N0002419R4416 A0003 Nonconformed.pdf

PDF 937 KB Posted

Attached to
USS BOXER (LHD 4) Fiscal Year (FY) 20 Docking Selected Restricted Availability (DSRA) RFP
Solicitation number
N00024-19-R-4416
Issued by

About this file

This solicitation amendment incorporates changes to solicitation N00024-19-R-4416 for the USS BOXER (LHD 4) FY20 Docking Selected Restricted Availability. Key details include:

  • The Navy seeks to award a fixed-price contract for ship repair and maintenance work including dry docking the USS BOXER at the contractor's facility between April 2020 and November 2020.

  • Changes to the solicitation include modifications to proposal submission instructions and evaluation criteria, questionnaire updates, and responses to bidders' questions.

  • Offerors must propose pricing for all work items using the pricing workbook attachment and provide labor rates, daily pier and dry dock rates, inter-port differential pricing, and growth reservation and new work pricing formulas. Proposals are due by December 13, 2019.

  • The Navy will evaluate proposals based on eligibility, schedule and resource capacity, past performance, and total evaluated price to select the best value solution. Evaluation sub-factors address manpower, physical resources, and integrated schedule.

View the file

Other files

File Type Posted
N0002419R4416 0006.pdf PDF
N0002419R4416 0006 Conformed.pdf PDF
N0002419R4416 0005.pdf PDF
N0002419R4416 0005 conformed.pdf PDF
N00002419R4416 A0004 Executed.pdf PDF
N00002419R4416 A0004 Conformed.pdf PDF
USS BOXER QA#4 AMD 4.xlsx XLSX spreadsheet
USS BOXER QA_3 FINAL.xlsx XLSX spreadsheet
N0002419R4416 A0003 Conformed.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N0002419FR93069

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment to N00024-19-R-4416 is to:

Reference SF 30 BLOCK 14 CONTINUATION PAGE

1. CONTRACT ID CODE PAGE OF PAGES

J 1 26

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 28-Nov-2019

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X N0002419R4416

X 9B. DATED (SEE ITEM 11)

30-Sep-2019

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 0 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

28-Nov-2019

CODE

NAVAL SEA SYSTEMS COMMAND (HQ)

1333 ISAAC HULL AVE SE

WASHINGTON NAVY YARD DC 20376-2040

N00024 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N0002419R4416

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMENDMENT 3

The purpose of Amendment 3 for solicitation N00024-19-R-4416 is to:

General:

RFP response due date remains unchanged.

Section L:

Proposal submission instructions.

Update submission instructions.

Section M:

Evaluation factor description corrections – Part III, Section C., 2nd para.

Questionnaire:

Attachment J-1: Specification Package No. TPPC-LHD4-SWRMC20-CN01 updated to Specification Package No. TPPC-LHD4-SWRMC20-CN01 (Errata 3)

Questionnaire

**Please note that a final Amendment will be posted**

The following have been modified:

AMENDMENT 1

The purpose of Amendment 1 to N00024-19-R-4416 is to:

General:

Change the Contracting Officer from Martha Bello to Stephanie Hoffman as annotated in the

RFP.

Section C:

• Changed language in Paragraph 1.4, 1.5 and 3.6.

Section L:

Changed pre-proposal information(PPI) due date from 13 November 2019 to 22 November 2019;

Changed Ship check due date from 6 December 2019 to 20 November 2019;

Proposal submission instructions to CD copies only; and, Add additional Ship Check request instructions to Section III – General Information.

Section M:

Add language to Section M, VOL. I, Paragraph D, Part 6 concerning the Value Adjusted Total Evaluated Price in the event of a marginal factor rating.

Questionnaire:

Attachment J-1: Specification Package No. TPPC-LHD4-SWRMC20-CN01 updated to

Specification Package No. TPPC-LHD4-SWRMC20-CN01 (Errata 1) Exhibit A Contract Data Requirements List (CDRL) (DD Form 1423) Added A015 and

A016

SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

DOCUMENTS/EXHIBITS/ATTACHMENTS

The following document(s), exhibit(s), and other attachment(s) form a part of this solicitation:

No. Document Attachment S-1 Manpower Utilization Data Sheet Attachment S-2 Past Performance Questionnaire Attachment S-3 Pre-Proposal Information (PPI) Form Attachment S-4 Manpower Plan to Actual Data Sheet Attachment S-5 Eligibility Criteria Data Sheet Attachment S-6 Value Adjusted Total Evaluated Price Reduction Tables Attachment S-7 Proposal Assessment Rev 1 Attachment S-8 Pier and Dry-dock Graphical Representation Template Attachment S-9 Past Performance Questionairre

The following document(s), exhibit(s), and other attachment(s) also form a part of this solicitation and will form a part of the contract resulting from this solicitation:

Attachment J-1 Specification Package TPPC-LHD4-SWRMC20-CN01(as of Errata Three) Attachment J-2 Work Item Plans, Drawings, and Other References Attachment J-3 Execution Milestones and Key Event Dates Rev 1 Attachment J-4 Pricing Workbook Attachment J-5 Quality Assurance Surveillance Plan Attachment J-6 Subcontracting Plan (to be incorporated upon award) Attachment J-7 Schedule Model Review

Exhibit A Contract Data Requirements List (CDRL) (DD Form 1423) A001-A003; A005-A009; A011; A012;

A014, A015, A016 (Does not include A004, A0010, or A0013) Exhibit B Contract Data Requirements List (CDRL) (DD Form 1423) B001-B009 Exhibit C Contract Data Requirements List (CDRL) (DD Form 1423) C001-C002

SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS

INSTRUCTIONS TO OFFERORS

I. INTRODUCTION

A. This solicitation is a Request for Proposals (RFP) that will result in the award of a single Fixed-Price contract to complete the USS BOXER (LHD 4) Dry-Docking Selected Restricted Availabiltiy (DSRA).

B. The Government intends to award a single Fixed-Price contract to the offeror whose proposal represents the Best Value to the Government, after evaluation in accordance with Section M of this solicitation.

C. ALL INQUIRIES shall be made in writing and directed to Stephanie Hoffman, Contracting Officer, and LT Michelle Wogu, Contract Specialist, at Stephanie.L.Hoffman@navy.mil, and michelle.wogu@navy.mil, respectively. To ensure the Government is able to adequately address and respond to offeror pre-proposal information (PPI) via amendment, it is requested questions be submitted no later than 22 November 2019 at 3:00 pm, local time, Washington DC. The Navy reserves the right to not answer any requests received after this date and time. Furthermore, offerors should note that the proposal due date will not be extended solely on the basis of requests received after this date and time. Solicitation questions should reference the solicitation and/or specification page and paragraph number and be submitted on the Pre-Proposal Information (PPI) form (Attachment S-3) provided with this solicitation.

D. Estimated Award Date: The Government anticipates making an award in April 2020.

II. INSTRUCTIONS FOR THE SUBMISSION OF OFFERS

A. Proposal Due Date:

1. All copies of proposals (Volumes I & II) shall be received by the Government at the address below no later than 13 Dec 2019 at 10:00 am, local time, Washington DC. Electronic submittal of proposals will not be accepted. Late proposals WILL NOT be considered. Partial proposals or attachments submitted late WILL NOT be considered. Offerors are advised to consult FAR 15.208 related to timely receipt of proposals.

a) Offerors must provide a proposal valid for at least 120 calendar days from the proposal due date. (Complete block 12 of the Standard Form (SF) 33).

B. Proposal Submission:

1. Proposals shall be sent to:

Naval Sea Systems Command (NAVSEA) HQ

Attn: Stephanie Hoffman

SEA 02445

1333 Isaac Hull Ave SE, Washington Navy Yard, DC 20736

2. Offerors shall mark all submittals “DO NOT OPEN PACKAGE IN MAIL ROOM— FORWARD UNOPENED DIRECTLY TO SEA0244”. The outside of the package shall clearly indicate the Offeror’s name, the solicitation number and the contents of the package.

Volume Title Number of Paper

Originals (See Note 1)

Number of Paper Copies

Number of CDs (See Notes 2 - 4)

I Price Proposal 1 0 1 II Technical

Proposal 2 0 5 (see note 2)

a) Note 1: Original CDs may be shipped in the same boxes as the copies to eliminate excess shipping costs and should be clearly labeled “ORIGINAL CD”. Originals should be clearly labeled “ORIGINAL TECHNICAL PROPOSAL” or “ORIGINAL PRICE PROPOSAL.” The exterior of each box MUST clearly indicate its contents.

b) Note 2: Number of Technical Proposal CDs shall consist of ONE original and FOUR copies (5 total), clearly marked.

c) Note 3: All original versions of the proposal shall take precedence over copies.

d) Note 4: The CDs must be scanned to ensure that the files contained on them do not contain any computer viruses. The CDs shall be labeled to indicate the Offeror’s name, the solicitation number and the associated volume numbers.

e) Note 5: The files on the CD shall be in a format that is compatible with and capable of being opened in the most current Microsoft Office Suite or Adobe Acrobat. The material presented in electronic format shall be identical to the paper copy of the proposal. In cases where the hard copy and the electronic copy of the proposal conflict, the hard copy shall take precedence. All spreadsheets shall be in Microsoft Excel format such that each mathematical equation is obvious. No fields shall be password protected. If files are compressed, the necessary decompression program must be included.

III. GENERAL INFORMATION

A. Ship Checks:

1. The USS BOXER (LHD 4) will not be available for ship check prior to the proposal submission due date. Instead, potential offerors may inspect the USS ESSEX (LHD

2) in San Diego, CA from 30 September 2019 to 20 November 2019.

2. To schedule a ship check, offerors shall email a "Request for Ship Check" to

Stephanie Hoffman and LT Michelle Wogu at Stephanie.L.Hoffman@navy.mil and michelle.wogu@navy.mil, respectively.

3. In addition to the above, if an offeror intends to have a subcontractor participate in a ship check in lieu of themselves (i.e. Prime Offeror (contractor), the Sub-contractor’s Security Access must go thru the Prime Offeror they are estimating for and must state “Ship Check for Estimating purposes for USS BOXER.”

4. Participants will be subject to security, safety, and other applicable regulations established by Southwest Regional Maintenance Center (SWRMC) and ship’s Commanding Officers. Contractors conducting SWRMC related work efforts must visit SWRMC security website for latest forms and instructions at:

http://www.navsea.navy.mil/Home/RMC/SWRMC/

B. Specifications and associated reference documentation

1. Upon request, the Government will provide the Specification Package Work Items (Attachment J-1) and Work Item References (Attachment J-2).

