
CPFF
Option Period 2 Period Engineering, Design, and Technical Services in support of MK 41 VLS. See Notes B and D.
OPTION Material to support Item 1201
CPFF
Material in support of MK 41 VLS Engineering, Design, and Technical Services.
See Notes B and D.
OPTION Travel Cost to Support Item 1201
COST
Travel in support of MK 41 VLS Engineering, Design, and Technical Services.
See Notes B and D.
CPFF
Option Period 2 Integration Engineering and Technical Services in support of MK 41 VLS. See Notes B and D.
OPTION Material to Support Item 1204
CPFF
Material in support of MK 41 VLS Integration Engineering and Technical Services. See Notes B and D.
OPTION Travel Cost to Support Item 1204
COST
Travel in support of MK 41 VLS Integration Engineering and Technical Services.
See Notes B and D.
CPFF
Option Period 2 Depot Operations Services in support of MK 41 VLS. See Notes B and D.
OPTION Material to Support Item 1211
CPFF
Material in support of MK 41 VLS Depot Operations Services. See Notes B and D.
OPTION Travel Cost to Support Item 1211
COST
Travel in support of MK 41 VLS Depot Operations Services. See Notes B and D.
CPFF
Option Period 2 Launcher Installation and Test in support of MK 41 VLS. See Notes B and D.
OPTION Material to Support Item 1220
CPFF
Material in support of MK 41 VLS Launcher Installation and Test Support. See Notes B and D.
OPTION Travel to support Item 1220
COST
Travel in support of MK 41 VLS Launcher Installation and Test Support. See Notes B and D.
72,000 Hours
CPFF
Option Period 2 Aegis Modernization Installation and Test in support of MK 41 VLS. See Notes B and D.
OPTION Material to Support Item 1230
CPFF
Material in support of MK 41 VLS Aegis Modernization Installation and Test Support. See Notes B and D.
OPTION Travel to support Item 1230
COST
Travel in support of MK 41 VLS Aegis Modernization Installation and Test Support. See Notes B and D.
CPFF
Option Period 2 On-Site Support of MK 41 VLS. See Notes B and D.
OPTION Material to Support Item 1240
CPFF
Material in support of MK 41 VLS On-Site Support. See Notes B and D.
OPTION Travel to support Item 1240
COST
Travel in support of MK 41 VLS On-Site Support. See Notes B and D.
CPFF
Option Period 3 Period Engineering, Design, and Technical Services in support of MK 41 VLS. See Notes B and D.
OPTION Material to support Item 1301
CPFF
Material in support of MK 41 VLS Engineering, Design, and Technical Services.
See Notes B and D.
OPTION Travel Cost to Support Item 1301
COST
Travel in support of MK 41 VLS Engineering, Design, and Technical Services.
See Notes B and D.
CPFF
Option Period 3 Integration Engineering and Technical Services in support of MK 41 VLS. See Notes B and D.
OPTION Material to Support Item 1304
CPFF
Material in support of MK 41 VLS Integration Engineering and Technical Services. See Notes B and D.
OPTION Travel Cost to Support Item 1304
COST
Travel in support of MK 41 VLS Integration Engineering and Technical Services.
See Notes B and D.
CPFF
Option Period 3 Depot Operations Services in support of MK 41 VLS. See Notes B and D.
OPTION Material to Support Item 1311
CPFF
Material in support of MK 41 VLS Depot Operations Services. See Notes B and D.
OPTION Travel Cost to Support Item 1311
COST
Travel in support of MK 41 VLS Depot Operations Services. See Notes B and D.
CPFF
Option Period 3 Launcher Installation and Test in support of MK 41 VLS. See Notes B and D.
OPTION Material to Support Item 1320
CPFF
Material in support of MK 41 VLS Launcher Installation and Test Support. See Notes B and D.
OPTION Travel to support Item 1320
COST
Travel in support of MK 41 VLS Launcher Installation and Test Support. See Notes B and D.
48,000 Hours
CPFF
Option Period 3 Aegis Modernization Installation and Test in support of MK 41 VLS. See Notes B and D.
OPTION Material to Support Item 1330
CPFF
Material in support of MK 41 VLS Aegis Modernization Installation and Test Support. See Notes B and D.
OPTION Travel to support Item 1330
COST
Travel in support of MK 41 VLS Aegis Modernization Installation and Test Support. See Notes B and D.
CPFF
Option Period 3 On-Site Support of MK 41 VLS. See Notes B and D.
