Exhibit_C_-_Contract_Data_Requirements_List(s),_DD_Form_1423_DRAFT.doc

DOC document 275 KB Posted

Attached to
AN/BYG-1 Combat Control System (CCS) Payload Control System
Solicitation number
N00024-18-R-6102
Issued by

About this file

Exhibit C

View the file

Other files

File Type Posted
Attachment_8_-_RFP_Question_Submittal_Form_DRAFT.pdf PDF
Attachment_2__-_DD_Form_254_(DRAFT).pdf PDF
Attachment_13_-_Classified_Material_Request_Form_DRAFT.pdf PDF
N0002418R6102_Attachment_9_-_Part_A_Supporting_Cost_Data_Workbook__DRAFT.xlsx XLSX spreadsheet
Attachment_4B_-_CLASSIFIED_GFI_Form_DRAFT.xlsx XLSX spreadsheet
N0002418R6102_Attachment_9_-_Part_B_Supporting_Cost_Data_Workbook_DRAFT.xlsx XLSX spreadsheet
Attachment_1_-_Appendix_C_TI22APB23_(DRAFT).doc DOC document
Attachment_1_-_Appendix_B_TI22APB21_(DRAFT).doc DOC document
N00024-18-R-6102_DRAFT.pdf PDF
Attachment_1_-_Appendix_E_TI24APB25_(DRAFT).doc DOC document
Exhibit_A_-_Contract_Data_Requirements_List(s),_DD_Form_1423_DRAFT.doc DOC document
Attachment_4B_-_CLASSIFIED_GFI_Form_DRAFT.pdf PDF
Attachment_1_-_Statement_of_Work_for_the_Payload_Control_System_(DRAFT).doc DOC document
Attachment_1_-_Appendix_D_TI24APB23_(DRAFT).doc DOC document
Attachment_1_-_Appendix_A_TI20APB21_(DRAFT).doc DOC document
Attachment_5_-_PCS_GFP_Form_DRAFT.xlsx XLSX spreadsheet
Attachment_3_CDRLS_DRAFT.pdf PDF
Exhibit_B_-_Contract_Data_Requirements_List(s),_DD_Form_1423_DRAFT.doc DOC document
DRAFT_Attachment_4A_-_PCS_GFI_List_16_aug_18_N00024-18-NR-98173.pdf PDF
Attachment_1_-_Appendix_G_Eng_Svcs_(DRAFT).doc DOC document
Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EXHIBIT C

N00024-18-R-6XXX

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item) Form Approved

OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing, and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

C

C. CATEGORY:

TDP TM OTHER CSDR

D. SYSTEM/ITEM

PAYLOAD CONTROL SYSTEM

E. CONTRACT/PR NO.

N00024-18-NR-98173

F. CONTRACTOR

TBS

1. DATA ITEM NO.

C001

2. TITLE OF DATA ITEM

SOFTWARE RESOURCES DATA REPORT; INITIAL DEVELOPER RPT AND DATA DICT

3. SUBTITLE

SOFTWARE RESOURCES DATA REPORTING (SRDR)

17. PRICE GROUP

4. AUTHORITY (Data Acquisition Doc. No.)

DI-MGMT-81739B

5. CONTRACT REFERENCE

Att 2 SOW Paragraphs 3.1.8

6. REQUIRING OFFICE

PMS425

7. DD 250 REQ

LT

9.

DIST STATEMENT REQUIRED

10. FREQUENCY

ONE/R

12. DATE OF FIRST SUBMSSN

SEE BLOCK 16

14. DISTRIBUTION

18. ESTIMATED

TOTAL PRICE

8. APP CODE
D
11. AS OF DATE
13. DATE OF SUBSEQ SUBMSSN

b. COPIES

N/A
See Block 16
N/A
SEE BLOCK 16
a. ADDRESSEE

Final

16. REMARKS

Draft
Reg
Repro
PMS425A3
0
1
0
NUWCDMO
0
1
0
PMS425
0
1
0
PCO
0
1
0
ACO
0
1
0
DCARC
0
1
0
15. TOTAL
0
6
0

G. PREPARED BY

Jake Glassman, PMS425ND

H. DATE

7/17/18

I. APPROVED BY

Angel Jaeger, PMS425A3

J. DATE

7/17/18

DD Form 1423-1, Feb 2001 Previous editions are obsolete. Page 1 of 5 Pages

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item) Form Approved

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing, and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

