USS BOXER QA_3 FINAL.xlsx

XLSX spreadsheet 508 KB Posted

Attached to
USS BOXER (LHD 4) Fiscal Year (FY) 20 Docking Selected Restricted Availability (DSRA) RFP
Solicitation number
N00024-19-R-4416
Issued by

About this file

This amendment to solicitation N00024-19-R-4416 provides additional information for the USS BOXER (LHD 4) FY20 DSRA project. The Navy seeks offers for maintenance, modernization, and repair availabilities for the USS BOXER, with responses due originally on December 13, 2019. The amendment incorporates changes from Errata 3 and references to Attachment J-1. Interested parties should contact the listed Navy points of contact to obtain those materials. The responses to bidders' questions are also appended, providing clarification on requirements, specifications, and availability details.

View the file

Other files

File Type Posted
N0002419R4416 0006.pdf PDF
N0002419R4416 0006 Conformed.pdf PDF
N0002419R4416 0005.pdf PDF
N0002419R4416 0005 conformed.pdf PDF
N00002419R4416 A0004 Executed.pdf PDF
N00002419R4416 A0004 Conformed.pdf PDF
USS BOXER QA#4 AMD 4.xlsx XLSX spreadsheet
N0002419R4416 A0003 Nonconformed.pdf PDF
N0002419R4416 A0003 Conformed.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QA1

USS BOXER (LHD 4) DSRA Pre-Proposal Information (PPI) Questions

Solicitation #:N00024-19-R-4416Phone
TPPCMichelle Wogu, Michelle.wogu@navy.mil202-781-4230
Stephanie Hoffman, Stephanie.L.Hoffman@navy.mil202-781-1456
The following are answers to questions received from potential offerors. The answers provide clarification only and DO NOT constitute an amendment to the solicitation.
To request references, drawings, RLARs, and Erratas being provided under this Solicitation Question & Answer Set,

please contact the NAVSEA POCs.

Q #Work Item No.Document Number/TitleQuestionGovernment Response
001RFP and Attachment S-7RFP Section L, "Instructions for the Submission of Offers" Paragraph ll-2 table lists the number of paper copies of the Price Proposal at 0 and the Technical Proposal at 0 copies. Paragraph 2.c (Note 3) references paper copies of the proposal and Attachment S-7 states a requirement for 1 copy of the Price Proposal and 4 copies of the Non-Price Proposal. Due to these discrepancies, please confirm there are 0 hard copies of each of the proposals to be submitted.See amendment for updated information.
002258-10-001High Pressure Steam Drain Valve; replaceParagraph 3.2.1 states, "New material shall conform to 2.3, including Category and Group A-1".

*Contractor notes the equipment identified in 1.3.1 and 1.3.2 use APL 887055831, Globe Valve, iaw std drawing/pn 803-5184193-A3, 3/4” Globe Stop and that this would be applicable for the CFM valve in 1.3.2.

*Contractor notes the valve in 1.3.1 is being provided as GFM, the NSN provided (4820-00-464-2352) is a Globe Valve, Carbon Steel, 900# and that this valve should be a Globe Stop Check valve, 1500#, Chrome Moly.

Question: Can the Customer provide clarifaction regarding the disparities between the equipment identified in 1.3.1 and 5.1 and the equipment identified by the contractor and will an Errata be issued for this specification?

Correct APL provided for valve listed in 1.3.1. Errata Work Specification written
003512-11-009Ventilation System; overhaulParagraph 3.3 states, "Remove existing, fabricate, and install each new equipment listed in 1.3.3 through 1.3.6 and located in 1.2, using 2.4 through 2.10 for guidance".

*Contractor notes that Ventilation Systems identified in 1.3.4.10 through 1.3.4.13 state 2.5 drawing 512-6123518 Rev H, Vent & Air Cond-Assy 317 & 318 - Third Deck - Fr 73-81, Port & Stbd as the applicable reference, however contractor was unable to find these systems on this reference.

*Contractor notes that the Ventilation Systems identified in 1.3.4.10 through 1.3.4.13 are found on reference 2.6 drawing 512-6123493 Rev F, Vent & Air Cond Assy 336 & 337 Second Dk Fr 73-81 Port & Stbd.

Question: Can the Customer provide clarifaction regarding the disparities between the Ventilation Systems identified in 1.3.4.10 through 1.3.4.13 and references 2.5 and 2.6 and will an Errata be issued for this specification?

Errata Work Specification identifing correct Reference written.
004512-11-010Ventilation Ducting; overhaulParagraph 3.3 states, "Remove existing, fabricate, and install each new equipment listed in 1.3.4 through 1.3.6 and located in 1.2, using 2.3 through 2.7 for guidance".

*Contractor notes reference 2.5 drawing 513-5862559 Rev H, Vent & Air Cond Aft Mchry Rm Fr81-89, sheets 9 and 10 and 11 and 12 apear to duplicate information and does not include a Parts list that include Find No's. 101 through 150.

Question: Can the Customer provide clarification as to the disparities regarding the missing data for Find No's. 101 through 150 of reference 2.5 and will an Errata be issued for this specification?

Errata Work Specification written providing Ref 2.10
005511-11-005Laundry Press Steam Supply and Condensate Drain Piping; replaceParagraph 3.3 states, "Remove each existing and install new laundry steam supply and condensate drain CuNi piping to include associated components and fittings listed in 1.3, located in 1.2, in accordance with 2.2 through 2.4 and Attachment B".

*Contractor notes there is no Attachment B clearley identified with the specification or listed as a reference, however pages 5 through 7 of 7, LAR SWRMC - 0045 - 19 is attached and it is believed this is the intended document for Attachment B.

Question: Can the Customer provide clarification as to the disparities regarding Attachment B and will an Errata be issued for this specification?

Correct, LAR SWRMC-0045-19 is Attachment B as Referenced in 3.3. No Errata Work Specification will be issed.
006992-11-012Fuel Assistance and Towboat Service for Fuel Barge; provide
(OPTION ITEM)Paragraph 3.1 states, "Allow 5 work days for the Government to refuel the ship. The ship must be refueled prior to machinery space turnover".