2. Offerors may request solicitation attachments by submitting a request to:

a) Stephanie Hoffman at Stephanie.L.Hoffman@navy.mil; and

b) LT Michelle Wogu at michelle.wogu@navy.mil.

3. Additional work item references not already in the possession of the offerors, commercially available, listed under 52.211-2, are available through the following websites:

a) https://jedmics.net/

b) https://webjed.nnsy.navy.mil/

c) https://psjed.psns.navy.mil/

C. Alteration of Solicitation

1. Offerors shall respond to the solicitation as posted. Offerors who alter the solicitation (except for completing appropriate “fill-in” blocks and certifications) may be considered non-responsive and thus ineligible for award.

D. Proposal Information

1. Offerors shall not presume the Government has knowledge outside of information provided in the proposal. Additionally, offerors are advised that statements such as:

“the offeror understands”, “the offeror has a long history of outstanding support”, “standard procedures shall be used”, “well known techniques shall be employed”, or any paraphrasing of the solicitation, shall be considered inadequate to demonstrate experience, knowledge of, or compliance with solicitation requirements. Offerors are encouraged to provide specific and concise information to validate all assertions.

E. Amendments

1. The Government may revise the solicitation at any time by means of an Amendment.

It is an offeror’s responsibility to ensure it is accessing the Federal Business Opportunities (FBO) website to view potential amendments and procurement notifications for this solicitation.

F. Teaming Arrangements

1. Proposals must be submitted by one (1) prime contractor. An Offeror may be listed as a subcontractor in multiple proposals but may only submit one (1) proposal as a prime contractor with a unique Commercial and Government Entity (CAGE) code and Taxpayer Identification Number. To be evaluated as a Joint Venture (JV), offerors must provide a notarized agreement (with the price proposal) delineating roles and responsibilities for all proposed work.

IV. PROPOSAL FORMAT

A. To facilitate efficiency and consistency in proposal evaluation the following is mandatory. PROPOSALS WHICH DO NOT FOLLOW THIS DIRECTION MAY

BE REJECTED AS NON-RESPONSIVE AND THUS INELIGIBLE FOR

AWARD.

B. Hard Copy Proposals

1. All electronic pages,, except the Integrated Master Schedule, shall be double-sided on

8.5 x 11 inch paper with a one-inch margin. The text used shall be Times New Roman with a minimum font size of 12-point. Each side of the page shall count as one “page”. Any type contained on graphics pages will not be smaller than 10-point font, shall be legible, and readable. Any pages that may be revised as a result of discussions (if required) shall contain revision numbers and date of the proposal revision submission. Offerors shall use the attachments provided with this solicitation for their proposal content as specified in Section V where required.

C. Page Limits:

1. Volume I has no page limit with the exception of the cover letter, which shall not exceed three (3) pages

2. Volume II,

a) Factor 1 Eligibility Factor: No page limitation

b) Factor 2 Schedule and Resource Capacity:

(1) Sub-factor A (1): Shall not exceed 25 pages

(2) Sub-factor A (2): No page limitation

(3) Sub-factor A (3): No page limitation

(4) Sub-factor A (4): No page limitation

(5) Sub-factor B (1): Shall not exceed 10 pages

(6) Sub-factor C (1): No page limitation

c) Factor 3 Past Performance:

(1) No page limitation with the exception of the 1-page Small Business Narrative.

(2) Past Performance Questionnaire (PPQ): no more than a total of five (5) PPQs, one per contract identified, no page limitation

(3) Past Performance References: No page limitation

V. PROPOSAL CONTENT

A. VOLUME I

1. Price Proposal: The price proposal shall not contain non-price factor information. The price proposal shall be comprised of the following documentation:

a) Cover Letter,

b) Signed SF 33 with all amendments acknowledged,

c) Small Business Subcontracting plan per FAR Part 19 (large businesses only),

d) Any Joint Venture / teaming agreements (if applicable),

e) Completed Solicitation Section B carrying forward information from the Pricing

Workbook Spreadsheet, Attachment J-4, containing:

(1) Work Item Pricing,

(2) Daily Extension Rates,

(3) Inter-port Differential (IPD),

(4) IPD Reduction for Days Completed Early,

(5) Fully Burdened Ship Repair Labor & Material Burden Rate, and New Work &

Growth Reservation

f) Completed Execution Milestones and Key Event Dates (Attachment J-3), and

g) Completed Proposal Assessment (Attachment S-7).

2. Cover Letter: The cover letter, which shall not exceed three (3) pages, shall meet all the requirements of the “first page of the proposal” outlined in FAR 52.215-1(c)(2)(i-v). In addition to those requirements, the offeror shall include the following in the cover letter:

a) Identification of all enclosures included with the proposal,

b) CAGE and Data Universal Numbering System (DUNS) numbers for the Prime contractor,

c) Notice of any alterations to the solicitation, such as “fill-in” blocks and certifications.

d) Notice of any alterations to the solicitation (except for completing appropriate “fill-in” blocks and certifications). Offerors who alter the solicitation (except for completing appropriate “fill-in” blocks and certifications) may be considered non-responsive and thus ineligible for award.

e) Name, address, and telephone number of each proposed first-tier subcontractor with a proposed subcontract estimated at $10 million or more.

f) For any work item (WI) with a total dollar value of zero dollars proposed in the Pricing Workbook (Attachment J-4) provide an explanation as to why. In addition, if applicable:

(1) For any WI with a total value of zero labor hours proposed (prime and subcontractor combined) (although material is proposed), provide an explanation as to why.

(2) For any WI with a total dollar value of zero material proposed (prime and subcontractor combined) (although labor is proposed), provide an explanation as to why.

3. Standard Form 33 (SF 33): As part of the price proposal package, the offeror shall submit the completed SF 33 with blocks 12 through 18 completed, as well as all sections with applicable “fill-ins” filled in and shall acknowledge all amendments. The representative who signs this form must be authorized to contractually bind the company providing the offer. Section B CLIN pricing must also be completed for ALL APPLICABLE CLINs. The Offeror shall complete and provide all Representations, Certifications, and Other Statements included in Section K of the solicitation.

Submission of a signed offer to the Government constitutes agreement and acceptance of the terms and conditions of the solicitation in a FFP contracting environment.

4. Subcontracting Plan:

a) A subcontracting plan is NOT REQUIRED from a small business concern.

b) Provide rationale for any proposed goals that are lower than:

(1) 20 percent of prime contracts for small businesses

(2) 5 percent of prime and subcontracts for women-owned small businesses

(3) 5 percent of prime contracts and subcontracts for small disadvantaged businesses

(4) 3 percent of prime contracts and subcontracts for HUBZone small businesses

(5) 3 percent of prime and subcontracts for service-disabled veteran-owned small businesses

c) Address FAR 52.219-9 and all of the subparagraphs in FAR 52.219-9(d):

subparagraphs (12), (13), (14) and (15).

5. Completed Solicitation Section B and Pricing Workbook (Attachment J-4)

a) Offerors must propose on all applicable contract line items (CLINs), complete

Section B Note “SCHEDULE OF PRICES / RATES: SHIP REPAIR LABOR RATE (FULLY BURDENED)”, complete Section B Note “SCHEDULE OF PRICES /

RATES: DAILY RATES FOR PIERSIDE AND DRY-DOCKING (FULLY

BURDENED)”, and complete the Pricing Workbook Spreadsheet (Attachment J-4) to be considered responsive.

b) The contractor must submit prices using the Pricing Workbook attachment containing Work Item Pricing, Daily Extension Rates, Inter-port Differential (IPD), IPD Reduction for Days Completed Early, Value Adjusted Total Evaluated Price (VATEP), and Fully Burdened Ship Repair Labor Rate & Material Burden Rate in Microsoft Excel in the format provided in this solicitation. The breakdown of CLIN prices, corresponding to the work item pricing, must add up to the total of each CLIN.

If there is a discrepancy between the two, the CLIN price shall govern. The pricing workbook attachment fully burdened ship repair labor rates and material burden rate must match the rates provided in the Section B Note “SCHEDULE OF PRICES / RATES: SHIP REPAIR LABOR RATE (FULLY BURDENED)”. If there is a discrepancy between the two, the Section B fully burdened ship repair labor rates and material burden rates shall govern.

c) Offerors are to insert pricing in all yellow shaded fields in the pricing workbook attachment.

6. Value Adjusted Total Evaluated Price (VATEP) Schedule Acceleration (USS BOXER

FY20 Dry-Docking Phased Maintenance Availability) (Attachment S-6)

a) The Navy would obtain additional value, in terms of additional Operational

Availability, should the Availability complete before its no-later-than completion date. Therefore, the Navy has included a VATEP price adjustment to incorporate this additional value into its price evaluation. The VATEP schedule acceleration adjustment reduction to the offerors proposed price shall be applied in accordance with the VATEP Reduction Tables attachment. Any proposed early completion will be incorporated in the resultant contract via Section F and the Execution Milestones and Key Events (Attachment J-3). The Navy will apply a Total Evaluated Price reduction based on the values shown in Attachment S-6 using the proposed number of “Days Completed Early” in Attachment J-3.

b) The VATEP price adjustment will not be applied in calculating the Offeror’s Total Evaluated Price if the Offeror has been evaluated and assigned a Marginal rating (proposal has not demonstrated an adequate approach and understanding of the requirements, and/or risk of unsuccessful performance is high) for Factor 2 – Schedule & Resource Capacity.

c) The resultant contract will incorporate the accelerated delivery schedule via Section F and the applicable Milestones and Key Events (Attachment J-3), even if the VATEP price adjustment is not applied in calculating the Offeror’s Total Evaluated Price.

7. Inter-port Differential (IPD)

a) The IPD applicable to the LHD 4 FY20 DSRA must be included in all offers and is calculated using foreseeable costs for fuel, towing and pilot charges, and travel to the contractor’s facility by applicable Government personnel. The following chart provides the values to be included in all offerors’ price proposals to determine the offeror’s total evaluated price. Additionally, the Navy has included an Inter-port Differential Reduction for “Days Completed Early” as proposed in the Execution Milestones and Key Events (Attachment J-3). This reduction value is to be applied per day for any VATEP schedule acceleration proposed.

Location Differential Inter-port Differential Reduction for “Days Completed Early” stated in Attachment J-3

Portland, OR $13,768,203 $946 San Diego, CA $1,190 $0

b) Offeror’s whose location is not listed in the above Government provided port differential tables shall submit a bidder’s question requesting a Government provided port differential be calculated for the offeror’s proposed location for the USS BOXER

(LHD 4) FY20 DSRA.

8. The Government provided pier differential must be included in all offers proposing to use a Government provided pier in lieu of a contractor owned pier and is calculated using average electricity and water consumption, as well as sewage and oily waste disposal.

The following chart provides the values to be included in offerors’ price proposals, as applicable, to determine the offeror’s total evaluated price:

Location** Differential San Diego, CA $4,892,958

**Offeror’s whose location is not listed in the above Government provided pier differential table shall submit a bidder’s question requesting a Government provided pier differential be calculated for the location of the offeror’s proposed Government provided pier space for the USS BOXER (LHD 4) FY20 DSRA.

B. VOLUME II

Non-Price Proposal: The non-price proposal shall be comprised of two factors, as follows:

1. Factor 1 – Eligibility Factor:

Offerors must provide the following to demonstrate eligibility for Award (There is no page limit associated with this Factor):

a) Provide a completed Eligibility Criteria Data Sheet (Attachment S-5) that identifies the specific pier and dock intended to be used for the proposed availability and indicates that the pier and dock meet the minimum characteristics identified in Attachment S-5.

b) Provide a signed letter identifying and confirming ownership of a pier capable of berthing and a dry-dock capable of docking the vessel during the applicable period in accordance with the Execution Milestones & Key Events (Attachment J-3). The representative who signs the letter must be authorized to contractually bind the company. If the offeror is utilizing a subcontractor for physical resources (pier or dry-dock), a letter signed by the subcontractor identifying and confirming committed access to the proposed pier & dry-docks is required. The subcontractor representative who signs the letter must be authorized to contractually bind the company.

c) Provide a copy of the offeror's current Master Ship Repair Agreement (MSRA), MSRA number, or proof of MSRA equivalency that meets the requirement of CNRMC instruction 4280 series. To be eligible for award, a prospective contractor must possess a MSRA as described in DFARS 217.71 Master Agreement for Repair and Alteration of Vessels (MARAV) or demonstrate organization and facilities equivalent to that reflected in a MSRA. Offerors meeting this eligibility requirement with documents and evidence outside of a MSRA must contact the PCO to schedule an on-site inspection. All requests for MSRA equivalency inspections must be received by 1:00 pm, local time, Washington DC on 15 November 2019. Requests shall be sent to Stephanie Hoffman at Stephanie.L.Hoffman@navy.mil and LT Michelle Wogu at michelle.wogu@navy.mil.

Failure to request an inspection by the designated time may result in a negative determination of offeror eligibility.

d) Provide a current dry-dock certification applicable to the dry-dock proposed for the

Availability. Certifications shall demonstrate the dry-dock will remain certified throughout the entire proposed use of the dry-dock. If the proposed dry-dock is currently uncertified, or if the certification will expire prior to the end of the offeror's proposed docking period, the offeror shall provide a detailed plan and schedule to certify or re-certify the dry-dock in order to remain certified throughout the proposed docking period in the Execution Milestones & Key Events (Attachment J-3).

2. Factor 2 –Resource Capacity & Schedule:

Offerors shall demonstrate their ability to provide the manpower resources, and the physical resource capacity, to complete the USS BOXER (LHD 4) FY20 DSRA availability requirements as proposed, by addressing the following Sub-factors:

a) Sub-factor A - Manpower

(1) Offerors shall provide a narrative, not to exceed 25 pages:

(a) That supports the extent to which the offeror has provided the planned manpower resources, both prime and subcontractor, necessary to complete their current projects. As part of their narrative, offerors shall provide:

(i) A root cause analysis of any manpower resource shortfalls (defined as actual manpower resources less than planned manpower resources)

(ii) An explanation of the mitigations implemented and planned to resolve those shortfalls (iii)An explanation of how the offeror will provide the proposed manpower resources to complete the availability, accounting for the offeror’s current manpower resourcing performance, as shown in the Offeror’s current Progress/Manning data

(b) Corresponding to the curves (total) and (trade), provided in response to

Factor 2, Sub-factor A, Manpower, paragraphs (3) and (4), outline how the Offeror will achieve proposed manning levels via overtime, additional hiring actions, or the utilization of subcontractors (if applicable). Outline the state of the offeror’s current workforce (Factor 2, Sub-factor A, paragraph (2)) in relationship to the proposed Availability, and ensure the following areas are addressed:

(i) Should the offeror propose to utilize overtime for the proposed availability, the narrative shall include a plan to manage and provide the overtime associated with the proposed Availability.

(ii) Should the offeror propose to hire additional personnel for the proposed Availability, the narrative shall include a plan to manage and provide the additional personnel associated with the proposed Availability.

(iii)Should the offeror propose to utilize subcontracted resources for the proposed Availability, the offeror shall include in their narrative an explanation of the requirements that will be completed by the prime and the work that will be subcontracted, including the work item, trade and period of performance for each subcontract requirement. The offeror shall include in its narrative a plan to manage the subcontractor manning levels included in the proposed Availability.

(2) The Offeror shall provide current Progress/Manning Reports demonstrating the extent to which the Offeror is providing planned prime and subcontractor manpower resources necessary to complete current ship repair and construction projects. These reports should follow the format requested in the NSI 009-60.

There is no page limit associated with this documentation.

(a) Provide all current Progress/Manning Reports in the form of CDRLs or equivalent data reports provided to your customer for current ship repair and construction projects. “Current” is defined as a project in-progress or completed within the last three (3) months as of the date of the initial proposal due date for this procurement.

(b) Provide a completed solicitation Section J, Manpower Plan to Actual Data

Sheet, (Attachment S-4).

(3) The Offeror shall provide three (3) Manpower Curves (Total) in accordance with NSI 009-60 that graphically delineate the resources tied to each individual ship availability in men-per-day. All curves provided shall represent the full Availability period of performance, total manpower ceiling and shall show correlated manning values across all curves. Offeror shall include a data table providing the numerical data by trade that populates each curve. There is no page limit associated with this documentation. A curve shall be provided for each of the following and reflect the full Availability period of performance:

(a) The manpower curve (total) associated with the NSI 009-60 Initial IPS for the proposed Availability. This chart shall show the total manpower resources currently employed by the offeror and expected to be employed by the Offeror.

(b) The total manpower resources required to complete this proposed Availability plus work the Offeror currently has under contract during the Availability period of performance. This shall be represented by multiple stacked curves each representing an individual Availability. Each ship Availability shall be labeled by hull number. This chart shall show the total manpower resources currently employed by the offeror and expected to be employed by the Offeror.

(c) The total manpower resources required to complete this proposed

Availability period of performance, plus work the Offeror may complete, including the resources to complete ALL outstanding proposals and the resources required to complete any other anticipated requirements during the Availability period of performance. All projects included in the Manpower Utilization Data Sheet (Attachment S-1), shall be included in this curve.

This shall be represented by multiple stacked curves each representing an individual Availability. Each ship Availability shall be labeled by hull number. This chart shall show the total manpower resources currently employed by the Offeror and expected to be employed by the Offeror.

(4) The Offeror shall provide Manpower Curves (Trade) in accordance with NSI

009-60 which graphically delineate the resources tied to each trade in men-per-day. All curves provided shall represent the full Availability period of performance and shall show correlated manning values across all curves.

Offeror shall include a data table providing the numerical data by trade that populates each curve. The following trades shall be reflected in each curve:

ship fitter, welder, inside machinist, outside machinist, electrician, pipe fitter, sheet metal, painter, carpenter, rigger, labor, other. There is no page limit associated with this documentation. Curve(s) shall be provided for each of the following and reflect the full Availability period of performance:

(a) The manpower curve (trade) associated with the NSI 009-60 Initial IPS for the proposed Availability.

(b) The trade manpower resources required to complete this proposed

Availability period of performance. This shall be represented by multiple stacked curves each representing an individual trade. Each trade shall be labeled.

(c) The trade manpower resources required to complete this proposed

Availability period of performance, plus work the Offeror may complete, including the resources to complete ALL outstanding proposals and the resources required to complete any other anticipated requirements during the Availability period of performance. All projects included in the Manpower Utilization Data Sheet (Attachment S-1) shall be included in this curve. This shall be represented by multiple stacked curves each representing an individual trade. Each trade shall be labeled.

(d) Chart showing the available trade manpower resources currently employed by the Offeror and expected to be employed by the Offeror during the Availability period of performance. This shall be represented by multiple stacked curves each representing an individual trade. Each trade shall be labeled.

b) Sub-factor B – Physical Resource Capacity

(1) The Offeror shall provide a narrative and a graphical representation (in the formant of the Pier and Dry-dock Graphical Representation Template (Attachment S-8) that demonstrates that the Offeror has the pier and dry-dock available to complete the requirements of the proposed Availability. The graphical representation shall show the pier and dry-dock expected to be in working capacity by month from proposal submission through the Availability period of performance, and the awarded and outstanding work utilizing those resources by month. The narrative shall not exceed 10 pages, and the narrative and graphical representation shall address the following:

(a) The pier and dry-dock required to complete work the Offeror currently has under contract based on current contract schedule. Additionally, identify the total pier and dry-dock currently in working capacity, and expected to be in working capacity by month from proposal submission through the Availability period of performance.

(b) The pier and dry-dock required to complete all outstanding proposals, per proposed schedules. Identify the pier and dry-dock committed to previously awarded requirements, as well as the proposed use of resources to complete the work of ALL outstanding proposals (including this proposal).

(c) The pier and dry-dock required to complete any other anticipated requirements (including but not limited to non-navy work, pier and dry-dock upgrades or maintenance).

(d) Should the offeror propose to utilize subcontracted pier or dry-dock, the

Offeror shall include an explanation of the requirements that will be sourced by the prime's facility and the pier and dry-dock that will be provided by the subcontractor.

(e) The Offeror's plan to resolve pier and dry-dock resource conflicts as a result of the award of other outstanding proposals. Pier and dry-dock shall not be committed to multiple ships during the same time period without reasonable explanation.

(f) In the event the Offeror proposes an interval of less than seven (7) days between the undocking date of other requirements and the proposed docking date of this Availability, and/or a proposed docking date within the first seven (7) days of the Availability, then the narrative shall detail the necessary steps to accomplish.

c) Sub-factor C - Integrated Production Schedule (IPS)

(1) The Offeror shall provide documentation for the proposed Availability inclusive of the Initial IPS elements of NAVSEA Standard Item 009-60. Offerors shall provide the documentation in accordance with format requirements of FY20 NAVSEA Standard Item 009-60. The offeror shall provide the reports in the electronic formats required by FY20 NAVSEA Standard Item 009-60 and in paper (hard copy) format. The hard copy of the Gantt charts shall be provided on 11 x 17 inch paper. Offerors shall integrate all work included in the work package. However, for the purposes of proposal submission only, reports do not require incorporation of Alteration Installation Team (AIT) schedules, Government-Contracted Third Party Maintenance Provider schedules, Ship's Force schedules, Commercial Industrial Services (CIS) schedules, Fleet Maintenance Activity (FMA) schedules and Navy Intermediate-Level schedules.

There is no page limit associated with this documentation.

3. Factor 3 –Past Performance:

Offerors shall provide past performance information for up to five (5) previous contracts. Offerors shall complete Attachment S-9 Past Performance Contractor Performance Assessment Reporting System (CPARS) References for each of the contracts provided where CPARS contract data is available. If CPARS data is not available for a contract, Offerors shall provide Attachment S-2 Past Performance Questionnaire (PPQ).

Offerors shall demonstrate within either Attachment S-2 or Attachment S-9 that the contracts reference are recent and relevant to the efforts required by this solicitation.

“Recent” is defined as a contract in-progress or completed within the last three (3) years as of the date of the initial solicitation. If the offeror has not completed up to five (5) contracts within the last three (3) years as of the date of the initial solicitation, information on recent and relevant subcontracts and/or commercial contracts may be submitted.

“Relevant” is defined as a contract that is of similar scope, magnitude, and complexity to the requirements as set forth in this solicitation.

o Scope: Experience in the areas defined in the Solicitation as specified in Attachment J-1 Specification Package and J-2 Work Item Plans, Drawings, and Other References.

o Magnitude: The measure of the similarity of the volume, dollar value and/or duration of the work actually performed under the offeror’s submitted contracts to the requirements of this solicitation.

o Complexity: The measure of the similarity of technical difficulty, managerial intricacy and/or required coordination of efforts and disciplines performed by the offeror in its submitted contracts to the requirements of this solicitation. For complexity, not only will the tasks performed by the offeror be considered, but also the offeror’s ability to coordinate tasks (e.g., concurrent performance requirements).

An offeror that does not have recent and relevant past performance to provide for consideration is requested to affirmatively state that it does not have recent and relevant past performance for the Government to consider.

If the Offeror does not have CPARS and is required to submit Attachment S-9, the Offeror shall instruct their customers to complete the Past Performance Questionnaires and return them before the closing date of this solicitation.

E-mail to:

Stephanie Hoffman, Contracting Officer, Stephanie.L.Hoffman@navy.mil;

and, LT Michelle Wogu, Contract Specialist, michelle.wogu@navy.mil

Any questionnaire received after the proposal due date/time may be considered as late and may not be considered in the Offeror’s past performance evaluation. The Government, at its discretion, will determine whether or not questionnaires received after the proposal due date will be considered.

All Offerors, that are large business shall address historical compliance with the requirements of FAR Part 52.219-9 (Small Business Subcontracting Plan) and DFARS 252.219-7003 (Small Business Subcontracting Plan (DOD CONTRACTS)) in a separate narrative not to exceed one page. eSRS information attached to the narrative is not included in the page limits.

SECTION M - EVALUATION FACTORS FOR AWARD

EVALUATION FACTORS FOR AWARD

I. GENERAL

A. The Government intends to award a Fixed-Price contract for the completion of the USS BOXER (LHD 4) Dry-Docking Selected Restricted Availability (DSRA) to the offeror whose proposal represents the Best Value to the Government.

B. Offerors are advised that the Government intends to make award on the basis of initial proposals without conducting discussions with Offerors, but reserves the right to conduct discussions if determined by the Contracting Officer to be necessary (see paragraph (f)(4) of FAR 52.215-1). Therefore, each initial offer should contain the Offeror’s best terms from a price and technical standpoint.

C. Offerors are advised that the Government will not evaluate any proposal information not contained within the body of the proposal.

II. BASIS OF AWARD

A. The Government will select the best overall offer, based upon an assessment of non-price factors/Sub-factors and Cost/Price. A contract may be awarded to the offeror who is deemed responsible in accordance with FAR 9.104, whose proposal conforms to the RFP’s requirements (to include all stated terms, conditions, representations, certifications, and all other information required by Section L of this solicitation) and represents the best value to the Government utilizing trade-offs, in accordance with the evaluation criteria.

B. The best value basis for award will be based on the following evaluation factors:

1. Non- Price Factors

a) Factor 1: Eligibility Factor

b) Factor 2: Schedule & Resource Capacity

(1) Sub-factor A: Manpower

(2) Sub-factor B: Physical Resource Capacity

(3) Sub-factor C: Integrated Product Schedule (IPS)

c) Factor 3: Past Performance

2. Cost/Price Factor

a) Factor 4: Price

C. Ratings will be applied to each factor as follows:

a) Non-price Factor 1 in terms of acceptable or non-acceptable

b) An overall adjectival rating from section IV below for Non-Price Factor 2, as well as an adjectival rating for each Subfactor under Factor 2.

c) A performance confidence rating from section IV below for Non-Price Factor 3.

D. The Navy will first evaluate Factor 1, eligibility for acceptability. If an Offeror is found to be unacceptable for Factor 1, then the Navy reserves the right to not conduct additional evaluation. Overall, non-Price factors, when combined, are considered more important than the Price factor. Factor 2 is significantly more important than Factor 3. Under Factor 2, Sub-factors A, B and C are approximately equal in importance. This may result in an award to a higher rated, higher priced Offeror, where the decision is consistent with the evaluation factors, and the Source Selection Authority (SSA) determines that the benefits associated with award to the higher price Offeror outweigh the difference in price. The importance of price as an evaluation factor will increase as the difference in non-price factors among competing proposals decreases. The SSA will base the source selection decision on an assessment of proposals against all source selection criteria in the solicitation.

III. EVALUATION FACTOR DESCRIPTIONS

A. Factor 1 – Eligibility Factor:

The objective of this factor is to:

1. Assess whether, upon receipt of proposals, the offeror holds a Master Ship Repair

Agreement (MSRA) or has applied for and will hold by time of award, a Master Ship Repair Agreement (MSRA) or MSRA Equivalency through NAVSEA 02,

2. Assess whether the offeror has ownership or committed access to a pier capable of berthing the vessel, and has ownership or committed access to a dry-dock capable of docking the vessel, in accordance with Section L.

3. Assess if the proposed dry-dock is certified and remains certified during the required period of performance; and should the dry-dock certification lapse anytime during the proposed docking period, the offeror has adequately described a plan for recertification.

B. Factor 2 – Schedule & Resource Capacity:

Basis of Evaluation - The objective of this factor is to evaluate the offeror's response to the Section L requirements for this factor, as follows:

1. The Government will evaluate Factor 2, Sub-factor A, Manpower to:

a) Assess the extent to which the offeror’s narrative demonstrates a detailed, substantiated and complete understanding of how the offeror will provide the manpower resources to successfully complete the Availability’s requirements as proposed, accounting for the offeror’s current manpower resourcing performance. In addition, assess the extent to which the offeror’s narrative regarding utilization of overtime, hiring additional personnel and utilization of subcontractors is supported by current manning performance and narrative.

b) Assess the extent to which the Offeror's completed Manpower Plan to Actual Data Sheet (Attachment S-4) and associated CDRLs or equivalent reports correlate with the narrative in Factor 2, Sub-factor A (1).

c) Assess the extent to which the offeror’s proposed manpower curves (total) demonstrate a detailed, substantiated and complete understanding of how the offeror will provide the manpower resources to successfully complete the Availability’s requirements and all existing and proposed work. The Government will assess these curves in relation to the narrative provided in Factor 2, Sub-factor A (1). Emphasis will be placed on how the offeror plans to de-conflict anticipated manning shortfalls.

d) Assess the extent to which the offeror’s proposed manpower curves (trade) demonstrate a detailed, substantiated and complete understanding of how the offeror will provide the trade manpower resources to successfully complete the Availability’s requirements and all existing and proposed work. The Government will assess these curves in relation to the narrative provided in Factor 2, Sub-factor A (1). Emphasis will be placed on how the offeror plans to de-conflict anticipated trade manning shortfalls.

2. The Government will evaluate Factor 2, Sub-factor B, Physical Resource Capacity to:

a) Assess the extent to which the offeror’s narrative and graphical representation demonstrates that the Offeror's capability to provide the required physical resources to complete the Availability. An emphasis will be placed on how the offeror plans to de-conflict anticipated physical resource conflicts.

3. The Government will evaluate Factor 2, Sub-factor C, Integrated Product Schedule for:

a) Understanding of scope and integration of the work items in the Work Item

Specification Package (Attachment J-1)

b) Identifying the critical path and logically sequencing work items, and

c) Integrating the milestones and key events in the Execution Milestones & Key Events

(Attachment J-3) reasonably.

C. Factor 3 – Past Performance:

The Government will measure how well an Offeror has performed on recent and relevant contracts in the past as an indicator of the Offeror’s probability of meeting the solicitation requirements and an indicator of the successful performance on the current requirement.

The Government will evaluate the recency, relevancy and quality of an Offeror’s past performance to assess a performance confidence rating. The Government will utilize CPARS data (Attachment S-9) where available, and if unavailable, utilize PPQ (Attachment S-2) as provided. The Government reserves the right to evaluate other sources of information. Other sources of information for past performance may include, but are not limited to, an Offeror’s past performance information from the Past Performance Information Retrieval System

(PPIRS), the Federal Awardee Performance and Integrity Information System (FAPIIS), Electronic Subcontract Report System (eSRS), as well as any other sources reasonably available to the Government.

For large businesses, the Government will consider historical compliance with the requirements of FAR Part 52.219-9.

Assessment of past performance will be a subjective assessment based on consideration of all relevant facts and circumstances. The Government is seeking to determine whether the Offeror has consistently demonstrated on recent and relevant contracts a commitment to customer satisfaction and timely delivery of quality goods and services at fair and reasonable prices.

Offerors shall also address unfavorable reports of past performance and their response, or lack thereof, will be taken into consideration. In particular, recent and relevant contracts will be examined to ensure that corrective measures have been put in place to prevent the reoccurrence of past performance problems. Prompt actions taken to correct performance problems will be a reflection of management concern for customer satisfaction; however, such action may not mitigate all negative performance trends.

The Government’s past performance evaluation will focus on the following areas:

Cost Control Schedule Technical Performance Subcontract Management

In accordance with FAR 15.305(a) (2) (iv), an Offeror without a record of relevant past performance or for whom information on past performance is not available, will not be evaluated favorably or unfavorably on past performance. The lack of a performance record will result in a neutral performance risk assessment.

D. Factor 4 - Price

1. The Government will analyze price proposals in accordance with FAR 15.404 using the information contained in the Pricing Workbook (Attachment J-4). Although award will be made based on an offeror’s total price, a price proposal that is found unreasonable and/or unbalanced may be rejected. Reasonableness will be determined based on proposals submitted in accordance with FAR 15.404.

This is the start of the file's text. The full file is on GovTribe.