OPTION Material to Support Item 1340
CPFF
Material in support of MK 41 VLS On-Site Support. See Notes B and D.
OPTION Travel to support Item 1340
COST
Travel in support of MK 41 VLS On-Site Support. See Notes B and D.
CPFF
Option Period 4 Engineering, Design, and Technical Services in support of MK 41 VLS. See Notes B and D.
OPTION Material to support Item 1401
CPFF
Material in support of MK 41 VLS Engineering, Design, and Technical Services.
See Notes B and D.
OPTION Travel Cost to Support Item 1401
COST
Travel in support of MK 41 VLS Engineering, Design, and Technical Services.
See Notes B and D.
CPFF
Option Period 4 Integration Engineering and Technical Services in support of MK 41 VLS. See Notes B and D.
OPTION Material to Support Item 1404
CPFF
Material in support of MK 41 VLS Integration Engineering and Technical Services. See Notes B and D.
OPTION Travel Cost to Support Item 1404
COST
Travel in support of MK 41 VLS Integration Engineering and Technical Services.
See Notes B and D.
CPFF
Option Period 4 Depot Operations Services in support of MK 41 VLS. See Notes B and D.
OPTION Material to Support Item 1411
CPFF
Material in support of MK 41 VLS Depot Operations Services. See Notes B and D.
OPTION Travel Cost to Support Item 1411
COST
Travel in support of MK 41 VLS Depot Operations Services. See Notes B and D.
CPFF
Option Period 4 Launcher Installation and Test in support of MK 41 VLS. See Notes B and D.
OPTION Material to Support Item 1420
CPFF
Material in support of MK 41 VLS Launcher Installation and Test Support. See Notes B and D.
OPTION Travel to support Item 1420
COST
Travel in support of MK 41 VLS Launcher Installation and Test Support. See Notes B and D.
60,000 Hours
CPFF
Option Period 4 Aegis Modernization Installation and Test in support of MK 41 VLS. See Notes B and D.
OPTION Material to Support Item 1430
CPFF
Material in support of MK 41 VLS Aegis Modernization Installation and Test Support. See Notes B and D.
OPTION Travel to support Item 1430
COST
Travel in support of MK 41 VLS Aegis Modernization Installation and Test Support. See Notes B and D.
CPFF
Option Period 4 On-Site Support of MK 41 VLS. See Notes B and D.
OPTION Material to Support Item 1440
CPFF
Material in support of MK 41 VLS On-Site Support. See Notes B and D.
OPTION Travel to support Item 1440
COST
Travel in support of MK 41 VLS On-Site Support. See Notes B and D.
SECTION B INTRODUCTION
NOTE A - Offeror shall complete the "Price Group" and "Estimated Total Price" blocks of each data item Blocks 17 and 18 of the Contract Data Requirements List(s) Exhibits A-K, attached hereto.
NOTE B – Option item to which the option clause in SECTION I applies and which is to be supplied only if and to the extent said option is exercised.
NOTE C – If the contract is for Mechanical only, the Electronic CLINs shall be deleted in the awarded contract.
NOTE D – If the contract is for Electronic only, the Mechanical CLINS shall be deleted in the awarded contract.
NOTE E – Any Technical Instructions for FMS shipsets will be specified by SLIN under their respective CLIN.
Offerors may propose on either the mechanical or electronic requirements or both. If an Offeror elects to propose for both efforts, two individual and separate proposals must be submitted for each of the electronic and mechanical requirements; NAVSEA will not accept a combined electronic/mechanical requirement proposal. NAVSEA shall award a contract for mechanical requirements and a separate contract for electronic requirements. Offerors who propose for both efforts may be awarded either the electronic or the mechanical requirements, or both in the event that each individual offer is selected under the source selection criteria prescribed in Section M. The Mechanical requirements contract award shall only contain the Mechanical requirements under this solicitation; the Electronic requirements contract award shall only contain the Electronic requirements under this solicitation.
MK 41 Vertical Launch System Design Agent Engineering Services Electronic Requirements:
Items 0001-0003, 0100, and (if options are exercised) Items 0004-0006, 0011-0013, 0101-0103, 0104-0106, 0111 0113, 0201-0203, 0204-0206, 0211-0213, 0301-0303, 0304-0306, 0311-0313, 0401-0403, 0404-0406, 0411-0413.