Contractor has reviewed the RFP, specification, and all identified references noting that, the intent of this items work scope appears to be for out of home port (San Diego) bidders. Historically, in the port of San Diego naval vessels are typically defueled prior to arrival at the Contractors facility and are typically refueled after departing the Contractor facility.

Question: Is this work item to be priced only by OUT of homeport (San Diego) bidders and is it be accomplished only if the contract is awarded outside of San Diego?This work item is to be bid only by out of homeport bidders
007992-11-014Boat Storage and Work Area; provide (OPTION ITEM)Paragraph 3.1 states, "Provide a 30-foot by 35-foot covered and secured area, located convenient to the ship, for the storage and maintenance of one boat for the duration of the overhaul availability".

Contractor notes the requirements of this specifcation duplicates that of Work Item 992-11-009, Pierside Small Boat Storage; provide (OPTION ITEM) paragraphs 3.1 throgh 3.6.

Contractor has reviewed the RFP, specification, and all identified references noting that, the intent of this items work scope appears to be for out of home port (San Diego) bidders. Historically, in the port of San Diego all small boat repairs are accomplished at Naval Amphibious Base Coronado.

Question: Contractor has reviewed the RFP, specification, and all identified references noting that, the intent of this items work scope appears to be for out of home port (San Diego) bidders. Historically, in the port of San Diego all small boat repairs are accomplished at Naval Amphibious Base Coronado.

This work item is to be bid only by out of homeport bidders
008992-21-001Defuel Ship's Operating Fuel, Fuel Oil, and JP-5 Tank; accomplish (OPTION ITEM)Paragraph 3.1 states, "Coordinate the removal or transfer of each fluid through the Ship's Damage Control Assistant (DCA), via the SUPERVISOR, to maintain ship's stability and prevent flooding".

Contractor has reviewed the RFP, specification, and all identified references noting that, the intent of this items work scope appears to be for out of home port (San Diego) bidders. Historically, in the port of San Diego naval vessels are typically defueled prior to arrival at the Contractors facility and are typically refueled after departing the Contractor facility.

Question: Is this work item to be priced only by OUT of homeport (San Diego) bidders and is it be accomplished only if the contract is awarded outside of San Diego?Option Item to be bid by all bidders
009N/ASolicitation N00024-19-R-4416
Section L - Instructions, Conditions and Notices to Bidders, Item 8, Page 167 of 189,IAW Section L - Instructions, Conditions and Notices to Bidders, Item 8, which states, "The Government provided pier differential must be included in all offers proposing to use a Government provided pier in lieu of a contractor owned pier and is calculated using average electricity and water consumption, as well as sewage and oily waste disposal" and then provides a Pier Differential for Location San Diego, CA..

a) Contractor notes that Section L - Instructions, Conditions and Notices to Bidders, Item 8, of this solicitation implies that a Government Provided Pier will be available for offerors proposing for Location San Diego, CA.

b) Contractor notes that the J-1 Specification Package identifies within the following listed (9) Work Items to provide (114) Office Work stations, for AIT's and the RMC;

*WI's 980-00-001, 980-31-001, 980-80-003, 980-90-005, 980-90-010, 980-90-015, 980-90-019, 980-90-025, 992-11-002.

c) Contractor notes that the J-1 Specification Package identifies within the following listed (6) Work Items to provide (14) Commercial Trailer/Office(s), for AIT's and/or as directed by the SUPERVISOR;

*WI's 980-90-006, 980-90-017, 980-90-020, 980-90-023, 980-90-024, 992-00-002.

Question 1): If the pierside portion of the avail is executed at a Government Provided Pier at Location San Diego, CA. will the (114) Office Work stations, listed in the (9) Work Items listed above in b), need to be supported by the Contractor during the pierside portion of the availability, and if so, what work items and to what extent?

Question 2) If the pierside portion of the avail is executed at a Government Provided Pier at Location San Diego, CA. will the (14) Commercial Trailer/Office(s), listed in the (6) Work Items listed above in c) need to be supported by the Contractor, and if so, what work items and to what extent?

All Work Specifications Requiring an Office Trailer shall be estimated individually as requested and provide services/equipment to support as requested. Expect office trailers to be on Flight Deck of Vessel at Naval Station and during docking Phase. Contractor to support
010321-90-001ShipALt LHD1-71492K, HESS (400Hz) Line Voltage Regulator; accomplishWork item 321-90-001: Please clarify that the material in added in Attachment A via Errata 1 is going to be provided as GFM. Contractor also requesting clarification if the following items from ref 2.9, Drawing 8770834, are going to be provided as GFM:

FN#5 4 EA Cable ASSY, Aircraft FN#22 15 EA Enclosure, Contactor FN#23 4 EA Box, Service

FN#24 45 EA Regulator, Line VoltageLAR Submitted to Change FN#23 4 EA Box, Service from GFM to IAF (Installing Activity Furnished). Other Items Listed will be provided.
011321-90-002ShipALt LHD1-71497K, Aircraft Electrical Servicing System (AESS)Work item 321-90-002: Please clarify that the material in added in Attachment A via Errata 1 is going to be provided as GFM. Contractor also requesting clarification if the following items from ref 2.9, Drawing 8677184, are going to be provided as GFM:

FN#10 12 EA Rectifier and Bus Transfer FN#11 12 EA Cable ASSY, Aircraft

FN#12 12 EA Adapter, AircraftThe listed Items will be provided as GFM
012631-11-010Item 631-11-010.
Please confirm that the intent of this specification is to remove and replace all structural, piping, ventilation and equipment insulation in way of the 009-23 for preservation requirements.Errata Work Specification written-Identify any damaged or deterioated insulation
013531-12-004Item 531-12-004, paragraph 3.1 states "Accomplish the requirements of 009-77 of 2.1."

Paragraph 3.1.1 states "Accomplish the requirements of 009-09 of 2.1 for a step by step procedure to install, maintain and remove each cofferdam."

Since the ship is going into dry-dock, are these paragraphs still required?

Please advise or issue Errata spec.PREVIOUSLY ANSWERED ON Q&A 2 2-Errata work Specification has additional Overlay "DRYDOCK REQUIRED" Customer does not scheduled Contractors work. It may be accomplish In or Out of Drydock
014520-11-003WI 520-11-003 paragraph 3.3 calls out to accomplish 009-51, which is cancelled in NAVSEA Standard Item FY-20.

