N00024-18-R-6411-0006.pdf

PDF 750 KB Posted

Attached to
MK 48 MOD 7 APB6/TI-1 Federal contract opportunity
Solicitation number
N00024-18-R-6411
Issued by
Department of the Navy Naval Sea Systems Command

About this file

Amendment 0006

View the file

Other files for this federal contract opportunity

Other files attached to MK 48 MOD 7 APB6/TI-1, newest first.
File Type Posted
Attachment_14-Shipping_Instructions_10.15.2018.xlsx XLSX spreadsheet
N00024-18-R-6411-0007.pdf PDF
Attachments.zip ZIP file
N00024-18-R-6411-0005.pdf PDF
N00024-18-R-6411-0004.pdf PDF
N00024-18-R-6411-0003.pdf PDF
N00024-18-R-6411-0002.pdf PDF
N00024-18-R-6411-0001.pdf PDF
Attachment_15_-_Competition_Library_Request_Form.pdf PDF
FBO_Posted_Attachments.zip ZIP file
N00024-18-R-6411.pdf PDF
Exhibit_A_and_Exhibit_B_-CDRLS.pdf PDF
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to provide responses to bidder questions and update the solicitation.

1. CONTRACT ID CODE PAGE OF PAGES

S 1 76

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 12-Oct-2018

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N0002418R6411

X 9B. DATED (SEE ITEM 11)

15-Jun-2018

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

12-Oct-2018

CODE

NAVAL SEA SYSTEMS COMMAND (HQ)

1333 ISAAC HULL AVE SE

WASHINGTON NAVY YARD DC 20376-2060

N00024 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N0002418R6411

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION A - SOLICITATION/CONTRACT FORM

The required response date/time has changed from 19-Oct-2018 12:00 PM to 26-Oct-2018 12:00 PM.

SECTION B - SUPPLIES OR SERVICES AND PRICES

CLIN 0228

The CLIN description has changed from Program Protection FTE to Anti-Tamper FTE.

SECTION C - DESCRIPTIONS AND SPECIFICATIONS

The following have been modified:

SECTION C-1

1 CLIN DESCRIPTIONS

CLIN 0001– Design of MK 48 MOD 7 APB6/TI-1 Guidance and Control (G&C) Section and Warhead Electronics System (WES) Kit The Contractor shall design, develop, fabricate, test, and certify the MK 48 MOD 7 APB6/TI-1 Guidance and Control (G&C) Section (to include all associated Functional Item Replacements (FIRs), internal as well as affected Section-to-Section cables and shell assemblies) and Warhead Electronics System (WES) Kit (to include internal as well as affected Section-to-Section cable and mounting hardware) in accordance with Section C, Statement of Work (SOW), and contract baseline (Attachment 1) and the Contractor developed, Government approved MK 48 MOD 7 APB6/TI-1 G&C FIR level System/Subsystem Specification (SSS-3s). The Contractor is responsible for G&C related design work for the life of the contract, including but not limited to any design changes necessary as a result of findings from testing performed on the Engineering Development Model (EDM), Proof of Design (POD) and Proof of Manufacturing (POM) units in accordance with Section C-7 through Section C-12 of SOW and DMSMS/obsolescence management in accordance with paragraph 2.4, DIMINISHING MANUFACTURING

SOURCES AND MATERIAL SHORTAGES (DMSMS) / OBSOLESCENCE MANAGEMENT.

The Contractor is responsible for design and prototyping efforts of the MK 48 MOD 7 APB6/TI-1 G&C Section and WES Kit, as well as any design work occurring leading up to successful PRR, including any design changes necessary as a result of findings from testing performed on the POD and POM units. The WES Kit shall include any internal and impacted Section to Section Cabling.

The Contractor shall design, develop, fabricate, test, and certify an Anti-Tamper solution for the MK 48 MOD 7 APB6/TI-1 in accordance with Sections C-3.3.4.3.1 of the SOW. All NRE and deliverables associated with Anti-tamper, including developing AT test equipment or modification of test equipment to support AT, shall be covered under this CLIN and be included as part of Exhibit A and B CDRLS.

The Contractor shall design, develop, fabricate, test, and certify Anti-Tamper factory test equipment, associated cabling and fixtures required in accordance with Sections C-7.1.11 of the SOW. The Anti-Tamper Factory Test Equipment shall be stand alone and not combined with any other test equipment. The Contractor shall develop Factory Test Equipment utilizing operating system software that is supported by the Original Equipment Manufacturers (OEM) and whose end of support date is beyond the contract period of performance.

The Contractor is responsible for all MK 48 MOD 7 APB6/TI-1 related non-recurring engineering, design work, documentation, hardware and software deliverables associated with Anti-Tamper for the life of the contract, including but not limited to any design changes necessary as a result of findings from testing performed on the Engineering Development Model (EDM), Proof of Design (POD) and Proof of Manufacturing (POM) units.

CLIN 0002– Design of Factory Test Equipment (MK 48 MOD 7 APB6/TI-1 G&C Section and WES) The Contractor shall design, develop, fabricate, test, and certify factory test equipment, associated cabling and fixtures required to test the MK 48 MOD 7 APB6/TI-1 G&C Section in accordance with Sections C-7.1.1 and C-

7.1.2 of the SOW. The Factory Test Equipment shall optimize the number of individual test sets and maximize commonality for lifecycle support purposes. Note Contractor can propose factory test equipment configurations that include combining G&C Section and FIR level test capability. The Contractor shall develop Factory Test Equipment and utilize operating system software that is supported by the Original Equipment Manufacturers (OEM) and whose end of support date is beyond the contract period of performance.

The Contractor shall design, develop, fabricate, test and certify factory test equipment, associated cabling and fixtures required to test each of the FIRs developed by the Contractor, resident within the MK 48 MOD 7 APB6/TI- 1 G&C Section in accordance with Sections C-7.1.3 and C-7.1.4 of the SOW. The Contractor is responsible for design and fabrication efforts of the MK 48 MOD 7 APB6/TI-1 factory test equipment for each respective G&C Section FIR designed by the Contractor, as well as any design work occurring during the life of the contract, including any design changes necessary as a result of findings from testing performed on the POD, POM, and (IF OPTIONS EXERCISED) LRIP units and utilize operating system software that is supported by the Original Equipment Manufacturers (OEM).