MK 41 Vertical Launch System Design Agent Engineering Services Mechanical Requirements:
Items 1001-1003, 1100, and (if options are exercised) Items 1004-1006, 1011-1013, 1020-1022, 1030-1032, 1040 1042, 1101-1103, 1104-1106, 1111-1113, 1120-1122, 1130-1132, 1140-1142, 1201-1203, 1204-1206, 1211-1213, 1220-1222, 1230-1232, 1240-1242, 1301-1303, 1304-1306, 1311-1313, 1320-1322, 1330-1332, 1340-1342, 1401 1403, 1404-1406, 1411-1413, 1420-1422, 1430-1432, 1440-1442.
Applicability of Clauses:
The following Clauses under Section B apply to both Electronic and Mechanical requirements and shall be included under both the Electronic and Mechanical contract awards.
CLAUSES INCORPORATED BY FULL TEXT
B-231-H001 TRAVEL COSTS (NAVSEA) (OCT 2018)
(a) Except as otherwise provided herein, the Contractor shall be reimbursed for its actual travel costs in accordance with FAR 31.205-46. The travel costs to be reimbursed shall be those costs for which the Contractor has maintained appropriate documentation and which have been determined to be allowable, allocable, and reasonable by the Procuring Contracting Officer, Administrative Contracting Officer, or their duly authorized representative.
(b) Reimbursable travel costs include only that travel performed from the Contractor's facility to the worksite, in and around the worksite, and from the worksite to the Contractor's facility.
(c) Relocation costs and travel costs incidental to relocation are allowable to the extent provided in FAR 31.205-35;
however, Procuring Contracting Officer approval shall be required prior to incurring relocation expenses and travel costs incidental to relocation.
(d) The Contractor shall not be reimbursed for the following daily local travel costs:
(i) travel at U.S. Military Installations where Government transportation is available,
(ii) travel performed for personal convenience/errands, including commuting to and from work, and
(iii) travel costs incurred in the replacement of personnel when such replacement is accomplished for the Contractor's or employee's convenience.
(End of text)
B-232-H004 PAYMENTS OF FEE(S) (LEVEL OF EFFORT)--BASIC (NAVSEA) (OCT 2018)
(a) For purposes of this contract, "fee" means "target fee" in cost-plus-incentive-fee type contracts, "base fee" in cost-plus-award-fee type contracts, or "fixed fee" in cost-plus-fixed-fee type contracts.
(b) The Government shall make payments to the Contractor, subject to and per the clause in this contract entitled "Fixed Fee" (FAR 52.216-8) or "Incentive Fee", (FAR 52.216-10), as applicable. Such payments shall be equal to * percent (*%) of the allowable cost of each invoice submitted by and payable to the Contractor pursuant to the clause of this contract entitled "Allowable Cost And Payment" (FAR 52.216-7), subject to the withholding terms and conditions of the "Fixed Fee" or "Incentive Fee" clause, as applicable (percentage of fee is based on fee dollars divided by estimated cost dollars, including facilities capital cost of money). Fee shall not be applied on Facilities Capital Cost of Money per FAR 15.404-4(c)(3) and DFARS 215-404-71-4. Total fee(s) paid to the Contractor shall not exceed the fee amount(s) set forth in this contract.
(c) The fee(s) specified in SECTION B, and payment thereof, is subject to adjustment pursuant to paragraph (g) of the text entitled Level of Effort. If the fee(s) is reduced and the reduced fee(s) is less than the sum of all fee payments made to the Contractor under this contract, the Contractor shall repay the excess amount to the Government. If the final adjusted fee exceeds all fee payments made to the contractor under this contract, the Contractor shall be paid the additional amount, subject to the availability of funds. In no event shall the Government be required to pay the Contractor any amount in excess of the funds obligated under this contract at the time of the discontinuance of work.
(d) Fee(s) withheld pursuant to the terms and conditions of this contract shall not be paid until the contract has been modified to reduce the fee(s) per the text entitled Level of Effort", or until the Procuring Contracting Officer has advised the paying office in writing that no fee adjustment is required.
*To be completed by the Government at contract award
CLAUSES INCORPORATED BY FULL TEXT
B-232-H006 LIMITATION OF COST OR LIMITATION OF FUNDS CLARIFICATION (NAVSEA) (OCT 2018)
The clause entitled "Limitation of Cost" (FAR 52.232-20) or "Limitation of Funds" (FAR 52.232-22), as appropriate, shall apply separately and independently to each separately identified estimated cost.