Please remove 009-51 and replace with applicable active requirement.

Errata work Specification written to change 009-51 to 009-53
015534-11-003WI 534-11-003 paras 3.3 & 3.3.1 calls out using Attachment B for guidance.

Please provide copy of Attachment B

Errata Work Specification written to include Attachment B
016534-12-002WI 534-12-002 paras 3.3 & 3.3.1 calls out using Attachment B for guidance.

Please provide copy of Attachment B.

Errata Work Specification written to include Attachment B
017RFPSolicitation N00024-19-R-4416,
Contractor notes receipt of the RFP on 30 September 2019 with a current proposal due date of 13 December 2019, which results in a compressed proposal development timeline due to several factors;

1.) Despite data being available, the proposal due date only allows contractors roughly ~50 planning days to prepare and provide a robust proposal for a package that contains 53 large ShipAlt's. These ShipAlt's are significant in size, especially Joint Strike Fighter, and Contractors (and needed Subcontractors) are straining to process timely estimates to guage requirements and plan resources.

2.) The USS Boxer proposal has been plagued by a slow start as Contractors, especially Subcontractors, have shifted their planning efforts over to this RFP. The USS Mobile Bay, USS Spruance, and USS Jackson consumed the first three weeks of the available USS Boxer planning timeline.

3.) As directed, the Contractor has attempted to conduct ship checks with inconsistent results due to USS Essex Ship's Force not granting full access to personnel attempting to ship check, despite being on the approved access list. Also includes not being authorized to use cameras to aid the planning process. This has caused significant delays in the Contractor's ability to verify locations of work, interferences, etc. for over 200 work items that have been identified to ship check. The Contractor acknowledges and appreciates the Government's attempt to resolve these issues but it has nontheless resulted in delays to appropriate planning (for Subcontractors as well). The USS Essex is also undergoing a Planned Maintenance Availability (PMA), and although the USS Essex is a similar hull, the capture of interferences between hulls has been hindered by Building Yard field runs of ventilation duct, electrical, and piping systems. Further complicating and extending the time it takes to ship check.

4.) From what the Contractor has reviewed in the work package so far, there is a high probability and expectation that bidders will receive multiple Errata and possible Addendums during this planning effort. Due to the size of the ShipAlts, the Contractor also expects that these changes/additions will occur late in the planning timeframe, further stressing bidders' ability to recover and accurately capture requirements.

Question: In order to depressurize the planning schedule and afford all contractors ample time to prepare/submit accurate proposals, and to allow for adequate time for subcontractor/vendor solicitations/evaluations/selections, request that the proposal due date be extended from 13 December 2019 at 10:00 AM, Eastern Standard Time to 3 January 2020 at 10:00 AM, Eastern Standard Time. A 21-day proposal due date extension, or roughly ~14 additional planning days (excluding Sundays and upcoming holidays).

Response date remains unchanged.
018980-90-003ShipAlt LHD1-86395K, LHD Navigation Critical Distribution System, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)
Note 4.1.3 states, "Testing Start Date: 12/08/2020" and 4.1.4 states, "Inport Testing Completion Date: 04/27/2020".

*Contractor believes the believes that Note 4.1.4 is incorrect and should state "Inport Testing Completion Date: 04/27/2021".

Question: Can the Customer provide clarification as to the disparity regarding Note 4.1.4 Inport Testing Completion Date and will an Errata be issued for this specification?Accomplish IAW Milestones for Combat Systems
019992-00-002Temporary Service; provideParagraph 3.18 states, "Provide ungrounded electrical power at 6000 Amps, 450 Volts, 60 HZ, 3 Phase at the ship's power connection to the switchboard. Power shall be ungrounded from a dedicated 450 volt transformer secondary serving only the ship, via facility switchgear and cabling system to terminals onboard ship".

*Contractor believes the services prescribed in paragraph 3.18 reflect the vessels full up normal pier side requirements and not the reduced requirements while the vessel is in Dock.

Question: Can the Customer provide approximate electrical power requirements that the Contractor can expected while the vessel is Dry-Docked so a comparatively accurate electrical services estimte can be provided by all bidder's?

Bid as Written-The power rating (amps) is not to be demanded or have diversity factor applied.
020251-80-001 (E1)ShipAlt LHD1-87160D, Forced Draft Blower Lube Oil Cooler Power Supply; accomplishParagraph 3.1 states, "3.1 Accomplish the requirements of 2.2 and 2.3.3 and applicable portion of 2.4".

Contractor note that reference 2.4 drawing 304-8677073 Rev A, LHD-4, Cable Routing Key Plan has not been provided and also is identified within the following listed specifications, *Work Item, 313-90-001 (E1), Reference 2.31, *Work Item, 321-90-001 (E1), Reference 2.10, *Work Item, 555-90-001 (E1), Reference 2.17, *Work Item, 663-90-001 (E1), Reference 2.55, *Work Item, 665-90-001 (E1), Reference 2.28, *Work Item, 700-90-001 (E1), Reference 2.11, *Work Item, 703-90-001 (E1), Reference 2.55, *Work Item, 783-90-001 (E1), Reference 2.27, Question: Contractor request the Customer provide missing reference drawing 304-8677073 Rev A, LHD-4, Cable Routing Key Plan?

Reference provided via email to offerors.and on CD from PM
021N/ASolicitation N00024-19-R-4416,
Page 162 of 191,Amendment 0001, Section L - Instructions, Conditions and Notices to Bidders, Part III. GENERAL INFORMATION, A. Ship Checks,

Item 3 states, "In addition to the above, if an offeror intends to have a subcontractor participate in a ship check in lieu of themselves (i.e. Prime Offeror (contractor), the Sub-contractor’s Security Access must go thru the Prime Offeror they are estimating for and must state “Ship Check for Estimating purposes for USS BOXER".

As the Government is already aware, the Contractor has made several attempts to conduct Ship Checks but has not been granted full access to the USS Essex despite being on the approved access list. The Contractor now notes that Ship Check delays have been further exacerbated. Subcontractor requests to Ship Check have returned unapproved by the SWRMC FSO despite the Amendment 0001 directive. These requests via the Prime have been returned stating, “Your request has been returned without action due to the following: Incorrect contract number”

The Contractor acknowledges and appreciates the Government's ongoing attempts to resolve these issues with the SWRMC FSO; however, despite the attempts both Contractors and the Subcontractor community have lost valuable time needed to develop accurate and timely estimates.