The Contractor shall design, develop, fabricate, test, and certify WES factory test equipment, associated cabling and fixtures required to test the MK 48 MOD 7 APB6/TI-1 WES Kit in accordance with Sections C-7.1.9 and C-7.1.10 of the SOW. The Contractor shall develop Factory Test Equipment utilizing operating system software that is supported by the Original Equipment Manufacturers (OEM) and whose end of support date is beyond the contract period of performance. This CLIN will account for all of the Contractor’s design and fabrication efforts of the MK 48 MOD 7 APB6/TI-1 WES Kit factory test equipment, as well as any design work occurring during the life of the contract, including any design changes necessary as a result of findings from testing performed on the POD, POM, and (IF OPTIONS EXERCISED) LRIP units.

CLIN 0003– Data for CLIN 0001 - (G&C Section and WES Kit) The data to be furnished hereunder shall be prepared by the Contractor in accordance with Exhibit A and Exhibit B.

CLIN 0004– Data for CLIN 0002 – (Factory Test Equipment) The data to be furnished hereunder shall be prepared by the Contractor in accordance with Exhibit A and Exhibit B.

(IF OPTION EXERCISED)CLINs 0005, 0105, 0205, 0305, 0405, and 0430– Engineering Services and Support The Contractor shall, subject to Technical Instructions issued in accordance with Section H clause 5252.242-9115 TECHNICAL INSTRUCTIONS (APR 1999), conduct system studies and prototyping; provide services; testing;

integration support; analyses of design and/or production related issues for the MK 48 MOD 7 APB6/TI-1 G&C Section, WES Kit and Factory Test Equipment; and obsolescence risk mitigation for MK 48 Torpedo components.

The engineering services shall be performed within the limits as to place(s) and period(s) specified within the Technical Instructions.

The maximum liability of the Government for each engineering services item shall not exceed the amount set forth in the Schedule, or the amount obligated, whichever is less. If, at any time, the Contractor has reason to believe that the amounts it expects to incur in the performance of each engineering services item in the next succeeding sixty

(60) days, when added to all amounts previously incurred, will exceed seventy-five percent (75%) of the amount then set forth in the Schedule, or the amount obligated, whichever is less; or if, at any time, the Contractor has reason to believe that the man days and/or amount for the full performance of each engineering services item will be greater than or substantially less than that set forth in the Schedule, or the amount obligated, whichever is less, the

Contractor shall notify the Contracting Officer in writing, giving its revised estimate of the man-days and/or amount for the performance of said item. The Contractor shall not exceed the obligated amount for each engineering services item, unless and until such amount has been increased in writing by the Contracting Officer.

(IF OPTION EXERCISED) CLIN 0006 and CLIN 0019– Provisioned Items Ordered (PIO) The Contractor shall fabricate and/or procure, assemble, test, and deliver hardware and any associated software and firmware in support of the MK 48 MOD 7 APB6/TI-1 Contractor and Government owned hardware in accordance with “HQ C-1-0003 Provisioned Items Orders (APR 1999)”.

(IF OPTION EXERCISED) CLINs 0008, 0108, 0208, 0308, 0408, 0432– Other Direct Costs The Contractor shall invoice the costs of subsistence, transportation and incidental material, as authorized by a Technical Instruction (TI) in accordance with Section H clause 5252.242-9115 TECHNICAL INSTRUCTIONS (APR 1999), for Engineering Services and Support and Hardware Repair and Maintenance that are provided under CLINs 0005, 0105, 0205, 0305, 0405, 0107, 0207, 0307, 0407, 0430, and 0431 in accordance with HQ C-1-0008 Support for Engineering Services (NAVSEA) (JUN 1992).

(IF OPTION EXERCISED) CLIN 0009– Enhanced Data Rights The Contractor shall deliver Government Purpose Rights or greater on all data identified in (Attachment 2- Enhanced Government Data Rights) for the price set forth in Section B, CLIN 0009. The Contractor shall remove all markings of rights asserted from previously submitted Exhibits A and Exhibit B CDRLs. The Contractor shall submit/resubmit the Exhibit A and Exhibit B CDRLs marked with Government Purpose Rights or greater.

CLIN 0010 – RESERVED

CLIN 0011– MK 48 MOD 7 APB6/TI-1 Guidance and Control Box (GCB) Engineering Development Models (EDMs) The Contractor shall fabricate and/or procure, assemble, test, and deliver MK 48 MOD 7 APB6/TI-1 Guidance and Control Box (GCB) Engineering Development Models (EDMs). The MK 48 MOD 7 APB6/TI-1 GCB EDMs shall meet the functional requirements in Section C-14 of the SOW, contract baseline (Attachment 1) and Contractor developed, Government approved MK 48 MOD 7 APB6/TI-1 GCB System/Subsystem Specification 3 (SSS-3), however it does not have to meet form and fit requirements in Section 3.3.4.3.1.

CLIN 0012– MK 48 MOD 7 APB6/TI-1 G&C Section Pre-Proof of Design (POD) The Contractor shall fabricate and/or procure, assemble, test, and deliver MK 48 MOD 7 APB6/TI-1 G&C Section Pre-PODs, including new or affected Section-to-Section cables. The MK 48 MOD 7 APB6/TI-1 G&C Section Pre- PODs shall meet the requirements in Section C-15 of the SOW, contract baseline (Attachment 1) and all Contractor developed, Government approved MK 48 MOD 7 APB6/TI-1 SSS-3s. It should be noted that CLINS 0012 and 0013 have different delivery acceptance test requirements.