Section C - Descriptions and Specifications
SPECIAL INSTRUCTIONS
SECTION C
PART 1 - CONTRACT LINE ITEM DESCRIPTIONS
The MK 41 Vertical Launching System (VLS) is the primary missile launching system in Navy surface combatants and is used to store and launch multiple missile variants. The VLS has the capability to launch all STANDARD Missile (SM) 2, TOMAHAWK, Vertical Launch Anti-Submarine Rocket, NATO SEASPARROW, Evolved NATO SEASPARROW, SM-3 and SM-6 missile variants. The VLS program provides launchers, launch control units, canisters and associated support equipment for TICONDEROGA and ARLEIGH BURKE Class United States Navy surface combatants. The MK 41 VLS has been sold to and integrated into multiple allied navies including Australia, Canada, Germany, Japan, the Netherlands, New Zealand, Norway, South Korea, Spain, and Turkey.
The Electronics & Computer Programs Engineering Agent Contractor shall provide system and other multi-discipline engineering, installation, repair, logistic and management services as described below in support of all current and legacy MK 41 VLS Launcher electronic systems, tactical and ancillary computer programs, launcher support and test equipment and production support equipment including but not limited to Automated Test Equipment. This support shall be provided for the design, development, production, test, product improvement and sustaining phases of the program.
The Electronics & Computer Programs Engineering Agent Contractor shall serve as the electronic systems and computer programs technical expert and key member of the VLS engineering team that consists of the Mechanical Systems Engineering Agent, Components Engineering Agent, Technical Direction Agent (TDA), System Integration Agent (SIA) and In-Service Engineering Agent (ISEA). The Contractor shall closely coordinate and collaborate with the Mechanical Systems Engineering and Components Engineering Agents on all projects that require a combination of VLS mechanical, electronic and/or digital designs or modifications.
The Mechanical Systems Engineer Agent Contractor shall provide system and other multi-discipline engineering, installation, repair, logistic and management services as described below in support of all current and legacy MK 41 VLS Launcher mechanical systems, Canister Assemblies, Launcher Ancillary Equipment, Canister & Launcher handling equipment, Cartridge Actuated Devices and associated production support equipment including but not limited to Automated Test Equipment. This support shall be provided for the design, development, production, test, product improvement and sustaining phases of the program.
The Mechanical Systems Engineer Agent Contractor will serve as the mechanical systems technical expert and key member of the VLS engineering team that consists of the Electronics & Computer Programs Engineering Agent, Components Engineering Agent, Technical Direction Agent (TDA), System Integration Agent (SIA) and In-Service Engineering Agent (ISEA). The Contractor shall closely coordinate and collaborate with the Electronics & Computer Programs and Components Engineering Agents on all projects that require a combination of VLS mechanical, electronic and/or digital designs or modifications.
All contractor personnel assigned to performance of this contract shall be U.S. citizens. All contractor key personnel assigned to the performance of this contract shall have at least a SECRET clearance.
The services to be furnished shall be performed in accordance with the following descriptions, specifications and requirements addressed herein. All tasks to be performed under this contract shall be described and authorized in writing by Technical Instructions (Tls) approved by the Procuring Contracting Officer (PCO) and Contracting Officer Representative (COR).
The following Open Architecture requirements apply to all Items described below:
The Government intends to design and procure system(s) having Open Architecture designs and corresponding components to the maximum extent practical for the MK 41 VLS. The contractor shall define, document, and follow an open systems approach for using modular design, standards-based interfaces, and widely-supported consensus based standards. The contractor shall develop, maintain, and use an open systems management plan and demonstrate compliance with that plan during all design reviews. As part of an open systems management plan, the contractor shall identify to the Government all Commercial-Off-the-Shelf/Non-development Item (COTS/NDI) components, their functionality, and provide copies of license agreements related to the use of these components for Government approval prior to use. The contractor shall analyze the costs and risks of individual open interfaces and address these findings into the open systems management plan. The proposed open systems management plan will be incorporated into the contract with any changes, alterations, and/or modifications requiring Government approval.