C

C. CATEGORY:

D. SYSTEM/ITEM

E. CONTRACT/PR NO.

N00024-18-NR-98173

F. CONTRACTOR

1. DATA ITEM NO.

C002

2. TITLE OF DATA ITEM

SOFTWARE RESOURCES DATA REPORT; FINAL DEVELOPER RPT AND DATA DICT

3. SUBTITLE

SOFTWARE RESOURCES DATA REPORTING (SRDR)

17. PRICE GROUP

4. AUTHORITY (Data Acquisition Doc. No.)

DI-MGMT-81740A

5. CONTRACT REFERENCE

Att 2 SOW Paragraphs 3.1.8

6. REQUIRING OFFICE

7. DD 250 REQ

9.

10. FREQUENCY

12. DATE OF FIRST SUBMSSN

14. DISTRIBUTION

18. ESTIMATED

8. APP CODE
D
11. AS OF DATE
13. DATE OF SUBSEQ SUBMSSN

b. COPIES

N/A
See Block 16
N/A
SEE BLOCK 16
a. ADDRESSEE

Final

16. REMARKS

Draft
Reg
Repro
PMS425A3
1
1
0
NUWCDMO
1
1
0
PMS425
1
1
0
PCO
1
1
0
ACO
1
1
0
DCARC
1
1
0
15. TOTAL
6
6
0

G. PREPARED BY

H. DATE

7/17/18

I. APPROVED BY

Angel Jaeger, PMS425A3

J. DATE

DD Form 1423-1, FEB 2001 Previous editions are obsolete. Page 2 of 5 Pages

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item) Form Approved

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing, and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

C

C. CATEGORY:

D. SYSTEM/ITEM

E. CONTRACT/PR NO.

N00024-18-NR-98173

F. CONTRACTOR

1. DATA ITEM NO.

C003

2. TITLE OF DATA ITEM

COST DATA SUMMARY REPORT (DD FORM 1921)

3. SUBTITLE

CONTRACTOR COST DATA REPORTING (CCDR)

17. PRICE GROUP

4. AUTHORITY (Data Acquisition Doc. No.)

DI-FNCL-81565C

5. CONTRACT REFERENCE

Att 2 SOW Paragraphs 3.1.8

6. REQUIRING OFFICE

7. DD 250 REQ

9.

10. FREQUENCY

12. DATE OF FIRST SUBMSSN

14. DISTRIBUTION

18. ESTIMATED

8. APP CODE
D
11. AS OF DATE
13. DATE OF SUBSEQ SUBMSSN

b. COPIES

N/A
See Block 16
N/A
SEE BLOCK 16
a. ADDRESSEE

Final

16. REMARKS

Draft
Reg
Repro
PMS425A3
1
1
0
NUWCDMO
1
1
0
PMS425
1
1
0
PCO
1
1
0
ACO
1
1
0
DCARC
1
1
0
15. TOTAL
6
6
0

G. PREPARED BY

H. DATE

7/17/18

I. APPROVED BY

Angel Jaeger, PMS425A3

J. DATE

DD Form 1423-1, FEB 2001 Previous editions are obsolete. Page 3 of 5 Pages

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item) Form Approved

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing, and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

C

C. CATEGORY:

D. SYSTEM/ITEM

E. CONTRACT/PR NO.

N00024-18-NR-98173

F. CONTRACTOR

1. DATA ITEM NO.

C004

2. TITLE OF DATA ITEM

FUNCTIONAL COST-HOUR REPORT

(DD FORM 1921-1)

3. SUBTITLE

17. PRICE GROUP

4. AUTHORITY (Data Acquisition Doc. No.)

DI-FNCL-81566C

5. CONTRACT REFERENCE

Att 2 SOW Paragraphs 3.1.8

6. REQUIRING OFFICE

7. DD 250 REQ

9.