CLIN 0013- MK 48 MOD 7 APB6/TI-1 G&C Section POD The Contractor shall fabricate and/or procure, assemble, test, and deliver MK 48 MOD 7 APB6/TI-1 G&C Section PODs, including new or affected Section-to-Section cables. The MK 48 MOD 7 APB6/TI-1 G&C Section PODs shall meet the requirements in Section C-15 of the SOW, contract baseline (Attachment 1) and all Contractor developed, Government approved MK 48 MOD 7 APB6/TI-1 SSS-3s. It should be noted that CLINS 0012 and 0013 have different delivery acceptance test requirements.

CLIN 0014 – MK48 MOD7 APB6/TI-1 GCB FIR Pre-PODs The Contractor shall fabricate and/or procure, assemble, test, and deliver MK 48 MOD 7 APB6/TI-1 Guidance and Control Box (GCB) FIR Pre-PODs, inclusive of new and affected GCB FIR interface cables. The MK 48 MOD 7 APB6/TI-1 GCB Pre-PODs shall meet the requirements in Section C-15 of the SOW, contract baseline (Attachment

1) and Contractor developed, Government approved MK 48 MOD 7 APB6/TI-1 GCB SSS-3.

CLIN 0015 – MK48 MOD7 APB6/TI-1 Receiver FIR Pre-PODs The Contractor shall fabricate and/or procure, assemble, test, and deliver MK 48 MOD 7 APB6/TI-1 Receiver FIR Pre-PODs, inclusive of new or affected Receiver FIR interface cables. The MK 48 MOD 7 APB6/TI-1 Receiver

FIR Pre-PODs shall meet the requirements in Section C-15 of the SOW, contract baseline (Attachment 1) and Contractor developed, Government approved MK 48 MOD 7 APB6/TI-1 Receiver SSS-3.

CLIN 0016– MK 48 MOD 7 APB6/TI-1 WES Kit Pre-PODs The Contractor shall fabricate and/or procure, assemble, test, and deliver MK 48 MOD 7 APB6/TI-1 WES Kit Pre- PODs, inclusive of new or affected Section-to-Section cables. The MK 48 MOD 7 APB6/TI-1 WES Kit PODs shall meet the requirements in Section C-15 of the SOW and contract baseline (Attachment 1).

CLIN 0017– MK 48 MOD 7 APB6/TI-1 WES Kit PODs The Contractor shall fabricate and/or procure, assemble, test, and deliver MK 48 MOD 7 APB6/TI-1 WES Kit PODs, inclusive of new or affected Section-to-Section cables. The MK 48 MOD 7 APB6/TI-1 WES Kit PODs shall meet the requirements in Section C-15 of the SOW, contract baseline (Attachment 1).

CLIN 0018 – MK48 MOD7 APB6/TI-1 Transmitter FIR Pre-PODs The Contractor shall fabricate and/or procure, assemble, test, and deliver MK 48 MOD 7 APB6/TI-1 Transmitter FIR Pre-PODs, inclusive of new or affected Transmitter FIR interface cables. The MK 48 MOD 7 APB6/TI-1 Transmitter FIR Pre-PODs shall meet the requirements in Section C-15 of the SOW, contract baseline (Attachment

1) and Contractor developed, Government approved MK 48 MOD 7 APB6/TI-1 Transmitter SSS-3.

(IF OPTION EXERCISED) CLINs 0107, 0207, 0307, 0407, and 0431 – Hardware Repair and Maintenance The Contractor shall provide hardware repair and maintenance services for Government owned hardware delivered under this contract and not covered under a manufacturer or third-party warranty. The Contractor shall provide a cost estimate and schedule for rework or repair and retest to the Government within 10 working days of receipt of GFE needing rework or repair. The Government will assess that information and notify the Contractor in writing within 10 days as to whether or not the repair is authorized. The Contractor shall not proceed with the repair if it does not receive any written notification from the Government as instructed below.

The Contractor shall provide hardware repair services for Contractor owned hardware that has been damaged by the Government due to no fault of the Contractor. The Government will provide to the Contractor the damaged equipment in need of rework or repair. The Contractor shall provide a cost estimate and schedule for rework or repair and retest to the Government within 10 working days of receipt of equipment needing rework or repair. The Government will assess that information and notify the Contractor as to whether or not the repair is authorized. The Contractor shall not proceed with the repair if it does not receive below written notification from the Government.

The Contractor shall, subject to Technical Instructions issued in accordance with Section H clause NAVSEA 5252.242-9115 TECHNICAL INSTRUCTIONS (APR 1999), repair the aforementioned hardware under this contract as hereby specified. Prior to the Contractor performing any hardware repair services the Contracting Officer’s designated Contracting Officer’s Representative (COR) (see Section G) will authorize all repairs.

The maximum liability of the Government for each hardware repair and maintenance item shall not exceed the amount set forth in the Schedule, or the amount obligated whichever is less. If, at any time, the Contractor has reason to believe that the amounts it expects to incur in the performance of each hardware repair and maintenance item in the next succeeding sixty (60) days, when added to all amounts previously incurred, will exceed seventy-five percent (75%) of the amount then set forth in the Schedule; or if, at any time, the Contractor has reason to believe that the man days and/or amount for the full performance of each hardware repair and maintenance item will be greater than or substantially less than that set forth in the Schedule, the Contractor shall notify the Contracting Officer in writing, giving its revised estimate of the man-days and/or amount for the performance of said item. The Contractor shall not exceed the obligated amount for each hardware repair and maintenance item, unless and until such amount has been increased in writing by the Contracting Officer.

CLIN 0219- MK 48 MOD 7 APB6/TI-1 G&C Section Pre-POMs The Contractor shall fabricate and/or procure, assemble, test, and deliver MK48 MOD 7 APB6/TI-1 G&C Section Pre-POMs, inclusive of new or affected Section-to-Section cables, in accordance with Section C-16 of the SOW, contract baseline (Attachment 1) and all Contractor developed, Government approved MK 48 MOD 7 APB6/TI-1 SSS-3s. It should be noted that CLINS 0219 and 0220 have different delivery acceptance test requirements.