1. In satisfying the Government's requirements, the following design approach characteristics shall be utilized:
a. Open Architecture - The contractor shall develop and maintain an architecture that incorporates appropriate considerations for configurability, portability, maintainability, technology insertion, vendor independence, reusability, scalability, interoperability, upgradeability, and long-term supportability.
b. Modular, Open Design - The contractor shall develop an architecture that is layered and modular and uses COTS/NDI hardware, operating systems, and middleware that utilize non-proprietary or non-vendor unique, key Application Programming Interfaces (APIs). As part of its open system management plan, the contractor will be required, at a minimum, to describe how the proposed system architecture meets these goals, including the steps taken to use non-proprietary or non-vendor unique COTS or reusable NDI components wherever practicable.
c. System Requirements Accountability - The contractor shall ensure that all system requirements (including those contained in the Initial Capabilities Document, Capabilities Development Document, Capabilities Production Document, and in this Section C are accounted for through a demonstrated ability to trace each requirement to one or more modules that consist of components that are self-contained elements with well-defined, open and published interfaces implemented using open standards.
d. Inter-component Dependencies - The design shall minimize inter-component dependencies to allow components to be decoupled and reused, where appropriate, across various naval programs and platforms.
e. Modular Open Systems Approach (MOSA) - The contractor shall describe its rationale for the modularization choices made to generate the design. The contractor's rationale must explicitly address any tradeoffs performed, particularly those that compromise the modular and open nature of the system. The MOSA requirements will not apply to the legacy components that exist within the MK 41 VLS.
f. MOSA Objectives - The contractor shall specify how it plans to use MOSA to enable the system to adapt to evolving requirements and threats; accelerate transition from science and technology into technology and deployment; facilitate systems reconfiguration and integration; reduce the development cycle time and total life cycle cost; maintain continued access to cutting edge technologies and products from multiple suppliers; and mitigate the risks associated with technology obsolescence, being locked into proprietary or vendor-unique technology, and reliance on a single source of supply over the life of the system.
g. Open Systems Management Plan - The contractor shall provide a plan for supporting the proposed Modular Open System Approach, including, but not limited to, plans for integrating the systems under development both internally and externally, a strategy for maintaining the currency of the technology (through COTS and other reusable NDI insertion, technology refresh strategies, and other appropriate means) and creation of different processes necessary to support MOSA.
h. Technology Insertion - The contractor's architectural approach shall support the rapid and affordable insertion and refreshment of technology through modular design, the use of open standards and open interfaces.
i. Life-Cycle Sustainability - The contractor shall consider use of COTS/NDI and open standards to enhance the system's life-cycle supportability by implementing performance-based logistics arrangements to sustain the components through their life cycle.
j. Interface Design and Management - The contractor shall:
i. Clearly define and describe all component and system interfaces;
ii. Define and document all subsystem and configuration item (CI) level interfaces to provide full functional, logical, and physical specifications;
iii. Identify processes for specifying the lowest level (i.e. subsystem or component) at and below which it intends to control and define interfaces by proprietary or vendor-unique standards and the impact of that upon its proposed logistics approach. Interfaces described shall include, but not be limited to, mechanical, electrical (power and signal wiring), software, firmware, and hardware;
iv. Identify the interface and data exchange standards between the component, module or system and the interconnectivity or underlying information exchange medium;
v. Consider using these interfaces to support an overall information assurance strategy that implement Information Assurance Processes (IA);
vi. If applicable, select external interfaces from existing open or Government standards with an emphasis on enterprise-level interoperability. The contractor shall describe how its selection of interfaces will maximize the ability of the system to easily accommodate technology insertion (both hardware and software) and facilitate the insertion of alternative or reusable modular system elements
k. Treatment of Proprietary or Vendor-Unique Elements - The contractor shall explain the use of proprietary, vendor-unique or closed components or interfaces. If applicable, the contractor will define its process for identifying and justifying proprietary, vendor-unique or closed interfaces, code modules, hardware, firmware, or software to be used. When interfaces, hardware, firmware, or modules that are proprietary or vendor unique are required, the contractor shall demonstrate to the Government that those proprietary elements do not preclude or hinder other component or module developers from interfacing with or otherwise developing, replacing, or upgrading open parts of the system.
l. Open Business Practices - The contractor shall demonstrate that the modularity of the system design promotes the identification of multiple sources of supply and/or repair, and supports flexible business strategies that enhance subcontractor competition. The contractor shall conduct a market survey to identify COTS candidates and other reusable NDI capable of achieving the performance requirements of solutions that it proposes to custom build. The survey results shall be provided to support each major review. COTS and other reusable NDI selection criteria shall address the following factors, at a minimum: Electrostatic Sensitive Device (ESD) immunity;
Electromagnetic Interference/Electromagnetic Compatibility (EMI/EMC); Integrated Logistics Support requirements; Safety; Reliability consistent with the environment described in the System Specification;
Maintainability; Subsystem performance trade-offs; Power, cooling, and physical form factors; Open system architecture break out compatibility; Cost; Manufacturer's quality assurance provisions; Market acceptability;
Obsolescence; Adequacy of available technical and intellectual property data and re-procurement data rights on the product; and Merits of the software supported by the product.