10. FREQUENCY

12. DATE OF FIRST SUBMSSN

14. DISTRIBUTION

18. ESTIMATED

8. APP CODE
D
11. AS OF DATE
13. DATE OF SUBSEQ SUBMSSN

b. COPIES

N/A
See Block 16
N/A
SEE BLOCK 16
a. ADDRESSEE

Final

16. REMARKS

Draft
Reg
Repro
PMS425A3
1
1
0
NUWCDMO
1
1
0
PMS425
1
1
0
PCO
1
1
0
ACO
1
1
0
DCARC
1
1
0
15. TOTAL
6
6
0

G. PREPARED BY

H. DATE

7/17/18

I. APPROVED BY

Angel Jaeger, PMS425A3

J. DATE

DD Form 1423-1, FEB 2001 Previous editions are obsolete. Page 4 of 5 Pages

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item) Form Approved

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing, and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

C

C. CATEGORY:

D. SYSTEM/ITEM

E. CONTRACT/PR NO.

N00024-18-NR-98173

F. CONTRACTOR

1. DATA ITEM NO.

C005

2. TITLE OF DATA ITEM

CONTRACTOR BUSINESS DATA REPORT (DD FORM 1921-3)

3. SUBTITLE

17. PRICE GROUP

4. AUTHORITY (Data Acquisition Doc. No.)

DI-FNCL-81765B

5. CONTRACT REFERENCE

Att 2 SOW Paragraphs 3.1.8

6. REQUIRING OFFICE

7. DD 250 REQ

9.

10. FREQUENCY

12. DATE OF FIRST SUBMSSN

14. DISTRIBUTION

18. ESTIMATED

8. APP CODE
D
11. AS OF DATE
13. DATE OF SUBSEQ SUBMSSN

b. COPIES

N/A
See Block 16
SEE BLOCK 16
SEE BLOCK 16
a. ADDRESSEE

Final

16. REMARKS

Draft
Reg
Repro
PMS425A3
1
1
0
NUWCDMO
1
1
0
PMS425
1
1
0
PCO
1
1
0
ACO
1
1
0
DCARC
1
1
0
15. TOTAL
6
6
0

G. PREPARED BY

H. DATE

7/17/18

I. APPROVED BY

Angel Jaeger, PMS425A3

J. DATE

DD Form 1423-1, FEB 2001 Previous editions are obsolete. Page 5 of 5 Pages

BLOCK 4: If software size delivered per section 3.4 is reported in logical Software Lines of Code (SLOC), the SLOC count shall be determined using the Center for Systems and Software Engineering Unified CodeCount (UCC) available at http://sunset.usc.edu/research/CODECOUNT/.

BLOCK 9: Distribution Statement D: Distribution authorized to the Department of Defense and U.S. DoD contractors only for Administrative or Operational Use, 11 July 2018. Other requests shall be referred to Program Executive Officer, Submarines (PMS425), Washington Navy Yard, DC. Release to Australia authorized under the BYG-1 Armament Cooperative Program.

BLOCKS 10 -13: Prepare the Inititial Software Resources Data Report (SRDR) in accordance with DI-FNCL-81739B (or the most recently approved version) and the OSD Deputy Director, Cost Assessment (DDCA)-approved contract CSDR Plan. The DID, DI-FNCL-81739B, is available from the Defense Cost and Resource Center (DCARC) website at http://dcarc.cape.osd.mil. The CSDR Plan is included as a contract attachment. SRDR, Initial Developer Report shall be submitted within 60 days of completion of SRR for each TI/APB. Subsequent submissions shall be provided upon major process changes or as required to support subsequent TI/APBs.

BLOCKS 14 AND 15: All CSDR reports shall be submitted electronically to the Defense Cost and Resource Center (DCARC) secure Web site using the CSDR Submit-Review System. Additionally, one copy of the each SRDR report shall be submitted to PMS425. Distribution and email addresses are provided in the attached “CDRL Addressee List”.

BLOCK 4: If software size delivered per section 3.4 is reported in logical Software Lines of Code (SLOC), the SLOC count shall be determined using the Center for Systems and Software Engineering Unified CodeCount (UCC) available at http://sunset.usc.edu/research/CODECOUNT/.

BLOCK 9: Distribution Statement D: Distribution authorized to the Department of Defense and U.S. DoD contractors only for Administrative or Operational Use, 11 July 2018. Other requests shall be referred to Program Executive Officer, Submarines (PMS425), Washington Navy Yard, DC. Release to Australia authorized under the BYG-1 Armament Cooperative Program.

BLOCKS 10 - 13: Prepare the Final Software Resources Data Report (SRDR) in accordance with DI-FNCL-81740A (or the most recently approved version) and the OSD Deputy Director, Cost Assessment (DDCA)-approved contract CSDR Plan. The DID, DI-FNCL-81740A, is available from the Defense Cost and Resource Center (DCARC) website at http://dcarc.cape.osd.mil. The CSDR Plan is included as a contract attachment. SRDR. Final Developer Report shall be submitted within 60 days of delivery of Release to Fleet software for each TI/APB. Subsequent submissions shall be provided upon major process changes or as required to support subsequent TI/APBs.

BLOCKS 14 AND 15: All CSDR reports shall be submitted electronically to the Defense Cost and Resource Center (DCARC) secure Web site using the CSDR Submit-Review System. Additionally, one copy of the each CSDR report shall be submitted to PMS425. Distribution and email addresses are provided in the attached “CDRL Addressee List”.

BLOCK 9: Distribution Statement D: Distribution authorized to the Department of Defense and U.S. DoD contractors only for Administrative or Operational Use, 11 July 2018. Other requests shall be referred to Program Executive Officer, Submarines (PMS425), Washington Navy Yard, DC. Release to Australia authorized under the BYG-1 Armament Cooperative Program.

BLOCKS 10 -13: Prepare the Cost Data Summary Report (CDSR) in accordance with DI-FNCL-81565C (or the most recently approved version) and the OSD Deputy Director, Cost Assessment (DDCA)-approved contract CSDR Plan. The DID, DI-FNCL-81565C, is available from the Defense Cost and Resource Center (DCARC) website at http://dcarc.cape.osd.mil. The CSDR Plan is included as a contract attachment. Cost Data Summary Report (DD Form 1921) shall be submitted in conjunction with CDRL C002, SRDR, Final Developer.

BLOCKS 14 AND 15: All CSDR reports shall be submitted electronically to the Defense Cost and Resource Center (DCARC) secure Web site using the CSDR Submit-Review System. Additionally, one copy of the each SRDR report shall be submitted to PMS425. Distribution and email addresses are provided in the attached “CDRL Addressee List”.

BLOCK 9: Distribution Statement D: Distribution authorized to the Department of Defense and U.S. DoD contractors only for Administrative or Operational Use, 11 July 2018. Other requests shall be referred to Program Executive Officer, Submarines (PMS425), Washington Navy Yard, DC. Release to Australia authorized under the BYG-1 Armament Cooperative Program.

BLOCKS 10 -13: Prepare the Functional Cost Hour Report (FCHR) in accordance with DI-FNCL-81566C (or the most recently approved version) and the OSD Deputy Director, Cost Assessment (DDCA)-approved contract CSDR Plan. The DID, DI-FNCL-81566C, is available from the Defense Cost and Resource Center (DCARC) website at http://dcarc.cape.osd.mil. The CSDR Plan is included as a contract attachment. .

BLOCKS 14 AND 15: All CSDR reports shall be submitted electronically to the Defense Cost and Resource Center (DCARC) secure Web site using the CSDR Submit-Review System. Additionally, one copy of the each CSDR report shall be submitted to PMS425. Distribution and email addresses are provided in the attached “CDRL Addressee List”.

BLOCK 9: Distribution Statement D: Distribution authorized to the Department of Defense and U.S. DoD contractors only for Administrative or Operational Use, 11 July 2018. Other requests shall be referred to Program Executive Officer, Submarines (PMS425), Washington Navy Yard, DC. Release to Australia authorized under the BYG-1 Armament Cooperative Program.

BLOCKS 10 -13: Prepare the Contractor Business Data Report in accordance with DI-FNCL-81765B (or the most recently approved version) and the OSD Deputy Director, Cost Assessment (DDCA)-approved contract CSDR Plan. The DID, DI-FNCL-81765B, is available from the Defense Cost and Resource Center (DCARC) website at http://dcarc.cape.osd.mil. The CSDR Plan is included as a contract attachment. Reports are due 60 calendar days subsequent to the end of the contractor’s fiscal year.

BLOCKS 14 AND 15: The Contractor Business Data Report (DD Form 1921-3) shall be submitted electronically to the Defense Cost and Resource Center (DCARC) secure Web site using the CSDR Submit-Review System. Additionally, one copy of the each CSDR report shall be submitted to PMS425. Distribution and email addresses are provided in the attached “CDRL Addressee List”.

File details come from the government source that posted it.