CLIN 0220- MK 48 MOD 7 APB6/TI-1 G&C Section POMs The Contractor shall fabricate and/or procure, assemble, test, and deliver MK48 MOD 7 APB6/TI-1 G&C Section POMs, inclusive of new or affected Section-to-Section cables, in accordance with Section C-16 of the SOW, contract baseline (Attachment 1) and all Contractor developed, Government approved MK 48 MOD 7 APB6/TI-1 SSS-3s. It should be noted that CLINS 0219 and 0220 have different delivery acceptance test requirements.

POM units shall be production representative of the MK48 MOD 7 APB6/TI-1 G&C Section LRIP units.

CLIN 0221– MK48 MOD7 APB6/TI-1 GCB FIR Pre-POMs The Contractor shall fabricate and/or procure, assemble, test, and deliver MK 48 MOD 7 APB6/TI-1 Guidance and Control Box (GCB) FIR Pre-POMs, inclusive of new or affected GCB FIR interface cables. The MK 48 MOD 7 APB6/TI-1 GCB Pre-POMs shall meet the requirements in Section C-16 of the SOW, contract baseline (Attachment

1) and Contractor developed, Government approved MK 48 MOD 7 APB6/TI-1 GCB SSS-3.

CLIN 0222– MK48 MOD7 APB6/TI-1 Receiver FIR Pre-POMs The Contractor shall fabricate and/or procure, assemble, test, and deliver MK 48 MOD 7 APB6/TI-1 Receiver FIR pre-POMs, inclusive of new or affected Receiver FIR interface cables. The MK 48 MOD 7 APB6/TI-1 Receiver FIR Pre-POMs shall meet the requirements in Section C-16 of the SOW, contract baseline (Attachment 1) and Contractor developed, Government approved MK 48 MOD 7 APB6/TI-1 Receiver SSS-3.

CLIN 0224- MK 48 MOD 7 APB6/TI-1 WES Kit POMs The Contractor shall fabricate and/or procure, assemble, test, and deliver MK48 MOD 7 APB6/TI-1 WES Kit POMs, inclusive of new or affected Section-to-Section cables, in accordance with Section C-16 of the SOW, contract baseline (Attachment 1) and Contractor developed, Government approved MK 48 MOD 7 APB6/TI-1 WES

SSS-3.

CLIN 0225– MK48 MOD7 APB6/TI-1 Transmitter FIR Pre-POMs The Contractor shall fabricate and/or procure, assemble, test, and deliver MK 48 MOD 7 APB6/TI-1 Transmitter FIR Pre-POMs, inclusive of new or affected Transmitter FIR interface cables. The MK 48 MOD 7 APB6/TI-1 Transmitter FIR Pre-POMs shall meet the requirements in Section C-16 of the SOW, contract baseline (Attachment

1) and Contractor developed, Government approved MK 48 MOD 7 APB6/TI-1 Transmitter SSS-3.

CLIN 0226 and (IF OPTION EXERCISED) 0426– MK 48 MOD 7 APB6/TI-1 G&C Section Factory Test Equipment The Contractor shall fabricate and/or procure, assemble, test and deliver MK 48 MOD 7 APB6/TI-1 G&C Section Test Equipment and Contractor developed G&C Section Functional Item Replacement (FIR) test equipment, associated cabling and fixtures that meet the requirements of Sections C-7.1.2 and 7.1.4 of the SOW, and that is capable of performing all MK 48 MOD 7 APB6/TI-1 G&C Section FAT defined in Guidance and Control (G&C) Section Sub-System Specification (SSS) for Torpedo MK 48 MOD 7 Improvements Increment II (8475615), Attachment 1, and Contractor developed, Government approved MK 48 MOD 7 APB6/TI-1 FIR level SSS-3.

FTE units will be shipped in place and available to the contractor until completion of LRIP.

CLIN 0227 and (IF OPTION EXERCISED) 0427– MK 48 MOD 7 APB6/TI-1 WES Kit Factory Test Equipment The Contractor shall fabricate and/or procure, assemble, test and deliver MK 48 MOD 7 APB6/TI-1 WES Kit Factory Test Equipment, associated cabling and fixtures that meet the requirements of Sections C-7.1.10 of the SOW, and that is capable of performing all MK 48 MOD 7 APB6/TI-1 WES Kit item FAT defined in Technical Insertion-1 Warhead Electronics System (TI-1 WES) SSS-3, Contract Baseline (Attachment 1).

FTE units will be shipped in place and available to the contractor until completion of LRIP.

(IF OPTION EXERCISED) CLIN 0228 – MK 48 MOD 7 APB6/TI-1 Anti-Tamper Factory Test Equipment Delivery

The Contractor shall fabricate and/or procure, assemble, test and deliver MK 48 MOD 7 APB6/TI-1 Anti-Tamper Test Equipment, associated cabling and fixtures that meet the requirements of Sections C-7.1.11 of the SOW, and that is capable of meeting the requirements as stated in MK 48 MOD 7 APB6/TI-1 System Program Protection Requirements (Attachment 11).

(IF OPTION EXERCISED) CLIN 0428– MK 48 MOD 7 APB6/TI-1 G&C Section LRIPs The Contractor shall fabricate and/or procure, assemble, test, and deliver MK48 MOD 7 APB6/TI-1 G&C Section LRIPs, including new or affected Section-to-Section cables, in accordance with Section C-17 of the SOW, contract baseline (Attachment 1) and all Contractor developed, Government approved MK 48 MOD 7 APB6/TI-1 SSS-3s

(IF OPTION EXERCISED) CLIN 0429 – MK 48 MOD 7 APB6/TI-1 WES Kit LRIPs The Contractor shall fabricate and/or procure, assemble, test, and deliver MK48 MOD 7 APB6/TI-1 WES Kit LRIPs, including new or affected Section-to-Section cables, in accordance with Section C-17 of the SOW and contract baseline (Attachment 1).

SECTION C-3

3 STATEMENT OF WORK

This Statement of Work (SOW) describes the Government’s requirements for the development, qualification and Low-Rate Initial Production (LRIP) of a product to satisfy the MK 48 MOD 7 Technology Insertion-1 (TI-1) requirements and ensure successful integration of Government Operational Software (OPSW), Advanced Processor Build 6 (APB6), with TI-1 Contractor deliverables.