m. Reuse of Pre-existing or Common Items - The contractor shall reuse pre-existing or common items unless a determination is made by the contractor to not reuse. Contractor decisions not to reuse pre-existing items must be accompanied by one or more justifications such as cost (both of adoption and life cycle support), schedule, functional and non-functional performance, etc. The general objective of these efforts shall be the development of common system and/or common elements or components which meet the performance requirements of the various U.S. Navy or Marine Corps platform missions, where commonality offers the greatest technical and cost benefits.
n. Third Party Development - The contractor shall address how it will provide to the Government information needed to support third-party development and delivery of competitive alternatives of designs for other components or modules on an ongoing basis. The contractor shall provide a list of those proprietary, vendor-unique elements that it requests be exempt from this review.
o. Life Cycle Management and Open Systems - The contractor's architecture shall provide for insertion of COTS into the system and demonstrate that COTS, reusable NDI, and other components are logistically supported throughout the life cycle. The contractor shall describe and demonstrate the strategy for reducing product or system and associated supportability costs through insertion of COTS and other reusable COTS or NDI products.
The contractor shall establish a process to logistically support COTS or NDI products. The contractor shall describe the availability of commercial repair parts and repair services, facilities, and manpower required for life cycle support and demonstrate they are adequate to ensure long term support for COTS or NDI products. The contractor shall provide the proposed methodology for pass through of COTS warranties to the Government
p. Use of Standards - In designing the system(s), the contractor shall use the following standards in descending order of importance:
(i.) Standards as specified within the contract
(ii.) Commercial standards
a. Standards developed by international or national industry standards bodies that have been widely adopted by industry. Examples of widely adopted standards are:
1. SQL for databases
2. HTML for presentation layer
3. XML for data transfer
4. Web Services for remote system calls
b. Standards adopted by industry consensus-based standard bodies and widely adopted in the market place.
c. De facto standards (those widely adopted and supported in the market place).
2. The following engineering process and support requirements apply to all Items described below:
a. The contractor shall provide support to the TDA, SIA, ISEA and VLS Production Activities.
b. The contractor shall use the PEO IWS Systems Engineering Operations Manual, PEO TSC Instruction 4810.2, Software Development, Verification and Validation (V&V), Design Reuse, and Metrics Policy, PEO TSC Instruction 4810.3, Guidance for Prime Item Development Specification (PIDS) Document Preparation, and PEO IWS Instruction 5239.2, PEO IWS Surface Navy Combat System Cybersecurity, as applicable for engineering tasks.
c. The contractor shall collaborate with and support the VLS Mechanical Systems Engineering Agent and VLS Components Engineering Agent.
d. The contractor shall perform qualification testing and evaluation in accordance with requirements identified in
WS 20313. MIL-HDBK-781A shall be used for guidance in planning of engineering tests and to support of alternate sources qualification.
e. The contractor shall use IEEE P1220, Standard for Application and Management of the Systems Engineering Process, EIA Standard IS-632, Systems Engineering, and/or EIA Standard IS-731, Systems Engineering Capability Model, for system engineering processes.
f. The contractor shall maintain a system Reliability & Maintainability (R&M) program and shall:
i. Support R&M program planning activities.
ii. Provide reliability assessments using MIL-HDBK-217 as a guide.
iii. Conduct failure analyses of design-related failures.
iv. Ensure components and subassemblies obtained from subcontractors and suppliers for use under this contract meet allocated R&M requirements.
g. The contractor shall generate or update and maintain a System Safety Program (SSP) that is fully integrated into the design process in accordance with CDRL B001. The SSP shall promote early identification, evaluation and resolution of hazards. The contractor shall ensure qualified engineers and managers are assigned to support the
VLS SSP.
i. The System Safety Program, in accordance with NAVSEA 5100.12-M and MIL-STD-882E, shall impose design requirements and establish management controls in order to eliminate any hazard or reduce the associated risk of the contractor designed subsystem or equipment to an acceptable level. The contractor is responsible to ensure subsystems or equipment can be operated, maintained and supported safely.