Question:

1.) In order to depressurize the planning schedule and afford all contractors ample time to Ship Check and prepare/submit accurate proposals, request that the proposal due date be extended from 13 December 2019 at 10:00 AM, Eastern Standard Time to 3 January 2020 at 10:00 AM, Eastern Standard Time. A 21-day proposal due date extension, or roughly ~14 additional planning days (excluding Sundays and upcoming holidays).

2) The Contractor requests that the Ship Check and PPI Schedule also be extended during this time to allow all Bidders, and their solicited Subcontractors, ample time to Ship Check and submit questions that arise during their assessments.

Response date remains unchanged.
022AllAs of 11/12/19 contractor has not received answers to 43 questions. The answers (that have yet to be received) will impact subcontractors, vendors and labor estimates. With the Holidays playing a major factor in acquiring pricing and availability, contractor requests a 3 week extension from the time all of the answers are received.Response date remains unchanged.
023130-11-009Item 130-11-009, paragraph 3.3.4.1 states “Submit one legible copy, in hard copy or approved transferrable media, of a report listing results of the requirements of 3.4.4 to the SUPERVISOR."

Paragraph 3.4.4 does not exist on the spec.

Please provide errata listing correct paragraph.Errata Work Specification to correct Para.3.3.4.1 to read results of requirements of 3.3.4
024703-90-001 Errata 1Item 703-90-001 errata1, paragraph 3.22 states; "Accomplish the requirements of 009-26 of 2.1, including Attachment D, for electrical grade matting in accordance with 2.23."

Is it the intention of this paragraph to accomplish reference 2.23 in its entirety or electrical grade matting only?

Please review & advise.Accomplish Reference in it entirety
025N/ASolicitation N00024-19-R-4416Section L, Page 175 of 189, Item 3 Factor 3 - Past PerformanceOfferors shall provide past performance information for up to five (5) previous contracts. Offerors shall complete Attachment S-2 Past Performance Contractor Performance Assessment Reporting System (CPARS) References for each of the contracts provided where CPARS contract data is available. If CPARS data is not available for a contract, Offerors shall provide Attachment S-9 Past Performance Questionnaire (PPQ).

Contractor notes that the title of the documents (S-2 and S-9) have been reversed in the RFP. The S-2 should state Past Performance Questionnaire and the S-9 should state Past Performance CPARS References.

Question;

Will the Government issue an Amendment and provide correction to page 175 of the RFP?Amendment reflects corrections to S-2 and S-9 document titles.
026512-11-006

1.3.1 Quantity (One EA), Air Conditioner 7.5 Ton, Mfr: Engineered Coil Company, Mfr Dwg: 1002-00-D, Mfr ID: SCAC 7.5, Type: HRMT SE, Navy Std Size 7.5, APL 330510001

Para 3.1 Remove existing and install new each equipment listed in 1.3.1 and located in 1.2.1, using 2.2 through 2.5 for guidance.

Contractor has been informed by his supplier that the material listed in Para 1.3.1 is obsolete and no longer manufactured due to Clean Air Act.

Question:

Will the Government issue an errata and provide a replacement unit?

Repeat Question-Errata Work Specification Issued on Errata 2
027542-31-001Item 542-31-001, paragraph 3.7 states "Accomplish the requirements of 009-32 of 2.1, including Table 5, line 31, columns A and B for preservation of stanchion."
For pricing purposes, please identify the quantity of stanchions requiring preservation.Errata Work Specification written to remove requirements of Stanchion Preservation
028980-90-013SHIP ALT LHD1-81322K ADNS AN/USQ-144K (V) 2 AIT SUPPORT SVC; PROVIDEItem 980-90-013, paragraph 3.10 states "Provide lockable, weatherproof, connex stw… Storage units shall be placed on the flight deck or an area adjacent to ship."
How many storage units will be required in order to support AIT?Number of storage units is at bidders discretion, but must equal the square footage noted in para 3.10. Errata Work Specification Written-One Each 8 Ft X 20 Ft Lockable Storage Conex
029980-90-018SHIPALT LHD1-81402K, 81301KR1, 71947K, FC 81300, FC 79817, SWD 93593, AND SWD 86478 AIT SUPPORT SERVICE; PROVIDEItem 980-90-018, paragraph 3.9. states " Provide lockable, weatherproof, storage units with minimum of 120 sq ft of floor space…Storage units be placed…"
How many storage units will be required in order to support AIT?Number of storage units is at bidders discretion, but must equal the square footage noted in para 3.9. Errata Work Specification Written-One Each 8 Ft X 20 Ft Lockable Storage Conex
030980-90-019SHIPALT LHD1-00339K AND 80020K, AN/SMQ-13, MORIAH WIND SYSTEM AIT SUPPORT; PROVIDEItem 980-90-019, paragraph 3.7 states "Provide one lockable, weatherproof, connex stw unit with a minimum square feet of floor space"
What is the minimum sq ft of floor space amount?Minimum required square footage is 160 square feet. Errata Work Specification Written-One Each 8 Ft X 20 Ft Lockable Storage Conex
031980-90-025SHIPALT LHD1-94754K, CEC AN/USG-2B WITH SBAA, AIT SUPPORT SERVICE; PROVIDEItem 980-90-025, paragraph 3.11 states " Provide lockable, weatherproof, storage units with a min of 200 sq ft… Storage units be placed…"
How many storage units will be required in order to support AIT?Number of storage units is at bidders discretion, but must equal the square footage noted in para 3.11. Errata Work Specification Written-One Each 8 Ft X 20 Ft Lockable Storage Conex
032583-10-001Boat Handling/Stowage Slewing Arm Davit (SLAD); repair
Item 583-10-001, paragraph 3.1.1 States " Provide the services of a qualified on-site technical representative to provide technical assistance and oversight with the removal, disassembly, inspection, repair, assembly, installation, testing and adjustments of the equipment listed in 1.3 and located in 1.2."
Please provide contact information for the technical representative of the equipment listed in 1.3.Bidder to Contact Manufacture to Identifiy Qualified 009-90
033634-10-001Item 634-10-001, paragraph 3.2 states “Accomplish the requirements of 09-26 of 2.1, including Attachment A, for installation of new chemical – resistant deck covering system, in each location listed in 1.2.4 - CPO Shower (2-41-3-L)."

Paragraph 1.2.4.1 – CPO Shower Stall No. 2 is where the work will be conducted.

FY 20, Standard Items 009-26, Attachment A is Ceramic Tile (Quarry and Porcelain). Attachment C is Chemical – Resistant Floorings.

Please confirm the correct Attachment used (A or C) for the location listed in 1.2.4.1.Errata Work Specification Written-Attachment C is Chemical – Resistant Floorings.
034634-10-002Item 634-10-002, paragraph 1.2.3 Storage Battery Shop Lead Acid No. One (1-67-3-Q), shows that decking to be installed will be Chemical – Resistant Flooring.

In Work Item 313-90-001 (E1), reference 2.29 634-8770238, ShipAlt LHD1-83220K, L-Ion Battery Shop for JSF Mod to Deck Covering, shows decking to be installed will be peel and stick nonskid.

Both items have the same compartment number.

Please advise.Deck covering for 1-67-3-Q will be acomplished under the 313-90-001 work item. Errata will be issued to remove location 1.2.3 from WI 623-10-002.
035663-90-001 (E1)ShipAlt LHD1-82483K, Capstone Space Arrangement; accomplishParagraph 3.1 states, "Accomplish the requirements of 2.2 through 2.54 and applicable portion of 55".

Contractor notes reference 2.20 drawing 436-8770755, ShipAlt LHD1-82483K Capstone CKT B & DL Mods B & EWD, Sheet 1, LOM, Item # 2, identifies drawing 401-6117426 that is not listed or provided as a reference.

Contractor notes 4.1 do

Question: Can the Customer provide the missing drawing 401-6117426 that was not provided as a reference for this specification and will an Errata be issued for this specification?

Reference provided via email to offerors and from PM on CD
036123-12-002JP-5 Tank; repairParagraph 3.2.1 states, "Vee-out and weld a total of 60 linear feet of each deteriorated and damaged weld. Each area of repair shall include deck, bulkhead, shell plating, and overhead of each space listed in 1.2.1 through 1.2.4 for a total of 15 linear foot per tank".

Contractor notes that there are (5) Locations list in 1.2 and that the total of 60 linear feet to Vee-out and weld apears to be deficiant... 75 LF = (5 Locations X 15 linear feet)

Question: Can the Customer provide clarifaction regarding the disparity identified for paragraph 3.2.1 for the quanity of Vee-out weld repairs to be proposed and will an Errata be issued for this specification?

3.2.1 for each space listed in 1.2.1 through 1.2.4 60 LF x 4 Locations =15 LF per space
037123-11-006Fuel/Ballast Tank; repairParagraph 3.2.1 states, "Vee-out and weld 10 linear feet of each deteriorated and damaged weld. Each area of repair must include deck, bulkhead, shell plating, and overhead of each space listed in 1.2 for total of 130 linear feet per space".

Contractor notes that there are (18) Locations list in 1.2 and that the total of 130 linear feet to Vee-out and weld apears to be deficiant... 180 LF = (18 Locations X 10 linear feet)

Question: Can the Customer provide clarifaction regarding the disparity identified for paragraph 3.2.1 for the quanity of Vee-out weld repairs to be proposed and will an Errata be issued for this specification?

Errata Work Specification issued under Errata 2
038631-13-006Item 631-13-006, paragraph 3.2 requires the accomplishment of 009-114 (mold remediation) for areas of overhead insulation showing visible signs of mold.

Since the USS Boxer is unavailable for ship check, the contractor needs the square footage of mold requiring remediation.

For pricing purposes please provide the square footage of mold to be remediated by location.Errata work Specification to cover 1200 SqFt
039663-90-001 (E1)Para 2.11
320-8770744, ShipAlt LHD1-82483K Power Distr ModRef drawing 320-8770744 Special Note. S-6 states this Shipalt must be worked concurrently with ref 16-19.

Ref-16 SHIPALT LHD-1-90787K Power Distr Mod, 320-8790384.

Ref-17 SHIPALT LHD-1-90787K Power Distr Mod, 320-8790342.

Ref-18 LMMT AN/USQ-212(V)1 Power System Modificaations, 321-8795199.

Ref-19 CANES AN/USQ-2088(V)6, MDL 3 Power System Instalation, 321-8795277.

Question:

Will the Goivernment provide reference drawings, 320-8790384, 320-8790342, 321-8795199 and 321-8795277?

Are available from PM Via CD
040N/ASolicitation N00024-19-R-4416,
Page 162 of 191,As the Government is already aware (via PPI), the Contractor and Subcontractors have made multiple attempts to conduct Ship Checks but not been granted access to the USS Essex. Contractor and Subcontractor requests to Ship Check have returned unapproved multiple times by the SWRMC FSO despite the Amendment 0001 directive. Previous requests via the Prime have been returned stating, “Your request has been returned without action due to the following: Incorrect contract number”.

Now, to make matters worse, the Contractor wishes to notify the Government that the most recent request was again returned by Aisha Tate, Security Specialist, Code 1113, SWRMC Industrial Security, Kros-Wise, Inc., e-mail: aisha.tate.ctr@navy.mil stating that, "Your request has been returned without action due to the following: There is not contracting officers signature on the provided contract. Also, I am seeing a delivery date but no POP. "

The Contractor acknowledges and appreciates the Government's continued attempts to resolve these reoccurring issues with the SWRMC FSO; however, despite multiple attempts both Contractors and the Subcontractor community have lost valuable time needed to develop accurate and timely estimates. In some cases, the Contractor has had no option but to abandon much needed Ship Checks in order to complete work item estimates. This has injected significant and unnecessary risk into the planning process, estimated cost, and subsequent bid.

Due to Ship Check failures and Government's non-response to requests for immediate proposal due date extensions via PPIs, the Contractor is now even further behind schedule than what the Government was previously notified.

Question:

1.) In order to depressurize the planning schedule and afford all contractors ample time to Ship Check and prepare/submit accurate proposals, request that the proposal due date be extended from 13 December 2019 at 10:00 AM, Eastern Standard Time to 10 January 2020 at 10:00 AM, Eastern Standard Time. A 28-day proposal due date extension, or roughly ~19 additional planning days (excluding Sundays and upcoming holidays).

2) The Contractor requests that the Ship Check and PPI Schedule also be extended during this time to allow all Bidders, and their solicited Subcontractors, ample time to Ship Check and submit questions that arise during their assessments.

Response, Ship Check, and PPI schedule dates remain unchanged.
041VariousSeveral AIT work items require office space throughout the availability extending beyond the period of time the vessel is in drydock at the shipyard. Please confirm that office space requirements while at the NAVAL Station will be provided by the Government.No, office space at the Naval Station will NOT be provided and bidders should price work item accordingly.45
042150-11-00207 Deck Plate Crack; repairPara 3.4 Accomplish the requirements of 009-26 of 2.1, including Attachment G, for peel and stick non-skid.

Para 3.4.1 Accomplish the requirements of 009-32 of 2.1, including Table 2, Line 46, for the location listed in 1.2.

Contractor notes NAVSEA Std Items FY-20, Table 2 Line 46, Column A states, For surface preparation, near white blast or waterjetting.

Contractor has identified the areas being repaired are small in size and recommends Table 2 Line 21 or 22, Column A to accompplish power tool cleaning to bare metal, SP-11.

Question:

Will the Government issue an errata and change the requirements to Table 2 Line 21 or 22, Column A to accomplish power tool cleaning to bare metal, SP-11?Errata Work specification written to change Line-Do not concur with contractors recommendations.46
043313-90-001 (E1)

AND

634-10-002 ShipAlt LHD1-83220K, Lithium-Ion Battery Shop to Support Joint Strike Fighter (JSF); accomplish

AND

Chemical - Resistant Floor Covering System; install WI 313-90-001 Para 2.29 634-8770238, ShipAlt LHD1-83220K L-Ion Battery Shop for JSF Mod to Deck Covering.

Wi 634-10-002 Para 1.2.3 Storage Battery Shop Lead Acid No. One (1-67-3-Q).

Contractor notes WI 313-90-001 requires Peel and Stick and 634-11-002 requires Chemical- Resistant for the same compartment.

Question:

Will the Government issue an errata to change or remove the requirements from one of the work items?Same as Question 038-Deck covering for 1-67-3-Q will be acomplished under the 313-90-001 work item. Errata will be issued to remove location 1.2.3 from WI 623-10-002.47
044110-11-002Ref 2.3Please provide Reference 2.3 (801-6505858-G)As Per Planning Yard there is no REV G, SDI is Incorrect0
045663-90-001Ref 2.6The incorrect Reference was provided (49671-8770739). Please provide Reference 2.6 (624-8770739)Will be provided
046167-11-004
Title: Structural Door Assembly; replace3.3 Fit and install the following new door for that listed in 1.3 and located in 1.2 in accordance with 2.2, 2.3 and Paragraph 600-2.2.4 of 2.4, using 2.5 for guidance.

Contractor was informed by his vendor that the provided references states the door is to be modified to a 35 PSI door. Reference does not state what part of the dorr shall be modified to accomplish a 35 PSI door.

Question:

Will the Government provide the correct reference drawings that shows the changes to manufacture a door rated at 35 PSI?Ref 2.2, sheet22, Find 103, Spec or DWG # 805-1400060, see remarks. No Errata DWG will be provided
047N/ASolicitation N00024-19-R-4416, Pages 93 and 154 of 191.Contract Data Requirement List (CDRL) A015 Performance Report requires contractors to submit Earned Value Management System (EVMS) reports. EVMS on fixed price contracts is typically reserved for developmental contracts, or for “first ship of a class” contracts. EVMS requirements are generally not invoked on fixed-price services contracts such as will be awarded by this solicitation. Implementation of these EVMS requirements will likely significantly increase the cost of contract performance and inhibit competition by contractors who are unable to meet EVMS requirements. Sufficient reporting tools exist in the solicitation to provide progress payment and track schedule status without the need for EVMS reports. Will the Government remove CDRL A015 Performance Report from the solicitation?At this time CDRL A015 remains a requirement.
048N/ASolicitation N00024-19-R-4416, Page 154 of 191.Contract Data Requirement List (CDRL) A016 Final Labor Hour Material Data requires Contractors to report financial information that does not align with how the Government requires offerors to price the work in this solicitation. Additionally, this requirement will require the submission of data that is not appropriate in a Firm-Fixed Price Services Contract. Will the Government remove CDRL A016 Final Labor Hour Material Data from the solicitation?At this time CDRL A016 remains a requirement.
049562-11-001Rudder Bearing Seal and Rudderstock Seal; repairParagraph 3.12.1 states, "Remove existing, fit and install new the following parts"

*One EA, Bearing, Spher Roller, Self Aligning Pc 46 Reference 2.4, Sheet 3, MIL-R-7362, Type I *One EA, Bearing, Spher Roller, Self Aligning Pc 47 Reference 2.4, Sheet 3, MIL-R-7362, Type I

Contractor notes that venders including the OEM identified in 4.1 continue to "No-Bid" the above listed items.

Question: Can the Customer provide reference 2.4 drawing 562-6125047 Rev F, Rudder & Support Assembly Arrangement & DetailsPcs 46 and 47 as GFM and if so and will an Errata be issued for this specification?

Solicit for Quote; NORFOLK BEARING & SUPPLY CO., INC ADDRESS: 3512 E. Princess Anne Road, NorFolk, VA 23502, Office (757) 853-3691, FAX: (757) 855-5861, E-mail: norsales@norfolkbearings.com, WEB: www.norfolkbearings.com
050562-11-002Rudder Bearing Seal and Rudderstock Seal; repairParagraph 3.12.1 states, "Remove existing, fit and install new the following parts"

*One EA, Bearing, Spher Roller, Self Aligning Pc 46 Reference 2.4, Sheet 3, FF-B-185 *One EA, Bearing, Spher Roller, Self Aligning Pc 47 Reference 2.4, Sheet 3, FF-B-185

Contractor notes that venders including the OEM identified in 4.1 continue to "No-Bid" the above listed items.

Question: Can the Customer provide reference 2.4 drawing 562-6125047 Rev F, Rudder & Support Assembly Arrangement & Details Pcs 46 and 47 as GFM and if so and will an Errata be issued for this specification?

Solicit for Quote; NORFOLK BEARING & SUPPLY CO., INC ADDRESS: 3512 E. Princess Anne Road, NorFolk, VA 23502, Office (757) 853-3691, FAX: (757) 855-5861, E-mail: norsales@norfolkbearings.com, WEB: www.norfolkbearings.com
051665-90-001 (E1)ShipAlt LHD1-82046K, Joint Strike Fighter (JSF) Shops and Services; accomplishParagraph 3.1 states," Accomplish the requirements of 2.2 through 2.27, and applicable portion of 2.28".

*Contractor notes reference 2.4 drawing 167-8677123, ShipAlt LHD1-82046K JSF Shops & Services Mod to Structural Doors Items 102 and 103 SCE column is “F” and the Remarks state ~ # 043402 and ~ # 043403 and no further procurement reference notes provided.

*Contractor believes that reference 2.4, Items 102 and 103 maybe intended to be provided as GFM however there is no reference to that effect indicated within this document or the specification.

Question: Can the Customer provide clarification as to if the Contract will be required to procure reference 2.4, Items 102 and 103 or will they be provided as GFM and if so and will an Errata be issued for this specification?

Items 102 and 103 will not be provided as GFM. Reservation note RSV-1 applies. Once LAR is answered it will be invoked by RCC as required.
052508-11-007Lagging and Insulation, Outside Machinery Space; replaceParagraph 3.1.1.1 states, "Accomplish the requirements of 009-114 of 2.1".

*Contractor notes that no Square Footage or number of locations was provided for bidders to utilize for estimatting purposes.

*Contractor believes that the requirements identified in paragraph 3.1 that state, "Provide 100 mandays of labor and 150,000 dollars of material to accomplish lagging and insulation repair as directed by the SUPERVISOR" covers the requirements of paragragraph 3.1.1.1 NSI 009-114, Cat II, Mold Remediation: accomplish.

Question: Can the Customer provide conformation that the requirements of 3.1.1.1 are covered by the RTR pools identified in paragraph 3.1 and if not will an Errata be issued for this specification?

Concur, the RTR pools will be used as required.
053508-12-001Chill Water Pipe Lagging; replaceParagraph 3.2.2 states, "Accomplish the requirements of 009-114 of 2.1".

*Contractor notes that no Square Footage or number of locations was provided for bidders to utilize for estimatting purposes.

*Contractor believes that the requirements identified in paragraph 3.2 that state, "Provide 650 mandays of labor and 150,000 dollars of material to accomplish work not previously identified in the Work Item, as directed by the SUPERVISOR" covers the requirements of paragragraph 3.2.2 NSI 009-114, Cat II, Mold Remediation: accomplish.

Question: Can the Customer provide conformation that the requirements of 3.2.2 are covered by the RTR pools identified in paragraph 3.2 and if not will an Errata be issued for this specification?

Concur, the RTR pools will be used as required.
054631-11-006Aircraft Hangar Overhead; preserveParagraph 3.2 states, "Accomplish the requirements of 009-114 of 2.1 for mold remediation/removal for areas of overhead insulation showing visible signs of mold in the location listed in 1.2.1.1".

*Contractor notes the specification does not provide the locations and the amount of mold that may need to be remediated from the overhead.

Question: Is the Contractor to assume that the total area identified in 1.2.1.1 from frame 83 to 130, 40 feet off the center line port to 40 feet off center line starboard all need to be remediated?Answer Provided via Q&A 3-Errata Work specification
055631-11-003Emergency Generator Room No. One and AC Machinery Room Bilge; preserveParagraph 3.5.1 states “Install each new aluminized cloth spray shield on each flammable liquid pipe, valve flange and component in accordance with ASTM F 1138.”

Contractor notes that there are no flammable liquid pipe references provided that would allow for an accurate estimate of how many new aluminized cloth spray shields will be require replacement.

Question: Can the Customer provide flammable liquid pipe references that would allow all bidders and will an Errata be issued for this specification?

No Errata will be issued-For Estimating Purposes, estimate up to 30 Ea 5 Inch Flanges
056721-90-001ShipAlt LHD1-82035K, Joint Strike Fighter (JSF) Topside Modification: Warfare System; accomplishParagraph 3.1 states, "Accomplish the requirements of 2.2 through 2.29".

Contractor notes that upon review of reference 2.9 drawing 480-8770568, ShipAlt LHD1-82035K JSF-CIWS Mt 22 Removal Blk Wrg Diag that the following listed 2nd Tier references are required.

*# Reference 6, drawing 723-8666643, *# Reference 7, drawing 480-5865860, *# Reference 8, drawing 480-5865858, *# Reference 9, drawing 480-7236827, Question: Can the Customer provide the (4) missing 2nd Tier reference drawings that was not provided as a reference for this specification and will an Errata be issued for this specification?

As Per Notes 21 of DWG 8770568 References are not rquired for installation. References will still be provided via CD from PM
057255-35-001Item 255-35-001, paragraph 3.10.1 states "Accomplish the requirements of 009-12 of 2.1 for each new fastener (stud) to support insulation and lagging."

What is the intent of this paragraph? Does the Government want to weld studs to the feed pumps?

Please review and advise.Para. 3.10.1 deleted for welding of studs. Errata Written
058255-35-001Item 255-35-001, paragraph 3.6 states "Accomplish the requirements of 2.6 for a shop test of each emergency feed and transfer pump. Allowable seal leakage: less than 5 drops per minute."

Reference 2.6 is for shipboard testing, therefore contractor is unable to accomplish this in the shop.

Please provide advise.Errata Work Specification to delete Shop Test
059992-11-010Temp Refrigerated Stw Facility; ProvideItem 992-11-010 paragraph 3.1. states "Provide and maintain temp refrigeration facilities…from start of avail to 30 days after hab date."

Paragraph 1.2. States location of work will be "Contractor's Plant Adjacent to Ship".

Please clarify if reefer services will be required for the duration of the avail + 30 days or only when in contractors facilities as indicated by the item title.Estimate Work Spec as Written. Will be subject to a Change order after further discussion with ship. Questions is written incorrectly, the correct wording is-" start of availability to 30 days after habitability date..
060980-90-015SHIPALT LHD1-83325K, OPA SYS IMPROVEMENT FOR LHD CLASS SHIP, AIT SUPPORT SERVICE; PROVIDEItem 980-90-015 paragraph 3.2. states "Accomplish the requirements of 009-05 of 2.1 for temp access cuts at 4 locations as designed by supervisor."

1. Please provide H x W dimensions of the required 4ea access cuts for estimating purposes.

2. Since the locations of the access cuts are unknown, contractor will require an equitable adjustment to accomplish the 009-23 requirement.

Please provide the dimensions for each access cut and concur with 009-23 (for each access cut) or advise.Each access cut will be 48” X 48”. Any changes at time of work will be settled by equitable adjustment.
061123-41-002Item 123-41-002 paragraph 3.4 states "Accomplish the requirements of 009-32 of 2.1, including Table 3, Line 10, for areas located in 1.2."

Location listed in 1.2 is Auxiliary Machinery & Deballast Compressor Room (6-73-0-E).

Is the intention of paragraph 3.4 to accomplish the preservation listed in 1.2?, unless otherwise directed, contractor assumes the intention of paragraph 3.4 is to accomplish the preservation of areas listed in 1.3.

Please concur or advise.Concur, Requirements of Para. 3.4 is to accomplish 009-32 to items listed in Para 1.3
062508-12-003Lagging and Insulation, Outside Machinery Space; replaceParagraph 3.2 states, "Accomplish the requirements of 009-114 of 2.1".

*Contractor notes that no Square Footage or number of locations was provided for bidders to utilize for estimatting purposes.

*Contractor believes that the requirements identified in paragraph 3.4 that state, "Provide 200 mandays of labor and 150,000 dollars of material to accomplish lagging and insulation repair not previously identified in the Work Item, as directed by the SUPERVISOR" should cover the requirements of paragragraph 3.2 NSI 009-114, Cat II, Mold Remediation: accomplish.

Question: Can the Customer provide conformation that the requirements of 3.2 are covered by the RTR pools identified in paragraph 3.4 and if not will an Errata be issued for this specification?

Errata work Specification will be written. Para 3.4 will be utilized to cover results of Para. 3.2 and inspection results for 3.1.
063663-90-001 (E1)ShipAlt LHD1-82483K, Capstone Space Arrangement; accomplishParagraph 3.12 states to, “Accomplish the requirements of 09-26 of 2.1, including Attachment D, for removal and installation of electrical grade matting IAW reference 2.7.”

*Contractor notes reference 2.7, 634-8770740, ShipAlt LHD1-82483K Capstone Space Arr CIC Mod to Deck Covering, Sheet 4 (Deck Covering Schedule), Line One, shows that deck covering in Combat Information Center (02-65-0-C) is to be removed and installed.

Contractor notes that Work Item 897-11-004, paragraph 3.1.1 shows that deck covering is to be removed and installed in Combat Information Center also.

Question: Can the customer provide clarification as to the disparity between Work Items 663-90-001 paragraph 3.12 reference 2.7 and 897-11-004 paragraph 3.1.1 will an Errata be issued for these specifications?

Accomplish Deck covering Utilizing work specification 897-11-004 for CIC 02-65-0-C. No Errata will be issued
064634-10-001Porcelain Tile Deck Covering System; installParagraph 3.2 states "Accomplish the requirements of 009-26 of 2.1, including Attachment A, for installation of new chemical resistant deck covering system, in each location listed in 1.2.4"- CPO Shower (2-41-3-L).

Contractor notes 1.2.4.1 identifies the CPO Shower Stall No. 2 that is where the work will be conducted and that NSI 009-26, Attachment A is Ceramic Tile (Quarry and Porcelain) and Attachment C is Chemical – Resistant Floorings.

Can the Customer provide clarification as to what Attachment will be correct to use for the location listed in 1.2.4.1 and will an Errata be issued for this specification?

Errata Work Specification Written-Attachment C is Chemical – Resistant Floorings. Repeat of Question 037 on Q&A #3
065643-21-001Crew and Troop Messroom; repairParagraph 3.6 states, "Accomplish the requirements of 009-26 of 2.1, including Attachment C, for installation of Chemical-resistant flooring, in each location listed in 1.2.1".

Contractor notes that LHD Mess Deck floor covering replacement there is a 50’ x 5’ x 2” plate running port to starboard thru the mess decks. This plate requires additional underlayment to achieve a level deck.

Question: Can the Customer confiorm the existence of this plate on USS Boxer, or provide the structural reference indicating the existence or non-existence of this plate?

USS BOXER has no existing Plate as described.
066634-11-008Wear Resistant Deck Tile; replaceParagraph 3.1 states, "Accomplish the requirements of 009-26 of 2.1, including Attachment B, for installation of new wear resistant deck tile system, in location listed in 1.2"-(Medevac Elevator Machinery Space (1-81-1-Q).

*Contractor notes after Decking Sub-Contractor ship check onboard the USS Essex, decking found was painted.

*Contractor notes typicaly a high durability paint system is applacable for compartment 1-81-1-Q (Medevac Elevator Machinery Space).

Question: What is the correct decking system to be installed on USS Boxer (LHD 4) ?

Errata work specification written-009-26 Attachment F and correct location (Elevator Platform)
067992-00-002Temporary Service; provideParagraph 3.16 states, "Supply 1500 pounds per hour at 100 to 150 PSI steam to each shore steam connection for the following periods: Avail Start to Docking and Engineering Production Completion Date to dock trials".

Contractor notes NAVSTA San Diego CA, Steam service is only available at the following piers; Pier 1, Pier 2, Pier 7 and Pier 13.

Question: Can the Customer confirm that if the Contractor intends to exacute the pier side durations at NAVSTA San Diego CA, that only a pier with Steam services will be provided?

This is the start of the file's text. The full file is on GovTribe.