3.1 OVERVIEW

The MK 48 MOD 7 APB6/TI-1 HWT Program is an evolutionary upgrade to the MK 48 MOD 7 Heavyweight Torpedo (HWT). The Program will be entering the Engineering and Manufacturing Development Phase (Milestone B) and consists of a software upgrade referred to as APB6 and a hardware upgrade referred to as TI-1.

TI-1 will include a Guidance and Control (G&C) Section upgrade, a redesigned TI-1 Warhead Electronics System (WES), and associated cabling. The MK 48 MOD 7 APB6/TI-1 G&C Section will contain the following new or redesigned Functional Item Replacements (FIRs) or their functional equivalents: high resolution sonar array, transmitter, receiver, Guidance and Control Box (GCB), tuning box, and Ethernet switch. The Government will develop and deliver APB6 OPSW, which includes an improved interface with the launch platform, increased modularity within certain Computer Software Configuration Items (CSCIs), and other software improvements.

All GFI (Attachment 7) is for informational purposes only. The Government does not warrant the ability to build compliant hardware using the GFI provided. The Contractor is fully responsible and is provided the design space to develop new or revised hardware, and associated drawings, processes, and procedures to make compliant the design of the MK48 MOD7 APB6 TI1 to the top level detail and performance specification requirements (Attachment 7).

During the MK 48 MOD 7 APB6/TI-1 development effort, the Contractor shall design, develop, fabricate and/or procure, assemble, test, qualify, and deliver hardware units of the MK 48 MOD 7 APB6/TI-1 G&C Section and the TI-1 WES Kit. The MK 48 MOD 7 APB6/TI-1 G&C Section and the TI-1 WES Kit shall include any internal FIR to FIR or intra-FIR cabling. The MK 48 MOD 7 APB6/TI-1 G&C Section and the TI-1 WES Kit shall also include any new or modified Section to Section cables impacted by interface changes. The TI-1 program shall include a new G&C Section to Fleet Exercise Section recorder cable to support the new record interfaces defined in the TI-1 ICD (Attachment 1). The TI-1 program shall also include modifications to the 201W1 Fleet Exercise Section cable and the 203W11 Warhead Section legacy cables based on the interfaces defined in the TI-1 ICDs. The Contractor shall perform non-recurring engineering (NRE) and deliver a design that meets all of the threshold requirements of the MK 48 MOD 7 APB6/TI-1 System/SubSystem Specifications SSS Level 2, (SSS-2, section level), SSS Level 3 (SSS-3, FIR level) and Cable specifications. The Contractor shall develop middleware in accordance with the middleware specifications provided by the Government and referenced by the System/SubSystem Specifications (Attachment 1).

The contractor shall implement as part of the MK 48 MOD 7 APB6/TI-1 system, Anti-Tamper technology for the purpose of protecting any Resident – Critical Program Information (R-CPI) defined in the Program Protection requirements.

The TI-1 G&C SSS-2 defines the full functionality of the G&C therefore it contains both Contractor (Hardware, Middleware, Firmware, etc.) and Government (Operational Software) requirements. The Contractor shall be responsible for meeting all requirements that are marked “Hardware”. The Government requires the Contractor to support the integration of Hardware/Software requirements.

The MK 48 MOD 7 TI-1 G&C Section shall support the legacy copper post-launch communication as well as provide an interface to support a future post-launch communication system as defined in the ICD. The MK 48 MOD 7 TI-1 G&C Section shall support both the TI-1 WES and legacy WES designs without any reconfiguration of the G&C. The G&C Section design shall include interfaces and provide functionality to accommodate both WES variants as defined in the SSS-2 and the ICD.

The MK 48 MOD 7 TI-1 upgrade includes a modification to the torpedo weapon identification method as defined in the Torpedo to Fire Control System interface requirements document (Attachment 1). The Government will lead efforts for meeting this requirement.

The Contractor shall utilize an array architecture that meets all of the performance specifications.

The Contractor shall develop and implement a comprehensive qualification program. The Contractor shall work with the Government in support of Government integration efforts required to successfully integrate MK 48 MOD 7 APB6/TI-1 hardware deliverables with APB6 OPSW, utilizing the Weapons Analysis Facility (WAF) at NUWC Newport. The Contractor shall support Government efforts during final weapon integration utilizing the available MK 660 and MK 710 Automated Test Equipment (ATE) at NUWC Newport and NUWC Keyport. The Contractor shall support Government efforts during in-water runs and other system level testing as defined in the Government Qualification Acceptance Test Plan (QATP) (Attachment 6).

The Contractor shall deliver GCB Engineering Development Model (EDM) units to support early land-based hardware/software integration. In order to validate its design prior to LRIP, the Contractor shall perform Design Verification Testing (DVT) on both Proof of Design (POD) hardware units and Proof of Manufacturing (POM) hardware units. At a minimum, POM DVT shall consist of verifying requirements impacted by design changes from POD. The Contractor shall subject EDM, POD, POM and LRIP (IF OPTION EXERCISED) units to a Factory Acceptance Test (FAT). POM units will be used by the Government to support Government qualification testing.

The Contractor shall design, develop, test, fabricate and deliver Factory Test Equipment capable of verifying compliance with the performance requirements in accordance with the Contract Baseline (Attachment 1) and Government approved Contractor Test Requirements Documents (TRDs) (CDRL B007) for all Contractor delivered hardware. The effort shall include factory test equipment related to the MK 48 MOD 7 APB6/TI-1 G&C Section, MK 48 MOD 7 APB6/TI-1 WES Kits and associated Contractor developed FIRs (with the exception of the three FIRs listed below).

There are three FIRs that will be treated differently:

(1) Inertial Measurement Unit (IMU):

For the IMU, the Government will provide the Contractor with the IMU Critical Item Performance Specification (CIPS) 8595316 and the IMU Interface Control Drawing (ICD) 8475616 as part of the Contract baseline (Attachment 1). The Contractor will have three options to procure the IMU:

The Contractor shall procure IMUs from a source controlled vendor, or The Contractor shall procure IMUs from a qualified vendor other than the source controlled vendor, or The Contractor shall build the IMUs from the IMU CIPS and IMU ICD

See Section C-7.1.8 for IMU factory test equipment requirements.

(2) Wire Link Interface Assembly (WLIA):

For the WLIA, the Contractor may introduce a new design or use the Government Furnished Information (GFI) Legacy MK 48 MOD 7 WLIA TDP (Attachment 7) as a design basis. All GFI is for informational purposes only.

The Government does not warrant the ability to build compliant hardware using the GFI provided. The Contractor is fully responsible and is provided the design space to develop new or revised hardware, and associated drawings, processes, and procedures to make compliant the design of the MK48 MOD7 APB6 TI1 to the top level detail and performance specification requirements (Attachment 1). See Section C-7.1.6 for WLIA Factory Test Equipment details.

(3) Depth Sensor Assembly (DSA):

The Government will provide the Contractor a TDP for the fabrication, assembly, test and delivery of the DSA FIR per the Contract baseline (Attachment 1). See Section C-7.1.5 for DSA Factory Test Equipment requirements.

The Government will provide the Contractor with the TDP for the fabrication, assembly, test and delivery of the Warhead Add-On Sensor (WAS) as Government-Furnished Information (GFI) Attachment 7. The Contractor shall either redesign the WAS or build the WAS to print from the provided GFI WAS TDP. All GFI is for informational purposes only. The Government does not warrant the ability to build compliant hardware using the GFI provided.

The Contractor is fully responsible and is provided the design space to develop new or revised hardware, and associated drawings, processes, and procedures to make compliant the design of the MK48 MOD7 APB6 TI1 to the top level detail and performance specification requirements (Attachment 1).

The Government will provide the Contractor with the TDPs for the fabrication and assembly of the following Contract baseline (Attachment 1) G&C Section shell assemblies:

Shell Assembly Forward, 6879926 Shell Assembly Aft, 5856804 Modified Shell, 6114212

The Contractor shall develop and deliver the G&C Section in accordance with the aforementioned Contract baseline (Attachment 1) G&C Section shell assembly drawings. Any proposed changes to these drawings shall be submitted by the Contractor via an Engineering Change Proposal (ECP) (CDRL A019) which requires review and approval by the Government before proceeding.

The MK 48 MOD 7 APB6/TI-1 hardware provided by the Contractor under this effort (excluding EDM Units CLIN 0011) shall:

(a) meet, or exceed, all necessary performance requirements as stated in the specifications, and

(b) when configured into an AUR, be capable of fitment, load, and deployment from a United States Navy (USN) submarine without hardware changes to the submarine (with the exception of Fire Control System changes identified in contract baseline documents (Attachment 1), and

(c) minimize impact to the existing MK 48 HWT logistics infrastructure, equipment, procedures, and Navy and

Intermediate Maintenance Activity (IMA) training

Figure 3-1 depicts the Sub System Specification (SSS) flow down showing links between Government and Contractor specifications.

Figure 3-1

3.2 APPLICABLE DOCUMENTS

To the extent referenced herein, the following documents form a part of this SOW and are hereby incorporated by reference. In the event of a conflict between the documents referenced herein and the contents of this SOW, the contents of this SOW shall take precedence. Other documents and specifications provided as Government- Furnished Information (GFI) are identified in Attachment 7. All GFI is for informational purposes only. The Government does not warrant the ability to build compliant hardware using the GFI provided. The Contractor is fully responsible and is provided the design space to develop new or revised hardware, and associated drawings, processes, and procedures to make compliant the design of the MK48 MOD7 APB6 TI1 to the top level detail and performance specification requirements (Attachment 1).

3.2.1 Department of Defense Specifications

3.2.1.1 Contract Baseline Documents

See Attachment 1, Contract Baseline, for the list of design specifications, performance specifications, interface requirement documents, assembly drawings, and source control drawings. In the case where a particular assembly drawing is provided as both a PDF and in a native file format the PDF version shall be the controlling document and supersede the native file format version.

3.2.1.2 Program Unique Documents

See Attachment 10, Program Unique Documents.

3.2.1.3 Other Government Documents

Title Date and/or Revision

Naval Systems Engineering Technical Review (SETR) Handbook (See Attachment 10)

Version 1

NAVSEA 05H Technical Review Manual (TRM) (See Attachment 10) 18 Dec 2009

NAVSEA Instruction 5000.8 Naval SYSCOM Risk Management Policy (Attachment 10)

21 July 2008

DoN Anti-Tamper Desk Reference Edition 6.0 (Attachment 11) 1 April 2015

AT Plan Template (Version 4.0) (See Attachment 11) April 2017

Anti-Tamper (AT) Technical Implementation Guidelines (TIG) (Attachment 11) 30 November 2016

DoD Program Manager’s Guidebook for Integrating the Cybersecurity Risk Management Framework (RMF) into the System Acquisition Lifecycle (Version 1.0) (Attachment 11)

September 2015

DoD Cybersecurity Test and Evaluation Guidebook (Version 1.0) (See Attachment 11)

1 July 2015

DoDI 8500.01 Cybersecurity (See http://www.dtic.mil/whs/directives/) (See Attachment 11)

14 March 2014

DoDI 8510.01 Risk Management Framework (RMF) for DoD Information Technology (IT) (See http://www.dtic.mil/whs/directives/) (See Attachment 11)

12 March 2014

NIST SP800-30, Guide for Conducting Risk Assessments (http://csrc.nist.gov/publications/PubsSPs.html#800-30 ) (Attachment 11)

September 2012

NAVSEA 9400.2-M

NAVSEA PIT-Control System Cybersecurity Implementation Manual (NAVSEA Manual, Ser 05H/096, dtd 06 Oct 2016) (Authorization document: NAVSEA Instruction, Ser 00/365, dtd 20 Sep 2016, https://navsea.portal.navy.mil/hq/Docs/Instructions/09400.02A.pdf) (Attachment 11)

Version 5 October 2016

DoD SCRM Key Practices and Implementation Guide (Attachment 11) 25 February 2010

Committee on National Security Systems (CNSSI) 1253 Security Categorization and Control Selection (Attachment 11)

27 March 2014

DoD Security Technical Implementation Guidance (STIGs) (DISA website: http://iase.disa.mil/stigs )

(See STIG Master List)

DoD Security Requirements Guides (SRGs) (DISA website: http://iase.disa.mil/stigs/ )

(See SRG-STIG Library Compilation)

Manufacturing Readiness Level (MRL) Deskbook 2016 (Attachment 13) 2016

DOD 5000.04-M-1 Contractor Cost Data Reporting Manual (See Attachment 9) 18 April 2007

MIL-HDBK-2155 Failure Reporting, Analysis and Corrective Action Taken (See http://www.assistdocs.com)

11 Dec 1995

MIL-HDBK-263 ELECTROSTATIC DISCHARGE (ESD) CONTROL

HANDBOOK FOR PROTECTION OF ELECTRICAL AND ELECTRONIC

PARTS, ASSEMBLIES, AND EQUIPMENT (EXCLUDING ELECTRICALLY

INITIATED EXPLOSIVE DEVICES) (See http://www.assistdocs.com)

Rev B 31 July 1994

MIL-STD-882E System Safety Program Requirements (See http://www.assistdocs.com)

Rev. E

MIL-STD-1686 – Electrostatic Discharge Control Program For Protection of Electrical and Electronic Parts, Assemblies and Equipment (Excluding Electrically Initiated Explosive Devices) (See http://www.assistdocs.com)

Rev, C 25 October 1995

MIL-STD-130N Identification Marking of U.S. Military Property (See http://www.assistdocs.com)

Rev. N

MIL-STD-1839D (See http://www.assistdocs.com) 12 May 2010

MIL-HDBK-1839A (See http://www.assistdocs.com) 27 Nov 2000

MIL-DTL-24784 (See http://www.assistdocs.com) 03 Nov 2007

IEEE STD 12207 Systems and Software Engineering - Software life Cycle Processes (See http://www.astm.org/standards)

21 March 2008

ANSI/ISO/ASQ 9001-2015 AS9001 D (See http://webstore.ansi.org/) 23 September 2015

DoD 8570.01-M Information Assurance Workforce Improvement Program (http://dtic.mil/whs/directives/corres/pdf/857001m.pdf )

12/19/2005, Change 4 dtd 11/10/2015

DOD 5220.22-M National Industrial Security Program Operating Manual (See http://www.dtic.mil/whs/directives/)

28 Feb 2006

3.2.1.4 Non-Government documents

Title Description Date and/or Revision

Carnegie Mellon Capability Maturity Model Integration Version 1.3

Carnegie Mellon Capability Maturity Model Integration November 2010

ANSI/EIA-649-A National Consensus Standard for Configuration Management (See http://webstore.ansi.org/)

October 2004

ANSI/EIA-748-B Alliance Standard Earned Value Management Systems (See http://webstore.ansi.org/)

10 Sep 2007

SAE ARP 5580 Recommended failure modes and effects analysis (FMEA) practices for non-automobile applications (See https://portal.ipc.org/ipc-store.htm)

SAE AS5553B Counterfeit Electrical, Electronic, and Electromechanical (EEE) Parts; Avoidance, Detection, Mitigation, and Disposition

2016-09-12

SAE AS6462A Fraudulent/Counterfeit Electronic Parts; Avoidance, Detection, Mitigation, and Disposition Verification Criteria

2014-08-26

SAE AS6081 Fraudulent/Counterfeit Electronic Parts: Avoidance, Detection, Mitigation, and Disposition – Distributors

2012-11-07

SAE ARP6178 Fraudulent/Counterfeit Electronic Parts; Tool for Risk Assessment of Distributors

2011-12-19

SAE AS6174 Counterfeit Materiel; Assuring Acquisition of Authentic and Conforming Materiel

2014-07-29

SAE AS6301 Compliance Verification Criterion Standard for SAE AS6081, Fraudulent/Counterfeit Electronic Parts:

Avoidance, Detection, Mitigation, & Disposition-Dist

2014-01-14

IPC/WHMA-A-620 Requirements and Acceptance for Cable and Wire Harness Assemblies

January 2017

IPC-J-STD-001G Training and Certification 2017-11-06

IPC-2220 Series Design 2012-11-20

IPC-6010 Series Qualification and Performance 2005-10-28

IPC-A-610 Inspection/Test/Acceptability 2017-10-01

IPC-TM-650 Inspection/Test/Acceptability 2007-01-01

IPC-QL-653 Inspection/Test/Acceptability 1997-11-01

IPC-MI-660 Inspection/Test/Acceptability 1984-02-01

3.3 REQUIREMENTS

The Contractor shall document and submit Contractor Data Requirements Lists (CDRLs) as defined on the DD-1423 forms. For those CDRLs required to be submitted via the Government’s web-based Configuration Management database (CMPro), if the Government is unable to provide, or the Contractor is unable to receive access to the CMPro Database, the Contractor shall submit CDRLs in Adobe PDF (.pdf, searchable) or MS (.doc or .docx) formats to the Government. Other CDRLs are required to be submitted via the Heavyweight Torpedo Technical Data System (HTTDS) or the Automated Process Control System (APCS).

3.3.1 Program Management

The Contractor shall develop and provide a Program Management Plan (PMP) (CDRL A001). The PMP shall contain sufficient detail to allow the Government to verify the Contractor’s management and scheduling of all efforts necessary to meet the Contract requirements to include completion of program reviews and completion of associated CDRL deliverables. The Contractor shall include a description of their process of identifying and tracking risks and opportunities in the PMP. Where these efforts are event driven, as opposed to calendar driven, the Contractor shall provide schedule estimates.

The PMP shall include within its body the Contractor’s proposed Integrated Master Schedule (IMS). The IMS shall include within its body milestones, stages, and activities consistent with the proposed PMP. The IMS should align to the contract line item number (CLIN) structure, the contract work breakdown structure (WBS) and the appropriate SOW and specification paragraph. The PMP, with the IMS, shall provide within its body sufficient evidence that the proposal activities, processes and procedures will accomplish the requirements in this solicitation. The Contractor shall identify the program’s critical path, associated risks, and mitigation plans.

The Contractor shall designate a full-time Contractor Program Manager (CPM). The CPM shall be responsible for providing Monthly Earned Value Management (EVM) Reports and IMS progress reports in accordance with the Integrated Program Management Report (IPMR) (CDRL A002). The Contractor shall implement EVM in accordance with EVM system guidelines found within Earned Value Management Systems, American National Standards Institute/Electronic Industries, Alliance Standard (ANSI/EIA-748-B), with a post award Integrated Baseline Review (IBR) in accordance with DFAR clause 252.234-7002.

The CPM shall provide the Contractor’s Progress and Status Report (CDRL A003). The Contractor’s Progress, Status, and Management Report must cover within its body all efforts under this Contract including Subcontractor/Suppliers performance against the schedule baseline established in the Program Management Plan, Technical Instructions/Engineering Services, Obsolescence Reviews, Risk Management, Failure Analysis, Returned Goods, and other work performed under the contract during the month of the report, in addition to Design, Development, Manufacture, Test, and Production efforts.

Deliverables: Program Management Plan (PMP) (CDRL A001) Integrated Program Management Reports (IPMR) (CDRL A002) Contractor’s Progress and Status Report (CDRL A003)

3.3.1.1 Risk Management

The Contractor shall develop a Contractor’s Risk Management Plan (CDRL A004). The Contractor’s Risk Management Plan shall include a risk management process that is focused on program risk areas and the program’s critical path to systematically identify and mitigate cost, schedule, and technical risks. The Contractor shall use the NAVSEA Instruction 5000.8 Naval SYSCOM Risk Management Policy (Attachment 10), as the basis for its risk management process.

The Contractor shall provide as part of the Contractor’s Progress and Status Report (CDRL A003) risk item reports, to include the identification and adjudication of risk items. NAVSEA Instruction 5000.8 Naval SYSCOM Risk Management Policy may be used for guidance (Attachment 10).

Deliverables: Contractor’s Risk Management Plan (CDRL A004)

3.3.1.2 Program Status

The Contractor shall schedule all Monthly Status Meetings and Quarterly Program Management Reviews (PMRs) as well as develop, coordinate, and distribute Presentation Materials (CDRL A005) such as agendas and presentation packets for each review. The Contractor shall record, generate, and process submittal of the review minutes from the participants of reviews, and track all action items after the reviews. The Contractor shall submit Report, Record of Meeting/Minutes (CDRL A006) with those minutes and action item tracking data. Progress and updated status on action items shall also be included in the Contractor’s Progress, Status, and Management Report (CDRL A003).

Unless otherwise noted by the Government for the individual review or meeting events, the Contractor shall provide unclassified electronic and video or audio teleconference capability, allowing remote participation in conference room presentations by, and verbal participation of, Government personnel located in Internet-connected Government offices, including NUWC Newport and NUWC Keyport locations. The Contractor shall provide Internet-based ability to access or download unclassified program review documentation, models, and data to Government personnel located in Internet-connected Government offices.

Deliverables: Presentation Material (CDRL A005) Report, Record of Meeting/Minutes (CDRL A006)

3.3.1.2.1 Monthly Status Meeting

The Contractor’s Program Manager shall conduct Monthly Status Meetings. The Monthly Status Meeting shall include topics on the Contractor’s Progress and Status Report (CDRL A003), covering all efforts under this Contract including Subcontractor/Suppliers performance against the schedule baseline.

3.3.1.2.2 Program Management Reviews

The Contractor shall conduct Quarterly PMRs. PMRs shall include the following information, at a minimum:

Schedule performance including all completed and planned efforts Risk management activities and current status (including open items and planned mitigation efforts) Program Status (progress and/or issues) A review of all program, contractual, and technical issues A review of all on-going technical efforts (design, development, test), including cost and schedule performance A cost data review

Of the four PMRs held each year, three shall occur at the Contractor’s facility or a location agreed to by the Government and one will be conducted in the Washington D.C. Area (within 50 driving miles of the Washington Navy Yard). When the PMR is held at the Contractor’s facility, the Contractor shall provide administrative support and access to the facilities to attending Government personnel. The Contractor shall propose date(s) and location no less than 45 days prior to the PMR. The Government will confirm the date(s) and location no less than 30 days prior to the PMR. The Contractor shall submit the PMR agenda, PMR presentations (CDRL A005) and PMR meeting minutes (CDRL A006).

3.3.1.2.3 Small Business Participation

This contract includes a requirement for a Subcontracting Plan (Attachment 25) in accordance with FAR 52.219-9 and DFARS 252.219-7003 which complies with the requirements presented in FAR 19.704. The contractor’s Subcontracting Plan, in accordance with FAR 19.702(a)(1), shall be reviewed and approved by the Procuring Contracting Officer. During contract execution, the prime contractor’s compliance with its Subcontracting Plan will be monitored and evaluated in accordance with the requirements of FAR 19.705-6 (g) or DFARS 219.702-70(d). In addition to the Small Business Subcontracting Plan, all Contractors, both small and other than small businesses, must comply with the Small Business Participation Commitment Document (SBPCD) incorporated into the contract as Attachment 24. During contract execution, the prime contractor’s compliance with its SBPCD will be monitored and evaluated in accordance with CDRL A018.

Deliverables: Small Business Participation Commitment Document (CDRL A018)

3.3.1.3 Integrated Baseline Review (IBR)

The Contractor shall host a post-award IBR no later than 90 days after contract award. During the post-award IBR, the Contractor shall present its initial PMP (CDRL A001) to the Government for approval.