ii. The contractor shall submit a System Safety Program Progress Report (SSPPR) contractor when authorized by Technical Instruction and documented in accordance with CDRL B003.
iii. The contractor shall ensure that Commercial Off the Shelf (COTS) components and subassemblies obtained from subcontractors and suppliers for use under this contract meet allocated safety requirements and that sufficient data will be obtained to perform safety analysis of safety critical functionality.
iv. The VLS System Safety Program Plan (SSPP) shall be updated and implemented by the contractor when authorized by Technical Instruction and documented in accordance with CDRL B001.
v. The contractor shall perform the appropriate Hazard Analysis identified by the SSPP for the requirements, design, testing and operations phases. The Hazard Analyses shall be documented in accordance with CDRL B002.
vi. The contractor shall support System Safety Working Groups (SSWGs), Weapon System Explosive Safety Review Board (WSESRB) meetings, IPT meetings and meetings with other Government certifying activities.
vii. The contractor shall implement a method to identify, document and track hazards and the associated risks identified from the hazard analysis. Hazard documentation and tracking shall be accomplished using a Government provided database. Database updates shall be submitted in accordance with CDRL B005. The method implemented to identify hazards shall evaluate the equipment during performance as well as the safety impacts due to inadvertent functioning or functional failure. In addition, subsystems (equipment) that interface to the procured equipment shall be evaluated to ensure hazards and risks are mitigated to an acceptable level.
h. The contractor shall establish and conduct a Logistics Support Analysis (LSA) Program in accordance with TechAmerica Standard, GEIA-STD-0007 and the requirements contained therein as tailored by the Technical Instruction statement of work. The contractor shall establish and employ procedures for monitoring subcontractor and vendor activities to ensure they likewise establish and maintain procedures consistent with the requirements of the statement of work. The LSA program shall provide the basis for the integration of all logistic support elements and integrated logistics support programs. The LSA program shall be the analytical logistics effort within the system engineering process and shall constitute a composite of technologies used in the definition of specific logistic support requirements and in the injection of support criteria into the design and subsystem integration process.
i. The contractor shall develop training products including Interactive Multimedia Instruction (IMI), new IMI course curricula, and other IMI related tasks. Each of the training products shall be in conformance with MIL- PRF-29612B. Provide technical input and training updates when applicable as a result of integration programs or new product integration to the MK 41 Operation and Maintenance (O&M) Difference Course. Provide technical support in the conduct of ENCAN/DECAN and Dockside Handling Courses.
j. The contractor shall have a risk management process for identifying, assessing and prioritizing the cost, schedule and technical risks of the program. The risk management process shall be an integral element of the program's planning, management and reporting processes. A Risk Management Program shall conform to the process defined in in NAVSEAINST 5000.8, Navy SYSCOM Risk Management Policy.
k. The contractor shall integrate human factors into the design of items in accordance with MIL-STD-46855A and
MIL-STD-1472G.
l. The contractor shall analyze reported problems and provide timely recommendations/solutions.
m. The contractor shall use a parts control program based on existing part selection wherever possible and only introduce new parts when a MK 41 VLS part does not meet the design requirements.
n. The contractor shall provide cost estimate comparisons of options for various trade studies, perform Cost as an
Independent Variable Analysis and /or support Cost Analysis Requirements Description (CARD) activities.
o. The contractor shall provide progress, status, cost and management reports.
p. Costs specifically identifiable to a Foreign Military Sales (FMS) Case shall be segregated and shall be charged to that FMS Case contract line item. TIs issued for FMS tasks will identify the billable contract line item.
q. The contractor shall provide the Government and Government support contractors electronic access to the contractor’s electronic engineering information data base system throughout the term of the contract.
r. All technical documentation and engineering reports shall be provided in editable electronic format within 30 days after task completion to the PMO and NSWC DD.
s. All software deliveries shall include, but not limited to, source code, executable(s) and compiler generated files.
Software documentation (requirements, design, user’s manual, concept of operation, supplemental engineering documentation) and test documentation (test plan, test report, traceability matrix, test data, scenarios, step-by-step list, log files, sniffer data) shall be provided in an editable electronic format within 30 days after task completion to the PMO and NSWC DD.
t. New TDP documents shall be provided in editable electronic format (i.e. Pro-E files/SolidWorks) within 30 days after task completion to NSWC DD in accordance with CDRL D005.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .